CN111576663A - Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall - Google Patents
Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall Download PDFInfo
- Publication number
- CN111576663A CN111576663A CN202010480405.5A CN202010480405A CN111576663A CN 111576663 A CN111576663 A CN 111576663A CN 202010480405 A CN202010480405 A CN 202010480405A CN 111576663 A CN111576663 A CN 111576663A
- Authority
- CN
- China
- Prior art keywords
- heat
- connecting rod
- steel mesh
- wall
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 56
- 239000010959 steel Substances 0.000 title claims abstract description 56
- 239000000945 filler Substances 0.000 title claims description 8
- 238000009415 formwork Methods 0.000 claims abstract description 20
- 238000009413 insulation Methods 0.000 claims abstract description 17
- 238000004321 preservation Methods 0.000 claims abstract description 10
- 229920006389 polyphenyl polymer Polymers 0.000 claims description 9
- 239000010410 layer Substances 0.000 claims description 8
- 239000011241 protective layer Substances 0.000 claims description 6
- 238000003825 pressing Methods 0.000 claims description 4
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 claims description 3
- 229910002804 graphite Inorganic materials 0.000 claims description 3
- 239000010439 graphite Substances 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 239000002245 particle Substances 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 239000000853 adhesive Substances 0.000 claims description 2
- 230000001070 adhesive effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 11
- 239000002699 waste material Substances 0.000 abstract description 4
- 230000001681 protective effect Effects 0.000 description 13
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 3
- 235000017491 Bambusa tulda Nutrition 0.000 description 3
- 241001330002 Bambuseae Species 0.000 description 3
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 3
- 239000011425 bamboo Substances 0.000 description 3
- 239000003292 glue Substances 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/10—Forming or shuttering elements for general use with additional peculiarities such as surface shaping, insulating or heating, permeability to water or air
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
Abstract
The utility model provides an assembled protects mould and adds cast-in-place heat preservation infilled wall body of steel mesh, belongs to building wall body field, has solved traditional external wall and has kept warm and carry out secondary construction and influence technical problem such as construction cycle, heat-proof quality and loss waste. The solution is as follows: an assembled mould-protecting and steel mesh-adding cast-in-place heat-insulating filling wall body further comprises a steel mesh sheet arranged on the inner side of a concrete wall and a connecting piece for connecting a mould-protecting plate and the steel mesh sheet; the connecting piece includes connecting rod, chuck and fixture block, the connecting rod level sets up in the heat preservation infilled wall body, the connecting rod is close to outside one end and is equipped with the pressure disk, the fixture block is installed in the connecting rod and is close to inboard one end, the fixture block pass through steel mesh fixing device with the wire net piece is connected. The heat-insulation wall body is characterized in that the steel wire mesh sheets are fixedly connected with the formwork, and the steel wire mesh sheets are fixedly connected with the formwork through the connecting pieces.
Description
Technical Field
The invention belongs to the field of building walls, and particularly relates to an assembled type mold-protecting and steel mesh-adding cast-in-place heat-insulating filler wall.
Background
According to the direction of the national macro policy, more than 30% of assembly type buildings and the improvement of the current 75% to higher standard of building energy saving and the passive zero energy consumption are realized in 2020. The wall body is used as a main body structure of a building, and the heat insulation performance of the wall body directly determines the energy consumption level of the whole building.
At present, the traditional heat insulation mode is an aerated building block or a heat insulation building block, the mode is that the building main body concrete frame structure is completed and then secondary construction is carried out for filling in the construction process, the synchronous construction of the building main body is easily influenced, and further the construction period is influenced.
The building blocks belong to a mode of 'production, supply and pinning', are produced and cut into specified sizes in a factory, are conveyed to a construction site for on-site building, are easy to cause loss and waste and pollute the environment, and meanwhile, the building of the building blocks also breaks away from the main concept of assembly type buildings advocated by the state.
Disclosure of Invention
The invention aims to overcome the defects in the prior art, provides an assembled mould-protecting steel mesh cast-in-place heat-insulating filler wall, and solves the technical problems that the construction period, the heat-insulating property, the loss waste and the like are influenced by secondary construction of the traditional wall heat insulation.
In order to solve the problems, the technical scheme of the invention is as follows: the utility model provides an assembled protects mould and adds cast-in-place heat preservation infilled wall of steel mesh, heat preservation infilled wall is from outer to interior in proper order including protecting template and concrete wall, it includes protective layer, adhesive linkage, heat preservation and mortar layer from outer to interior in proper order to protect the template, wherein: the heat-insulation filling wall also comprises a steel wire mesh arranged on the inner side of the concrete wall and a connecting piece for connecting the heat-insulation formwork and the steel wire mesh;
the connecting piece comprises a connecting rod, a chuck and a clamping block, the connecting rod horizontally penetrates through the heat-insulation filling wall body, a pressure plate is arranged at one end, close to the outer side, of the connecting rod, a plurality of groups of clamping grooves are formed in the middle of the connecting rod, a plurality of barb-shaped frameworks are arranged in the circumferential direction of the outer side wall of the connecting rod between the pressure plate and the clamping grooves, and a plurality of barb buckles are arranged in the circumferential direction of the head portion, close to;
a bayonet with a downward opening and matched with the clamping groove is arranged at the lower part of the chuck, and a handheld part is arranged at the top of the chuck; the pressing plate is arranged on the outer side of the die protection plate, and the chuck is clamped in a clamping groove on the inner side of the die protection plate;
the fixture block is mounted at one end, close to the inner side, of the connecting rod, a mounting sleeve is arranged at one side of the fixture block, corresponding to the connecting rod, an annular clamping table matched with the barb buckle is arranged on the inner wall of the mounting sleeve, a steel mesh fixing device is arranged at the other side of the fixture block, and the fixture block is connected with the steel mesh sheet through the steel mesh fixing device;
and a plurality of groups of horizontal tie bars are arranged in the concrete wall.
Further, the steel mesh fixing device is the adapter sleeve that the level set up, adapter sleeve is close to wire net piece end both sides about both sides are equipped with the fixed turning notch of steel wire respectively, and is two sets of turning notch turns the limit opposite direction, adapter sleeve is close to wire net piece end left and right sides and is equipped with the steel wire respectively and places the notch, the steel wire group that mutually perpendicular set up in the wire net piece is located respectively in the turning notch and the placing notch.
Further, the protective layer is made of rubber powder polyphenyl particle materials, and the heat insulation layer is a molded polyphenyl plate or a graphite molded polyphenyl plate.
Further, the thickness of the concrete wall is 1/3 of the thickness of the heat-insulating filler wall.
By adopting the technical scheme, the invention has the following beneficial effects:
1. the protective formwork and the steel wire mesh are fixedly connected through the connecting piece, the protective formwork is used as an outer formwork, the functions of heat preservation and a formwork are achieved, the protective formwork is not required to be dismounted after pouring, the complex procedure of construction after the formwork is dismounted is avoided, loss and waste are avoided, and the crack resistance strength of the poured concrete is reinforced due to the arrangement of the steel wire mesh;
2. the barb-shaped framework on the connecting rod enables the connection between the connecting piece and the template protection plate to be more stable, the chuck is smoothly clamped into the clamping groove by the chuck handheld part and the clamping opening, and the connecting rod is prevented from moving left and right;
3. the fixture block left side is connected with the connecting piece through barb buckle and annular ka tai cooperation, and the fixture block right side is passed through the turning notch and is placed the notch and be connected with the wire net piece, simple structure, convenient and fast.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the construction of the connector of the present invention;
FIG. 3 is an exploded view of the connector of the present invention;
fig. 4 is a sectional view of the cartridge of the present invention.
Detailed Description
The invention is described in further detail below with reference to the figures and examples.
As shown in fig. 1 to 4, the assembled mold-protecting steel mesh cast-in-place heat-insulating infilled wall comprises a mold-protecting plate 1 and a concrete wall 2 from outside to inside, the mold-protecting plate 1 comprises a protective layer 1-1, a bonding layer 1-2, a heat-insulating layer 1-3 and a mortar layer 1-4 from outside to inside, wherein: the heat-insulation filling wall also comprises a steel wire mesh 4 arranged on the inner side of the concrete wall 2 and a connecting piece 3 for connecting the heat-insulation formwork 1 and the steel wire mesh 4;
the connecting piece 3 comprises a connecting rod 3-1, a chuck 3-2 and a fixture block 3-3, the connecting rod 3-1 horizontally penetrates through the heat-insulation filling wall body, a pressure plate 3-4 is arranged at one end, close to the outer side, of the connecting rod 3-1, a plurality of groups of clamping grooves 3-5 are arranged in the middle of the connecting rod 3-1, a plurality of barb-shaped frameworks 3-6 are arranged in the circumferential direction of the outer side wall of the connecting rod 3-1 between the pressure plate 3-4 and the clamping grooves 3-5, and a plurality of barb buckles 3-7 are arranged in the circumferential direction of the head part, close to the inner side;
a bayonet 3-2-1 with a downward opening and matched with the clamping groove 3-5 is arranged at the lower part of the chuck 3-2, and a handheld part 3-2-2 is arranged at the top of the chuck 3-2; the pressing plate 3-4 is arranged on the outer side of the die protection plate 1, the chuck 3-2 is clamped in a clamping groove 3-5 on the inner side of the die protection plate 1, and the pressing plate 3-4 and the chuck 3-2 are respectively pressed on two sides of the die protection plate 1 to fixedly connect the die protection plate 1;
the fixture block 3-3 is mounted at one end, close to the inner side, of the connecting rod 3-1, a mounting sleeve 3-3-1 is arranged on one side, corresponding to the connecting rod 3-1, of the fixture block 3-3, an annular clamping table 3-3-2 matched with the barb buckle 3-7 is arranged on the inner wall of the mounting sleeve 3-3-1, a steel mesh fixing device is arranged on the other side of the fixture block 3-3, and the fixture block 3-3 is connected with the steel wire mesh sheet 4 through the steel mesh fixing device;
and a plurality of groups of horizontal tie bars are arranged in the concrete wall 2, and the heat-insulating filler wall body is connected and fixed with the shear wall of the building main body through the tie bars.
Further, the steel mesh fixing device is a connecting sleeve 3-3-3 which is horizontally arranged, the upper side and the lower side of the end, close to the steel wire mesh, of the connecting sleeve 3-3-3 are respectively provided with a corner notch 3-3-4 for fixing a steel wire, the turning directions of the two groups of corner notches 3-3-4 are opposite, the left side and the right side of the end, close to the steel wire mesh, of the connecting sleeve 3-3-4 are respectively provided with a steel wire placing notch 3-3-5, and steel wire groups which are vertically arranged in the steel wire mesh 4 are respectively arranged in the corner notch 3-3-4 and the placing notch 3-3-5.
Further, the protective layer 1-1 is made of rubber powder polyphenyl particle materials, and the heat insulation layer 1-3 is made of molded polyphenyl boards or graphite molded polyphenyl boards.
Further, the thickness of the concrete wall 2 is 1/3 of the thickness of the heat-insulating filler wall.
After the protective template 1 is arranged at a fixed position, the head of a connecting rod 3-1 of a connecting piece 3 is inserted into the protective template 1 from outside to inside, after the protective template 1 is compressed by a pressure plate 3-4, a bayonet 3-2-1 of a chuck 3-2 is inserted into a clamping groove 3-5 of the connecting rod 3-1, the protective template 1 is fixed by the pressure plate 3-4 and the chuck 3-2, the fixing of the connecting rod 3-1 and the protective template 1 is reinforced by the arrangement of a barb-shaped framework 3-6, an annular clamping table 3-3-2 in an installation sleeve 3-3-1 at one side of a clamping block 3-3 is matched and fixed with a barb buckle 3-7, and steel wire groups which are vertically arranged in a steel wire mesh 4 are respectively arranged at a corner notch 3-3-4 and a placement notch 3-3-5, the connection between the protective formwork 1 and the steel wire mesh 4 is completed.
The protective formwork 1 plays a role of an outer side formwork, the bamboo glue formwork is arranged at the end of the inner side of the clamping block 3-3, the protective formwork 1 and the bamboo glue formwork are fixedly connected through the primary and secondary edges and the split bolts, then concrete pouring is carried out, after concrete is poured for 24 hours, the split bolt groups, the primary and secondary edges and the bamboo glue formwork are removed, the protective formwork 1 and the concrete wall 2 are left to form an integrated structure, and then the cast-in-place heat preservation filling wall with the protective formwork and the steel mesh is completed.
Claims (4)
1. The utility model provides an assembled protects mould and adds cast-in-place heat preservation infilled wall of steel mesh, heat preservation infilled wall is from outer to interior including protecting template (1) and concrete wall (2) in proper order, protect template (1) from outer to interior including protective layer (1-1), adhesive linkage (1-2), heat preservation (1-3) and mortar layer (1-4) in proper order, its characterized in that: the heat-insulation filling wall also comprises a steel wire mesh (4) arranged on the inner side of the concrete wall (2) and a connecting piece (3) for connecting the heat-insulation formwork (1) and the steel wire mesh (4);
the connecting piece (3) comprises a connecting rod (3-1), a chuck (3-2) and a clamping block (3-3), the connecting rod (3-1) horizontally penetrates through the heat-insulation filling wall body, a pressure plate (3-4) is arranged at one end, close to the outer side, of the connecting rod (3-1), a plurality of groups of clamping grooves (3-5) are formed in the middle of the connecting rod (3-1), a plurality of barb-shaped frameworks (3-6) are arranged in the circumferential direction of the outer side wall of the connecting rod (3-1) between the pressure plate (3-4) and the clamping grooves (3-5), and a plurality of barb buckles (3-7) are arranged in the circumferential direction of the head portion, close to the inner side;
a bayonet (3-2-1) with a downward opening and matched with the clamping groove (3-5) is arranged at the lower part of the chuck (3-2), and a handheld part (3-2-2) is arranged at the top of the chuck (3-2); the pressing plate (3-4) is arranged on the outer side of the die protection plate (1), and the chuck (3-2) is clamped at a clamping groove (3-5) on the inner side of the die protection plate (1);
the fixture block (3-3) is mounted at one end, close to the inner side, of the connecting rod (3-1), a mounting sleeve (3-3-1) is arranged at one side, corresponding to the connecting rod (3-1), of the fixture block (3-3), an annular clamping table (3-3-2) matched with the barb buckle (3-7) is arranged on the inner wall of the mounting sleeve (3-3-1), a steel mesh fixing device is arranged at the other side of the fixture block (3-3), and the fixture block (3-3) is connected with the steel mesh sheet (4) through the steel mesh fixing device;
a plurality of groups of horizontal tie bars are arranged in the concrete wall (2).
2. The assembly type mold-protecting steel mesh cast-in-place heat-insulating filling wall body as claimed in claim 1, wherein: the steel mesh fixing device is a connecting sleeve (3-3-3) horizontally arranged, the upper side and the lower side of the end, close to the steel wire mesh, of the connecting sleeve (3-3-3) are respectively provided with a corner notch (3-3-4) for fixing a steel wire, the turning directions of the two groups of corner notches (3-3-4) are opposite, the left side and the right side of the end, close to the steel wire mesh, of the connecting sleeve (3-3-3) are respectively provided with a steel wire placing notch (3-3-5), and steel wire groups vertically arranged in the steel wire mesh (4) are respectively arranged in the corner notch (3-3-4) and the placing notch (3-3-5).
3. The assembly type mold-protecting steel mesh cast-in-place heat-insulating filling wall body as claimed in claim 1, wherein: the protective layer (1-1) is made of rubber powder polyphenyl particle materials, and the heat insulation layer (1-3) is a molded polyphenyl board or a graphite molded polyphenyl board.
4. The assembly type mold-protecting steel mesh cast-in-place heat-insulating filling wall body as claimed in claim 1, wherein: the thickness of the concrete wall (2) is 1/3 of the thickness of the heat-insulating filler wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010480405.5A CN111576663B (en) | 2020-05-30 | 2020-05-30 | Cast-in-situ heat preservation filling wall with assembled form protection and steel net |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010480405.5A CN111576663B (en) | 2020-05-30 | 2020-05-30 | Cast-in-situ heat preservation filling wall with assembled form protection and steel net |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111576663A true CN111576663A (en) | 2020-08-25 |
CN111576663B CN111576663B (en) | 2024-08-09 |
Family
ID=72119715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010480405.5A Active CN111576663B (en) | 2020-05-30 | 2020-05-30 | Cast-in-situ heat preservation filling wall with assembled form protection and steel net |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111576663B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112377678A (en) * | 2020-09-30 | 2021-02-19 | 济南城建集团有限公司 | Connecting structure and fixing method for fixing underground pipe gallery pipeline |
CN112411779A (en) * | 2020-12-11 | 2021-02-26 | 君道元通(北京)节能科技有限公司 | Self-locking built-in heat preservation structure connecting rod |
CN112575931A (en) * | 2020-12-02 | 2021-03-30 | 山东赛昌新型材料有限公司 | Connecting piece, heat-preservation external formwork cast-in-place concrete wall and wall construction method |
CN113338460A (en) * | 2021-06-22 | 2021-09-03 | 山东智胜节能建材有限公司 | Positioning anchoring reinforcing steel mesh built-in heat preservation system |
CN113565223A (en) * | 2021-08-28 | 2021-10-29 | 大城县鑫源保温建材有限公司 | Cast-in-place wall body embeds spacing connecting piece of heat preservation system |
CN115306058A (en) * | 2022-09-13 | 2022-11-08 | 中交第四公路工程局有限公司 | Disassembly-free heat preservation template and installation method |
CN117779963A (en) * | 2023-12-26 | 2024-03-29 | 唐山伟基建材有限公司 | High-strength heat-insulation connecting piece |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203891229U (en) * | 2014-06-05 | 2014-10-22 | 赵世柱 | Internal and external wall integrated lateral pulling thermal insulation formwork with decorative faces |
CN105113706A (en) * | 2015-09-01 | 2015-12-02 | 肖宁海 | Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method |
WO2017219920A1 (en) * | 2016-06-24 | 2017-12-28 | 东南大学 | Building based on large-space structure body and freestanding type external envelope structure, and construction method |
CN207032854U (en) * | 2017-06-06 | 2018-02-23 | 刘海叶 | One kind building self-heat conserving template |
CN108915128A (en) * | 2018-08-08 | 2018-11-30 | 陈红庆 | A kind of modeling rack heat-preserving wall and construction method |
CN212772949U (en) * | 2020-05-30 | 2021-03-23 | 长治市潞鑫源新型墙体建材有限公司 | Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall |
-
2020
- 2020-05-30 CN CN202010480405.5A patent/CN111576663B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203891229U (en) * | 2014-06-05 | 2014-10-22 | 赵世柱 | Internal and external wall integrated lateral pulling thermal insulation formwork with decorative faces |
CN105113706A (en) * | 2015-09-01 | 2015-12-02 | 肖宁海 | Reinforced truss gypsum plate with insulation layer, novel dismantling-free formwork and their construction method |
WO2017219920A1 (en) * | 2016-06-24 | 2017-12-28 | 东南大学 | Building based on large-space structure body and freestanding type external envelope structure, and construction method |
CN207032854U (en) * | 2017-06-06 | 2018-02-23 | 刘海叶 | One kind building self-heat conserving template |
CN108915128A (en) * | 2018-08-08 | 2018-11-30 | 陈红庆 | A kind of modeling rack heat-preserving wall and construction method |
CN212772949U (en) * | 2020-05-30 | 2021-03-23 | 长治市潞鑫源新型墙体建材有限公司 | Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112377678A (en) * | 2020-09-30 | 2021-02-19 | 济南城建集团有限公司 | Connecting structure and fixing method for fixing underground pipe gallery pipeline |
CN112575931A (en) * | 2020-12-02 | 2021-03-30 | 山东赛昌新型材料有限公司 | Connecting piece, heat-preservation external formwork cast-in-place concrete wall and wall construction method |
CN112411779A (en) * | 2020-12-11 | 2021-02-26 | 君道元通(北京)节能科技有限公司 | Self-locking built-in heat preservation structure connecting rod |
CN113338460A (en) * | 2021-06-22 | 2021-09-03 | 山东智胜节能建材有限公司 | Positioning anchoring reinforcing steel mesh built-in heat preservation system |
CN113565223A (en) * | 2021-08-28 | 2021-10-29 | 大城县鑫源保温建材有限公司 | Cast-in-place wall body embeds spacing connecting piece of heat preservation system |
CN115306058A (en) * | 2022-09-13 | 2022-11-08 | 中交第四公路工程局有限公司 | Disassembly-free heat preservation template and installation method |
CN117779963A (en) * | 2023-12-26 | 2024-03-29 | 唐山伟基建材有限公司 | High-strength heat-insulation connecting piece |
Also Published As
Publication number | Publication date |
---|---|
CN111576663B (en) | 2024-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111576663A (en) | Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall | |
CN110748075B (en) | Composite internal partition board for fabricated building and preparation method thereof | |
CN212772949U (en) | Assembly type mold-protecting steel mesh-adding cast-in-place heat-insulating filler wall | |
CN208343121U (en) | Prefabricated assembled steel structure concrete wallboard mould | |
CN211279058U (en) | Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting | |
CN201553566U (en) | Assembled tower crane adhering device | |
CN214883834U (en) | Novel combination beam and retaining wall connected node structure | |
CN204894178U (en) | Bolt fast -assembling brickmaking mould | |
CN210828060U (en) | Bamboo-ice combined structure beam and bamboo-ice combined structure wall | |
CN112609982A (en) | Method for manufacturing wall with heat-insulation plate by adopting energy-saving bolt | |
CN108867942B (en) | Building outer wall dismantling-free template and preparation method thereof | |
CN107989224B (en) | Connecting mechanism for wall corner of assembled house and construction process of connecting mechanism | |
CN112780022A (en) | Shear wall disassembly-free template and production method thereof | |
CN208363277U (en) | A kind of single building wall board connection system of board-like assembled | |
CN206844536U (en) | Stone material cellular compound plate | |
CN208763393U (en) | A kind of template component | |
CN110878600A (en) | Desulfurized gypsum based composite light wallboard and splicing method thereof | |
CN218952784U (en) | Building template structure | |
CN221760983U (en) | Composite fireproof external wall insulation board with dismantling-free template | |
CN214995919U (en) | Aluminum profile aluminum template convenient to disassemble and used for building | |
CN219508909U (en) | Large glass fiber reinforced plastic plate modularized building structure | |
CN104563278B (en) | Insulating layer wall layer integrated molding building and its manufacturing method | |
CN210888039U (en) | Green type aluminum mould board for building | |
CN219863644U (en) | Solid waste-based cementing material foaming cement wallboard containing FRP | |
CN219973630U (en) | Cast-in-place slab band reinforcement of assembled superimposed sheet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |