CN111571822A - Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater - Google Patents
Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater Download PDFInfo
- Publication number
- CN111571822A CN111571822A CN202010458295.2A CN202010458295A CN111571822A CN 111571822 A CN111571822 A CN 111571822A CN 202010458295 A CN202010458295 A CN 202010458295A CN 111571822 A CN111571822 A CN 111571822A
- Authority
- CN
- China
- Prior art keywords
- leveling
- rod
- shaft
- fixedly connected
- storage tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
- B28D1/146—Tools therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
The invention discloses a simulated balance leveling water heater water storage tank installation pre-punching positioning auxiliary device and a method, and relates to the technical field of water heater installation. This water heater water storage tank installation of simulation balance leveling location assistor of punching in advance, including three angular frame, the antiskid cover has been cup jointed on three angular frame's the bottom, and three department of buckling of three angular frame all pegs graft and have the sucking disc, three positive middle part fixed mounting of angular frame has leveling mechanism, and the left and right sides at leveling mechanism top is respectively through the left and right sides fixed connection of connecting block and fixture bottom, fixture's middle part is provided with manual tension mechanism. This water heater water storage tank installation of simulation balance leveling is location assistor in advance punches through setting up leveling mechanism, can effectively fix a position water flat line on the wall to guarantee that the hole site of location all is located same water flat line on the wall, solved and lacked the problem that is applicable to ordinary house ornamentation personnel installation water heater water storage tank location assistor in advance punches among the prior art.
Description
The application is a divisional application of a water heater water storage tank with a leveling analog balance, wherein the application date is 2018, 07, 19 and the application number is CN201810798882.9, and the water heater water storage tank is provided with a pre-punching positioning auxiliary device.
Technical Field
The invention relates to the technical field of water heater installation, in particular to an auxiliary device and a method for simulating balance leveling water heater water storage tank installation pre-punching positioning.
Background
The traditional solar water heater is basically installed on the roof of the residential building, the number of the floors of the residential building is increased with the improvement of the building construction technology, therefore, the installation mode of the solar water heater installed on the roof is not suitable for the current residential buildings, the current solar water heater is changed to be installed on the balcony of the residential home, the water storage tank is hung on the wall surface by punching the wall surface in advance and inserting the expansion screw, when the hole is punched in advance, ordinary home decoration personnel need to spend a great deal of time for positioning the hole site, if the hole sites are not in the same horizontal line, the situation that the water storage tank is inclined when the water storage tank is installed subsequently can be caused, the installation stability of the water storage tank is influenced, meanwhile, certain potential safety hazards exist, home decoration teachers who have a good punching experience are low in occupation ratio of home decoration staff, and a water storage tank of the water heater is not provided with a pre-punching auxiliary device suitable for common home decoration staff in the prior art.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a simulated balance leveling water heater water storage tank installation pre-punching positioning assistor and a method thereof, and solves the problem that the prior art lacks a water heater water storage tank installation pre-punching assistor suitable for common home decoration personnel.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides an installation of simulation balance leveling water heater water storage tank location assistor that punches in advance and method, includes three corner frames, cup joint the antiskid cover on three buckling positions of three corner frames, and all peg graft and have the sucking disc, the positive middle part fixed mounting of three corner frames has leveling mechanism, and the left and right sides at leveling mechanism top is respectively through the left and right sides fixed connection of connecting block with the fixture bottom, fixture's middle part is provided with manual tension mechanism.
Preferably, the leveling mechanism comprises a fixing strip, a fixing piece, a rotating shaft, a lantern ring, an anti-falling block, an opening, a balancing weight, a pointer, a leveling rod, a reference picture, a first pin shaft, a first connecting rod, a connecting shaft, a connecting sheet, a second connecting rod, a groove, a second pin shaft, a threaded rod and a leveling nut.
Preferably, the left end and the right end of the back of the fixing strip are respectively fixedly connected to the left side and the right side of the front of the triangular frame, the middle of the top of the fixing strip is fixedly connected with a fixing piece, the front top of the fixing piece is movably connected with the rear end of a rotating shaft, the front end of the rotating shaft is sleeved with a lantern ring, the front end of the rotating shaft is fixedly connected with an anti-falling block, an opening is formed in the front of the fixing piece, the opening is formed in the fixing strip and penetrates through the upper side and the lower side of the fixing strip, the bottom of the lantern ring is fixedly connected with a balancing weight, one end, opposite to the balancing weight, of the lantern ring penetrates through the opening and extends to the lower side of the opening, one side, opposite to the balancing weight, of the lantern ring is fixedly connected with a pointer, the middle of a leveling rod is sleeved on the rotating shaft, the middle of the top of, the connecting shaft is inserted into one end, far away from the first pin shaft, of the first connecting rod in an inserting mode, connecting pieces are fixedly connected to the front end and the rear end of the connecting shaft in a penetrating mode, one end of a second connecting rod is connected to the connecting shaft in a sleeved mode, a groove is formed in the lower portion of the second connecting rod, the front side and the rear side of the inner wall of the groove are movably connected with the front end and the rear end of the second pin shaft respectively, one end, far away from the connecting shaft, of the second connecting rod is connected to the second pin shaft in a sleeved mode, threaded rods are fixedly connected to the left end and the right.
Preferably, the clamping mechanism comprises a fixing plate, a rolling shaft, a roller, a clamping plate, an anti-falling rubber sheet, a fixing piece, a stabilizing rod and a return spring.
Preferably, the bottom of the fixed plate is fixedly connected with the top of the connecting block, the front surface of the fixed plate is movably connected with an idler wheel through a rolling shaft, the top of the idler wheel is connected with the front side of the bottom of the clamping plate in a sliding way, the rear side of the bottom of the clamping plate is connected with the top of the fixed plate in a sliding way, the inner right wall of the clamping plate is fixedly connected with an anti-drop rubber sheet, the bottom of the anti-falling rubber sheet is fixedly connected to the inner bottom of the clamping plate, the right side of the bottom of the clamping plate is fixedly connected with a fixing piece, and the left side of the fixing piece is fixedly connected with two stabilizer bars, one ends of the two stabilizer bars opposite to the fixing piece are inserted in the fixing plate, and the two stabilizer bars are respectively sleeved with a return spring, the left end and the right end of each return spring are respectively and fixedly connected with the opposite sides of the fixed plate and the fixed part, and the opposite sides of the two fixed plates are respectively and fixedly connected with the left side and the right side of the connecting plate.
Preferably, the manual stretching mechanism comprises a supporting sheet, a third pin shaft, a rotating rod, a fourth pin shaft, an inclined rod, a fixed shaft, a linkage block, a pull ring and a connecting piece.
Preferably, the bottom of the supporting sheet is fixedly connected to the top of the connecting plate, a third pin shaft is inserted into the top end of the supporting sheet, the middle of the rotating rod is sleeved on the third pin shaft, fourth pin shafts are inserted into the left end and the right end of the rotating rod, two opposite ends of the two inclined rods are sleeved on the fourth pin shafts respectively, a fixed shaft is inserted into one end, away from the fourth pin shaft, of each inclined rod, the rear end of the fixed shaft is movably connected with the front of the linkage block, a pull ring is fixedly connected to the right side of the linkage block, the bottom of the linkage block is fixedly connected with the top of the connecting piece, and the bottom of the connecting piece is fixedly connected with the top of the clamping plate.
Preferably, the top of the front surface of the reference sheet is provided with scale marks, and the scale marks in the middle of the reference sheet are perpendicular to the ground plane.
(III) advantageous effects
The invention provides a simulated balance leveling water heater water storage tank installation pre-punching positioning auxiliary device and a method. The method has the following beneficial effects:
(1) the water storage tank installation pre-punching positioning assistor comprises a triangular frame, a leveling mechanism is arranged on the triangular frame, a horizontal line can be effectively positioned on the wall surface, and the hole sites positioned on the wall surface can be ensured to be positioned on the same horizontal line through the confirmation of the horizontal line, so that common home decoration personnel can quickly position the installation hole sites of the water storage tank, the installation efficiency of the water storage tank of the water heater is greatly improved, the condition that a large amount of time is consumed when the home decoration personnel with rich experience are dispatched is avoided, and the problem that the water storage tank pre-punching positioning assistor suitable for the common home decoration personnel to install the water storage tank in the prior art is lacked is solved.
(2) The balance weight is arranged in the leveling mechanism, so that the triangular frame can be fixed on a wall surface through a sucking disc, the triangular frame cannot be ensured to be in a horizontal state due to manual installation, the balance weight deviates when being vertical to a ground plane due to large gravity and drives the pointer to synchronously swing by taking the rotating shaft as an axis, and meanwhile, the leveling rod drives the reference picture to swing by taking the rotating shaft as the axis through the matching arrangement of the leveling rod, so that the horizontal line where the leveling rod is located is determined to be parallel to the ground plane when the pointer is opposite to the central axis of the reference picture in front of the reference picture, the accuracy of the auxiliary for positioning the hole position is ensured, and the working efficiency of home decoration personnel is further improved.
(3) According to the auxiliary device and the method for installing the pre-punching positioning for the water storage tank of the simulated balance leveling water heater, the threaded rods are connected to the left end and the right end of the leveling rod, and the leveling nuts are arranged on the threaded rods in a matched mode, so that when the leveling rod shakes to a large extent, the gravity centers of the left end and the right end of the leveling rod are changed by rotating the leveling nuts on the threaded rods, the leveling efficiency of the leveling rod can be further accelerated, and the time spent in installing the pre-punching hole positions for the water storage tank is reduced to a certain extent.
(4) This simulation balance leveling water heater water storage tank installation location assistor and method of punching in advance through set up mounting, stabilizer bar and reset spring in fixture to can make the grip block move between two fixed plates under reset spring's elasticity, thereby press from both sides tightly the measuring tape of placing on the grip block, make this assistor be applicable to the measuring tape of different length, improved the measurement accuracy to the interval between the hole position, greatly improved the use convenience of this assistor.
(5) The utility model provides a simulation balance leveling water heater water storage tank installation location assistor and method of punching in advance, through set up the backing sheet in manual tension mechanism, third round pin axle, bull stick and fourth round pin axle, and the cooperation setting of down tube and fixed axle, thereby can drive the linkage piece through the pulling pull ring and remove, and drive down tube and fourth round pin axle pulling bull stick through the fixed axle and rotate at the third round pin epaxial, thereby can drive two connecting piece synchronous motion through the pull ring of pulling one side, make two connecting pieces drive two grip blocks synchronous motion when effectively improving this assistor convenience of use, the condition that the mid point produced the skew between two grip blocks has been avoided appearing, thereby avoided the skew of measuring tape mid point to lead to the great condition appearance that destroys leveling rod horizontal state of measuring tape one end gravity.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of the structure at B in FIG. 1 according to the present invention;
fig. 4 is an enlarged view of the structure at C in fig. 1 according to the present invention.
In the figure: 1 triangular frame, 2 anti-slip sleeves, 3 suction cups, 4 leveling mechanisms, 5 clamping mechanisms, 6 manual stretching mechanisms, 7 connecting blocks, 8 connecting plates, 401 fixing strips, 402 fixing plates, 403 rotating shafts, 404 lantern rings, 405 anti-dropping blocks, 406 through holes, 407 balancing weights, 408 pointers, 409 leveling rods, 410 reference pictures, 411 first pin shafts, 412 first connecting rods, 413 connecting shafts, 414 connecting plates, 415 second connecting rods, 416 grooves, 417 second pin shafts, 418 threaded rods, 419 leveling nuts, 501 fixing plates, 502 rolling shafts, 503 rollers, 504 clamping plates, 505 anti-dropping rubber sheets, fixing pieces 506, 507 stabilizing rods, 508 reset springs, 601 supporting plates, 602 third pin shafts, 603 rotating rods, 604 fourth pin shafts, 605 inclined rods, 606 fixing shafts, 607 linkage rods, 608 pull rings and connecting pieces 609.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a simulation balance leveling water heater water storage tank installation location assistor and method of punching in advance, includes three corner brace 1, has cup jointed anti-skidding cover 2 on three corner brace 1's the bottom, and has all pegged graft sucking disc 3 in three department of buckling of three corner brace 1, and the positive middle part fixed mounting of three corner brace 1 has leveling mechanism 4, and the left and right sides at leveling mechanism 4 top is respectively through the left and right sides fixed connection of connecting block 7 with fixture 5 bottom, and fixture 5's middle part is provided with manual tension mechanism 6.
The leveling mechanism 4 comprises a fixing strip 401, a fixing plate 402, a rotating shaft 403, a collar 404, an anti-falling block 405, a through hole 406, a balancing weight 407, a pointer 408, a leveling rod 409, a reference plate 410, a first pin 411, a first connecting rod 412, a connecting shaft 413, a connecting piece 414, a second connecting rod 415, a groove 416, a second pin 417, a threaded rod 418 and a leveling nut 419.
The left end and the right end of the back of the fixing strip 401 are respectively fixedly connected with the left side and the right side of the front of the triangular frame 1, the middle part of the top of the fixing strip 401 is fixedly connected with a fixing plate 402, the top of the front of the fixing plate 402 is movably connected with the rear end 403 of a rotating shaft, the front end of the rotating shaft 403 is sleeved with a lantern ring 404, the front end of the rotating shaft 403 is fixedly connected with an anti-falling block 405, the front part of the fixing plate 402 is provided with a through hole 406, a through hole 6 is arranged on the fixing strip 401 and penetrates through the upper side and the lower side of the fixing strip 401, the bottom of the lantern ring 404 is fixedly connected with a balancing weight 407, one end of the balancing weight 407 opposite to the lantern ring 404 penetrates through the through hole 406 and extends to the lower side of the through hole 406, one side of the lantern ring 404 opposite to the balancing weight 407 is fixedly, the scale line in the middle of the reference picture 410 is perpendicular to the ground plane, the balancing weight 407 is arranged in the leveling mechanism 4, so that the triangular frame 401 can be fixed on the wall surface through the sucker 3, the triangular frame 1 cannot be ensured to be in a horizontal state due to manual installation, the balancing weight 407 deviates when being perpendicular to the ground plane due to large gravity and drives the pointer 408 to synchronously swing around the rotating shaft 403 as an axis, meanwhile, the leveling rod 409 drives the reference picture 410 to swing around the rotating shaft 403 as an axis through the matching arrangement of the leveling rod 409, so that the horizontal line where the leveling rod 409 is located is determined to be parallel to the ground plane when the pointer 408 faces the central axis of the reference picture 410 in front of the reference picture 410, the accuracy of the auxiliary device in positioning the hole position is ensured, the work efficiency of home decoration personnel is further improved, the left side and the right side of the front of the leveling rod 409 are fixedly connected with the first pin shaft 411, and one end of the first connecting, a connecting shaft 413 is inserted into one end of the first connecting rod 412 far away from the first pin shaft 411, connecting pieces 414 are fixedly connected to the front end and the rear end of the connecting shaft 413, one end of a second connecting rod 415 is sleeved on the connecting shaft 413, a groove 416 is formed below the second connecting rod 415, the front side and the rear side of the inner wall of the groove 416 are movably connected with the front end and the rear end of a second pin shaft 417 respectively, one end of the second connecting rod 415 far away from the connecting shaft 413 is sleeved on the second pin shaft 417, threaded rods 418 are fixedly connected to the left end and the right end of the leveling rod 409, leveling nuts 419 are screwed on the two threaded rods 418, the threaded rods 418 are connected to the left end and the right end of the leveling rod 409 through the matching arrangement of the leveling nuts 419 on the threaded rods 418, so that the center of gravity of the left end and the right end of the leveling rod 409 can be changed by rotating the leveling, thereby can further accelerate leveling pole 409's leveling efficiency, the certain degree has reduced the time for water storage tank installation hole site location cost of punching in advance, through set up levelling mechanism 4 on three angular frame 1, thereby can effectively fix a position the water flat line on the wall, thereby can guarantee through the affirmation of water flat line that the hole site of location all is located same water flat line on the wall, thereby be convenient for ordinary house ornamentation personnel fix a position water storage tank installation hole site fast, water heater water storage tank's installation effectiveness has greatly been improved, the appearance of spending a large amount of time circumstances when having avoided dispatching to experienced house ornamentation personnel simultaneously, the problem that lacks the location assistor that punches in advance of being applicable to ordinary house ornamentation personnel installation water heater water storage tank among the prior art has been solved.
The clamping mechanism 5 comprises a fixing plate 501, a rolling shaft 502, a rolling wheel 503, a clamping plate 504, an anti-falling rubber sheet 505, a fixing piece 506, a stabilizing rod 507 and a return spring 508, wherein the bottom of the fixing plate 501 is fixedly connected with the top of the connecting block 7, the front surface of the fixing plate 501 is movably connected with the rolling wheel 503 through the rolling shaft 502, the top of the rolling wheel 503 is movably connected with the front side of the bottom of the clamping plate 504, the rear side of the bottom of the clamping plate 504 is movably connected with the top of the fixing plate 501, the inner right wall of the clamping plate 504 is fixedly connected with the anti-falling rubber sheet 505, the bottom of the anti-falling rubber sheet 505 is fixedly connected with the inner bottom of the clamping plate 504, the right side of the bottom of the clamping plate 504 is fixedly connected with the fixing piece 506, the left side of the fixing piece 506 is fixedly connected with two stabilizing rods 507, one, two reset spring 508 the left and right sides both ends respectively with the relative one side fixed connection of fixed plate 501 and mounting 506, and two fixed plate 501 the relative one side respectively with connecting plate 8 the left and right sides fixed connection, through set up mounting 506 in fixture 5, stabilizer bar 507 and reset spring 508, thereby can make grip block 504 move between two fixed plates 501 under reset spring 508's elasticity, thereby press from both sides the measuring tape of placing on grip block 504 tightly, make this assistor be applicable to the measuring tape of different length, the measurement accuracy to the interval between the hole position has been improved, the use convenience of this assistor has greatly been improved.
The manual stretching mechanism 6 comprises a support plate 601, a third pin shaft 602, a rotating rod 603, a fourth pin shaft 604, an inclined rod 605, a fixed shaft 606, a linkage block 607, a pull ring 608 and a connecting piece 609, wherein the bottom of the support plate 601 is fixedly connected to the top of the connecting plate 8, the top end of the support plate 601 is inserted with the third pin shaft 602, the middle of the rotating rod 603 is sleeved on the third pin shaft 602, the fourth pin shafts 604 are inserted in the left end and the right end of the rotating rod 603, the two fourth pin shafts 604 are respectively sleeved with the opposite ends of the two inclined rods 605, the fixed shaft 606 is inserted in one end of the inclined rod 605 far away from the fourth pin shaft 604, the rear end of the fixed shaft 606 is movably connected with the front face of the linkage block 607, the right side of the linkage block 607 is fixedly connected with the pull ring 608, the bottom of the linkage block 607 is fixedly connected with the top of the connecting piece 609, the bottom of the connecting piece 609 is fixedly connected with the top of the clamping plate 504, third round pin axle 602, bull stick 603 and fourth round pin axle 604, and the cooperation setting of down tube 605 and fixed axle 606, thereby can drive linkage block 607 through pulling pull ring 608 and remove, and drive down tube 605 and fourth round pin axle 604 through fixed axle 606 and pull bull stick 603 and rotate on third round pin axle 602, thereby can drive two connecting piece 609 synchronous motion through the pull ring 608 that pulls one side, make two connecting pieces 609 drive two grip blocks 504 synchronous motion when effectively improving this assistor use convenience, the condition that the mid point produced the skew has been avoided between two grip blocks 504 appears, thereby the condition that the mid point skew of gauge leads to the great damage leveling pole 409 horizontal state of one end gravity of gauge to appear.
When the pre-punching positioning assistor and the method for mounting the pre-punching positioning assistor on the water storage tank of the analog balance leveling water heater are used, the triangular frame 1 is adsorbed on the wall surface through the sucking disc 3, the pull ring 608 is pulled to drive the linkage block 607 to move, the fixing shaft 606 drives the inclined rod 605 to move, so that the inclined rod 605 pulls the rotating rod 603 through the fourth pin shaft 604 to rotate around the third pin shaft 602, the other linkage block 607 is pulled in the same way, the two linkage blocks 607 drive the two connecting pieces 609 to slide on the two fixing plates 501 through the two linkage blocks 607, so that the measuring scale is placed in the two clamping plates 504, the fixing piece 506 and the stabilizing rod 507 are pulled to move towards the fixing plate 501 through the elasticity of the return spring 508, so that the two anti-dropping rubber sheets 505 clamp the two ends of the measuring scale, the balancing weight 407 is kept vertical to the ground under the action of gravity, so that the lantern ring, the leveling rod 409 tends to be horizontal on the rotating shaft 403 under the action of gravity, so that whether the leveling rod 409 is horizontal or not is judged through whether the pointer 408 is aligned with the reference sheet 410 or not, the gravity center of the leveling rod 409 is changed through rotating the leveling nut 419, the leveling rod 409 tends to be horizontal in a speeded mode, and a measuring scale on the clamping plate 504 is driven to be horizontal through the connecting block 7.
In conclusion, the auxiliary device and the method for positioning the pre-punched holes in the water storage tank of the analog balance leveling water heater can ensure that the triangular frame 401 is fixed on the wall surface through the suction cup 3 by arranging the balancing weight 407 in the leveling mechanism 4, because the manual installation can not ensure that the triangular frame 1 is in a horizontal state, the balancing weight 407 deviates when the gravity is large and keeps vertical to the ground plane and drives the pointer 408 to synchronously swing by taking the rotating shaft 403 as an axis, and meanwhile, through the matched arrangement of the leveling rod 409, the leveling rod 409 drives the reference picture 410 to swing by taking the rotating shaft 403 as an axis, so that the horizontal line where the leveling rod 409 is positioned is determined to be parallel to the ground plane when the pointer 408 is right ahead of the reference picture 410 and opposite to the central axis of the reference picture 410, the accuracy of the auxiliary device for positioning the hole position is ensured.
Meanwhile, the threaded rods 418 are connected to the left end and the right end of the leveling rod 409, and the leveling nuts 419 are arranged on the threaded rods 418 in a matched mode, so that when the leveling rod 409 shakes to a large extent, the gravity centers of the left end and the right end of the leveling rod 409 are changed by rotating the leveling nuts 419 on the threaded rods 418, the leveling efficiency of the leveling rod 409 can be further improved, and the time spent in positioning of pre-punched hole sites for installing the water storage tank is shortened to a certain degree.
Simultaneously, through setting up levelling mechanism 4 on three angular frame 1, thereby can effectively fix a position water flat line on the wall, thereby can guarantee through water flat line that the hole site of location all is located same water flat line on the wall, thereby be convenient for ordinary house ornamentation personnel fix a position water storage tank installation hole site fast, the installation effectiveness of water heater water storage tank has greatly been improved, the appearance of spending the plenty of time condition when having avoided simultaneously to schedule experienced house ornamentation personnel, the problem that lacks the location assistor that punches in advance of being applicable to ordinary house ornamentation personnel installation water heater water storage tank among the prior art is solved.
Simultaneously, through set up mounting 506, stabilizer bar 507 and reset spring 508 in fixture 5 to can make grip block 504 move between two fixed plates 501 under reset spring 508's elasticity, thereby press from both sides tight the measuring tape of placing on grip block 504, make this assistor be applicable to the measuring tape of different length, improve the measurement accuracy to the interval between the hole position, greatly improved the use convenience of this assistor.
Meanwhile, the support plate 601, the third pin shaft 602, the rotating rod 603 and the fourth pin shaft 604 are arranged in the manual stretching mechanism 6, and the inclined rod 605 and the fixed shaft 606 are arranged in a matched manner, so that the linkage block 607 can be driven to move by pulling the pull ring 608, the inclined rod 605 and the fourth pin shaft 604 are driven by the fixed shaft 606 to pull the rotating rod 603 to rotate on the third pin shaft 602, the two connecting pieces 609 can be driven to synchronously move by pulling the pull ring 608 on one side, the use convenience of the assistor is effectively improved, meanwhile, the two connecting pieces 609 can drive the two clamping plates 504 to synchronously move, the situation that the midpoint between the two clamping plates 504 deviates is avoided, and the situation that the gravity on one end of the measuring tape greatly damages the horizontal state of the leveling rod 409 due to the deviation of the midpoint of the measuring tape is avoided.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (3)
1. The utility model provides a simulation balance leveling water heater water storage tank installation location assistor that punches in advance, includes three corner frames (1), its characterized in that: the bottom end of the triangular frame (1) is sleeved with an anti-skidding sleeve (2), three bent parts of the triangular frame (1) are all inserted with a sucker (3), the middle part of the front surface of the triangular frame (1) is fixedly provided with a leveling mechanism (4), the left side and the right side of the top of the leveling mechanism (4) are respectively and fixedly connected with the left side and the right side of the bottom of the clamping mechanism (5) through connecting blocks (7), and the middle part of the clamping mechanism (5) is provided with a manual stretching mechanism (6);
the leveling mechanism (4) comprises a fixing strip (401), a fixing plate (402), a rotating shaft (403), a sleeve ring (404), an anti-falling block (405), a through hole (406), a balancing weight (407), a pointer (408), a leveling rod (409), a reference plate (410), a first pin shaft (411), a first connecting rod (412), a connecting shaft (413), a connecting sheet (414), a second connecting rod (415), a groove (416), a second pin shaft (417), a threaded rod (418) and a leveling nut (419);
the left end and the right end of the back of the fixing strip (401) are respectively fixedly connected to the left side and the right side of the front of the triangular frame (1), the middle of the top of the fixing strip (401) is fixedly connected with a fixing plate (402), the front top of the fixing plate (402) is movably connected with the rear end (403) of a rotating shaft, the front end of the rotating shaft (403) is sleeved with a lantern ring (404), the front end of the rotating shaft (403) is fixedly connected with an anti-dropping block (405), a through hole (406) is formed in the front of the fixing plate (402), a through hole (6) is formed in the fixing strip (401) and penetrates through the upper side and the lower side of the fixing strip (401), the bottom of the lantern ring (404) is fixedly connected with a counterweight block (407), one end, back of the counterweight block (407), of the lantern ring (404), penetrates through the through hole (406) and extends to the lower side of the through, the middle part of a leveling rod (409) is sleeved on the rotating shaft (403), the middle part of the top of the leveling rod (409) is fixedly connected with a reference picture (410), the left side and the right side of the front of the leveling rod (409) are fixedly connected with a first pin shaft (411), one end of a first connecting rod (412) is sleeved on the first pin shaft (411), one end, far away from the first pin shaft (411), of the first connecting rod (412) is inserted with a connecting shaft (413), the front end and the rear end of the connecting shaft (413) are fixedly connected with connecting pieces (414), one end, far away from the connecting shaft (413), of a second connecting rod (415) is sleeved on the connecting shaft (413), a groove (416) is formed below the second connecting rod (415), the front side and the rear side of the inner wall of the groove (416) are respectively movably connected with the front end and the rear end of the second pin shaft (417), one end, far away from the connecting shaft (413) of the second connecting rod (, the left end and the right end of the leveling rod (409) are fixedly connected with threaded rods (418), and leveling nuts (419) are in threaded connection with the two threaded rods (418);
the clamping mechanism (5) comprises a fixing plate (501), a rolling shaft (502), a roller (503), a clamping plate (504), an anti-falling rubber sheet (505), a fixing piece (506), a stabilizing rod (507) and a return spring (508);
the bottom of fixed plate (501) and the top fixed connection of connecting block (7), and the front of fixed plate (501) has gyro wheel (503) through roller (502) swing joint, the top of gyro wheel (503) and the front side sliding connection of grip block (504) bottom, and the back side sliding connection of grip block (504) bottom is at the top of fixed plate (501), the interior right wall fixed connection of grip block (504) has anticreep rubber sheet (505), and the bottom fixed connection of anticreep rubber sheet (505) is on the interior bottom of grip block (504), the right side fixed connection of grip block (504) bottom has mounting (506), and the left side fixed connection of mounting (506) has two stabilizer bars (507), two stabilizer bars (507) are all pegged graft in fixed plate (501) in the one end of stabilizer bar (506) mutually opposite to each other, and all cup jointed reset spring (508) on two stabilizer bars (507), the left end and the right end of each of the two return springs (508) are fixedly connected with the opposite sides of the fixing plate (501) and the fixing piece (506) respectively, and the opposite sides of the two fixing plates (501) are fixedly connected with the left side and the right side of the connecting plate (8) respectively;
the manual stretching mechanism (6) comprises a supporting plate (601), a third pin shaft (602), a rotating rod (603), a fourth pin shaft (604), an inclined rod (605), a fixed shaft (606), a linkage block (607), a pull ring (608) and a connecting piece (609);
the bottom of the support sheet (601) is fixedly connected to the top of the connecting plate (8), a third pin shaft (602) is inserted into the top end of the support sheet (601), the middle of a rotating rod (603) is sleeved on the third pin shaft (602), fourth pin shafts (604) are inserted into the left end and the right end of the rotating rod (603), two fourth pin shafts (604) are respectively sleeved with opposite ends of two inclined rods (605), a fixed shaft (606) is inserted into one end, far away from the fourth pin shafts (604), of each inclined rod (605), the rear end of each fixed shaft (606) is movably connected with the front face of a linkage block (607), the right side of the linkage block (607) is fixedly connected with a pull ring (608), the bottom of the linkage block (607) is fixedly connected with the top of a connecting piece (609), and the bottom of the connecting piece (609) is fixedly connected with the top of the clamping plate (504).
2. The simulated balance leveled water heater water storage tank installation pre-punching positioning aid as claimed in claim 1, wherein: the top of the front side of the reference picture (410) is provided with scale marks, and the scale marks positioned in the middle of the reference picture (410) are vertical to the ground plane.
3. The simulated balance leveling water heater water storage tank installation pre-punching positioning aid and method according to any one of claims 1-2, wherein the method comprises the following steps: when the device is used, the triangular frame (1) is adsorbed on a wall surface through the sucking disc (3), the pull ring (608) is pulled to drive the linkage block (607) to move, the fixing shaft (606) drives the inclined rod (605) to move, so that the inclined rod (605) pulls the rotating rod (603) through the fourth pin shaft (604) to rotate by taking the third pin shaft (602) as an axis, the other linkage block (607) is pulled in the same way, the two connecting pieces (609) are driven to slide on the two fixing plates (501) through the two linkage blocks (607), the measuring tape is placed in the two clamping plates (504), the fixing piece (506) and the stabilizing rod (507) are pulled to move towards the fixing plates (501) through the elastic force of the return spring (508), so that the two anti-falling rubber pieces (505) clamp the two ends of the measuring tape, the balancing weight (407) is kept vertical to the ground under the action of gravity, and the lantern ring (404) drives the pointer (408) to keep swinging in different directions on the rotating shaft (403) and the balancing weight (, the leveling rod (409) tends to be horizontal on the rotating shaft (403) under the action of gravity, so that whether the leveling rod (409) is horizontal or not is judged through whether the pointer (408) is aligned with the reference picture (410), the gravity center of the leveling rod (409) is changed through rotating the leveling nut (419), the leveling rod (409) tends to be horizontal in a speeded up mode, and the measuring scale on the clamping plate (504) is driven to keep horizontal through the connecting block (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010458295.2A CN111571822A (en) | 2018-07-19 | 2018-07-19 | Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010458295.2A CN111571822A (en) | 2018-07-19 | 2018-07-19 | Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater |
CN201810798882.9A CN108818963B (en) | 2018-07-19 | 2018-07-19 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810798882.9A Division CN108818963B (en) | 2018-07-19 | 2018-07-19 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111571822A true CN111571822A (en) | 2020-08-25 |
Family
ID=64141032
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010458295.2A Withdrawn CN111571822A (en) | 2018-07-19 | 2018-07-19 | Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater |
CN201810798882.9A Active CN108818963B (en) | 2018-07-19 | 2018-07-19 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810798882.9A Active CN108818963B (en) | 2018-07-19 | 2018-07-19 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN111571822A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111571822A (en) * | 2018-07-19 | 2020-08-25 | 龚成香 | Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10045620A1 (en) * | 2000-09-15 | 2002-04-04 | Bosch Gmbh Robert | Machine tool with a room with lubricant and a pressure compensation device of the room |
CN102042685A (en) * | 2010-10-27 | 2011-05-04 | 宁波方太厨具有限公司 | Water heater installation method and pre-installation bracket applying same |
CN204555965U (en) * | 2015-04-09 | 2015-08-12 | 中国大唐集团新能源股份有限公司 | The power-supply unit of blower fan tower barrel inclinometric system |
CN105856070A (en) * | 2016-06-14 | 2016-08-17 | 周玉翔 | Workpiece finishing clamping device |
CN205656070U (en) * | 2016-04-05 | 2016-10-19 | 西南交通大学 | Fibre tensile testing device |
CN107830639A (en) * | 2017-11-30 | 2018-03-23 | 苏州宏恒化工有限公司 | A kind of punching positioner of water heater fixing hole |
CN108818963B (en) * | 2018-07-19 | 2020-11-06 | 山东龙普太阳能股份有限公司 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010066165A (en) * | 2008-09-11 | 2010-03-25 | Audio Technica Corp | Inclination sensor for laser leveler |
CN204843507U (en) * | 2015-07-15 | 2015-12-09 | 河北科技大学 | Aircraft wing bores and mills processing machine people |
CN205719190U (en) * | 2016-06-28 | 2016-11-23 | 云南师范大学 | A kind of balance |
CN206648731U (en) * | 2017-04-19 | 2017-11-17 | 陈雨轩 | A kind of day flat structure of physics experiments of high school |
CN206772286U (en) * | 2017-05-30 | 2017-12-19 | 新昌县羽林街道东商机械厂 | One kind building work horizontal alignment instrument |
CN207087217U (en) * | 2017-07-13 | 2018-03-13 | 盐城市永成专用焊接设备有限公司 | A kind of Work fixing device of butt welding machine |
CN107803678A (en) * | 2017-10-16 | 2018-03-16 | 嵊泗县东升水产冷冻厂 | A kind of clamping device suitable for polytype workpiece |
CN108015907A (en) * | 2017-11-30 | 2018-05-11 | 苏州宏恒化工有限公司 | One kind installation water heater punching positioner |
CN207616181U (en) * | 2017-12-06 | 2018-07-17 | 天津市久华新瑞科技有限公司 | High-precision mold processing milling machine |
-
2018
- 2018-07-19 CN CN202010458295.2A patent/CN111571822A/en not_active Withdrawn
- 2018-07-19 CN CN201810798882.9A patent/CN108818963B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10045620A1 (en) * | 2000-09-15 | 2002-04-04 | Bosch Gmbh Robert | Machine tool with a room with lubricant and a pressure compensation device of the room |
CN102042685A (en) * | 2010-10-27 | 2011-05-04 | 宁波方太厨具有限公司 | Water heater installation method and pre-installation bracket applying same |
CN204555965U (en) * | 2015-04-09 | 2015-08-12 | 中国大唐集团新能源股份有限公司 | The power-supply unit of blower fan tower barrel inclinometric system |
CN205656070U (en) * | 2016-04-05 | 2016-10-19 | 西南交通大学 | Fibre tensile testing device |
CN105856070A (en) * | 2016-06-14 | 2016-08-17 | 周玉翔 | Workpiece finishing clamping device |
CN107830639A (en) * | 2017-11-30 | 2018-03-23 | 苏州宏恒化工有限公司 | A kind of punching positioner of water heater fixing hole |
CN108818963B (en) * | 2018-07-19 | 2020-11-06 | 山东龙普太阳能股份有限公司 | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance |
Also Published As
Publication number | Publication date |
---|---|
CN108818963A (en) | 2018-11-16 |
CN108818963B (en) | 2020-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108818963B (en) | Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance | |
CN211145888U (en) | Engineering surveying and mapping device based on remote sensing technology | |
CN113281189B (en) | Detection apparatus for curtain panel tensile strength | |
CN215811495U (en) | Building curtain wall interlayer deformation performance detection device | |
CN211207897U (en) | Support device for outdoor curtain wall advertising board | |
CN219386897U (en) | Positioning tool based on profiled steel sheet installation | |
CN209444202U (en) | A kind of window arrangement convenient for placing outdoor machine of air-conditioner | |
CN211118587U (en) | Electronic information display screen convenient to move | |
CN209841652U (en) | Glue adhesiveness detection equipment for compartment-bonding structural glue | |
CN213297120U (en) | Quick-release aluminum formwork for building construction | |
CN213844930U (en) | Light detachable transformer box | |
CN213483239U (en) | Device is used in show of antidetonation architectural design | |
CN208588071U (en) | A kind of hanging air conditioner component being easily installed | |
CN220272108U (en) | Billboard mounting device | |
CN108800621B (en) | Balcony wall-mounted solar water heater | |
CN210127818U (en) | Lifting and translation construction hanging ladder outside floor window | |
CN218956043U (en) | Digital display measuring instrument for steel mesh frame deflection measurement | |
CN206609983U (en) | One kind can fall wind bar | |
CN220203141U (en) | Indoor suspended ceiling decorative structure | |
CN211181569U (en) | Information display fence for student dormitory management | |
CN217763781U (en) | Fresh air bag air pipe of portable easy installation | |
CN219528087U (en) | Building curtain wall mounting fastener | |
CN221722163U (en) | Building curtain ornamental strip mounting structure | |
CN219995446U (en) | Prefabricated air conditioner board of assembled building convenient to installation | |
CN216978395U (en) | Performance detection equipment for air conditioner ventilation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20200825 |
|
WW01 | Invention patent application withdrawn after publication |