CN111622514A - Working method of unloading platform for building construction - Google Patents
Working method of unloading platform for building construction Download PDFInfo
- Publication number
- CN111622514A CN111622514A CN202010516062.3A CN202010516062A CN111622514A CN 111622514 A CN111622514 A CN 111622514A CN 202010516062 A CN202010516062 A CN 202010516062A CN 111622514 A CN111622514 A CN 111622514A
- Authority
- CN
- China
- Prior art keywords
- shaped
- plate
- side wall
- fixedly connected
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/166—Landings, receiving platforms
Abstract
The invention relates to the technical field of building engineering, and discloses a working method of a discharging platform for building construction, wherein the discharging platform for building construction comprises a transverse plate, two steel plates are symmetrically welded on the side wall of the left side of the transverse plate, the side wall of one opposite side of the two steel plates is fixedly welded with a same U-shaped guard plate, the side wall of the upper side of the U-shaped guard plate is fixedly connected with four U-shaped rings, steel ropes are connected to the four U-shaped rings, fixed rods are fixedly welded at one ends of the two steel plates, which are far away from the transverse plate, respectively, three U-shaped fasteners are movably sleeved on the two fixed rods, a plurality of I-shaped steels are fixedly welded between the two steel plates, the I-shaped steels are uniformly arranged, supporting plates are fixedly welded on the side walls of the. The working method of the unloading platform for building construction reduces the labor intensity of construction workers and improves the convenience of the unloading platform.
Description
Technical Field
The invention relates to the technical field of building engineering, in particular to a working method of a discharging platform for building construction.
Background
In the building construction process, a discharging platform is needed to contain building materials, the discharging platform is a framework type platform which is usually used for carrying materials within a certain construction period and carrying out various operations, and the framework type platform is called as an operation platform, wherein various temporary operation platforms and operation frames are usually erected on a construction site, and can carry out various operations such as masonry decoration, painting and the like.
When the existing unloading platform is used, the bottom plate of the unloading platform cannot move, the position of building materials cannot be moved, the walking distance is longer when the building materials in the unloading platform are carried, the labor intensity of construction workers is increased, and the using convenience of the unloading platform is reduced.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides the working method of the unloading platform for building construction, which has the advantages of reducing the labor intensity of construction workers, improving the use convenience and the like, and solves the problems of higher labor intensity and inconvenient operation of the construction workers when the unloading platform is used in the prior art.
(II) technical scheme
The invention provides the following technical scheme: the working method of the unloading platform for building construction comprises a transverse plate, wherein two steel plates are symmetrically welded on the side wall on the left side of the transverse plate, the side wall on the opposite side of the two steel plates is fixedly welded with the same U-shaped guard plate, four U-shaped rings are fixedly connected with the side wall on the upper side of the U-shaped guard plate, steel ropes are connected with the four U-shaped rings, fixed rods are fixedly welded at one ends of the two steel plates, which are far away from the transverse plate, three U-shaped fasteners are movably sleeved outside the two fixed rods, a plurality of I-shaped steels are fixedly welded between the two steel plates and are uniformly arranged, supporting plates are fixedly welded on the side walls on the upper sides of the I-shaped steels, a bottom plate is arranged above the supporting plates, L-shaped reinforcing plates are fixedly connected with the side walls on the upper sides of the bottom plate through a plurality of first bolts, and are fixedly connected with the vertical side walls, the utility model discloses a slide rail, including bottom plate downside, U type fastener, slide bar, slide block, slide hole, slide wall, slide block, slide wall, slide plate, the equal fixedly connected with U type guide rail of the equal fixedly connected with of inner wall of the relative one side of U type backplate, two U type groove has all been seted up to the lateral wall of the relative one side of deflector, U type guide rail runs through the deflector through U type groove.
Preferably, the method specifically comprises the following working steps: fixing two fixing rods on the ground of a building by using a U-shaped ring, and then fixedly installing a U-shaped guard plate by four steel ropes; building material is neatly stacked on carrying the thing board, when needing to carry building material, the one end of thing board is carried in the pulling, mutually support through sleeve and U type guide bar, mutually support through deflector and U type guide rail, can make to carry the thing board and slide fast on the horizontal direction, carry the thing board and drive building material and remove, make building material be close to the inside of building more, thereby reduce the distance of construction worker's transport, reduce construction worker's intensity of labour, improve the convenience that the platform of unloading used.
Preferably, the rod walls on the upper sides of the two fixing rods are fixedly connected with supporting columns, slots corresponding to the supporting columns are formed in the side wall of the lower side of the bottom plate, and the upper ends of the supporting columns are located in the slots.
Preferably, the lateral wall on the left side of the carrying plate is fixedly connected with a U-shaped pull rod, and a rod wall fixing sleeve of the U-shaped pull rod is provided with an anti-skidding sleeve.
Preferably, a plurality of L-shaped reinforcing blocks are welded at the bent part of the U-shaped guard plate.
Preferably, the U-shaped guard plate is fixedly connected with the side wall on the right side of the transverse plate through a plurality of fastening bolts.
Preferably, a supporting inclined rod is fixedly connected between the U-shaped guard plate and the fixing rod.
(III) advantageous effects
Compared with the prior art, the invention provides a working method of the unloading platform for building construction, which has the following beneficial effects:
according to the working method of the unloading platform for building construction, the U-shaped guard plate is fixedly installed through the arranged transverse plate, the steel plate, the U-shaped guard plate, the U-shaped ring, the steel ropes, the fixing rods, the U-shaped fasteners, the I-shaped steel, the supporting plate, the bottom plate, the first bolt, the L-shaped reinforcing plate, the second bolt, the U-shaped guide rod, the sliding block, the fixing holes, the sleeve, the carrying plate, the guide plate, the U-shaped guide rail and the U-shaped groove; building material is neatly stacked on carrying the thing board, when needing to carry building material, the one end of thing board is carried in the pulling, mutually support through sleeve and U type guide bar, mutually support through deflector and U type guide rail, can make to carry the thing board and slide fast on the horizontal direction, carry the thing board and drive building material and remove, make building material be close to the inside of building more, thereby reduce the distance of construction worker's transport, construction worker's intensity of labour has been reduced, the convenience that the platform of unloading used has been improved.
Drawings
FIG. 1 is a schematic structural diagram of a working method of a discharging platform for building construction according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
FIG. 3 is an enlarged view of a portion B of FIG. 2;
FIG. 4 is an enlarged view of a portion C of FIG. 1;
fig. 5 is an enlarged view of a portion D of fig. 1.
In the figure: the steel plate comprises a transverse plate 1, a steel plate 2, a 3U-shaped guard plate, a 4U-shaped ring, a steel rope 5, a fixing rod 6, a 7U-shaped fastener, an 8I-shaped steel, a supporting plate 9, a bottom plate 10, a first bolt 11, a 12L-shaped reinforcing plate, a second bolt 13, a 14U-shaped guide rod, a 15 sliding block, a 16 fixing hole, a sleeve 17, an 18 loading plate, a 19 guide plate, a 20U-shaped guide rail, a 21U-shaped groove, a 22 supporting column, a 23 slot, a 24U-shaped pull rod, a 25 anti-skidding sleeve, a 26L-shaped reinforcing block, a 27 fastening bolt and a.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, a working method of a discharging platform for building construction comprises a transverse plate 1, two steel plates 2 are symmetrically welded on the side wall of the left side of the transverse plate 1, the same U-shaped guard plate 3 is fixedly welded on the side wall of the opposite side of the two steel plates 2, four U-shaped rings 4 are fixedly connected on the side wall of the upper side of the U-shaped guard plate 3, steel cables 5 are respectively connected outside the four U-shaped rings 4, fixing rods 6 are respectively fixedly welded on the ends of the two steel plates 2 far away from the transverse plate 1, three U-shaped fasteners 7 are respectively movably sleeved outside the two fixing rods 6, a plurality of i-shaped steels 8 are fixedly welded between the two steel plates 2, the plurality of i-shaped steels 8 are uniformly arranged, a supporting plate 9 is fixedly welded on the side wall of the upper side of the plurality of i-shaped steels 8, a bottom plate 10 is arranged above the supporting, the L-shaped reinforcing plate 12 is fixedly connected with the vertical side wall of the U-shaped guard plate 3 through a plurality of second bolts 13, the side wall of the lower side of the bottom plate 10 is tightly attached to the upper ends of a plurality of U-shaped fasteners 7, the side wall of the upper side of the bottom plate 10 is fixedly and symmetrically connected with two U-shaped guide rods 14, the rod walls of the two U-shaped guide rods 14 are movably sleeved with two sliding blocks 15, the left side wall and the right side wall of each sliding block 15 are respectively provided with a fixing hole 16, the U-shaped guide rods 14 penetrate through the sliding blocks 15 through the fixing holes 16, the hole wall of each fixing hole 16 is fixedly connected with a sleeve 17, the sleeves 17 are movably sleeved outside the U-shaped guide rods 14, the side walls of the upper sides of the four sliding blocks 15 are fixedly connected with a same loading plate 18, the side wall of the upper side of the loading plate 18 is symmetrically and fixedly connected with two guide plates 19, the, the U-shaped guide rail 20 penetrates through the guide plate 19 through a U-shaped groove 21, two fixing rods 6 are fixed on the building ground by using a U-shaped ring 4, and then the U-shaped guard plate 3 is fixedly installed through four steel ropes 5; building material is neatly stacked on carrying board 18, when needing to carry building material, the one end of carrying board 18 is carried in the pulling, mutually support through sleeve 17 and U type guide bar 14, mutually support through deflector 19 and U type guide rail 20, can make and carry thing board 18 and slide fast on the horizontal direction, it removes to carry thing board 18 to drive building material, make building material be close to the inside of building more, thereby reduce the distance that construction worker carried, reduce construction worker's intensity of labour, improve the convenience that the platform of unloading used.
The method specifically comprises the following working steps: fixing two fixing rods 6 on the building ground by using a U-shaped ring 4, and then fixedly installing a U-shaped guard plate 3 through four steel ropes 5; building material is neatly stacked on carrying board 18, when needing to carry building material, the one end of carrying board 18 is carried in the pulling, mutually support through sleeve 17 and U type guide bar 14, mutually support through deflector 19 and U type guide rail 20, can make and carry thing board 18 and slide fast on the horizontal direction, it removes to carry thing board 18 to drive building material, make building material be close to the inside of building more, thereby reduce the distance that construction worker carried, reduce construction worker's intensity of labour, improve the convenience that the platform of unloading used.
Equal fixedly connected with support column 22 of pole wall of two dead levers 6 upside, slot 23 corresponding with support column 22 has been seted up to the lateral wall of bottom plate 10 downside, and the upper end of support column 22 is located slot 23, and support column 22 can support bottom plate 10, can also fix a position bottom plate 10.
Carry the left lateral wall fixedly connected with U type pull rod 24 of thing board 18, the pole wall fixed cover of U type pull rod 24 is equipped with anti-skidding cover 25, is convenient for spur to carry thing board 18 and removes, has improved the convenience that the platform of unloading used.
A plurality of L-shaped reinforcing blocks 26 are welded at the bent part of the U-shaped guard plate 3, the L-shaped reinforcing blocks 26 can reinforce the bent part of the U-shaped guard plate 3, and the structural stability of the U-shaped guard plate 3 is improved.
U type backplate 3 improves the fixed steadiness of U type backplate 3 through a plurality of fastening bolt 27 and the lateral wall fixed connection on diaphragm 1 right side, avoids U type backplate 3 to drop and causes the incident, the effectual security that improves the platform of unloading and use.
Fixedly connected with supports down tube 28 between U type backplate 3 and dead lever 6, supports the down tube 28 and can carry out effectual support to U type backplate 3, has improved U type backplate 3's stability, has improved the stability of platform structure of unloading.
To sum up, the working method of the discharging platform for building construction comprises the steps that when the discharging platform is used, the U-shaped ring 4 is used for fixing the two fixing rods 6 on the ground of a building, and then the U-shaped guard plate 3 is fixedly installed through the four steel ropes 5; building material is neatly stacked on carrying board 18, when needing to carry building material, the one end of carrying board 18 is carried in the pulling, mutually support through sleeve 17 and U type guide bar 14, mutually support through deflector 19 and U type guide rail 20, can make and carry thing board 18 and slide fast on the horizontal direction, it removes to carry thing board 18 to drive building material, make building material be close to the inside of building more, thereby reduce the distance that construction worker carried, reduce construction worker's intensity of labour, improve the convenience that the platform of unloading used.
It should be noted that the term "comprises/comprising" when used in this specification is taken to specify the presence of stated elements, integers, steps, operations, elements, components, and/or groups thereof, but does not exclude the presence or addition of other elements, integers, steps, operations, elements, components, and/or groups thereof. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The working method of the discharging platform for building construction comprises a transverse plate (1), and is characterized in that two steel plates (2) are symmetrically welded on the left side wall of the transverse plate (1), the same U-shaped guard plate (3) is fixedly welded on the side wall of the two steel plates (2) on the opposite sides, four U-shaped rings (4) are fixedly connected to the side wall of the upper side of the U-shaped guard plate (3), steel ropes (5) are respectively connected to the four U-shaped rings (4), fixing rods (6) are respectively fixedly welded at one ends of the two steel plates (2) far away from the transverse plate (1), three U-shaped fasteners (7) are respectively movably sleeved outside the two fixing rods (6), a plurality of I-shaped steels (8) are fixedly welded between the two steel plates (2), the plurality of I-shaped steels (8) are uniformly arranged, and a plurality of supporting plates (9) are fixedly welded on the side wall of the upper side, a bottom plate (10) is arranged above the supporting plate (9), the side wall of the upper side of the bottom plate (10) is fixedly connected with an L-shaped reinforcing plate (12) through a plurality of first bolts (11), the L-shaped reinforcing plate (12) is fixedly connected with the vertical side wall of the U-shaped protecting plate (3) through a plurality of second bolts (13), the side wall of the lower side of the bottom plate (10) is tightly attached to the upper ends of a plurality of U-shaped fasteners (7), the side wall of the upper side of the bottom plate (10) is fixedly and symmetrically fixedly connected with two U-shaped guide rods (14), two sliding blocks (15) are movably sleeved on the rod walls of the two U-shaped guide rods (14), fixing holes (16) are formed in the left side wall and the right side wall of each sliding block (15), the U-shaped guide rods (14) penetrate through the sliding blocks (15) through the fixing holes (16), and sleeves (17) are fixedly connected, outside U type guide bar (14) were located to sleeve (17) movable sleeve, four the same thing board (18) of carrying of lateral wall fixedly connected with of sliding block (15) upside, carry two deflector (19) of lateral wall symmetry fixedly connected with of thing board (18) upside, the equal fixedly connected with U type guide rail (20) of inner wall of the relative one side of U type backplate (3), two U type groove (21) have all been seted up to the lateral wall of the relative one side of deflector (19), U type guide rail (20) run through deflector (19) through U type groove (21).
2. The working method of the discharging platform for building construction according to claim 1, characterized in that: the method specifically comprises the following working steps: two fixing rods (6) are fixed on the building ground by using a U-shaped ring (4), and then the U-shaped guard plate (3) is fixedly installed through four steel ropes (5); building material is neatly stacked on carrying thing board (18), when needing to carry building material, the one end of thing board (18) is carried in the pulling, mutually support through sleeve (17) and U type guide bar (14), mutually support through deflector (19) and U type guide rail (20), can make and carry thing board (18) and slide fast on the horizontal direction, it removes to carry thing board (18) drive building material, make building material be close to the inside of building more, thereby reduce the distance of construction worker's transport, reduce construction worker's intensity of labour, improve the convenience that the platform of unloading used.
3. The working method of the discharging platform for building construction according to claim 1, characterized in that: two equal fixedly connected with support column (22) of pole wall of dead lever (6) upside, slot (23) corresponding with support column (22) have been seted up to the lateral wall of bottom plate (10) downside, the upper end of support column (22) is located slot (23).
4. The working method of the discharging platform for building construction according to claim 1, characterized in that: the side wall of the left side of the loading plate (18) is fixedly connected with a U-shaped pull rod (24), and an anti-skidding sleeve (25) is fixedly sleeved on the rod wall of the U-shaped pull rod (24).
5. The working method of the discharging platform for building construction according to claim 1, characterized in that: a plurality of L-shaped reinforcing blocks (26) are welded at the bent part of the U-shaped guard plate (3).
6. The working method of the discharging platform for building construction according to claim 1, characterized in that: the U-shaped guard plate (3) is fixedly connected with the side wall on the right side of the transverse plate (1) through a plurality of fastening bolts (27).
7. The working method of the discharging platform for building construction according to claim 1, characterized in that: and a supporting inclined rod (28) is fixedly connected between the U-shaped guard plate (3) and the fixing rod (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010516062.3A CN111622514A (en) | 2020-06-09 | 2020-06-09 | Working method of unloading platform for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010516062.3A CN111622514A (en) | 2020-06-09 | 2020-06-09 | Working method of unloading platform for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111622514A true CN111622514A (en) | 2020-09-04 |
Family
ID=72271436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010516062.3A Pending CN111622514A (en) | 2020-06-09 | 2020-06-09 | Working method of unloading platform for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111622514A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113445759A (en) * | 2021-06-02 | 2021-09-28 | 杨晓凡 | A assembled platform of unloading safely for construction |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10231624A (en) * | 1997-02-19 | 1998-09-02 | Shimizu Corp | Good receiving stage with curing net |
EP1392939B2 (en) * | 2001-05-25 | 2011-02-16 | Xena Systems Limited | Rolling platform |
CN202483180U (en) * | 2012-01-12 | 2012-10-10 | 佛山市南海保达建筑机械设备有限公司 | Movable building material loading and unloading platform |
CN203080934U (en) * | 2012-12-19 | 2013-07-24 | 中建三局第一建设工程有限责任公司 | Overhanging type discharging platform |
CN206144172U (en) * | 2016-08-24 | 2017-05-03 | 通州建总集团有限公司 | Equipment standard platform of unloading of encorbelmenting |
CN208294099U (en) * | 2018-03-28 | 2018-12-28 | 天津中擎建筑工程有限公司 | A kind of portable type discharging platform |
CN109812027A (en) * | 2019-03-21 | 2019-05-28 | 广西建工集团建筑工程总承包有限公司 | A kind of discharging platform and its installation method |
CN209443804U (en) * | 2018-12-05 | 2019-09-27 | 中国建筑第八工程局有限公司 | A kind of construction discharging platform |
-
2020
- 2020-06-09 CN CN202010516062.3A patent/CN111622514A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10231624A (en) * | 1997-02-19 | 1998-09-02 | Shimizu Corp | Good receiving stage with curing net |
EP1392939B2 (en) * | 2001-05-25 | 2011-02-16 | Xena Systems Limited | Rolling platform |
CN202483180U (en) * | 2012-01-12 | 2012-10-10 | 佛山市南海保达建筑机械设备有限公司 | Movable building material loading and unloading platform |
CN203080934U (en) * | 2012-12-19 | 2013-07-24 | 中建三局第一建设工程有限责任公司 | Overhanging type discharging platform |
CN206144172U (en) * | 2016-08-24 | 2017-05-03 | 通州建总集团有限公司 | Equipment standard platform of unloading of encorbelmenting |
CN208294099U (en) * | 2018-03-28 | 2018-12-28 | 天津中擎建筑工程有限公司 | A kind of portable type discharging platform |
CN209443804U (en) * | 2018-12-05 | 2019-09-27 | 中国建筑第八工程局有限公司 | A kind of construction discharging platform |
CN109812027A (en) * | 2019-03-21 | 2019-05-28 | 广西建工集团建筑工程总承包有限公司 | A kind of discharging platform and its installation method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113445759A (en) * | 2021-06-02 | 2021-09-28 | 杨晓凡 | A assembled platform of unloading safely for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114961334B (en) | High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof | |
CN107447973B (en) | Unilateral suspension type air mobile steel platform | |
CN106013774B (en) | A kind of sliding formwork flexibility platform device for being suitble to dispatch | |
CN111622514A (en) | Working method of unloading platform for building construction | |
KR101116254B1 (en) | High-rise structure construction method by lifting up table-form | |
CN209780193U (en) | Suspension type scaffold | |
GB1013285A (en) | Method and apparatus for the construction of large conical or hyperboloidal reinforced concrete structures such as cooling towers | |
CN214762961U (en) | Movable telescopic device for hanging safety belt | |
CN212129863U (en) | Improved tool type hanging basket for mounting cable on anti-collision wall of bridge | |
JP6391135B2 (en) | How to install temporary pillars | |
CN111305433A (en) | Construction structure and construction method of inclined glass curtain wall of roof steel structure platform | |
CN219805569U (en) | Steel construction arched bridge arch rib section installation welding operation platform | |
JP2016145477A (en) | Demolition system and demolition method | |
CN212957577U (en) | Movable platform device for high-altitude reinforcing operation under steel beam of factory building | |
CN217632458U (en) | Tunnel preliminary building trolley | |
CN114737816B (en) | Mast dismantling method for lifting high-altitude operation platform by adopting shoulder pole beam | |
CN215212258U (en) | Safe and reliable elevator shaft protection operation platform convenient to layer-by-layer turnover use | |
CN220100587U (en) | Lift type protection operation platform for elevator shaft | |
CN215331588U (en) | Platform of unloading with pull formula rail guard | |
CN219100689U (en) | Attachment structure suitable for super high floor attached lifting scaffold | |
CN214459735U (en) | Hanging basket system device for full-section construction of variable-section steel box girder | |
CN219794600U (en) | Hanging basket for building curtain wall construction | |
CN209760042U (en) | Movable type liftable reeving machine operation platform | |
CN210636798U (en) | Creeping formwork structure applied to vertical wall and frame column of wind tunnel corner section | |
CN218953310U (en) | Lifting platform for shaft wall construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200904 |
|
RJ01 | Rejection of invention patent application after publication |