CN102042685A - Water heater installation method and pre-installation bracket applying same - Google Patents

Water heater installation method and pre-installation bracket applying same Download PDF

Info

Publication number
CN102042685A
CN102042685A CN 201010526034 CN201010526034A CN102042685A CN 102042685 A CN102042685 A CN 102042685A CN 201010526034 CN201010526034 CN 201010526034 CN 201010526034 A CN201010526034 A CN 201010526034A CN 102042685 A CN102042685 A CN 102042685A
Authority
CN
China
Prior art keywords
water
mounting bracket
water heater
outlet part
installation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010526034
Other languages
Chinese (zh)
Other versions
CN102042685B (en
Inventor
钟建设
李三岗
茅忠群
诸永定
蒋荣听
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Fotile Kitchen Ware Co Ltd
Original Assignee
Ningbo Fotile Kitchen Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Fotile Kitchen Ware Co Ltd filed Critical Ningbo Fotile Kitchen Ware Co Ltd
Priority to CN201010526034A priority Critical patent/CN102042685B/en
Publication of CN102042685A publication Critical patent/CN102042685A/en
Application granted granted Critical
Publication of CN102042685B publication Critical patent/CN102042685B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Housings, Intake/Discharge, And Installation Of Fluid Heaters (AREA)

Abstract

The invention discloses a water heater installation method, which comprises the following steps of: (1) arranging a pre-installation bracket at a preset position on a blank wall surface, wherein the pre-installation bracket is provided with a water inlet part and a water outlet part for laying a water pipe in a water heater and a positioning part for installing the water heater; (2) punching holes on the blank wall according to the water inlet part and the water outlet part of the pre-installation bracket and arranging a water inlet pipe and a water outlet pipe for the water heater; (3) laying ceramic tiles on the blank wall surface and the outer surface of the pre-installation bracket and preserving the positioning part and a cover plate preservation position, wherein the cover plate preservation position is formed by an installation region of the water inlet part and the water outlet part; and (4) arranging the water heater on a wall and on the outer surfaces of the ceramic tiles corresponding to the positioning part, the water inlet part and the water outlet part of the pre-installation bracket and covering the cover plate at the cover plate preservation position so as to finish installation. The invention also discloses the pre-installation bracket for installing the water heater. Compared with the prior art, the method has the advantages of easy, convenient, correct and reliable overall installation process, no big damage to the wall surface and the ceramic tiles and realization of attractive overall appearance after installation.

Description

Water heater installation method and be applied to pre-mounting bracket in this method
Technical field
The present invention relates to a kind of installation method of household electrical appliance, relate in particular to a kind of water heater installation method, the invention still further relates to the pre-mounting bracket that is applied in this installation method.
Background technology
Water heater has been come into huge numbers of families, bring convenience with comfortable to life, but water heater model in the market is a lot, different, also the installation method of the standard that neither one is unified, generally be on the metope that finishing finishes, water heater to be installed, on metope, punch then, pass through, need like this metope and ceramic tile are done large-scale operation for corresponding water pipe, have following deficiency: at first, install loaded down with trivial details, efficiency is low; Secondly, metope and ceramic tile are destroyed greatly, waste of material is serious; Once more, water pipe is after setting on the through hole of metope installs, because there is either large or small deviation in potential difference different existence in hole after the supporting installation, the water pipe configuration is not attractive in appearance, and very easily damages the pre-buried pipeline of portion's water, electricity, gas within the walls in the process of boring porthole; At last, overall appearance is not good enough after installing, and influences use experience and visual effect.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of water heater installation method quick and easy for installation at the above-mentioned state of the art.
Another technical problem to be solved by this invention provides and a kind of metope and ceramic tile is not produced the water heater installation method of destruction.
Another technical problem to be solved by this invention provides a kind of water heater installation method that compact and reasonable and good looking appearance are set.
Another technical problem to be solved by this invention provides a kind of simple in structure, the pre-mounting bracket that is applied in the water heater installation method easy for installation.
The present invention solves the problems of the technologies described above the technical scheme that is adopted: a kind of water heater installation method is characterized in that in turn including the following steps:
1. pre-mounting bracket is located at the predeterminated position of blank metope, aforesaid pre-mounting bracket has hot water supply device and lays the location division that water entering section that water pipe uses and outlet part and hot water supply device are installed;
2. according to the water entering section and the outlet part of aforesaid pre-mounting bracket, on the blank wall, punch, and arrange water heater water inlet pipe and outlet pipe;
3. all lay ceramic tile and reserve aforesaid location division and the cover plate reserved place on blank metope and pre-mounting bracket outer surface, this cover plate reserved place is formed by water entering section and outlet part installation region;
4. the location division of corresponding aforementioned pre-mounting bracket, water entering section and outlet part are located at water heater on the wall and are positioned at the ceramic tile outer surface, and a cover plate is covered on aforesaid cover plate reserved place, promptly finish installation.
As preferably, the pre-mounting bracket of step described in 1. is arranged on the blank metope by the connector of a plurality of diverse locations.
As preferably, described location division is a plurality of reference columns that are arranged on the pre-mounting bracket.
Further, also have the power line hole that the power supply source line passes through on the described pre-mounting bracket, accordingly, described blank wall is provided with the through hole that cooperates with the power line hole.
Water entering section and outlet part on the described pre-mounting bracket are equipped with snap ring.Be convenient to be provided with water pipe.
Consider that water heater generally all has relief valve, also be provided with the pressure release portion that is used to install relief valve near water entering section or outlet part on the described pre-mounting bracket, this pressure release portion is provided with the snap ring that is used to locate the pressure release water pipe, accordingly, described blank wall is provided with the pressure release through hole that cooperates with pressure release water pipe snap ring.
As preferably, described pre-mounting bracket is " worker " font, and described location division takes shape in both sides, upper end and middle part, and described water entering section and outlet part then take shape in the bottom.Whole stress equalization.
Further, described water entering section and outlet part are hole shape or flute profile.
A kind of pre-mounting bracket that is applied to the water heater installation method is characterized in that this pre-mounting bracket has hot water supply device and lays the location division that water entering section that water pipe uses and outlet part and hot water supply device are installed.
Compared with prior art, the invention has the advantages that: pre-mounting bracket and water heater are supporting, set in advance on the blank metope, be beneficial to and fit up the back hot water supply device installation that finishes, the integral installation process is simple and convenient, accurately and reliably, metope and ceramic tile are not produced destruction, overall appearance is good after installing.
Description of drawings
Fig. 1 is the pre-mounting bracket structural representation among the embodiment 1.
Fig. 2 is the structural representation after pre-mounting bracket is arranged at the blank metope.
Fig. 3 is the structural representation of water pipe after connecting.
Fig. 4 is the stagewise cutaway view schematic diagram of Fig. 3.
Fig. 5 is the structural representation that sticks behind the ceramic tile.
Fig. 6 is the front view of Fig. 5.
Fig. 7 is the structural representation behind the installation water heater.
Fig. 8 is the cutaway view of Fig. 7.
Fig. 9 is embodiment 2 pre-mounting bracket structural representations.
The specific embodiment
Embodiment describes in further detail the present invention below in conjunction with accompanying drawing.
Embodiment 1, pre-mounting bracket 1 in the present embodiment is supporting with water heater 100, a kind of pre-mounting bracket can be applied to the water heater of multiple model, before water pipe and circuit are installed, takes pre-mounting bracket to water heater user family by water heater build-in services personnel.As shown in Figure 1, pre-mounting bracket 1 has hot water supply device and lays the location division 14 that water entering section 13 that water pipe uses and outlet part and hot water supply device are installed, pre-mounting bracket 1 is " worker " font, and location division 14 takes shape in both sides, upper end and middle part, water entering section 13 and outlet part then take shape in the bottom, and outlet part comprises hot outlet part 11 and cold outlet part 12.Water entering section 13 and outlet part are flute profile.Water entering section 13 and outlet part are equipped with snap ring.Location division 14 is for being arranged in a plurality of reference columns on the pre-mounting bracket 1.Pre-mounting bracket medium position also has the power line hole 16 that the power supply source line passes through.Also be provided with pressure release portion 17 near water entering section 13 on the pre-mounting bracket 1, at the relief valve setting that water heater is equipped with, the snap ring that pressure release portion 17 is provided with for the pressure release water pipe.
The water heater installation method in turn includes the following steps:
1. pre-mounting bracket 1 is located at the predeterminated position of 10 on blank wall by connector, the preferred swell fixture of the connector is here seen shown in Figure 2;
2. according to the water entering section 13 and the outlet part of pre-mounting bracket, Fig. 3 and shown in Figure 4 is seen in punching on blank wall 10, and layout water heater water inlet pipe 13a, outlet pipe 11a and outlet pipe 12a;
3. all lay ceramic tile 2 and reserve location division 14 and the cover plate reserved place on 10 on blank wall and pre-mounting bracket 1 outer surface, this cover plate reserved place is formed by water entering section 13, hot outlet part 11 and cold outlet part 12 installation regions, sees Fig. 5 and shown in Figure 6;
Location division 14, water entering section 13, hot outlet part 11 and the cold outlet part 12 of 4. corresponding pre-mounting bracket are located at water heater 100 on the wall and are positioned at ceramic tile 2 outer surfaces, and a cover plate 3 is covered on cover plate reserved place place, promptly finish installation, see Fig. 7 and shown in Figure 8.
If power line also will set in advance, step 2. in corresponding power line hole, the blank wall is provided with through hole.
Embodiment 2, and as shown in Figure 9, the pre-mounting bracket of another structure is not provided with pressure release portion on the pre-mounting bracket of present embodiment, but other structures and installation method reference example 1.

Claims (9)

1. water heater installation method is characterized in that in turn including the following steps:
1. pre-mounting bracket is located at the predeterminated position of blank metope, aforesaid pre-mounting bracket has hot water supply device and lays the location division that water entering section that water pipe uses and outlet part and hot water supply device are installed;
2. according to the water entering section and the outlet part of aforesaid pre-mounting bracket, on the blank wall, punch, and arrange water heater water inlet pipe and outlet pipe;
3. all lay ceramic tile and reserve aforesaid location division and the cover plate reserved place on blank metope and pre-mounting bracket outer surface, this cover plate reserved place is formed by water entering section and outlet part installation region;
4. the location division of corresponding aforementioned pre-mounting bracket, water entering section and outlet part are located at water heater on the wall and are positioned at the ceramic tile outer surface, and a cover plate is covered on aforesaid cover plate reserved place, promptly finish installation.
2. water heater installation method according to claim 1 is characterized in that the pre-mounting bracket described in step 1. is arranged on the blank metope by the connector of a plurality of diverse locations.
3. water heater installation method according to claim 1 is characterized in that described location division is a plurality of reference columns that are arranged on the pre-mounting bracket.
4. water heater installation method according to claim 1 is characterized in that also having the power line hole that the power supply source line passes through on the described pre-mounting bracket, and accordingly, described blank wall is provided with the through hole that cooperates with the power line hole.
5. water heater installation method according to claim 1 is characterized in that water entering section and the outlet part on the described pre-mounting bracket is equipped with snap ring.
6. water heater installation method according to claim 1, it is characterized in that also being provided with the pressure release portion that is used to install relief valve near water entering section or outlet part on the described pre-mounting bracket, this pressure release portion is provided with the snap ring that is used to locate the pressure release water pipe, accordingly, described blank wall is provided with the pressure release through hole that cooperates with pressure release water pipe snap ring.
7. according to the described water heater installation method of arbitrary claim in the claim 1~6, it is characterized in that described pre-mounting bracket is " worker " font, and described location division takes shape in both sides, upper end and middle part, and described water entering section and outlet part then take shape in the bottom.
8. according to the described water heater installation method of arbitrary claim in the claim 1~6, it is characterized in that described water entering section and outlet part are hole shape or flute profile.
9. pre-mounting bracket that is applied to water heater installation method in the claim 1~8 is characterized in that this pre-mounting bracket has hot water supply device and lays the location division that water entering section that water pipe uses and outlet part and hot water supply device are installed.
CN201010526034A 2010-10-27 2010-10-27 Water heater installation method Active CN102042685B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010526034A CN102042685B (en) 2010-10-27 2010-10-27 Water heater installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010526034A CN102042685B (en) 2010-10-27 2010-10-27 Water heater installation method

Publications (2)

Publication Number Publication Date
CN102042685A true CN102042685A (en) 2011-05-04
CN102042685B CN102042685B (en) 2012-10-03

Family

ID=43909056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010526034A Active CN102042685B (en) 2010-10-27 2010-10-27 Water heater installation method

Country Status (1)

Country Link
CN (1) CN102042685B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571822A (en) * 2018-07-19 2020-08-25 龚成香 Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0791792A1 (en) * 1996-02-21 1997-08-27 UNICAL AG S.p.A. Wall-mounted boiler
JP2005214590A (en) * 2004-02-02 2005-08-11 Rinnai Corp Wall mounted type appliance
CN201203271Y (en) * 2007-09-27 2009-03-04 高建新 Water heater support hook
CN201476275U (en) * 2009-08-14 2010-05-19 博西华电器(江苏)有限公司 Water heater
CN201892318U (en) * 2010-10-27 2011-07-06 宁波方太厨具有限公司 Pre-installing support for installing water heater

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0791792A1 (en) * 1996-02-21 1997-08-27 UNICAL AG S.p.A. Wall-mounted boiler
JP2005214590A (en) * 2004-02-02 2005-08-11 Rinnai Corp Wall mounted type appliance
CN201203271Y (en) * 2007-09-27 2009-03-04 高建新 Water heater support hook
CN201476275U (en) * 2009-08-14 2010-05-19 博西华电器(江苏)有限公司 Water heater
CN201892318U (en) * 2010-10-27 2011-07-06 宁波方太厨具有限公司 Pre-installing support for installing water heater

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571822A (en) * 2018-07-19 2020-08-25 龚成香 Pre-punching positioning auxiliary device and method for mounting water storage tank of simulated balance leveling water heater

Also Published As

Publication number Publication date
CN102042685B (en) 2012-10-03

Similar Documents

Publication Publication Date Title
CN204043183U (en) Electric heater hidden by canopy
CN102042685B (en) Water heater installation method
CN201892318U (en) Pre-installing support for installing water heater
US20110025046A1 (en) Device for mounting and connecting sanitary equipment pipes provided being a wall and corresponding method
CN207146504U (en) A kind of heating module
KR20160119462A (en) water distributer for boiler
CN204645500U (en) A kind of anchoring piece linkage adopting upset bolt
CN206113078U (en) Take connector link large -gap warm up board
CN204554975U (en) Mobile energy-saving safe steam heater easily
CN203880948U (en) Panel assembly for fuel gas heating water heater
CN210569263U (en) Geothermal heat exchanger convenient to install
CN203383474U (en) Recyclable constant-temperature ceramic floor
CN206113106U (en) It opens central water supply system of instant heating promptly to need not return water
CN206386996U (en) A kind of high residential building central hot water supply system
CN205189357U (en) PVC hot -water heating floor
CN206207546U (en) A kind of modified wall-hung boiler interface module
CN210946991U (en) Centralized distributor
CN209789679U (en) Bathroom cabinet convenient to install
CN203421281U (en) Instant electric water heating faucet structure
CN202158649U (en) Solar energy water heater placed in bathroom
CN103017230B (en) Two for heat-exchange unit
CN106352394A (en) Centralized hot water supply system for high-rise housing units
CN201992828U (en) Concealed pressure-bearing water tank
CN213300483U (en) Integrated heat pump heating system
CN205807609U (en) A kind of heating ceramic tile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Installation method of water heater

Effective date of registration: 20201111

Granted publication date: 20121003

Pledgee: Cixi branch of industrial and Commercial Bank of China Limited

Pledgor: Ningbo Fotile Kitchen Ware Co.,Ltd.

Registration number: Y2020330000925

PE01 Entry into force of the registration of the contract for pledge of patent right