CN111576157A - 一种快捷绿色的临建场地硬化方法 - Google Patents
一种快捷绿色的临建场地硬化方法 Download PDFInfo
- Publication number
- CN111576157A CN111576157A CN202010451399.0A CN202010451399A CN111576157A CN 111576157 A CN111576157 A CN 111576157A CN 202010451399 A CN202010451399 A CN 202010451399A CN 111576157 A CN111576157 A CN 111576157A
- Authority
- CN
- China
- Prior art keywords
- green
- hardening
- hardening method
- paving
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C21/00—Apparatus or processes for surface soil stabilisation for road building or like purposes, e.g. mixing local aggregate with binder
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
一种快捷绿色的临建场地硬化方法,它涉及一种临建场地硬化方法,具体涉及一种快捷绿色的临建场地硬化方法。本发明为了解决现有场地硬化施工工期较长、施工成本较高、建筑垃圾较多的问题。本发明的具体步骤如下:步骤一、完成预制混凝土铺装板的铺制;步骤二、加工焊制起吊框架运输车;步骤三、完成场地硬化铺装。本发明属于建筑工程领域。
Description
技术领域
本发明涉及一种临建场地硬化方法,具体涉及一种快捷绿色的临建场地硬化方法,属于建筑工程领域。
背景技术
公路施工具有线路长、距离城市远的特点,因此施工人员需要自行组织项目驻地、拌和站及预制梁场等临时设施的建设。根据标准化建设的要求,场地硬化需采用混凝土材料进行浇筑硬化,以便达到晴天无扬尘,雨天不泥泞的要求。常规的场地硬化是在整平压实后的地面上进行立模浇筑。此种常规的场地硬化方法为一次性使用,为满足临时占地用后复垦的要求,需要对混凝土浇筑的场地进行破坏性拆除,产生大量建筑垃圾,不仅在费用上造成浪费,同时建筑垃圾填埋也是对环境的破坏。针对上述问题,研究一种快捷绿色的场地硬化方法是很符合实际需要的。
发明内容
本发明为解决现有场地硬化施工工期较长、施工成本较高、建筑垃圾较多的问题,进而提出一种快捷绿色的临建场地硬化方法。
本发明为解决上述问题采取的技术方案是:本发明的具体步骤如下:
步骤一、完成预制混凝土铺装板的铺制;
步骤二、加工焊制起吊框架运输车;
步骤三、完成场地硬化铺装。
进一步的,步骤一中预制混凝土铺装板的混凝土抗弯拉强度不小于4.5Mpa。
进一步的,步骤一中预制混凝土铺装板的预埋吊环与板内的钢筋网片相连接,预埋吊环采用未经冷拉的热轧光圆钢筋制作;采用角钢对预制混凝土铺装板的混凝土边角进行保护,护边角钢嵌入在混凝土表面,为保证护边角钢在使用中不易脱落,在角钢内侧焊接L型的钢筋构件。
进一步的,步骤一中浇筑混凝土时保证吊环处凹槽的预留,完成浇筑后进行压光、拉毛及养生工作。
进一步的,步骤二中起吊框架运输车的框架采用矩形方钢焊制;工字钢与框架上部的方钢相焊接,用作电葫芦提升机的轨道梁;框架底部安装四个万向轮,万向轮的布置满足对角位置上的万向轮距离不大于预制混凝土铺装板的短边长度。
本发明的有益效果是:本发明可明显缩短场地硬化施工工期,无需混凝土养生时间。预制拼装硬化板铺装完成后即可开放使用;本发明降低场地硬化成本。预制拼装硬化板可以重复利用,一次预制完成后可多次转场使用,非一次性投入;本发明铺装和拆除方式灵活,无需配备大型吊装设备;本发明临建场地恢复时拆除速度快,同时还可以有效减少建筑垃圾产生;本发明主要用于临建场地硬化,从而使临建场地硬化施工变得高效、绿色、环保;本发明的施工速度可提高2-3倍,人员成本可减少50%以上,场地硬化材料周转使用可达到90%以上。
附图说明
图1是场地硬化铺装操作示意图;
图2是预制混凝土铺装板块样式图;
图3是预制混凝土铺装板俯视图;
图4是预制混凝土铺装板内部钢筋布置图;
图5是预制混凝土铺装板剖视图;
图6是起吊框架运输车侧视图;
图7是起吊框架运输车正面示意图。
具体实施方式
具体实施方式一:结合图1至图7说明本实施方式,本实施方式所述一种快捷绿色的临建场地硬化方法的具体步骤如下:
步骤一、完成预制混凝土铺装板1的铺制;
步骤二、加工焊制起吊框架运输车2;
步骤三、完成场地硬化铺装。
本实施方式中的步骤三中完成原地面平整压实后,铺设中砂找平层,中砂找平层应具有良好的平整度,以保证铺装的混凝土板无翘起,无脱空。大面积中砂找平层找平可以利用“滚杠法”进行,该方法是借助钢管在既定标高的轨道上滚动,利用延伸至轨道外侧的钢管对中砂找平层的滚压来实现平面的平整(高削低补)。轨道采用常见的槽钢,将两条平行的槽钢调整至既定标高平放即可。该做法的好处在于倒运轨道不会对已经平整过的中砂找平层造成破坏,以保证中砂找平层的质量及连续性。预制混凝土铺装板的安装。将预制混凝土铺装板集中卸放在需硬化场地的边缘,利用起吊框架运输车装载混凝土铺装板,利用电葫芦提升机铺装混凝土板,混凝土板落定后,利用细粒米石填充吊环处的预留槽,起吊框架运输车在铺装完的混凝土板上往复装载、铺装及填充米石等作业环节。拆除硬化场地时,清理预留槽填充的米石,逆向操作铺装程序即可。
具体实施方式二:结合图1至图7说明本实施方式,本实施方式所述一种快捷绿色的临建场地硬化方法的步骤一中预制混凝土铺装板1的混凝土抗弯拉强度不小于4.5Mpa。
具体实施方式三:结合图1至图7说明本实施方式,本实施方式所述一种快捷绿色的临建场地硬化方法的步骤一中预制混凝土铺装板1的预埋吊环1-1与板内的钢筋网片1-3相连接,预埋吊环1-1采用未经冷拉的热轧光圆钢筋制作;采用角钢1-2对预制混凝土铺装板1的混凝土边角进行保护,护边角钢1-2嵌入在混凝土表面,为保证护边角钢在使用中不易脱落,在角钢内侧焊接L型的钢筋构件。
如此设置,保证护边角钢的牢固性,如此设置是因为本方法中混凝土铺装板是可重复利用的周转材料,防止在使用及运输周转途中出现啃边,掉角等破损现象的发生。
具体实施方式四:结合图1至图7说明本实施方式,本实施方式所述一种快捷绿色的临建场地硬化方法的步骤一中浇筑混凝土时保证吊环1-1处凹槽的预留,完成浇筑后进行压光、拉毛及养生工作。
具体实施方式五:结合图1至图7说明本实施方式,本实施方式所述一种快捷绿色的临建场地硬化方法的步骤二中起吊框架运输车2的框架2-1采用矩形方钢焊制;工字钢与框架2-1上部的方钢相焊接,用作电葫芦提升机2-2的轨道梁2-3;框架2-1底部安装四个万向轮2-4,万向轮2-4的布置满足对角位置上的万向轮2-4距离不大于预制混凝土铺装板1的短边长度。
便于满足在铺装初期框架运输车能够在单块铺装板上自有旋转,改变铺筑行进方向。
工作原理
本发明将场地硬化所需的混凝土面板按照一定尺寸分块进行预制并埋设吊环,预制块的尺寸需要满足社会常规运输车辆的尺寸,同时在预制板内布设钢筋网片满足板在使用过程中的受力特点,板块顶面边角利用角钢保护,防止在周转过程中的损坏。安装过程采用“滚杠法”对铺装板下层的中砂找平层进行找平作业,采用型钢加工起吊框架运输车,利用便捷的运输吊装框架在场内进行预制板块的铺装或拆除。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容做出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案内容,依据本发明的技术实质,在本发明的精神和原则之内,对以上实施例所作的任何简单的修改、等同替换与改进等,均仍属于本发明技术方案的保护范围之内。
Claims (5)
1.一种快捷绿色的临建场地硬化方法,其特征在于:所述一种快捷绿色的临建场地硬化方法的具体步骤如下:
步骤一、完成预制混凝土铺装板(1)的铺制;
步骤二、加工焊制起吊框架运输车(2);
步骤三、完成场地硬化铺装。
2.根据权利要求1所述一种快捷绿色的临建场地硬化方法,其特征在于:步骤一中预制混凝土铺装板(1)的混凝土抗弯拉强度不小于4.5Mpa。
3.根据权利要求1所述一种快捷绿色的临建场地硬化方法,其特征在于:步骤一中预制混凝土铺装板(1)的预埋吊环(1-1)与板内的钢筋网片(1-3)相连接,预埋吊环(1-1)采用未经冷拉的热轧光圆钢筋制作;采用角钢(1-2)对预制混凝土铺装板(1)的混凝土边角进行保护,护边角钢(1-2)嵌入在混凝土表面,为保证护边角钢在使用中不易脱落,在角钢内侧焊接L型的钢筋构件。
4.根据权利要求1所述一种快捷绿色的临建场地硬化方法,其特征在于:步骤一中浇筑混凝土时保证吊环(1-1)处凹槽的预留,完成浇筑后进行压光、拉毛及养生工作。
5.根据权利要求1所述一种快捷绿色的临建场地硬化方法,其特征在于:步骤二中起吊框架运输车(2)的框架(2-1)采用矩形方钢焊制;工字钢与框架(2-1)上部的方钢相焊接,用作电葫芦提升机(2-2)的轨道梁(2-3);框架(2-1)底部安装四个万向轮(2-4),万向轮(2-4)的布置满足对角位置上的万向轮(2-4)距离不大于预制混凝土铺装板(1)的短边长度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010451399.0A CN111576157A (zh) | 2020-05-25 | 2020-05-25 | 一种快捷绿色的临建场地硬化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010451399.0A CN111576157A (zh) | 2020-05-25 | 2020-05-25 | 一种快捷绿色的临建场地硬化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111576157A true CN111576157A (zh) | 2020-08-25 |
Family
ID=72123380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010451399.0A Withdrawn CN111576157A (zh) | 2020-05-25 | 2020-05-25 | 一种快捷绿色的临建场地硬化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111576157A (zh) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2932600A1 (de) * | 1979-08-10 | 1981-02-26 | Welz Hans Joachim Dipl Ing | Transportables bauelement |
JPH0571102A (ja) * | 1991-04-12 | 1993-03-23 | Three Bond Co Ltd | 道路用ブロツク |
CN203684028U (zh) * | 2014-01-17 | 2014-07-02 | 北京歌婓工程技术有限公司 | 一种用于临时场地、临时道路的预制板 |
CN206189229U (zh) * | 2016-11-22 | 2017-05-24 | 北京市地质工程公司 | 一种可拼装的预制板道路 |
CN107165020A (zh) * | 2017-05-23 | 2017-09-15 | 中冶建工集团有限公司 | 一种拼装式临建地坪的施工方法 |
CN206706484U (zh) * | 2017-02-28 | 2017-12-05 | 中建一局集团建设发展有限公司 | 模数化可循环的预制硬装地面板 |
CN206886560U (zh) * | 2017-06-05 | 2018-01-16 | 广州北环高速公路有限公司 | 一种水泥路面预制拼装装置 |
KR101879791B1 (ko) * | 2018-01-04 | 2018-07-18 | 주식회사 포유텍 | 가변형 조립식 복공판 |
CN109183550A (zh) * | 2018-10-09 | 2019-01-11 | 中建四局第六建筑工程有限公司 | 一种快捷可周转临时路铺设方法 |
CN110725174A (zh) * | 2019-10-29 | 2020-01-24 | 中交一公局集团有限公司 | 装配式便道施工方法 |
-
2020
- 2020-05-25 CN CN202010451399.0A patent/CN111576157A/zh not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2932600A1 (de) * | 1979-08-10 | 1981-02-26 | Welz Hans Joachim Dipl Ing | Transportables bauelement |
JPH0571102A (ja) * | 1991-04-12 | 1993-03-23 | Three Bond Co Ltd | 道路用ブロツク |
CN203684028U (zh) * | 2014-01-17 | 2014-07-02 | 北京歌婓工程技术有限公司 | 一种用于临时场地、临时道路的预制板 |
CN206189229U (zh) * | 2016-11-22 | 2017-05-24 | 北京市地质工程公司 | 一种可拼装的预制板道路 |
CN206706484U (zh) * | 2017-02-28 | 2017-12-05 | 中建一局集团建设发展有限公司 | 模数化可循环的预制硬装地面板 |
CN107165020A (zh) * | 2017-05-23 | 2017-09-15 | 中冶建工集团有限公司 | 一种拼装式临建地坪的施工方法 |
CN206886560U (zh) * | 2017-06-05 | 2018-01-16 | 广州北环高速公路有限公司 | 一种水泥路面预制拼装装置 |
KR101879791B1 (ko) * | 2018-01-04 | 2018-07-18 | 주식회사 포유텍 | 가변형 조립식 복공판 |
CN109183550A (zh) * | 2018-10-09 | 2019-01-11 | 中建四局第六建筑工程有限公司 | 一种快捷可周转临时路铺设方法 |
CN110725174A (zh) * | 2019-10-29 | 2020-01-24 | 中交一公局集团有限公司 | 装配式便道施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG181210A1 (en) | Reusable paving slab for temporary road andmethod for paving temporary road with the same | |
CN107542268A (zh) | 一种大剧院室内舞台钢结构的逆向安装施工方法 | |
CN111764216A (zh) | 一种装配式混凝土道路板施工方法及应用 | |
CN102747735A (zh) | 一种深基坑混凝土支护排桩异常变形的处理方法 | |
CN113774972B (zh) | 一种柱下独立基础超载冲切破坏的加固方法 | |
CN108374297A (zh) | 营业线隧道、桥梁段混凝土轨枕抽换方法 | |
CN109355983B (zh) | 一种城市轨道的无轨施工方法 | |
CN114032724A (zh) | 一种装配式再生混凝土乡村路面 | |
CN112127216B (zh) | 一种预制装配式沥青基板式无砟轨道及其施工方法 | |
EP4350074A1 (en) | Prefabricated track structure for built-in pump house section in rail transportation and construction method | |
CN109083442B (zh) | 既有建筑与新建基础对接时动荷载承载结构的施工方法 | |
CN111576157A (zh) | 一种快捷绿色的临建场地硬化方法 | |
CN210288002U (zh) | 一种可重复利用临时施工道 | |
CN106884366A (zh) | 一种装配式道路及其施工方法 | |
CN217810304U (zh) | 一种多功能道路施工预制板 | |
CN215104290U (zh) | 一种预制板式无砟轨道结构 | |
CN109811613A (zh) | 一种临时地面设施及其一体化施工方法 | |
CN206346525U (zh) | 地铁车辆移动式架车机和检修地沟联合结构 | |
CN112609966B (zh) | 一种利用简易格构柱叠合板体系构筑超厚混凝土顶板的施工方法 | |
CN114059414A (zh) | 一种适用于冻土区架空叠合式场道结构及施工方法 | |
CN109440572B (zh) | 一种预制板铺设煤矿坑中临建道路的施工方法 | |
CN112323548A (zh) | 一种有轨电车市政路口道床板施工方法 | |
CN217536556U (zh) | 一种可循环使用的装配式施工地坪 | |
CN112281561B (zh) | 一种重载高寿命公路结构及施工方法 | |
CN113622254B (zh) | 重载临用预制钢筋混凝土道路板的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20200825 |
|
WW01 | Invention patent application withdrawn after publication |