Water heater water storage tank installation of simulation balance leveling location assistor that punches in advance
Technical Field
The invention relates to the technical field of water heater installation, in particular to a water heater water storage tank installation pre-punching positioning auxiliary device for simulating balance leveling.
Background
The traditional solar water heater is basically installed on the roof of the residential building, the number of the floors of the residential building is increased with the improvement of the building construction technology, therefore, the installation mode of the solar water heater installed on the roof is not suitable for the current residential buildings, the current solar water heater is changed to be installed on the balcony of the residential home, the water storage tank is hung on the wall surface by punching the wall surface in advance and inserting the expansion screw, when the hole is punched in advance, ordinary home decoration personnel need to spend a great deal of time for positioning the hole site, if the hole sites are not in the same horizontal line, the situation that the water storage tank is inclined when the water storage tank is installed subsequently can be caused, the installation stability of the water storage tank is influenced, meanwhile, certain potential safety hazards exist, home decoration teachers who have a good punching experience are low in occupation ratio of home decoration staff, and a water storage tank of the water heater is not provided with a pre-punching auxiliary device suitable for common home decoration staff in the prior art.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a water heater water storage tank installation pre-punching positioning assistor for simulating balance leveling, and solves the problem that the water heater water storage tank installation pre-punching assistor suitable for general home decoration personnel is lacked in the prior art.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides a water heater water storage tank installation of simulation balance leveling location assistor that punches in advance, includes three corner frames, cup jointed the antiskid cover on three corner frames's the bottom, and three department of buckling of three corner frames all pegs graft and have the sucking disc, three corner frames positive middle part fixed mounting have leveling mechanism, and the left and right sides at leveling mechanism top is respectively through the left and right sides fixed connection of connecting block with the fixture bottom, fixture's middle part is provided with manual tension mechanism.
Preferably, the leveling mechanism comprises a fixing strip, a fixing piece, a rotating shaft, a lantern ring, an anti-falling block, an opening, a balancing weight, a pointer, a leveling rod, a reference picture, a first pin shaft, a first connecting rod, a connecting shaft, a connecting sheet, a second connecting rod, a groove, a second pin shaft, a threaded rod and a leveling nut.
Preferably, the left end and the right end of the back of the fixing strip are respectively fixedly connected to the left side and the right side of the front of the triangular frame, the middle of the top of the fixing strip is fixedly connected with a fixing piece, the front top of the fixing piece is movably connected with the rear end of a rotating shaft, the front end of the rotating shaft is sleeved with a lantern ring, the front end of the rotating shaft is fixedly connected with an anti-falling block, an opening is formed in the front of the fixing piece, the opening is formed in the fixing strip and penetrates through the upper side and the lower side of the fixing strip, the bottom of the lantern ring is fixedly connected with a balancing weight, one end, opposite to the balancing weight, of the lantern ring penetrates through the opening and extends to the lower side of the opening, one side, opposite to the balancing weight, of the lantern ring is fixedly connected with a pointer, the middle of a leveling rod is sleeved on the rotating shaft, the middle of the top of, the connecting shaft is inserted into one end, far away from the first pin shaft, of the first connecting rod in an inserting mode, connecting pieces are fixedly connected to the front end and the rear end of the connecting shaft in a penetrating mode, one end of a second connecting rod is connected to the connecting shaft in a sleeved mode, a groove is formed in the lower portion of the second connecting rod, the front side and the rear side of the inner wall of the groove are movably connected with the front end and the rear end of the second pin shaft respectively, one end, far away from the connecting shaft, of the second connecting rod is connected to the second pin shaft in a sleeved mode, threaded rods are fixedly connected to the left end and the right.
Preferably, the clamping mechanism comprises a fixing plate, a rolling shaft, a roller, a clamping plate, an anti-falling rubber sheet, a fixing piece, a stabilizing rod and a return spring.
Preferably, the bottom of the fixed plate is fixedly connected with the top of the connecting block, the front surface of the fixed plate is movably connected with an idler wheel through a rolling shaft, the top of the idler wheel is connected with the front side of the bottom of the clamping plate in a sliding way, the rear side of the bottom of the clamping plate is connected with the top of the fixed plate in a sliding way, the inner right wall of the clamping plate is fixedly connected with an anti-drop rubber sheet, the bottom of the anti-falling rubber sheet is fixedly connected to the inner bottom of the clamping plate, the right side of the bottom of the clamping plate is fixedly connected with a fixing piece, and the left side of the fixing piece is fixedly connected with two stabilizer bars, one ends of the two stabilizer bars opposite to the fixing piece are inserted in the fixing plate, and the two stabilizer bars are respectively sleeved with a return spring, the left end and the right end of each return spring are respectively and fixedly connected with the opposite sides of the fixed plate and the fixed part, and the opposite sides of the two fixed plates are respectively and fixedly connected with the left side and the right side of the connecting plate.
Preferably, the manual stretching mechanism comprises a supporting sheet, a third pin shaft, a rotating rod, a fourth pin shaft, an inclined rod, a fixed shaft, a linkage block, a pull ring and a connecting piece.
Preferably, the bottom of the supporting sheet is fixedly connected to the top of the connecting plate, a third pin shaft is inserted into the top end of the supporting sheet, the middle of the rotating rod is sleeved on the third pin shaft, fourth pin shafts are inserted into the left end and the right end of the rotating rod, two opposite ends of the two inclined rods are sleeved on the fourth pin shafts respectively, a fixed shaft is inserted into one end, away from the fourth pin shaft, of each inclined rod, the rear end of the fixed shaft is movably connected with the front of the linkage block, a pull ring is fixedly connected to the right side of the linkage block, the bottom of the linkage block is fixedly connected with the top of the connecting piece, and the bottom of the connecting piece is fixedly connected with the top of the clamping plate.
Preferably, the top of the front surface of the reference sheet is provided with scale marks, and the scale marks in the middle of the reference sheet are perpendicular to the ground plane.
(III) advantageous effects
The invention provides a water heater water storage tank installation pre-punching positioning assistor for simulating balance leveling. The method has the following beneficial effects:
(1) this water heater water storage tank installation of analog balance leveling is location assistor that punches in advance, through set up levelling mechanism on three corner frames, thereby can effectively fix a position water flat line on the wall, thereby can guarantee that the hole site of location all is located same water flat line on the wall through water flat line's affirmation, thereby be convenient for ordinary house ornamentation personnel fix a position water storage tank installation hole site fast, the installation effectiveness of water heater water storage tank has greatly been improved, the appearance of spending the plenty of time circumstances when having avoided simultaneously dispatching to experienced house ornamentation personnel, the problem that lacks the location assistor that punches in advance of being applicable to ordinary house ornamentation personnel installation water heater water storage tank among the prior art has been solved.
(2) The water heater water storage tank with the simulated balance leveling is provided with the pre-punching positioning assistor, and the balancing weight is arranged in the leveling mechanism, so that the triangular frame can be fixed on a wall surface through the sucking disc, and the manual installation can not ensure that the triangular frame is in a horizontal state, so that the balancing weight is vertically kept with a ground plane due to large gravity and drives the pointer to synchronously swing by taking the rotating shaft as an axis, and meanwhile, the leveling rod drives the reference picture to swing by taking the rotating shaft as the axis through the matching arrangement of the leveling rod, so that the pointer determines that the horizontal line where the leveling rod is located is parallel to the ground plane when the front of the reference picture is just opposite to the central axis of the reference picture, the accuracy of the assistor for positioning the hole is ensured, and the working efficiency of.
(3) This water heater water storage tank installation of simulation balance leveling is punching location assistor in advance, through both ends connecting threaded rod about the levelling rod to and the cooperation setting of leveling nut on the threaded rod, thereby can make the levelling rod when great range rocks appear, through rotating the leveling nut on the threaded rod, the focus at both ends about the levelling rod has been changed, thereby can further accelerate the leveling efficiency of levelling rod, the time of the hole site location cost of punching in advance for the water storage tank installation has been reduced to a certain extent.
(4) This water heater water storage tank installation of analog balance leveling location assistor of punching in advance through set up mounting, stabilizer bar and reset spring in fixture, thereby can make the grip block move between two fixed plates under reset spring's elasticity, thereby press from both sides tightly the measuring tape of placing on the grip block, make this assistor be applicable to the measuring tape of different length, improved the measurement accuracy to the interval between the hole position, greatly improved the use convenience of this assistor.
(5) This water heater water storage tank installation of analog balance leveling location assistor that punches in advance, through set up the backing sheet in manual tension mechanism, third round pin axle, bull stick and fourth round pin axle, and the cooperation setting of bull stick and fixed axle, thereby can drive the linkage piece through the pulling pull ring and remove, and drive bull stick and fourth round pin axle pulling bull stick through the fixed axle and rotate at the third round pin epaxial, thereby can drive two connecting piece synchronous motion through the pull ring of pulling one side, make two connecting pieces drive two grip blocks synchronous motion when effectively improving this assistor use convenience, the condition that the mid point produced the skew between two grip blocks has been avoided appearing, thereby avoided the skew of measuring tape mid point to lead to the great condition appearance that destroys leveling rod horizontal state of measuring tape one end gravity.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of the structure at B in FIG. 1 according to the present invention;
fig. 4 is an enlarged view of the structure at C in fig. 1 according to the present invention.
In the figure: 1 triangular frame, 2 anti-slip sleeves, 3 suction cups, 4 leveling mechanisms, 5 clamping mechanisms, 6 manual stretching mechanisms, 7 connecting blocks, 8 connecting plates, 401 fixing strips, 402 fixing plates, 403 rotating shafts, 404 lantern rings, 405 anti-dropping blocks, 406 through holes, 407 balancing weights, 408 pointers, 409 leveling rods, 410 reference pictures, 411 first pin shafts, 412 first connecting rods, 413 connecting shafts, 414 connecting plates, 415 second connecting rods, 416 grooves, 417 second pin shafts, 418 threaded rods, 419 leveling nuts, 501 fixing plates, 502 rolling shafts, 503 rollers, 504 clamping plates, 505 anti-dropping rubber sheets, fixing pieces 506, 507 stabilizing rods, 508 reset springs, 601 supporting plates, 602 third pin shafts, 603 rotating rods, 604 fourth pin shafts, 605 inclined rods, 606 fixing shafts, 607 linkage rods, 608 pull rings and connecting pieces 609.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are illustrative and intended to be illustrative of the invention and are not to be construed as limiting the invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a water heater water storage tank installation of simulation balance leveling location assistor that punches in advance, includes three corner brace 1, has cup jointed antiskid cover 2 on three corner brace 1's the bottom, and has all pegged graft sucking disc 3 in three department of buckling of three corner brace 1, and the positive middle part fixed mounting of three corner brace 1 has leveling mechanism 4, and the left and right sides at leveling mechanism 4 top is respectively through the left and right sides fixed connection of connecting block 7 with 5 bottoms of fixture, and the middle part of fixture 5 is provided with manual tension mechanism 6.
The leveling mechanism 4 comprises a fixing strip 401, a fixing plate 402, a rotating shaft 403, a collar 404, an anti-falling block 405, a through hole 406, a balancing weight 407, a pointer 408, a leveling rod 409, a reference plate 410, a first pin 411, a first connecting rod 412, a connecting shaft 413, a connecting piece 414, a second connecting rod 415, a groove 416, a second pin 417, a threaded rod 418 and a leveling nut 419.
The left end and the right end of the back of the fixing strip 401 are respectively fixedly connected with the left side and the right side of the front of the triangular frame 1, the middle part of the top of the fixing strip 401 is fixedly connected with a fixing plate 402, the top of the front of the fixing plate 402 is movably connected with the rear end 403 of a rotating shaft, the front end of the rotating shaft 403 is sleeved with a lantern ring 404, the front end of the rotating shaft 403 is fixedly connected with an anti-falling block 405, the front part of the fixing plate 402 is provided with a through hole 406, the through hole 406 is arranged on the fixing strip 401 and penetrates through the upper side and the lower side of the fixing strip 401, the bottom of the lantern ring 404 is fixedly connected with a balancing weight 407, one end of the balancing weight 407 opposite to the lantern ring 404 penetrates through the through hole 406 and extends to the lower side of the through hole 406, one side of the lantern ring 404 opposite to the balancing weight 407 is fixedly, the scale line in the middle of the reference picture 410 is perpendicular to the ground plane, the balancing weight 407 is arranged in the leveling mechanism 4, so that the triangular frame 401 can be fixed on the wall surface through the sucker 3, the triangular frame 1 cannot be ensured to be in a horizontal state due to manual installation, the balancing weight 407 deviates when being perpendicular to the ground plane due to large gravity and drives the pointer 408 to synchronously swing around the rotating shaft 403 as an axis, meanwhile, the leveling rod 409 drives the reference picture 410 to swing around the rotating shaft 403 as an axis through the matching arrangement of the leveling rod 409, so that the horizontal line where the leveling rod 409 is located is determined to be parallel to the ground plane when the pointer 408 faces the central axis of the reference picture 410 in front of the reference picture 410, the accuracy of the auxiliary device in positioning the hole position is ensured, the work efficiency of home decoration personnel is further improved, the left side and the right side of the front of the leveling rod 409 are fixedly connected with the first pin shaft 411, and one end of the first connecting, a connecting shaft 413 is inserted into one end of the first connecting rod 412 far away from the first pin shaft 411, connecting pieces 414 are fixedly connected to the front end and the rear end of the connecting shaft 413, one end of a second connecting rod 415 is sleeved on the connecting shaft 413, a groove 416 is formed below the second connecting rod 415, the front side and the rear side of the inner wall of the groove 416 are movably connected with the front end and the rear end of a second pin shaft 417 respectively, one end of the second connecting rod 415 far away from the connecting shaft 413 is sleeved on the second pin shaft 417, threaded rods 418 are fixedly connected to the left end and the right end of the leveling rod 409, leveling nuts 419 are screwed on the two threaded rods 418, the threaded rods 418 are connected to the left end and the right end of the leveling rod 409 through the matching arrangement of the leveling nuts 419 on the threaded rods 418, so that the center of gravity of the left end and the right end of the leveling rod 409 can be changed by rotating the leveling, thereby can further accelerate leveling pole 409's leveling efficiency, the certain degree has reduced the time for water storage tank installation hole site location cost of punching in advance, through set up levelling mechanism 4 on three angular frame 1, thereby can effectively fix a position the water flat line on the wall, thereby can guarantee through the affirmation of water flat line that the hole site of location all is located same water flat line on the wall, thereby be convenient for ordinary house ornamentation personnel fix a position water storage tank installation hole site fast, water heater water storage tank's installation effectiveness has greatly been improved, the appearance of spending a large amount of time circumstances when having avoided dispatching to experienced house ornamentation personnel simultaneously, the problem that lacks the location assistor that punches in advance of being applicable to ordinary house ornamentation personnel installation water heater water storage tank among the prior art has been solved.
The clamping mechanism 5 comprises a fixing plate 501, a rolling shaft 502, a rolling wheel 503, a clamping plate 504, an anti-falling rubber sheet 505, a fixing piece 506, a stabilizing rod 507 and a return spring 508, wherein the bottom of the fixing plate 501 is fixedly connected with the top of the connecting block 7, the front surface of the fixing plate 501 is movably connected with the rolling wheel 503 through the rolling shaft 502, the top of the rolling wheel 503 is movably connected with the front side of the bottom of the clamping plate 504, the rear side of the bottom of the clamping plate 504 is movably connected with the top of the fixing plate 501, the inner right wall of the clamping plate 504 is fixedly connected with the anti-falling rubber sheet 505, the bottom of the anti-falling rubber sheet 505 is fixedly connected with the inner bottom of the clamping plate 504, the right side of the bottom of the clamping plate 504 is fixedly connected with the fixing piece 506, the left side of the fixing piece 506 is fixedly connected with two stabilizing rods 507, one, two reset spring 508 the left and right sides both ends respectively with the relative one side fixed connection of fixed plate 501 and mounting 506, and two fixed plate 501 the relative one side respectively with connecting plate 8 the left and right sides fixed connection, through set up mounting 506 in fixture 5, stabilizer bar 507 and reset spring 508, thereby can make grip block 504 move between two fixed plates 501 under reset spring 508's elasticity, thereby press from both sides the measuring tape of placing on grip block 504 tightly, make this assistor be applicable to the measuring tape of different length, the measurement accuracy to the interval between the hole position has been improved, the use convenience of this assistor has greatly been improved.
The manual stretching mechanism 6 comprises a support plate 601, a third pin shaft 602, a rotating rod 603, a fourth pin shaft 604, an inclined rod 605, a fixed shaft 606, a linkage block 607, a pull ring 608 and a connecting piece 609, wherein the bottom of the support plate 601 is fixedly connected to the top of the connecting plate 8, the top end of the support plate 601 is inserted with the third pin shaft 602, the middle of the rotating rod 603 is sleeved on the third pin shaft 602, the fourth pin shafts 604 are inserted in the left end and the right end of the rotating rod 603, the two fourth pin shafts 604 are respectively sleeved with the opposite ends of the two inclined rods 605, the fixed shaft 606 is inserted in one end of the inclined rod 605 far away from the fourth pin shaft 604, the rear end of the fixed shaft 606 is movably connected with the front face of the linkage block 607, the right side of the linkage block 607 is fixedly connected with the pull ring 608, the bottom of the linkage block 607 is fixedly connected with the top of the connecting piece 609, the bottom of the connecting piece 609 is fixedly connected with the top of the clamping plate 504, third round pin axle 602, bull stick 603 and fourth round pin axle 604, and the cooperation setting of down tube 605 and fixed axle 606, thereby can drive linkage block 607 through pulling pull ring 608 and remove, and drive down tube 605 and fourth round pin axle 604 through fixed axle 606 and pull bull stick 603 and rotate on third round pin axle 602, thereby can drive two connecting piece 609 synchronous motion through the pull ring 608 that pulls one side, make two connecting pieces 609 drive two grip blocks 504 synchronous motion when effectively improving this assistor use convenience, the condition that the mid point produced the skew has been avoided between two grip blocks 504 appears, thereby the condition that the mid point skew of gauge leads to the great damage leveling pole 409 horizontal state of one end gravity of gauge to appear.
When the water storage tank of the water heater leveling simulation balance is used for installing the pre-punching positioning assistor, the triangular frame 1 is adsorbed on the wall surface through the sucking disc 3, the pull ring 608 is pulled to drive the linkage block 607 to move, the fixing shaft 606 drives the inclined rod 605 to move, so that the inclined rod 605 pulls the rotating rod 603 through the fourth pin shaft 604 to rotate around the third pin shaft 602, the other linkage block 607 is pulled in the same way, the two linkage blocks 607 drive the two connecting pieces 609 to slide on the two fixing plates 501 through the two linkage blocks 607, so that the measuring scale is placed in the two clamping plates 504, the fixing piece 506 and the stabilizing rod 507 are pulled to move towards the fixing plates 501 through the elasticity of the return spring 508, so that the two rubber anti-dropping pieces 505 clamp the two ends of the measuring scale, the balancing weight 407 is vertical to the ground under the action of gravity, so that the lantern ring 404 drives the pointer 408 to keep swinging on the rotating, the leveling rod 409 tends to be horizontal on the rotating shaft 403 under the action of gravity, so that whether the leveling rod 409 is horizontal or not is judged through whether the pointer 408 is aligned with the reference sheet 410 or not, the gravity center of the leveling rod 409 is changed through rotating the leveling nut 419, the leveling rod 409 tends to be horizontal in a speeded mode, and a measuring scale on the clamping plate 504 is driven to be horizontal through the connecting block 7.
In conclusion, the water storage tank of the water heater leveled by the analog balance is provided with the pre-punching positioning assistor, the balancing weight 407 is arranged in the leveling mechanism 4, so that the triangular frame 401 can be fixed on the wall surface through the suction cup 3, and the manual installation can not ensure that the triangular frame 1 is in a horizontal state, so that the balancing weight 407 deviates when being vertical to the ground plane due to large gravity and drives the pointer 408 to synchronously swing by taking the rotating shaft 403 as an axis, and meanwhile, through the matching arrangement of the leveling rod 409, the leveling rod 409 drives the reference picture 410 to swing by taking the rotating shaft 403 as an axis, so that the horizontal line where the leveling rod 409 is located is determined to be parallel to the ground plane when the pointer 408 is right ahead of the reference picture 410 and opposite to the central axis of the reference picture 410, the accuracy of the positioning assistor for the hole positioning is.
Meanwhile, the threaded rods 418 are connected to the left end and the right end of the leveling rod 409, and the leveling nuts 419 are arranged on the threaded rods 418 in a matched mode, so that when the leveling rod 409 shakes to a large extent, the gravity centers of the left end and the right end of the leveling rod 409 are changed by rotating the leveling nuts 419 on the threaded rods 418, the leveling efficiency of the leveling rod 409 can be further improved, and the time spent in positioning of pre-punched hole sites for installing the water storage tank is shortened to a certain degree.
Simultaneously, through setting up levelling mechanism 4 on three angular frame 1, thereby can effectively fix a position water flat line on the wall, thereby can guarantee through water flat line that the hole site of location all is located same water flat line on the wall, thereby be convenient for ordinary house ornamentation personnel fix a position water storage tank installation hole site fast, the installation effectiveness of water heater water storage tank has greatly been improved, the appearance of spending the plenty of time condition when having avoided simultaneously to schedule experienced house ornamentation personnel, the problem that lacks the location assistor that punches in advance of being applicable to ordinary house ornamentation personnel installation water heater water storage tank among the prior art is solved.
Simultaneously, through set up mounting 506, stabilizer bar 507 and reset spring 508 in fixture 5 to can make grip block 504 move between two fixed plates 501 under reset spring 508's elasticity, thereby press from both sides tight the measuring tape of placing on grip block 504, make this assistor be applicable to the measuring tape of different length, improve the measurement accuracy to the interval between the hole position, greatly improved the use convenience of this assistor.
Meanwhile, the support plate 601, the third pin shaft 602, the rotating rod 603 and the fourth pin shaft 604 are arranged in the manual stretching mechanism 6, and the inclined rod 605 and the fixed shaft 606 are arranged in a matched manner, so that the linkage block 607 can be driven to move by pulling the pull ring 608, the inclined rod 605 and the fourth pin shaft 604 are driven by the fixed shaft 606 to pull the rotating rod 603 to rotate on the third pin shaft 602, the two connecting pieces 609 can be driven to synchronously move by pulling the pull ring 608 on one side, the use convenience of the assistor is effectively improved, meanwhile, the two connecting pieces 609 can drive the two clamping plates 504 to synchronously move, the situation that the midpoint between the two clamping plates 504 deviates is avoided, and the situation that the gravity on one end of the measuring tape greatly damages the horizontal state of the leveling rod 409 due to the deviation of the midpoint of the measuring tape is avoided.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.