CN111607413A CN202010608958.4A CN202010608958A CN111607413A CN 111607413 A CN111607413 A CN 111607413A CN 202010608958 A CN202010608958 A CN 202010608958A CN 111607413 A CN111607413 A CN 111607413A
Authority
CN
China
Prior art keywords
flue
support frame
bent pipe
elbow
flue bent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010608958.4A
Other languages
Chinese (zh)
Inventor
单杭清
周鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010608958.4A priority Critical patent/CN111607413A/en
Publication of CN111607413A publication Critical patent/CN111607413A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B29/00Other details of coke ovens
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/08Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with apertured web, e.g. with a web consisting of bar-like components; Honeycomb girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention provides a manufacturing and construction method of a coke oven flue bent pipe support frame, which is implemented by the following steps: the angle steel is adopted to replace channel steel to manufacture the support frame, install the support frame, reinforce the support frame, install the flue bent pipe, and the support frame and the flue bent pipe are poured into a concrete entity together to complete the support and installation of the flue bent pipe. The method provided by the invention has the advantages that the adopted materials are light, the material consumption is less, the cost is lower, and the manual investment is saved.

Description

Manufacturing and construction method of coke oven flue bent pipe support frame
Technical Field
The invention relates to the field of metallurgical equipment, in particular to a manufacturing and construction method of a coke oven flue bent pipe support frame, which is used for providing an economical and efficient temporary fixing device for flue bent pipe installation.
Background
In the traditional construction method for installing the flue elbow of the coke oven, 10# channel steel is used as a longitudinal beam 1 and a cross beam 2 for fixing the flue elbow 4, the longitudinal beam 1 is supported on the cross beam 2, two ends of the cross beam 1 are respectively provided with a vertical column 3 made of 10# channel steel and supported on a flue vertical wall structure, and the vertical columns are used as supporting and fixing frames for assisting the installation and the positioning of the flue elbow 4, as shown in figure 1 of the attached drawings. After the flue bent pipe is installed in place, the supporting and fixing frame and the flue bent pipe are poured into a concrete structure together to form a part of a solid body. The construction method has the following disadvantages:
(1) the longitudinal beams and the cross beams respectively use through-length channel steel as supporting beams, so that the material consumption is large;
(2) because the height of the cross section of the channel steel is larger and exceeds the thickness of a flue steel bar protective layer, the longitudinal beams on two sides below the flue bent pipe are required to be manually provided with notches during actual construction, and materials and manpower are wasted;
(3) the required channel steel materials are not easy to obtain on site, extra purchase is needed, and the capital pressure is large.
Disclosure of Invention
Aiming at the technical problems, the invention provides a manufacturing and construction method of a coke oven flue bent pipe support frame, aims to overcome the defects of more support frame materials, higher cost, inconvenient construction and the like in the existing construction method, and provides an economical and efficient temporary fixing device for flue bent pipe installation.
In order to achieve the purpose, the invention adopts the following technical scheme:
a manufacturing and construction method of a coke oven flue bent pipe support frame is implemented by the following steps:
s1, manufacturing a support frame: adopting angle steel as a longitudinal beam and a cross beam, and welding the longitudinal beam and the cross beam into a ladder-shaped support frame according to the position of a flue bent pipe, so that a plurality of flue bent pipe spaces for accommodating the flue bent pipe are formed on the support frame;
s2, mounting a support frame: after the binding of the upper layer of the steel mesh sheets of the flue top plate is finished, installing the support frame on the upper layer of the steel mesh sheets of the flue top plate according to the position of the flue bent pipe determined in advance;
s3, reinforcing the support frame: reinforcing by taking each flue bent pipe blank as a unit, arranging a vertical reinforcing rib on one side of the support frame close to the longitudinal center line of the flue, fixing the upper end of the vertical reinforcing rib on the longitudinal beam, fixing the lower end of the vertical reinforcing rib on the arch bottom template, and arranging a base between the lower end and the arch bottom template to realize vertical support of the support frame; fixing the support frame and a flue vertical wall steel bar together at one side of the support frame far away from the longitudinal center line of the flue to realize vertical support of the support frame;
s4, mounting a flue bent pipe: the flue bent pipe penetrates through a flue bent pipe blank and is installed at a specified position, and the flue bent pipe is clamped on the support frame;
s5, pouring concrete: and pouring the support frame and the flue bent pipe together to form a concrete entity to complete the support and installation of the flue bent pipe.
Compared with the prior art, the method has the advantages of light weight of adopted materials, less material consumption, lower cost and labor investment saving.
Further, in step S1, the distance between the longitudinal beams and the distance between the cross beams of each flue elbow space are equal, and the distance is greater than the diameter of the flue elbow and smaller than the diameter of the top edge of the flue elbow.
Further, in step S1, the angle steel specification used is ≤ 50 × 5.
Further, in step S2, the position of the flue elbow is determined by the longitudinal centerline of the flue, and the mounting position of the support frame is determined by the transverse centerline of the flue elbow.
Drawings
FIG. 1 is a schematic structural view of a prior art flue elbow support frame;
FIG. 2 is a top view of the flue elbow support frame structure of the present invention;
FIG. 3 is a side view of the flue elbow support frame structure of the present invention;
FIG. 4 is a schematic view of the partial reinforcement of the flue elbow support of the present invention;
in the figure: 1-a longitudinal beam; 2-a cross beam; 3-upright column; 4-flue elbow pipe; 5-flue bent pipe blank space; 6-a support frame; 7-longitudinal central line of flue elbow; 8-flue longitudinal centerline; 9-vertical reinforcing ribs; 10-a base; 11-arch bottom template; 12-flue vertical wall reinforcing steel bars.
Detailed Description
The invention will be further described with reference to the accompanying drawings and specific embodiments. It is to be understood that the following description is only for purposes of clearly illustrating the present invention and is not to be taken in a limiting sense.
A manufacturing and construction method of a coke oven flue bent pipe support frame is implemented by the following steps:
s1, manufacturing a support frame: as shown in fig. 2 and fig. 3, the support frame is manufactured according to the actual size of the flue elbow, two longitudinal beams 1 arranged in parallel and back to back and a plurality of cross beams 2 vertically arranged between the two longitudinal beams 1 are welded to form a ladder-type structure, the longitudinal beams 1 and the cross beams 2 respectively adopt angle steel with the specification of & lt 50 x 5, wherein the cross beams 2 and the longitudinal beams 1 form a plurality of flue elbow spaces 5 for supporting the flue elbow 4, and each pair of cross beams forming the flue elbow spaces 5 are arranged in back to back.
The longitudinal beam interval and the cross beam interval of each flue bent pipe blank 5 are equal, the interval is larger than the diameter of a flue bent pipe body, the flue bent pipe can conveniently and smoothly pass through, and meanwhile, the interval is smaller than the diameter of the picking edge at the top of the flue bent pipe, so that the flue bent pipe can be finally clamped on the support frame 6. The whole supporting frame formed by the longitudinal beams 1 and the cross beams 2 plays a role in supporting the flue elbow.
S2, mounting a support frame: after the binding of the upper layer steel mesh sheets of the flue top plate is finished, the support frame can be installed; during installation, because the longitudinal center line 7 of the flue elbow and the longitudinal center line 8 of the flue are a set distance, the installation position of the flue elbow 4 is determined according to the longitudinal center line of the flue, the installation position of the support frame 6 is determined according to the transverse center line of the flue elbow, and then the support frame 6 is directly fixed on the reinforcing mesh sheet on the upper layer of the flue top plate.
S3, reinforcing the support frame: after the support frame 6 is installed in place, reinforcing the support frame 6 by taking each flue bent pipe blank 5 on the support frame 6 as a unit, as shown in fig. 4, welding the upper end of a vertical reinforcing rib 9 on a longitudinal beam 1 of the support frame on one side of the support frame 6 close to a longitudinal central line 8 of a flue, fixing the lower end of the vertical reinforcing rib to an arch bottom template 11 through a base 10 welded below the vertical reinforcing rib, wherein the vertical reinforcing rib 9 is made of reinforcing steel bar waste with the diameter of more than 20mm, and the base 10 is an iron plate with the diameter of 50 multiplied by 5mm, so that the vertical reinforcing rib 9 is prevented from being directly contacted with the arch; and one side of the support frame 6, which is far away from the longitudinal central line 8 of the flue, is fixedly welded with the support frame 6 and the vertical wall reinforcing steel bars 12 of the flue, so that the vertical support effect on the two sides of the support frame is realized.
S4, mounting a flue bent pipe: the flue bent pipe 6 penetrates through the flue bent pipe blank 5 and then is installed at a specified position, and the top edge of the flue bent pipe is clamped on the supporting frame 6, so that the supporting effect of the supporting frame 6 on the flue bent pipe 6 is realized.
S5, pouring concrete: and pouring the support frame 6 and the flue bent pipe 6 together to form a concrete entity to complete the support and installation of the flue bent pipe 4.
In the method, the material of the support frame is lightened, so that the material usage amount is reduced, the cost is greatly reduced, and the construction cost can be reduced by more than ten thousand yuan for each coke oven. The support frame adopted in the construction process is simple in structure and convenient to manufacture and install, the material of the support frame can be buried pipe support technical measures of a coke oven top plate and civil engineering reinforcing steel bar waste, and when the support frame is applied to other projects, the support frame can be manufactured by fully utilizing the existing material of a construction site according to local conditions, so that the purpose of saving cost is achieved. Therefore, the invention has good popularization and application prospects.
The foregoing is only a preferred embodiment of the present invention. Various modifications and equivalent changes may be made by those skilled in the art without departing from the spirit and scope of the present invention, and such modifications and changes are intended to be included within the scope of the present invention.

Claims (4)

1. A manufacturing and construction method of a coke oven flue bent pipe support frame is characterized by being implemented through the following steps:
s1, manufacturing a support frame: adopting angle steel as a longitudinal beam and a cross beam, and welding the longitudinal beam and the cross beam into a ladder-shaped support frame according to the position of a flue bent pipe, so that a plurality of flue bent pipe spaces for accommodating the flue bent pipe are formed on the support frame;
s2, mounting a support frame: after the binding of the upper layer of the steel mesh sheets of the flue top plate is finished, installing the support frame on the upper layer of the steel mesh sheets of the flue top plate according to the position of the flue bent pipe determined in advance;
s3, reinforcing the support frame: reinforcing by taking each flue bent pipe blank as a unit, arranging a vertical reinforcing rib on one side of the support frame close to the longitudinal center line of the flue, fixing the upper end of the vertical reinforcing rib on the longitudinal beam, fixing the lower end of the vertical reinforcing rib on the arch bottom template, and arranging a base between the lower end and the arch bottom template to realize vertical support of the support frame; fixing the support frame and a flue vertical wall steel bar together at one side of the support frame far away from the longitudinal center line of the flue to realize vertical support of the support frame;
s4, mounting a flue bent pipe: the flue bent pipe penetrates through a flue bent pipe blank and is installed at a specified position, and the flue bent pipe is clamped on the support frame;
s5, pouring concrete: and pouring the support frame and the flue bent pipe together to form a concrete entity to complete the support and installation of the flue bent pipe.
2. The manufacturing and construction method of the coke oven flue elbow support frame according to claim 1, characterized in that in step S1, the longitudinal beam spacing and the cross beam spacing of each flue elbow space are equal, and the spacing is larger than the diameter of the flue elbow and smaller than the diameter of the top ledge of the flue elbow.
3. The manufacturing and construction method of the coke oven flue elbow support frame as claimed in claim 1, wherein in step S1, the adopted specification of the angle steel is ≤ 50 × 5.
4. The manufacturing and construction method of the coke oven flue elbow support frame according to claim 1, characterized in that in step S2, the flue elbow position is determined by the flue longitudinal center line, and the support frame mounting position is determined by the flue elbow transverse center line.
CN202010608958.4A 2020-06-30 2020-06-30 Manufacturing and construction method of coke oven flue bent pipe support frame Withdrawn CN111607413A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010608958.4A CN111607413A (en) 2020-06-30 2020-06-30 Manufacturing and construction method of coke oven flue bent pipe support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010608958.4A CN111607413A (en) 2020-06-30 2020-06-30 Manufacturing and construction method of coke oven flue bent pipe support frame

Publications (1)

Publication Number Publication Date
CN111607413A true CN111607413A (en) 2020-09-01

Family

ID=72195556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010608958.4A Withdrawn CN111607413A (en) 2020-06-30 2020-06-30 Manufacturing and construction method of coke oven flue bent pipe support frame

Country Status (1)

Country Link
CN (1) CN111607413A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336369A (en) * 1999-05-27 2000-12-05 Kawasaki Steel Corp Structure for sealing bend pipe of coke oven
CN201011045Y (en) * 2007-03-30 2008-01-23 世仓物流设备(上海)有限公司 Primary and secondary beam of steel platform
CN101586810A (en) * 2009-06-26 2009-11-25 中国第一冶金建设有限责任公司 Secondary mounting method for construction elbow of flue opening
CN103590420A (en) * 2013-11-26 2014-02-19 山西省第五建筑工程公司 Top-formwork-erection-free construction method of coke oven base smoke dividing flue
KR20140066457A (en) * 2012-11-23 2014-06-02 주식회사 포스코 Gas exhausting apparatus and cokes manufacturing apparatus having the same
CN104004529A (en) * 2014-05-29 2014-08-27 中国五冶集团有限公司 Method for mounting coke oven flue elbow
CN104987868A (en) * 2015-07-03 2015-10-21 江苏永钢集团有限公司 Coke oven gas flue bent pipe mounting and fixing method
CN106147798A (en) * 2015-04-14 2016-11-23 五冶集团上海有限公司 Coke oven flue elbow installation method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000336369A (en) * 1999-05-27 2000-12-05 Kawasaki Steel Corp Structure for sealing bend pipe of coke oven
CN201011045Y (en) * 2007-03-30 2008-01-23 世仓物流设备(上海)有限公司 Primary and secondary beam of steel platform
CN101586810A (en) * 2009-06-26 2009-11-25 中国第一冶金建设有限责任公司 Secondary mounting method for construction elbow of flue opening
KR20140066457A (en) * 2012-11-23 2014-06-02 주식회사 포스코 Gas exhausting apparatus and cokes manufacturing apparatus having the same
CN103590420A (en) * 2013-11-26 2014-02-19 山西省第五建筑工程公司 Top-formwork-erection-free construction method of coke oven base smoke dividing flue
CN104004529A (en) * 2014-05-29 2014-08-27 中国五冶集团有限公司 Method for mounting coke oven flue elbow
CN106147798A (en) * 2015-04-14 2016-11-23 五冶集团上海有限公司 Coke oven flue elbow installation method
CN104987868A (en) * 2015-07-03 2015-10-21 江苏永钢集团有限公司 Coke oven gas flue bent pipe mounting and fixing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
方海滨: "浅谈焦炉机焦两侧烟道弯管及烟道顶板模板加固方法", 《浅谈焦炉机焦两侧烟道弯管及烟道顶板模板加固方法 *

Similar Documents

Publication Publication Date Title
JP7229368B2 (en) High-speed construction structure and method for secondary lining in excavated tunnels with various cross-sections
CN107327050B (en) Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN107965065B (en) Buckling support Combined type pre-embedded member construction method
CN109025315A (en) A kind of auxiliary device and its construction method of beam steel bar colligation
CN110847048B (en) Positioning construction method for corrugated steel web
CN206458083U (en) A kind of adjustable building template
CN210918296U (en) Square steel pipe sleeve fixing device
CN110700490B (en) Transfer floor large-span steel reinforced concrete beam and construction method
CN111607413A (en) Manufacturing and construction method of coke oven flue bent pipe support frame
CN111058619A (en) Temporary support system for post-cast strip of reinforced concrete beam plate and application method
CN205036103U (en) A push up tight reinforcing apparatus for concrete floor
CN106894344B (en) Space variable curved surface inclined tower column multilayer reinforcing steel bar mounting and positioning device and construction method thereof
CN202509530U (en) Post-cast strip water stopping steel plate combined structure of foundation bottom plate
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN213573090U (en) Accurate positioning structure of railway general contact net basis embedded bolt
CN212053745U (en) Formwork support frame for post-cast strip construction
CN210597281U (en) Bridge pile foundation in-situ binding reinforcement cage deviation control die carrier
CN211846865U (en) Device for hoisting corrugated pipe
CN210685375U (en) Quick-release formwork for cast-in-place slab strips between laminated floors
CN216881505U (en) Stand column framework installation jig frame device
CN112323835A (en) Construction method of raft plate split heads of foundation
CN206982971U (en) A kind of beam making bench
CN101913753B (en) Supporting method of large arch tyre of large and medium-size glass furnace
CN217398817U (en) Coke oven flue bent pipe mounting structure
CN219648607U (en) Reserved steel bar platform of precast box girder both sides panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200901

WW01 Invention patent application withdrawn after publication