CN1116440A - 测定钻孔方向的方法 - Google Patents
测定钻孔方向的方法 Download PDFInfo
- Publication number
- CN1116440A CN1116440A CN94190932A CN94190932A CN1116440A CN 1116440 A CN1116440 A CN 1116440A CN 94190932 A CN94190932 A CN 94190932A CN 94190932 A CN94190932 A CN 94190932A CN 1116440 A CN1116440 A CN 1116440A
- Authority
- CN
- China
- Prior art keywords
- cos
- sin
- magnetic field
- psi
- cir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/02—Determining slope or direction
- E21B47/022—Determining slope or direction of the borehole, e.g. using geomagnetism
Abstract
穿凿过程中来测定钻孔方向的方法,包括根据重力加速度g的测量值来测定倾角θ与高侧角Φ,根据磁场B来测定方位角Φ,这些测定是在由欧拉角坐标变换相关联的通常为XYZ与NEV坐标系中进行的。特别是g与B是在至少两个钻孔深度处进行的,使得Φi≠Φi+1,而Φi与Φi+1是根据Bi=[Φi]T[θi]T{[Φi]TBe}+Bp与sin2Φi+cos2Φi=sin2Φi+1+cos2Φi+1计算的,其中i是测量序数Be是局部磁场,Bp是扰动磁场。同时还精确地测定了扰动磁场。
Description
本发明涉及在对一钻孔进行穿凿过程中来测定此钻孔方向的方法。
具体地说,本发明涉及在对钻孔进行穿凿时,利用装设在所用钻杆柱中的三轴加速器/磁强计组件,来探测钻孔方向的方法,此方法包括以下步骤:
测量已知局部重力加速度矢量 g的重力加速度分量gx、gy、gz,用来测定倾角θ与高侧角;同时
测量总磁场 B的磁场分量Bx、By、Bz,用来测定方位角ψ。
x、y与z指在上述穿凿过程中固定到所说组件上的笛卡儿XYZ坐标系中的矢量分量,而ψ、θ与指界定出在上述XYZ系统与笛卡儿NEV坐标系之间的转动的角度,这里的N指磁北方向,V指垂直的 g方向而E指东向。
这样一种方法已公开于美国专利4163324号中。其中示明,在采用的钻杆柱中包括有一个钻头,它的一侧由一个非磁性的钻铤连接而它的另一侧则由一组磁性材料的钻铤连接。随后,这样一个组又连接到一钻管上。这一非磁性的钻铤包括一个监视仪,例如三轴加速器/磁强计组件。在测量总磁场 B时,除地磁场 Be外,还包括例如来自上述钻头和/或这种钻铤的扰动磁场。在上述专利中,对于磁性钻杆柱的影响,假定只是一个沿着钻孔轴线Z的 Bp矢量近似 Bpz即已足够。这样一种假设能在第一步中计算出一个不正确的方位角,在下一步中应用迭代程序来确定出至少一个第一级修正量。但在许多情况下,假设只是一个 Bpz和 Bpz的近似值是远离现实的。
例如,周知在穿凿过程中,非磁性的钻铤可以成为磁化的,结果导致在所谓的热点包围的扰动磁场中具有无法预定的方向。
在美国专利4682421号中提出了一种通过在测量仪器所在位置计算扰动的误差磁场M,来确定正确方位角的方法。
具体地说,该项专利中公开了一种对上述问题的两步处理法。在第一步中,确定了重力加速度向量 g和测量了等于( Be+ M)的总磁场 Bm后,便测定了 M的交叉轴向分量 Mxy。对于此第一步来说,至少需要三个x—y测量值,这是因为 Mxy是由上述测量值构成的圆用图解方法推导出的。因此,在进行上述测量时,是使钻杆柱在一个位置上沿着钻孔的轴线,即沿着此测量坐标系的Z轴转动。内行的人当知,钻杆柱在上述位置上沿着钻孔轴线转动将会延迟钻孔的穿凿作业。
在此专利的第二步中,示明了对 Mz进行几何方法的测定。但由于应用了余弦律(如该专利的图3中所示)来获取最小误差值,从数字上就必须限制在一个包括有θ与θ0在内的所有相关参数的平面内,因而所提供的测定结果只能看作是一种近视。结果, Mz与ψ中的可能误差将依赖于此余弦律中已用到的参数的误差。
为此,本发明的第一个目的在于解决在每次转动钻杆柱时都需测定钻孔方向的问题。
本发明的第二目的在于提供一种能通过直接计算来确定方位角的方法。
本发明的第三个目的在于给出一种能获得独立计算出的参数值而避免传播误差计算的方法。
因此,根据本发明,对上述方法的改进之处在于: g与 B至少是在两个钻孔深度Li与Li+1处测出的,使得i≠i+1;而ψi与ψi+1是根据 Bi=〔i〕T〔θi〕T{〔ψi〕TBe}+ Bp与sin2ψi+cos2ψi=sin2ψi+1+cos2ψi+1或它的一个等价公式算出的,这里的i=1,2,…, Be是局部地磁场, Bp是扰动 Be的磁场,而〔〕T是用于在欧拉角、θ与ψ下从NEV系列ZYZ系的坐标变换中的所谓“转置”矩阵。
在本发明的另一实施例中, g与 B是在至少三个钻孔深度li、li+1与li+2下测量的,使得i≠i+1≠i+2;而ψ、ψi+1与ψi+2则是依据Bi=〔i〕T〔θi〕T{〔ψi〕TBe}+ Bp算出的,i=1,2,3,…。
在如上所述的本发明的一个最佳实施例中,提供了检验所求得的方位角结果的一个步骤,即去核实恒等式sin2ψ+cos2ψ=1,同时对每一个ψ进行比较。
这样,如上所公开的本发明具有这样的优点:在穿凿钻孔过程中,基本上是以连续的方式求得测量值的,这无论是对于钻孔方向的测定还是对于检验测量值本身都是如此。因此,测量过程中的不规则性,例如起因于未预料到的地层条件或设备缺陷的不规则性,是可以快速和可靠地查出的。
在本发明的另一实施例中,测定了扰动磁场 Bp。有利的是, Bp是从直接计算求得,从而避免了例如在迭代过程与图解测定中的近似方法。
下面参看附图以举例方式更详细地描述本发明,在附图中:
图1示明了钻孔内加速度计/磁强计组件的,用来相对于同一笛卡儿坐标架来测量 g与 B的布置方式;
图2A与2B分别表示地球参考坐标价NEV与固定工具和连接组件的XYZ坐标架;
图3表明了由欧拉角坐标变换所连接的钻孔方向与坐标架定向的周知原理;而
图4示意地表明了依据本发明的在穿凿过程中进行测量的方法。
参看图1,其中示意地绘出了设在一钻孔内的测量仪表。此仪表包括一种周知的加速度计/磁强计组件,用来测量重力矢量分量gx、gy、gz与磁场向量分量Bx、By、Bz。此仪表布置成使它的Z轴与钻孔的Z轴准直。因此,加速度计与磁强计仪表部件的X轴与Y轴如此图所示相互准直。
图2A与2B中示意地表明了所用的坐标架。图2A中示明了地球的参考坐标架NEV,N指局部磁北方向,V指垂直方向即具体所说的局部重力矢量的方向,而E指东向,垂直于N与V构成的平面。图2B中示明了笛卡儿XYZ轴,其中的Z轴与钻孔Z轴线准直。
图3(例如可在美国专利4163324号中看到)示意地表明了相对于钻孔1的NEV与XYZ坐标架和它们相互相对的关系。如此图所示,有三个转动组成的序列:
NEV—ψ→N,E,V—θ→N2E1Z—→XYZ与各个坐标架的矢量,即方位角ψ、倾角θ与高侧角这些所谓的欧拉角相关联,而这是熟悉本项技术的人所周知的。上述转动属一般的坐标变换,可由矩阵表示,对于矢量PXYZ与PNEV给出一公式
PNEV=〔ψ〕〔θ〕〔〕PXYZ或等价地有PXYZ=〔〕T〔θ〕T〔ψ〕TPNEV,其中 而〔ψ〕T〔θ〕T与〔〕T是相应的所谓“转置矩阵”。如上所述,对于任何PXYZ—PNEV矢量偶,可把同样的结果用于在NEV坐标架中的重力矢量 g即(o,o,g)以及 B即(BN,O,BV)。这样有 对于这一重力矢量的具体例子,应看到倾角θ与高侧角对每一个测量位置都能容易地测定,例如这可以从前述的美国专利4163324号中看到。
图4示意地表明了用来在穿凿一钻孔时来测定此钻孔方向的方法。从地球表面S上的钻机处穿凿出一个钻孔b。为清楚起见,绘出一平行的曲线/(以虚线标出)L,用来指明钻孔的深度(或钻孔长度,或钻孔位置)L0,L1…,它们是沿着钻孔测量的,而L0是在S处,在这样一些位置上进行 g与 B的测量。图中示意地表明了Xi、Yi、Zi,指出了测量仪表在此钻孔中的变动位置。如前所述, Bp被认为是与钻杆柱的特点有关,从而又导致所说矢量根据XYZ坐标架的转动与移动,随着钻杆柱中的测量仪表转动与移动。
从以上所述可清楚地了解到,在每一种钻孔深度或位置Li处,总磁场 Bi可以写作 Bi= Be+ Bp。但是,为了计算出此矢量和,必须选择公共的基或公共的坐标架。如上所述,通常是采用XYZ坐标架与NEV坐标架的。
为了求出钻孔的方向,除角θi与i外,必须确定方位角ψi。于是,上述矢量和可以表示为 对于任意的钻孔深度Li或测量数i。从以上方程容易看出,Bx、Xy与Bz由于它们是测量值因而是已知的;矩阵与θ矩阵也是已知的,因为它们是以上述方式测定的;BN与BV是根据地磁数据库得知的;结果,仍然需要去求得方位角ψ与磁场扰动矢量分量。
根据本发明,至少是对于两个钻孔深度Li与Li+1(可写作为L1与L2),测量了 g与 B的分量。然后,对于这两种测量值,重新改写以上方程而求得以下方程 对以上方程(7)与(8)进行周知的直接计算即可得知,对各个矢量分量X、Y与Z所求得的6个标量方程可以认为共包括7个未知参数,即cosψ1、sinψ1、cosψ2、sinψ2、Bpx、Bpy与Bpz。
为了唯一地求得到ψ1与ψ2,将sin2ψ1+cos2ψ1=sin2ψ2+cos2ψ2取作第七个标量方程。内行的人显然可知,还可使用等价的方程sin2ψ1+cos2ψ1=1或sin2ψ2+cos2ψ2=1。从数学上显然可知1≠2,因而钻杆柱会被带动旋转的。这一准则常常能达到的,这是因为钻杆柱在穿凿钻孔时总是在测量位置间转动的。这样,最好是利用穿凿作业中经常发生的钻杆柱的转动,而不是去中止穿凿作业而后再如上所述地去转动。当对于上述7个参数计算出它们的值以后,便可根据(9) 求得ψi的值。
根据相同的思路,对于在例如L1、L2与L3相应的三个测量位置处的三个测量值,可以得出以下几个方程,其中有两个同(7)与(8)一致 由重新构成的上述方程(7)、(8)与(10)求得的9个标量方程可以按上述相同的方式看出:对于这9个未知参数来说,以上的方程组是完备的,为了求得以上参数的唯一解是不需另外的方程的。对于现在的方程组,可把cosψ1、sinψ1、cosψ2、sinψ2、cosψ3、sinψ3、Bpx、Bpy与Bpz再次视作为独立变量。此外,ψi的值可以依据前述方程求得。
类似于只有两个测量值的情形,注意到1≠2≠3,而不再需要特别的转动作用。
在本发明的另一实施例中包括有检验程序。
在已然于两个位置L1与L2上进行了测量后,将等价关系sin2ψ1+cos2ψ1=sin2ψ2+cos2ψ2,即sin2ψ1+cos2ψ1=1或sin2ψ2+cos2ψ2=1用于检验目的。要是出现了距离1的显著偏差时,在下一个钻孔深度,取新的一组B与g的测量值,并可以重复此检验程序。有利的是,对于这种检验也不需作另外的转动。此外只需测量不同的高侧角。
至于已在至少三个位置进行了测量因而用了九个方程来测量方位角ψ1、ψ2与ψ3时,现在首先对于各个i值应用恒等式sin2ψi+cos2ψi=1或它的一个等价式sin2ψi+cos2ψi=sin2ψi+1+cos2ψi+1。对于前述检验程度的应用,作出了相同的观察结果。
在下一个步骤中可以精确和可靠地测定出Bp。在绝大多数情形下, Bp与钻杆柱的特性有关。除了这种Bp的测定外,还可求出Bp中的突然变化,例如因工具故障、磁暴、异常的磁场等所造成的这类变化。
如上所述,对于以上的一种或另一种测定程序,分别只需要两或三组测量值。显然,通常的作业条件涉及到数千英尺或若干公里的钻孔深度,同时取得了许多组测量结果。总之,可以很快地和可靠地测定出和依循着钻孔的方向,而不需在操作上作出特殊的努力。
熟悉本项技术的人将可根据前面的描述作出种种变更型式的,但这种种变更型式应认为属于本发明的后附权利要求书之内。
Claims (5)
1.在对钻孔进行穿凿时,利用装设在所用钻杆柱中的三轴加速器/磁强计组件来探测此钻孔方向的一种方法,此方法包括如下步骤:
测量已知局部重力加速度矢量g的重力加速度分量gx、gy、gz,用来测定倾角θ与高侧角;同时
测量总磁场 B的磁场分量Bx、By、Bz,用来测定方位角ψ;
上面的x,y与z指在所说穿凿过程中固定到前述组件上的笛卡儿XYZ坐标系中的矢量分量,而ψ、θ与指界定出在上述XYZ系统与笛卡儿NEV坐标系之间的转动角度,这里的N指磁北方向,V指垂直的 g方向而E指东向,
其中: g与 B至少是在两个钻孔深度li与li+1处测出的,使得i≠i+1;而ψi与ψi+1是根据 Bi=〔i〕T〔θi〕T{〔ψi〕TBe}+ Bp与sin2ψi+cos2ψi=sin2ψi+1+cos2ψi+1或其一个等价公式算出的,这里的i=1,2,…, Be是局部地磁场, Bp是扰动Be的磁场,而〔〕T是用于在欧拉角、θ与ψ下从NEV系到XYZ系的坐标变换中的所谓“转置”矩阵。
2.如权利要求1所述的方法,特征在于:它还包括以下步骤:检验上述等价式sin2ψi+cos2ψi是否等于1;如果(sin2ψi+cos2ψi)≠1且i≠i+1≠i+2,至少在又一个钻孔深度li+2处测量 g与 B;计算ψi+2,再进行下一个检验步骤。
3.在对钻孔进行穿凿时,利用装设在所用钻杆柱中的三轴加速器/磁强计组件来探测此钻孔方向的一种方法,此方法包括如下步骤:测量已知局部重力加速度矢量 g的重力加速度分量gx、gy、gz,用来测定倾角θ与高侧角;同时测量总磁场 B的磁场分量Bx、By、Bz,用来测量方位角ψ;这里的x、y与z指在所说穿凿过程中固定到前述组件上的笛卡儿XYZ坐标系中的矢量分量,而ψ、θ与指界定出在上述XYZ系统与笛卡儿NEV坐标系之间的转动角度,这里的N指磁北方向,V指垂直的 g方向而E指东向,
基中: g与 B至少是在三个钻孔深度li、li+1与li+2处测出的,使得i≠i+1≠i+2;而ψi、ψi+1与ψi+2是根据 Bi=〔i〕T〔θi〕T{〔ψi〕TBe}+ Bp计算的,这里的i=1,2,…, Be是局部地磁场, Bp是扰动 Be的磁场,而〔〕T是用于在欧拉角、θ与ψ下从NEV系列XYZ系的坐标变换中的所谓“转置”矩阵。
4.如权利要求3所述的方法,特征在于:它还包括下述步骤:对于至少一个i检验是否sin2i+cos2i=1,或检验它的一个等价公式,如果sin2ψi+cos2ψi≠1且i≠i+1≠i+2≠i+3,则在至少又一个钻孔深度li+3处测量 g与 B;计算ψi+3,再进行下一个检验步骤。
5.如权利要求1至4中任一项所述的方法,特征在于:测定出扰动磁场Bp。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP93200082.1 | 1993-01-13 | ||
EP93200082 | 1993-01-13 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1116440A true CN1116440A (zh) | 1996-02-07 |
CN1044632C CN1044632C (zh) | 1999-08-11 |
Family
ID=8213568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN94190932A Expired - Fee Related CN1044632C (zh) | 1993-01-13 | 1994-01-12 | 测定钻孔方向的方法 |
Country Status (21)
Country | Link |
---|---|
US (1) | US5435069A (zh) |
EP (1) | EP0679216B1 (zh) |
JP (1) | JP3441075B2 (zh) |
CN (1) | CN1044632C (zh) |
AU (1) | AU675691B2 (zh) |
BR (1) | BR9405808A (zh) |
CA (1) | CA2153693C (zh) |
DE (1) | DE69402530T2 (zh) |
DK (1) | DK0679216T3 (zh) |
EG (1) | EG20489A (zh) |
MY (1) | MY110059A (zh) |
NO (1) | NO306829B1 (zh) |
NZ (1) | NZ259867A (zh) |
OA (1) | OA10172A (zh) |
PH (1) | PH30012A (zh) |
RO (1) | RO115905B1 (zh) |
RU (1) | RU2109943C1 (zh) |
SA (1) | SA94140536B1 (zh) |
UA (1) | UA41912C2 (zh) |
WO (1) | WO1994016196A1 (zh) |
ZA (1) | ZA94154B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022081A (zh) * | 2010-11-10 | 2011-04-20 | 中国海洋石油总公司 | 一种在复杂地层条件下的钻井方法和装置 |
CN103883254A (zh) * | 2013-11-18 | 2014-06-25 | 中国石油化工股份有限公司 | 一种基于导向钻井方向优先着陆控制的通用方法 |
CN103883251A (zh) * | 2013-04-24 | 2014-06-25 | 中国石油化工股份有限公司 | 一种基于旋转导向钻井的水平井方向优先着陆控制方法 |
CN105899749A (zh) * | 2013-11-08 | 2016-08-24 | 普拉德研究及开发股份有限公司 | 偏斜井眼和水平井眼的地层和结构解释 |
CN106437677A (zh) * | 2016-10-10 | 2017-02-22 | 北京合康科技发展有限责任公司 | 一种煤矿井下钻孔群钻孔质量评价方法及装置 |
CN106522924A (zh) * | 2016-11-15 | 2017-03-22 | 北京恒泰万博石油技术股份有限公司 | 一种随钻测量中方位角的获取方法 |
CN116804545A (zh) * | 2023-06-05 | 2023-09-26 | 中国科学院地质与地球物理研究所 | 一种欧拉角姿态解算方法及系统 |
Families Citing this family (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5657547A (en) * | 1994-12-19 | 1997-08-19 | Gyrodata, Inc. | Rate gyro wells survey system including nulling system |
GB9518990D0 (en) * | 1995-09-16 | 1995-11-15 | Baroid Technology Inc | Borehole surveying |
US5960370A (en) * | 1996-08-14 | 1999-09-28 | Scientific Drilling International | Method to determine local variations of the earth's magnetic field and location of the source thereof |
US5880680A (en) * | 1996-12-06 | 1999-03-09 | The Charles Machine Works, Inc. | Apparatus and method for determining boring direction when boring underground |
US5806194A (en) * | 1997-01-10 | 1998-09-15 | Baroid Technology, Inc. | Method for conducting moving or rolling check shot for correcting borehole azimuth surveys |
US6631563B2 (en) * | 1997-02-07 | 2003-10-14 | James Brosnahan | Survey apparatus and methods for directional wellbore surveying |
US6347282B2 (en) * | 1997-12-04 | 2002-02-12 | Baker Hughes Incorporated | Measurement-while-drilling assembly using gyroscopic devices and methods of bias removal |
US6076268A (en) * | 1997-12-08 | 2000-06-20 | Dresser Industries, Inc. | Tool orientation with electronic probes in a magnetic interference environment |
US6351891B1 (en) * | 1997-12-18 | 2002-03-05 | Honeywell International, Inc. | Miniature directional indication instrument |
US6411094B1 (en) | 1997-12-30 | 2002-06-25 | The Charles Machine Works, Inc. | System and method for determining orientation to an underground object |
CN1305565A (zh) * | 1998-06-18 | 2001-07-25 | 国际壳牌研究有限公司 | 确定井孔方位角的方法 |
GB9818117D0 (en) * | 1998-08-19 | 1998-10-14 | Halliburton Energy Serv Inc | Surveying a subterranean borehole using accelerometers |
CA2291545C (en) | 1999-12-03 | 2003-02-04 | Halliburton Energy Services, Inc. | Method and apparatus for use in creating a magnetic declination profile for a borehole |
GB2357097A (en) * | 1999-12-08 | 2001-06-13 | Norske Stats Oljeselskap | Method of assessing positional uncertainty in drilling a well |
FR2802680B1 (fr) * | 1999-12-17 | 2002-03-01 | Total Fina Sa | Regle a calcul de deviation pour le suivi de la trajectoire de forage dans un puits devie a deux dimensions |
US6633816B2 (en) | 2000-07-20 | 2003-10-14 | Schlumberger Technology Corporation | Borehole survey method utilizing continuous measurements |
GB0020364D0 (en) * | 2000-08-18 | 2000-10-04 | Russell Michael | Borehole survey method and apparatus |
US6381858B1 (en) * | 2000-09-22 | 2002-05-07 | Schlumberger Technology Corporation | Method for calculating gyroscopic wellbore surveys including correction for unexpected instrument movement |
US6536123B2 (en) * | 2000-10-16 | 2003-03-25 | Sensation, Inc. | Three-axis magnetic sensor, an omnidirectional magnetic sensor and an azimuth measuring method using the same |
US6668465B2 (en) | 2001-01-19 | 2003-12-30 | University Technologies International Inc. | Continuous measurement-while-drilling surveying |
US6854192B2 (en) * | 2001-02-06 | 2005-02-15 | Smart Stabilizer Systems Limited | Surveying of boreholes |
GB0102900D0 (en) * | 2001-02-06 | 2001-03-21 | Smart Stabiliser Systems Ltd | Surveying of boreholes |
WO2004099700A1 (en) * | 2003-04-28 | 2004-11-18 | Labowski, Howard, R. | Sighting device |
US6823602B2 (en) * | 2001-02-23 | 2004-11-30 | University Technologies International Inc. | Continuous measurement-while-drilling surveying |
US6518756B1 (en) * | 2001-06-14 | 2003-02-11 | Halliburton Energy Services, Inc. | Systems and methods for determining motion tool parameters in borehole logging |
US6530154B2 (en) | 2001-07-19 | 2003-03-11 | Scientific Drilling International | Method to detect deviations from a wellplan while drilling in the presence of magnetic interference |
US6736221B2 (en) * | 2001-12-21 | 2004-05-18 | Schlumberger Technology Corporation | Method for estimating a position of a wellbore |
US6654691B2 (en) * | 2002-02-08 | 2003-11-25 | Schlumberger Technology Corporation | Well-log presentation, software and method thereof |
GB0221753D0 (en) * | 2002-09-19 | 2002-10-30 | Smart Stabilizer Systems Ltd | Borehole surveying |
US7028409B2 (en) * | 2004-04-27 | 2006-04-18 | Scientific Drilling International | Method for computation of differential azimuth from spaced-apart gravity component measurements |
US7243719B2 (en) * | 2004-06-07 | 2007-07-17 | Pathfinder Energy Services, Inc. | Control method for downhole steering tool |
GB2415446B (en) * | 2004-06-21 | 2009-04-08 | Halliburton Energy Serv Inc | Wellbore surveying |
CA2476787C (en) * | 2004-08-06 | 2008-09-30 | Halliburton Energy Services, Inc. | Integrated magnetic ranging tool |
CA2484104C (en) * | 2004-10-07 | 2012-08-21 | Scintrex Limited | Method and apparatus for mapping the trajectory in the subsurface of a borehole |
US7650269B2 (en) | 2004-11-15 | 2010-01-19 | Halliburton Energy Services, Inc. | Method and apparatus for surveying a borehole with a rotating sensor package |
AU2005306537B2 (en) * | 2004-11-19 | 2011-04-28 | Halliburton Energy Services, Inc. | Methods and apparatus for drilling, completing and configuring U-tube boreholes |
US7475741B2 (en) * | 2004-11-30 | 2009-01-13 | General Electric Company | Method and system for precise drilling guidance of twin wells |
US8418782B2 (en) * | 2004-11-30 | 2013-04-16 | General Electric Company | Method and system for precise drilling guidance of twin wells |
US20090120691A1 (en) * | 2004-11-30 | 2009-05-14 | General Electric Company | Systems and methods for guiding the drilling of a horizontal well |
US8141635B2 (en) | 2008-10-09 | 2012-03-27 | Schlumberger Technology Corporation | Cased borehole tool orientation measurement |
US8280638B2 (en) * | 2009-02-19 | 2012-10-02 | Baker Hughes Incorporated | Multi-station analysis of magnetic surveys |
US9529113B2 (en) | 2010-08-31 | 2016-12-27 | Halliburton Energy Services, Inc. | Method and apparatus for downhole measurement tools |
CN102108856B (zh) * | 2010-12-07 | 2014-01-22 | 西安石油大学 | 小角度井斜姿态测量方法及装置 |
RU2482270C1 (ru) * | 2011-11-11 | 2013-05-20 | Закрытое Акционерное общество Научно-производственная фирма по геофизическим и геоэкологическим работам "Каротаж" | Способ определения ориентации скважинного прибора в буровой скважине |
US9448329B2 (en) * | 2012-09-14 | 2016-09-20 | Scientific Drilling International, Inc. | Method to determine local variations of the earth's magnetic field and location of the source thereof |
WO2014114369A1 (de) | 2013-08-27 | 2014-07-31 | Bauer Spezialtiefbau Gmbh | Verfahren und bohranordnung zum richtungsgenauen einbringen eines bohrrohres |
US9625609B2 (en) | 2013-11-25 | 2017-04-18 | Mostar Directional Technologies Inc. | System and method for determining a borehole azimuth using gravity in-field referencing |
CN105134171B (zh) * | 2015-07-29 | 2017-12-15 | 北京航空航天大学 | 一种两轴光纤陀螺连续测斜系统的实现方法 |
RU2610957C1 (ru) * | 2015-12-09 | 2017-02-17 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уфимский государственный авиационный технический университет" | Способ определения комплекса угловых параметров пространственной ориентации бурового инструмента |
DE112021007770T5 (de) * | 2021-09-30 | 2024-03-28 | Halliburton Energy Services Inc. | Bohrsystem mit richtungsvermessungsübertragung system und verfahren zur übertragung |
CN117027764B (zh) * | 2022-05-20 | 2024-02-09 | 中国石油天然气集团有限公司 | 钻井定位装置、方法和系统 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3791043A (en) * | 1971-06-09 | 1974-02-12 | Scient Drilling Controls | Indicating instruments |
GB1578053A (en) * | 1977-02-25 | 1980-10-29 | Russell Attitude Syst Ltd | Surveying of boreholes |
GB8504949D0 (en) * | 1985-02-26 | 1985-03-27 | Shell Int Research | Determining azimuth of borehole |
US4709486A (en) * | 1986-05-06 | 1987-12-01 | Tensor, Inc. | Method of determining the orientation of a surveying instrument in a borehole |
US4812977A (en) * | 1986-12-31 | 1989-03-14 | Sundstrand Data Control, Inc. | Borehole survey system utilizing strapdown inertial navigation |
US4709782A (en) * | 1987-01-13 | 1987-12-01 | Henry Lipinski | Skid-out highrise fire escape device |
US5128867A (en) * | 1988-11-22 | 1992-07-07 | Teleco Oilfield Services Inc. | Method and apparatus for determining inclination angle of a borehole while drilling |
US5012412A (en) * | 1988-11-22 | 1991-04-30 | Teleco Oilfield Services Inc. | Method and apparatus for measurement of azimuth of a borehole while drilling |
GB8906233D0 (en) * | 1989-03-17 | 1989-05-04 | Russell Anthony W | Surveying of boreholes |
FR2670532B1 (fr) * | 1990-12-12 | 1993-02-19 | Inst Francais Du Petrole | Methode pour corriger des mesures magnetiques faites dans un puits par un appareil de mesure, dans le but de determiner son azimut. |
-
1994
- 1994-01-01 EG EG1294A patent/EG20489A/xx active
- 1994-01-11 PH PH47599A patent/PH30012A/en unknown
- 1994-01-11 MY MYPI94000059A patent/MY110059A/en unknown
- 1994-01-11 ZA ZA94154A patent/ZA94154B/xx unknown
- 1994-01-12 NZ NZ259867A patent/NZ259867A/en unknown
- 1994-01-12 EP EP94905060A patent/EP0679216B1/en not_active Expired - Lifetime
- 1994-01-12 BR BR9405808A patent/BR9405808A/pt not_active IP Right Cessation
- 1994-01-12 DK DK94905060.3T patent/DK0679216T3/da active
- 1994-01-12 JP JP51569694A patent/JP3441075B2/ja not_active Expired - Fee Related
- 1994-01-12 CN CN94190932A patent/CN1044632C/zh not_active Expired - Fee Related
- 1994-01-12 US US08/180,246 patent/US5435069A/en not_active Expired - Lifetime
- 1994-01-12 CA CA002153693A patent/CA2153693C/en not_active Expired - Fee Related
- 1994-01-12 UA UA95083783A patent/UA41912C2/uk unknown
- 1994-01-12 WO PCT/EP1994/000094 patent/WO1994016196A1/en active IP Right Grant
- 1994-01-12 DE DE69402530T patent/DE69402530T2/de not_active Expired - Fee Related
- 1994-01-12 AU AU58834/94A patent/AU675691B2/en not_active Ceased
- 1994-01-12 RO RO95-01296A patent/RO115905B1/ro unknown
- 1994-01-31 SA SA94140536A patent/SA94140536B1/ar unknown
- 1994-07-21 RU RU95116643A patent/RU2109943C1/ru not_active IP Right Cessation
-
1995
- 1995-07-11 NO NO952745A patent/NO306829B1/no unknown
- 1995-07-11 OA OA60686A patent/OA10172A/en unknown
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102022081B (zh) * | 2010-11-10 | 2013-05-15 | 中国海洋石油总公司 | 一种在复杂地层条件下的钻井方法和装置 |
CN102022081A (zh) * | 2010-11-10 | 2011-04-20 | 中国海洋石油总公司 | 一种在复杂地层条件下的钻井方法和装置 |
CN103883251B (zh) * | 2013-04-24 | 2016-04-20 | 中国石油化工股份有限公司 | 一种基于旋转导向钻井的水平井方向优先着陆控制方法 |
CN103883251A (zh) * | 2013-04-24 | 2014-06-25 | 中国石油化工股份有限公司 | 一种基于旋转导向钻井的水平井方向优先着陆控制方法 |
CN105899749A (zh) * | 2013-11-08 | 2016-08-24 | 普拉德研究及开发股份有限公司 | 偏斜井眼和水平井眼的地层和结构解释 |
CN105899749B (zh) * | 2013-11-08 | 2018-06-08 | 普拉德研究及开发股份有限公司 | 偏斜井眼和水平井眼的地层和结构解释 |
US10422924B2 (en) | 2013-11-08 | 2019-09-24 | Schlumberger Technology Corporation | Stratigraphic and structural interpretation of deviated and horizontal wellbores |
CN103883254B (zh) * | 2013-11-18 | 2016-04-20 | 中国石油化工股份有限公司 | 一种基于导向钻井方向优先着陆控制的通用方法 |
CN103883254A (zh) * | 2013-11-18 | 2014-06-25 | 中国石油化工股份有限公司 | 一种基于导向钻井方向优先着陆控制的通用方法 |
CN106437677A (zh) * | 2016-10-10 | 2017-02-22 | 北京合康科技发展有限责任公司 | 一种煤矿井下钻孔群钻孔质量评价方法及装置 |
CN106437677B (zh) * | 2016-10-10 | 2019-10-01 | 北京合康科技发展有限责任公司 | 一种煤矿井下钻孔群钻孔质量评价方法及装置 |
CN106522924A (zh) * | 2016-11-15 | 2017-03-22 | 北京恒泰万博石油技术股份有限公司 | 一种随钻测量中方位角的获取方法 |
CN106522924B (zh) * | 2016-11-15 | 2020-01-07 | 北京恒泰万博石油技术股份有限公司 | 一种随钻测量中方位角的获取方法 |
CN116804545A (zh) * | 2023-06-05 | 2023-09-26 | 中国科学院地质与地球物理研究所 | 一种欧拉角姿态解算方法及系统 |
CN116804545B (zh) * | 2023-06-05 | 2024-02-13 | 中国科学院地质与地球物理研究所 | 一种欧拉角姿态解算方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
JP3441075B2 (ja) | 2003-08-25 |
OA10172A (en) | 1996-12-18 |
BR9405808A (pt) | 1995-12-19 |
NO952745L (no) | 1995-07-11 |
CA2153693C (en) | 2005-05-24 |
WO1994016196A1 (en) | 1994-07-21 |
NO952745D0 (no) | 1995-07-11 |
EP0679216A1 (en) | 1995-11-02 |
ZA94154B (en) | 1994-08-18 |
DK0679216T3 (da) | 1997-12-08 |
AU675691B2 (en) | 1997-02-13 |
DE69402530D1 (de) | 1997-05-15 |
US5435069A (en) | 1995-07-25 |
RU2109943C1 (ru) | 1998-04-27 |
MY110059A (en) | 1997-12-31 |
NZ259867A (en) | 1996-09-25 |
EG20489A (en) | 1999-06-30 |
RO115905B1 (ro) | 2000-07-28 |
UA41912C2 (uk) | 2001-10-15 |
CA2153693A1 (en) | 1994-07-21 |
AU5883494A (en) | 1994-08-15 |
DE69402530T2 (de) | 1997-09-04 |
NO306829B1 (no) | 1999-12-27 |
PH30012A (en) | 1996-10-29 |
EP0679216B1 (en) | 1997-04-09 |
SA94140536B1 (ar) | 2004-05-03 |
CN1044632C (zh) | 1999-08-11 |
JPH08505670A (ja) | 1996-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1044632C (zh) | 测定钻孔方向的方法 | |
EP0738366B1 (en) | Method of creating a borehole in an earth formation | |
US5675488A (en) | Location determination using vector measurements | |
EP0425569B1 (en) | A system and method for locating an underground probe | |
US5512830A (en) | Measurement of vector components of static field perturbations for borehole location | |
US6937023B2 (en) | Passive ranging techniques in borehole surveying | |
US6882937B2 (en) | Downhole referencing techniques in borehole surveying | |
US4709486A (en) | Method of determining the orientation of a surveying instrument in a borehole | |
RU2011154627A (ru) | Скважинные магнитные измерения во время вращения и способы использования их | |
Ekseth et al. | High-Integrity Wellbore Surveying | |
CN109915116A (zh) | 磁随钻探测邻井防碰方法及装置 | |
CN107109896A (zh) | 用于在磁扰动环境中的垂直井眼造斜的主动磁方位角工具面 | |
US11299979B2 (en) | Magnetic distance and direction measurements from a first borehole to a second borehole | |
CN111123380B (zh) | 基于重磁梯度数据张量不变量的目标深度估计方法及系统 | |
CN115324565B (zh) | 一种井眼轨迹测控方法、装置、电子设备及存储介质 | |
US10890062B2 (en) | Inferring orientation parameters of a steering system for use with a drill string | |
CN103835703A (zh) | 一种磁性导向钻井交变磁场信号的模拟方法 | |
Holcomb | Experiments in seismometer azimuth determination by comparing the sensor signal outputs with the signal output of an oriented sensor | |
Dubrule et al. | Evaluation of directional survey errors at Prudhoe Bay | |
Li et al. | Estimation of geomagnetic components under unknown interferences for drilling tools | |
CN116122792A (zh) | 用于在随钻测量期间获取加速度计的重力系数的方法 | |
Detrick et al. | 29. BGR MAGNETOMETER LOGGING IN HOLE 395A, LEG 1091 | |
CN107227949A (zh) | 一种近钻头动态井斜测量装置和方法 | |
McLeod | Similarities between magnetic and north-finding survey tools | |
Elstadt et al. | Three Component Downhole Magnetic Surveys. A Case Study of the Namaqualand Copper District |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |