CN111614021A - A high-voltage cable work trolley - Google Patents
A high-voltage cable work trolley Download PDFInfo
- Publication number
- CN111614021A CN111614021A CN202010673362.2A CN202010673362A CN111614021A CN 111614021 A CN111614021 A CN 111614021A CN 202010673362 A CN202010673362 A CN 202010673362A CN 111614021 A CN111614021 A CN 111614021A
- Authority
- CN
- China
- Prior art keywords
- voltage cable
- shaft
- rod
- holes
- levers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Handcart (AREA)
Abstract
一种高压电缆作业小车,涉及一种高压电缆检修小车,坐垫(4)的前后两侧下部分别与四根挂臂的立杆(3)下端铰接连接,在每一挂臂立杆(3)的上端外侧设有槽轮(2),坐垫(4)前部两侧的立杆(3)中部分别与杠杆(16)的中部铰接连接,两杠杆(16)的后上部外侧分别设有U形板(11),在U形板(11)的凹陷面上设有橡胶刹车片(30),两杠杆(16)的前下部分别设有脚套(21),坐垫(4)的前部设有工具箱(17);本发明利用坐垫上设置的四个挂臂分别挂在高压电缆上,由两脚套控制杠杆使U形板形成对高压电缆的刹车,获取了高压电缆上稳定的作业检修。
A high-voltage cable work trolley relates to a high-voltage cable maintenance trolley. There is a sheave (2) on the outer side of the upper end of the seat cushion (4), the middle part of the vertical rod (3) on both sides of the front part of the seat cushion (4) is hingedly connected with the middle part of the lever (16), and the rear upper outer side of the two levers (16) are respectively provided with U The shaped plate (11) is provided with a rubber brake pad (30) on the concave surface of the U-shaped plate (11), the front lower parts of the two levers (16) are respectively provided with foot covers (21), and the front part of the seat cushion (4) A tool box (17) is provided; in the present invention, the four hanging arms provided on the seat cushion are respectively hung on the high-voltage cable, and the levers are controlled by the two foot sleeves to make the U-shaped plate form a brake on the high-voltage cable, so as to obtain stable stability on the high-voltage cable. Work overhaul.
Description
【技术领域】【Technical field】
本发明涉及一种高压电缆检修小车,具体地说本发明涉及一种高压电缆作业小车。The invention relates to a high-voltage cable maintenance trolley, in particular to a high-voltage cable operation trolley.
【背景技术】【Background technique】
公知的,高压或特高压线路是远距离电能输送的主要途径,高压电缆是供电设备与用电设备之间的桥梁,起传输电能的作用;应用广泛,因此故障也经常发生,所使用的高压电缆为裸线,在长期使用过程中高压电缆上的间隔棒“根据线路数量大致分为一字形、Y字形、X字形、木字形或米字形”,受到长期的风力作用容易出现零件缺失,因此需要定期检修;在重冰区的高压电缆受到除冰作业的影响,也会使线路出现断股问题;并且高压电缆因为施工质量导致高压电缆系统故障的事例很多,例如电缆施工过程中在线路表面难免会留下细小的滑痕,高压电缆暴露在空气中,受到酸雨的影响都给长期安全运行留下隐患;由于处于高空的高压电缆受到风力的大负荷运行电缆蠕动力量很大,也会带来少量的断股现象;对于上述故障应及时排除;现在的检修或维修大多是利用一根安全带,然后人站立在下部高压电缆上完成作业,这样不仅非常不便,而且作业难度极大。It is well known that high-voltage or ultra-high-voltage lines are the main way of long-distance power transmission. High-voltage cables are bridges between power supply equipment and electrical equipment, and play the role of transmitting power. The cables are bare wires. During long-term use, the spacers on the high-voltage cables are "roughly divided into in-line, Y-shaped, X-shaped, wood-shaped or rice-shaped according to the number of lines". Parts are prone to missing parts due to long-term wind effect. Regular maintenance is required; high-voltage cables in heavy ice areas are affected by de-icing operations, which will also cause strand breaks in the line; and there are many cases of high-voltage cable system failures due to construction quality, such as cable construction. It is inevitable that small slip marks will be left. The high-voltage cables are exposed to the air and are affected by acid rain, which will leave hidden dangers for long-term safe operation; because the high-voltage cables at high altitude are subjected to the heavy load of the wind, the cable has a large creeping force, which will also bring There is a small amount of broken strands; the above faults should be eliminated in time; most of the current maintenance or maintenance is to use a seat belt, and then people stand on the lower high-voltage cable to complete the operation, which is not only very inconvenient, but also extremely difficult to operate.
【发明内容】[Content of the invention]
为了克服背景技术中的不足,本发明公开了一种高压电缆作业小车,利用坐垫上设置的四个挂臂分别挂在高压电缆上,由两脚套控制杠杆使U形板形成对高压电缆的刹车,获取了高压电缆上稳定的作业检修。In order to overcome the deficiencies in the background technology, the present invention discloses a high-voltage cable working trolley. The four hanging arms provided on the seat cushion are used to hang on the high-voltage cables respectively, and the levers are controlled by the two feet to make the U-shaped plate form a connection to the high-voltage cable. Brakes, access to stable work on high voltage cables.
实现本发明的技术方案如下:The technical scheme that realizes the present invention is as follows:
一种高压电缆作业小车,包括坐垫、挂臂、槽轮、杠杆、脚套、U形板和工具箱,坐垫的前后两侧下部分别与四根挂臂的立杆下端铰接连接,在每一挂臂立杆的上端外侧设有槽轮,坐垫前部两侧的立杆中部分别与杠杆的中部铰接连接,两杠杆的后上部外侧分别设有U形板,在U形板的凹陷面上设有橡胶刹车片,两杠杆的前下部分别设有脚套,坐垫的前部设有工具箱。A high-voltage cable work trolley includes a seat cushion, a hanging arm, a sheave, a lever, a foot cover, a U-shaped plate and a tool box. The outer side of the upper end of the hanging arm vertical rod is provided with a sheave, and the middle parts of the vertical rods on both sides of the front part of the seat cushion are hingedly connected with the middle part of the lever, respectively. Rubber brake pads are provided, foot covers are provided on the front lower parts of the two levers, and a tool box is provided on the front part of the seat cushion.
所述的高压电缆作业小车,在坐垫下部设置的长方盒前后两侧下部分别设有连接座,四根立杆下端内侧分别设有水平杆,四个水平杆的内端分别处于四个连接座的两板体之间,由四个轴杆分别依次穿过四个连接座的两板体其中一个板体的孔、水平杆内端设置的轴孔C和另一板体的孔后由开口销穿接轴杆一端设置的销孔,所述四个轴杆的另一端分别设有扩径头。The said high-voltage cable operation trolley is provided with connecting seats on the lower part of the front and rear sides of the rectangular box arranged at the lower part of the seat cushion, respectively; Between the two plates, the four shaft rods respectively pass through the hole of one of the two plates of the four connecting bases, the shaft hole C set at the inner end of the horizontal rod and the hole of the other plate, and then the opening is opened. The pins pass through the pin holes provided at one end of the shaft rods, and the other ends of the four shaft rods are respectively provided with diameter expansion heads.
所述的高压电缆作业小车,在四个水平杆的内端分别设有延伸杆,所述延伸杆内端向下倾斜或在延伸杆的上部面设有内侧上部略低的斜面。In the high-voltage cable work trolley, extension rods are respectively provided at the inner ends of the four horizontal rods.
所述的高压电缆作业小车,所述坐垫的外部为皮革或帆布,在皮革或帆布内为海绵块,所述皮革或帆布包裹在海绵块的上部和四周,海绵块四周下部的皮革或帆布上设有金属条,海绵块的下部和金属条处于长方盒内,多个螺丝由长方盒的四周设置的孔穿过后连接金属条上设置的螺孔。In the high-voltage cable work trolley, the outside of the seat cushion is leather or canvas, and the leather or canvas is a sponge block, the leather or canvas is wrapped on the upper part and around the sponge block, and the leather or canvas on the lower part of the sponge block A metal strip is provided, the lower part of the sponge block and the metal strip are in the rectangular box, and a plurality of screws are connected to the screw holes provided on the metal strip after passing through the holes provided around the rectangular box.
所述的高压电缆作业小车,工具箱的腔体底板中部由两固定螺丝与立管上端的外折边固定连接,立管下端与连接管前端连接,连接管的中后部分别设有光孔,两锁紧螺丝分别穿过两光孔和长方盒底板中部前后设置的孔后由螺母锁死。In the high-voltage cable work trolley, the middle part of the cavity bottom plate of the toolbox is fixedly connected with the outer edge of the upper end of the riser by two fixing screws, the lower end of the riser is connected with the front end of the connecting pipe, and the middle and rear parts of the connecting pipe are respectively provided with light holes , the two locking screws pass through the two light holes and the holes provided in the front and rear of the middle of the bottom plate of the rectangular box respectively, and are locked by nuts.
所述的高压电缆作业小车,在长方盒的两侧中部分别设有中部内凹。The said high-voltage cable working trolley is provided with a middle inner concave in the middle of both sides of the rectangular box.
所述的高压电缆作业小车,在四根立杆的上端外侧分别设有上部杆,每一上部杆的外端下部分别设有外立杆,槽轮处于外立杆与立杆的靠近上端之间,在槽轮两端端面分别设有凸出环,两凸出环中部设有贯通的通孔;在外立杆中下部和立杆的靠近上端分别设有相互对应的穿孔,外立杆和立杆的穿孔外口处分别设有阔口,轴的中部穿在槽轮中部的通孔内,轴的靠近两端分别处于外立杆和立杆的穿孔中,轴的两端端面分别设有凹坑,轴两端的凹坑设有多个环绕的豁口,安装时由两锥形顶杆通过锤击使轴的两端外扩入两阔口内获取轴的固定。The high-voltage cable operation trolley is provided with upper poles on the outer sides of the upper ends of the four vertical poles, and an outer vertical pole is respectively arranged at the lower part of the outer end of each upper pole, and the sheave is located between the outer vertical pole and the upper end of the vertical pole. , protruding rings are respectively provided on the end faces of the two ends of the sheave, and the middle of the two protruding rings is provided with a through hole; The outer openings of the perforated rods are respectively provided with wide openings, the middle part of the shaft passes through the through holes in the middle part of the sheave, and the near two ends of the shaft are respectively in the perforations of the outer vertical rod and the vertical rod, and the end faces of the two ends of the shaft are respectively provided with The pits at both ends of the shaft are provided with a plurality of surrounding gaps. During installation, the two conical top rods are hammered to expand the two ends of the shaft into the two wide openings to obtain the fixation of the shaft.
所述的高压电缆作业小车,在四根立杆的前部两立杆的任一立杆的上部杆中部设有安装孔,上部杆外侧下部的外立杆上设有工具包挂钩,所述工具包挂钩外上端中部设有凹陷面,杆体的上端外缘面设有凸起环,杆体外缘上部套有弹簧,锁杆一端的套孔套在杆体下部,所述杆体下端设置的缩径杆插接上部杆的安装孔,锁杆另一端处于工具包挂钩的凹陷面中形成工具包的防跌落。The high-voltage cable work trolley has a mounting hole in the middle of the upper pole of any one of the front two poles of the four poles, and a tool bag hook is arranged on the outer pole at the lower outer side of the upper pole. There is a concave surface in the middle of the outer upper end of the bag hook, a raised ring is arranged on the outer edge surface of the upper end of the rod body, a spring is sleeved on the upper part of the outer edge of the rod body, a sleeve hole at one end of the locking rod is sleeved on the lower part of the rod body, and a diameter reducing rod is arranged at the lower end of the rod body. The installation hole of the upper rod is inserted, and the other end of the locking rod is located in the concave surface of the tool bag hook to prevent the tool bag from falling.
所述的高压电缆作业小车,坐垫前部两侧的立杆中部分别设有轴孔A,在两杠杆的中部分别设有轴孔B,由两轴杆分别使两立杆与两杠杆的中部铰接连接。For the high-voltage cable work trolley, the middle parts of the vertical rods on both sides of the front of the seat cushion are respectively provided with shaft holes A, and the middle parts of the two levers are respectively provided with shaft holes B. The two shaft rods make the two vertical rods and the middle of the two levers respectively Hinged connection.
所述的高压电缆作业小车,在两杠杆的前下部分别设置的绳孔与两拉绳的上端连接,两拉绳的下端分别连接在两脚套上部的倒U形杆上中部设置的绳连接孔上。In the high-voltage cable work trolley, the rope holes respectively provided in the front and lower parts of the two levers are connected with the upper ends of the two pull ropes, and the lower ends of the two pull ropes are respectively connected with the upper and middle parts of the inverted U-shaped rods on the upper part of the two foot covers. on the hole.
通过上述公开内容,本发明的有益效果是:Through the above disclosure, the beneficial effects of the present invention are:
本发明所述的高压电缆作业小车,利用坐垫一侧两个的四个挂臂分别挂在两根高压电缆上,由两只脚控制脚套使两U形板内的橡胶刹车片形成对高压电缆的刹车,由于本申请不占用双手,所以作业进度可大幅度加快,在跨越间隔棒时可坐在高压电缆上依次使前部的两轮槽内收后再挂接高压电缆,然后更换坐在高压电缆上的位置再使后部的两轮槽内收后再挂接高压电缆;本发明获取了高压电缆上稳定的作业检修,可有效作业进度。The high-voltage cable work trolley of the present invention uses four hanging arms on one side of the seat cushion to hang on two high-voltage cables respectively, and the two feet control the foot cover to make the rubber brake pads in the two U-shaped plates form a pair of high-voltage cables. The brake of the cable, because the application does not occupy both hands, so the operation progress can be greatly accelerated. When crossing the spacer, you can sit on the high-voltage cable and make the two wheel grooves in the front in turn, then hook the high-voltage cable, and then replace the seat. At the position on the high-voltage cable, the rear two-wheel grooves are retracted and then the high-voltage cable is attached; the invention obtains stable operation and maintenance on the high-voltage cable, and can effectively work progress.
【附图说明】【Description of drawings】
图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;
图2是本发明的坐垫和工具箱结构示意图;Fig. 2 is the seat cushion of the present invention and the structural representation of the toolbox;
图3是本发明的挂臂结构示意图;Fig. 3 is the structure schematic diagram of the hanging arm of the present invention;
图4是本发明的轴立体结构示意图;Fig. 4 is the shaft three-dimensional structure schematic diagram of the present invention;
图5是本发明的槽轮立体结构示意图;5 is a schematic diagram of the three-dimensional structure of the sheave of the present invention;
图6是本发明的锁杆立体结构示意图;Figure 6 is a schematic view of the three-dimensional structure of the lock lever of the present invention;
图7是本发明的杠杆立体结构示意图;7 is a schematic diagram of the three-dimensional structure of the lever of the present invention;
图8是本发明的脚套立体结构示意图;FIG. 8 is a schematic diagram of the three-dimensional structure of the foot cover of the present invention;
在图中:1、上部杆;2、槽轮;3、立杆;4、坐垫;5、锁杆;6、工具包挂钩;7、轴;8、螺丝;9、中部内凹;10、轴孔A;11、U形板;12、水平杆;13、轴孔B;14、连接座;15、轴杆;16、杠杆;17、工具箱;18、连接管;19、立管;20、拉绳;21、脚套;22、锁紧螺丝;23、光孔;24、腔体;25、扩径头;26、销孔;27、轴孔C;28、长方盒;29、轴杆;30、橡胶刹车片;31、轮槽;32、外立杆;33、开口销;34、底板;35、海绵块;36、金属条;37、螺母;38、固定螺丝;39、外折边;40、弹簧;41、安装孔;42、凹陷;43、穿孔;44、阔口;45、斜面;46、延伸杆;47、豁口;48、缩径杆;49、杆体;50、凸起环;51、凹坑;52、凸出环;53、通孔;54、套孔;55、锁电缆槽;56、向上凹;57、绳孔;58、绳连接孔;59、倒U形杆。In the picture: 1. Upper rod; 2. Sheave; 3. Upright rod; 4. Seat cushion; 5. Lock rod; 6. Tool bag hook; 7. Shaft; 8. Screw; 9. Concave in the middle; 10. Shaft hole A; 11, U-shaped plate; 12, horizontal rod; 13, shaft hole B; 14, connecting seat; 15, shaft rod; 16, lever; 17, tool box; 18, connecting pipe; 19, stand pipe; 20, pull rope; 21, foot cover; 22, locking screw; 23, light hole; 24, cavity; 25, expanding head; 26, pin hole; 27, shaft hole C; 28, rectangular box; 29 , shaft; 30, rubber brake pads; 31, wheel grooves; 32, outer poles; 33, split pins; 34, bottom plate; 35, sponge blocks; 36, metal bars; 37, nuts; 38, fixing screws; 39 40, spring; 41, mounting hole; 42, depression; 43, perforation; 44, wide mouth; 45, inclined plane; 46, extension rod; 47, gap; 48, reduced diameter rod; 49, rod body; 50, raised ring; 51, pit; 52, raised ring; 53, through hole; 54, sleeve hole; 55, lock cable slot; 56, upward concave; 57, rope hole; 58, rope connection hole; 59 , Inverted U-shaped rod.
【具体实施方式】【Detailed ways】
下面结合实施例对本发明进行进一步的说明;下面的实施例并不是对于本发明的限定,仅作为支持实现本发明的方式,在本发明所公开的技术框架内的任意等同结构替换,均为本发明的保护范围;The present invention will be further described below in conjunction with the embodiments; the following embodiments are not intended to limit the present invention, but only serve as a way to support the realization of the present invention. Any equivalent structure replacement within the technical framework disclosed in the present invention is the present invention. the scope of protection of the invention;
结合附图1~8中所述的高压电缆作业小车,包括坐垫4、挂臂、槽轮2、杠杆16、脚套21、U形板11和工具箱17,坐垫4的前后两侧下部分别与四根挂臂的立杆3下端铰接连接,在每一挂臂立杆3的上端外侧设有槽轮2,坐垫4前部两侧的立杆3中部分别设有轴孔A10,在两杠杆16的中部分别设有轴孔B13,由两轴杆29分别使两立杆3与两杠杆16的中部铰接连接,两杠杆16的后上部外侧分别设有U形板11,在U形板11的凹陷面上设有橡胶刹车片30,橡胶刹车片30可以使片状或块状结构,如果是片状的橡胶刹车片30,可将U形板11制作为前后低中部高的形状,参考附图1或7中的U形板11可以看出,U形板11的中间部分设置为向上凹56的结构,进一步也使橡胶刹车片30为中间部分向上凹,这样便可使角度偏差时,U形板11上部的锁电缆槽55中橡胶刹车片30仍然可以接触高压电缆,在两杠杆16的前下部分别设置的绳孔57与两拉绳20的上端连接,两拉绳20的下端分别连接在两脚套21上部的倒U形杆59上中部设置的绳连接孔58上,坐垫4的前部设有工具箱17。Combined with the high-voltage cable work trolley described in the accompanying drawings 1 to 8, it includes a
结合附图1、2、3、4、5或6,在坐垫4下部设置的长方盒28前后两侧下部分别设有连接座14,四根立杆3下端内侧分别设有水平杆12,在四个水平杆12的内端分别设有延伸杆46,所述延伸杆46内端向下倾斜或在延伸杆46的上部面设有内侧上部略低的斜面45,四个水平杆12的内端分别处于四个连接座14的两板体之间,由四个轴杆15分别依次穿过四个连接座14的两板体其中一个板体的孔、水平杆12内端设置的轴孔C27和另一板体的孔后由开口销33穿接轴杆15一端设置的销孔26,所述四个轴杆15的另一端分别设有扩径头25;在四根立杆3的上端外侧分别设有上部杆1,每一上部杆1的外端下部分别设有外立杆32,槽轮2处于外立杆32与立杆3的靠近上端之间,在槽轮2两端端面分别设有凸出环52,两凸出环52中部设有贯通的通孔53;在外立杆32中下部和立杆3的靠近上端分别设有相互对应的穿孔43,外立杆32和立杆3的穿孔43外口处分别设有阔口44,轴7的中部穿在槽轮2中部的通孔53内,轴7的靠近两端分别处于外立杆32和立杆3的穿孔43中,轴7的两端端面分别设有凹坑51,轴7两端的凹坑51设有多个环绕的豁口47,安装时由两锥形顶杆通过锤击使轴7的两端外扩入两阔口44内获取轴7的固定;本申请考虑到工具包的放置;在附图3中公开了一种悬挂工具包的结构,在四根立杆3的前部两立杆3的任一立杆3的上部杆1中部设有安装孔41,上部杆1外侧下部的外立杆32上设有工具包挂钩6,所述工具包挂钩6外上端中部设有凹陷面,杆体49的上端外缘面设有凸起环50,杆体49外缘上部套有弹簧40,锁杆5一端的套孔54套在杆体49下部,所述杆体49下端设置的缩径杆48插接上部杆1的安装孔41,锁杆5另一端处于工具包挂钩6的凹陷面中,在使用时可将工具包的包带子放入工具包挂钩6的凹陷42中,以便防范工具包的防跌落。1, 2, 3, 4, 5 or 6 of the accompanying drawings, the lower part of the front and rear sides of the
结合附图1或2,所述坐垫4的外部为皮革或帆布,在皮革或帆布内为海绵块35,所述皮革或帆布包裹在海绵块35的上部和四周,海绵块35四周下部的皮革或帆布上设有金属条36,海绵块35的下部和金属条36处于长方盒28内,多个螺丝8由长方盒28的四周设置的孔穿过后连接金属条36上设置的螺孔,在长方盒28的两侧中部分别设有中部内凹9;工具箱17的腔体24底板中部由两固定螺丝38与立管19上端的外折边39固定连接,立管19下端与连接管18前端连接,连接管18的中后部分别设有光孔23,两锁紧螺丝22分别穿过两光孔23和长方盒28底板34中部前后设置的孔后由螺母37锁死。In conjunction with accompanying drawing 1 or 2, the outside of the
实施本发明所述的高压电缆作业小车,结合附图1至8,四根挂臂、两根杠杆16以及一体结构的U形板11、锁杆5、工具箱17、连接管18、长方盒28可使用轻质的铝合金浇注成型工艺制作,其中结构中在保证强度的情况下可通过设置工艺凹陷、工艺孔减轻重量,或者将连接管18替换为不锈钢管;拉绳20使用尼龙绳较佳;槽轮2使用不锈钢材质;Implementing the high-voltage cable work trolley according to the present invention, with reference to Figures 1 to 8, four hanging arms, two
安装使用过程如下:The installation and use process is as follows:
结合附图1或2将海绵块35的下部外缘外部涂抹少量玻璃胶,然后将金属条36粘贴在海绵块35的下部四周,将皮革或帆布套套在海绵块35上,在皮革或帆布套与金属条36外部之间涂抹玻璃胶粘贴牢固;使用一根铝合金扁方管或不锈钢扁方管制作连接管18,在连接管18靠近前部利用折弯机获取立管19,在立管19的左右两侧分别切割出豁口,切割后的立管19上端折弯出前后两外折边39,然后利用固定螺丝38将工具箱17的腔体24底板与外折边39固定连接,然后使用两锁紧螺丝22和螺母37将长方盒28的底板34与连接管18固定连接;然后将海绵块35的金属条36放入长方盒28中,使用多根螺丝8分别穿过长方盒28边部设置的孔后连接金属条36的螺孔,这样便可将皮革或帆布套的下部边牢固的夹持,需要说明的是在长方盒28的两侧分别设置的中部内凹9可减轻使用时两大腿根部的不适感;Apply a small amount of glass glue to the outside of the lower outer edge of the
结合附图1、3、4、5、6、7或8,先将弹簧40套在杆体49上,然后将锁杆5一端的套孔54套在杆体49的弹簧40下部,杆体49下端的缩径杆48插入上部杆1的安装孔41中“四个上部杆1只需要一个具有安装孔41和工具包挂钩6的即可”,使用具有倒圆锥凸起的楔钉通过锤击方式使缩径杆48“缩径杆48下端面结构与轴7的两端类似”下端外扩;四个槽轮2的安装相同,将槽轮2放入立杆3上部外侧的外立杆32内面,然后将轴7穿入槽轮2和立杆3、外立杆32的穿孔43,利用作业台面上设置的圆锥凸起插入轴7的一端,使用另一具有倒圆锥凸起的楔钉通过锤击方式使轴7两端外扩,这样轴7的两端便卡在立杆3、外立杆32穿孔43外端口设置的阔口44中直至四个槽轮2安装完毕;将四根挂臂的水平杆12的内端分别放入坐垫4长方盒28下部四角的连接座14两板体之间,使用轴杆15分别穿入四个连接座14两板体上设置的孔和水平杆12的轴孔C27,使用开口销33穿在轴杆15内端的销孔26中并将开口销33分开;在两U形板11上部面的锁电缆槽55中粘贴橡胶刹车片30,然后将两杠杆16分别贴在坐垫4前部两侧的立杆3中部内面上,使用轴杆29穿接立杆3的轴孔A10和两杠杆16的轴孔B13;最后使用两根拉绳20连接两杠杆16前下端的绳孔57和两脚套21倒U形杆59的绳连接孔58。1, 3, 4, 5, 6, 7 or 8, first put the
使用时,最好两人同时作业,首先电力塔架上的作业人员使用绳索将本申请拉至电力塔架上,先使用一根绳子将本申请捆绑连接在电力塔架的绝缘子串或角铁上,然后由另一个作业人员将两脚套21放在坐垫4上,使两U形板11下沉,然后将坐垫4放入两根平行的高压电缆之间,然后使坐垫4两侧的四个槽轮2中两个槽轮2的轮槽31卡在一根高压电缆上,另两个槽轮2的轮槽31卡在另一根高压电缆上,具体施工的作业人员通过坐在坐垫4上,两只脚分别踩在两脚套21上,这时两U形板11的橡胶刹车片30分别处于坐垫4两侧的两两轮槽31的高压电缆下部,也就是由双脚控制橡胶刹车片30的刹车,然后根据作业需要将零部件和工具放入工具箱17的腔体24中,然后将工具包挂在工具包挂钩6上并使用锁杆5压在工具包挂钩6的凹陷面中防止跌落,松开绳子后由双手拉住高压电缆行进便可实施对高压电缆或间隔棒的检修维护作业。When using, it is best for two people to work at the same time. First, the operator on the power tower uses a rope to pull the application to the power tower, and first use a rope to bind the application to the insulator string or angle iron of the power tower. Then another operator puts the two foot covers 21 on the
本发明的使用范围包括具有两根平行的高压电缆的检修维护。The scope of application of the present invention includes maintenance of two parallel high-voltage cables.
本发明未详述部分为现有技术。The parts of the present invention that are not described in detail are prior art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010673362.2A CN111614021B (en) | 2020-07-14 | 2020-07-14 | A high-voltage cable work trolley |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010673362.2A CN111614021B (en) | 2020-07-14 | 2020-07-14 | A high-voltage cable work trolley |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111614021A true CN111614021A (en) | 2020-09-01 |
| CN111614021B CN111614021B (en) | 2021-08-13 |
Family
ID=72198865
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010673362.2A Active CN111614021B (en) | 2020-07-14 | 2020-07-14 | A high-voltage cable work trolley |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111614021B (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113501376A (en) * | 2021-08-05 | 2021-10-15 | 国网河南省电力公司伊川县供电公司 | Cable paying-off support bracket |
| CN113575172A (en) * | 2021-08-05 | 2021-11-02 | 国网河南省电力公司伊川县供电公司 | Dolly is pruned to peripheral branch of power line |
| CN114476515A (en) * | 2022-01-18 | 2022-05-13 | 宁夏天地奔牛实业集团有限公司 | Mine conveyor cable trough for mounting consignment tool box and mine conveyor |
| CN115632337A (en) * | 2022-08-17 | 2023-01-20 | 梅钢 | A portable electric power maintenance vehicle for high-voltage cable detection |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201789231U (en) * | 2010-08-10 | 2011-04-06 | 陈英本 | Maintenance cable trolley structure |
| CN202524018U (en) * | 2012-03-02 | 2012-11-07 | 常州信息职业技术学院 | Quad-bundled conductor maintenance transport vehicle of high-voltage power transmission line |
| CN203553742U (en) * | 2013-10-16 | 2014-04-16 | 国家电网公司 | An obstacle-surmounting type portable ground wire flying vehicle |
| CN204905753U (en) * | 2015-08-12 | 2015-12-23 | 国网山东省电力公司临沂供电公司 | A removal driving of can finding range for transmission line hangs conductor spacer |
| CN106159792A (en) * | 2016-07-14 | 2016-11-23 | 国网山东省电力公司平原县供电公司 | A kind of power circuit clearing apparatus |
| CN109802331A (en) * | 2019-04-10 | 2019-05-24 | 问洋铭 | A kind of high-altitude route sliding job platform |
| CN209767000U (en) * | 2019-04-28 | 2019-12-10 | 林春富 | Power supply transmission line maintenance device |
| CN110994447A (en) * | 2019-11-28 | 2020-04-10 | 国网吉林省电力有限公司检修公司 | Wire walking aids |
| CN210517587U (en) * | 2019-06-04 | 2020-05-12 | 国家电网有限公司 | A 500kV transmission line four-split conductor spacer bar replacement vehicle |
-
2020
- 2020-07-14 CN CN202010673362.2A patent/CN111614021B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201789231U (en) * | 2010-08-10 | 2011-04-06 | 陈英本 | Maintenance cable trolley structure |
| CN202524018U (en) * | 2012-03-02 | 2012-11-07 | 常州信息职业技术学院 | Quad-bundled conductor maintenance transport vehicle of high-voltage power transmission line |
| CN203553742U (en) * | 2013-10-16 | 2014-04-16 | 国家电网公司 | An obstacle-surmounting type portable ground wire flying vehicle |
| CN204905753U (en) * | 2015-08-12 | 2015-12-23 | 国网山东省电力公司临沂供电公司 | A removal driving of can finding range for transmission line hangs conductor spacer |
| CN106159792A (en) * | 2016-07-14 | 2016-11-23 | 国网山东省电力公司平原县供电公司 | A kind of power circuit clearing apparatus |
| CN109802331A (en) * | 2019-04-10 | 2019-05-24 | 问洋铭 | A kind of high-altitude route sliding job platform |
| CN209767000U (en) * | 2019-04-28 | 2019-12-10 | 林春富 | Power supply transmission line maintenance device |
| CN210517587U (en) * | 2019-06-04 | 2020-05-12 | 国家电网有限公司 | A 500kV transmission line four-split conductor spacer bar replacement vehicle |
| CN110994447A (en) * | 2019-11-28 | 2020-04-10 | 国网吉林省电力有限公司检修公司 | Wire walking aids |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113501376A (en) * | 2021-08-05 | 2021-10-15 | 国网河南省电力公司伊川县供电公司 | Cable paying-off support bracket |
| CN113575172A (en) * | 2021-08-05 | 2021-11-02 | 国网河南省电力公司伊川县供电公司 | Dolly is pruned to peripheral branch of power line |
| CN113501376B (en) * | 2021-08-05 | 2022-08-02 | 国网河南省电力公司伊川县供电公司 | Cable paying-off support bracket |
| CN113575172B (en) * | 2021-08-05 | 2023-03-14 | 国网河南省电力公司伊川县供电公司 | Dolly is pruned to peripheral branch of power line |
| CN114476515A (en) * | 2022-01-18 | 2022-05-13 | 宁夏天地奔牛实业集团有限公司 | Mine conveyor cable trough for mounting consignment tool box and mine conveyor |
| CN114476515B (en) * | 2022-01-18 | 2024-02-06 | 宁夏天地奔牛实业集团有限公司 | Mining conveyor cable trough provided with consignment tool box and mining conveyor |
| CN115632337A (en) * | 2022-08-17 | 2023-01-20 | 梅钢 | A portable electric power maintenance vehicle for high-voltage cable detection |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111614021B (en) | 2021-08-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111614021B (en) | A high-voltage cable work trolley | |
| CN2412301Y (en) | Four-column bridge live-wire work crossing rack | |
| CN202997425U (en) | Hoisting device capable of replacing suspension type insulator chain under electrified state | |
| CN104577870B (en) | A kind of active obstacle type overhauls property-line driving | |
| CN103560437B (en) | A kind of optical cable pulley based on single-wheel sister block hangs and annex installation method | |
| CN112271632B (en) | Standing type high-voltage cable operation device | |
| CN107605394A (en) | A kind of livewire work single pendulum adjustable type rope ladder head device and its application method | |
| CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
| CN207442325U (en) | Helicopter hotline maintenance ground wire basket of work | |
| CN106384964A (en) | V-type insulator-chain electrified replacing operation method | |
| CN112609956A (en) | Building scaffold building machine for building construction | |
| CN207412637U (en) | A kind of sitting posture climber | |
| CN111994844A (en) | Transformer substation is with overhauing platform | |
| CN204741222U (en) | Portable multi -functional transmission line interruption maintenance appurtenance | |
| CN206976942U (en) | A kind of power construction wire-sending device | |
| CN205277273U (en) | Pole ladder is stepped on to cement concrete pole | |
| CN212450250U (en) | Special lifting appliance for outdoor construction of transformer substation | |
| CN205063803U (en) | Rope ladder head of preventing falling | |
| CN204760892U (en) | Extra -high voltage transformer substation makes somebody a mere figurehead generating line conductor spacer installing the system | |
| CN107364789A (en) | Large-scale reactor star suspender | |
| CN214280697U (en) | A overhaul coaster for quadripartion conductor transmission line | |
| CN210693256U (en) | Simple crossing frame | |
| CN111911773B (en) | A new type of combined support for equipment maintenance in substations | |
| CN206680114U (en) | A kind of device for being used to lift by crane cable pit cover plate | |
| CN110165600B (en) | Device and method for entering and exiting electric field of double-loop same-tower power transmission line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20210726 Address after: 276017 long Software Park c711, 276 shuangyueyuan Road, high tech Industrial Development Zone, Linyi City, Shandong Province Applicant after: Shandong chenzhiyi Information Technology Co.,Ltd. Address before: 323000 No.120, Qinglin village, Liandu District, Lishui City, Zhejiang Province Applicant before: Yu Weiyong |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250909 Address after: 100071 No. 3 Building, 2505 (Park), No. 128 West Nan Si Huan Road, Fengtai District, Beijing Patentee after: Beijing Guang'an United Power Engineering Design Co.,Ltd. Country or region after: China Address before: 276017 long Software Park c711, 276 shuangyueyuan Road, high tech Industrial Development Zone, Linyi City, Shandong Province Patentee before: Shandong chenzhiyi Information Technology Co.,Ltd. Country or region before: China |