CN111561726A - A ground heating coil fixing device that arranges for house construction - Google Patents

A ground heating coil fixing device that arranges for house construction Download PDF

Info

Publication number
CN111561726A
CN111561726A CN202010309079.1A CN202010309079A CN111561726A CN 111561726 A CN111561726 A CN 111561726A CN 202010309079 A CN202010309079 A CN 202010309079A CN 111561726 A CN111561726 A CN 111561726A
Authority
CN
China
Prior art keywords
limiting clamp
fixed
floor heating
arrangement
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010309079.1A
Other languages
Chinese (zh)
Other versions
CN111561726B (en
Inventor
金成高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shenjiang Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010309079.1A priority Critical patent/CN111561726B/en
Publication of CN111561726A publication Critical patent/CN111561726A/en
Application granted granted Critical
Publication of CN111561726B publication Critical patent/CN111561726B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • F24D3/14Tube and panel arrangements for ceiling, wall, or underfloor heating incorporated in a ceiling, wall or floor
    • F24D3/141Tube mountings specially adapted therefor
    • F24D3/143Tube clips with barbed anchors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Abstract

The invention relates to the technical field of floor heating pipe arrangement, in particular to a floor heating pipe arrangement fixing device for building construction. The fixing device is novel in design and simple in structure, the straight pipe part and the elbow part can be fixed in a right angle mode by adopting two fixing modes, the practicability is improved, the fixing effect is improved, the clamping mechanism is inserted into the heat insulation layer, the auxiliary fixing effect can be achieved by utilizing the barb and the heat insulation layer, the abutting plate is always attached to the upper side of the floor heating pipe under the effect of the telescopic mechanism, the auxiliary limiting effect is achieved, and the assembly of the floor heating pipes with different diameters is met.

Description

A ground heating coil fixing device that arranges for house construction
Technical Field
The invention relates to the technical field of floor heating pipe arrangement, in particular to a floor heating pipe arrangement fixing device for building construction.
Background
The ground heating pipe is a pipe used as a low-temperature hot water circulating flow carrier in a low-temperature hot water ground radiation heating system (ground heating for short), the ground heating pipe is generally laid above a ground heat insulation layer, and the ground heating pipe is fixed by adopting a pipe clamp in order to ensure the stability of the pipeline during arrangement.
But current pipe strap all can only fix the straight tube, and the part that corresponds the elbow is then not very ideal, and it is fixed with ground that the spike of current pipe strap runs through the heat preservation simultaneously, and the other end of pipe strap still is located the top of heat preservation, can not play supplementary fixed effect. Accordingly, a person skilled in the art provides a floor heating pipe arrangement fixing device for building construction to solve the problems set forth in the above background art.
Disclosure of Invention
The invention aims to provide a floor heating pipe arrangement fixing device for building construction, which solves the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a ground heating coil arrangement fixing device for building construction comprises a fixing cylinder, wherein a long nail penetrates through the upper surface of the fixing cylinder, and the upper surface of the fixed cylinder is vertically provided with a through hole at the position corresponding to the long nail, one side wall of the fixed cylinder is fixed with two connecting lugs which are distributed up and down, a second limit clamp and a first limit clamp are arranged on one side of the fixed cylinder side by side, the inner sides of the second limit clamp and the first limit clamp are both provided with a resisting plate, the two resisting plates are connected with the first limit clamp and the second limit clamp through a telescopic mechanism, a clamping mechanism is fixed below one end of each of the first limit clamp and the second limit clamp, and the outer sides of one ends of the first limiting clamp and the second limiting clamp are respectively fixed with a fixed block, one end of each fixed block is respectively fixed with a connecting ring connected with a connecting lug, and the connecting lugs are connected with the connecting rings through pin rods in a rotating manner.
As a further aspect of the invention: clamping mechanism is including being fixed in the inserted bar of first spacing card and second spacing card one end respectively, the bottom of inserted bar is provided with the plug that is the structure of falling triangle-shaped, and the both sides of inserted bar all are fixed with the barb of tilt up.
As a further aspect of the invention: the barb is 40 contained angles with the vertical direction of inserted bar, and both sides be equidistant wrong preface arrangement between the barb.
As a further aspect of the invention: telescopic machanism sets up the barrel on the inboard top of first spacing card and second spacing card including the embedding, the inside of barrel is provided with buffer spring, and the inside of barrel is located buffer spring's below and is provided with the briquetting, the bottom of briquetting is provided with the depression bar that runs through the barrel and links to each other with the board outside middle section.
As a further aspect of the invention: the bilateral symmetry of briquetting is provided with the guide block, the inboard position department that corresponds the guide block of barrel has all seted up the guide way, the internal diameter of guide way and the external diameter looks adaptation of guide block.
As a further aspect of the invention: the butt plate is of an arc-shaped structure, a protective pad is arranged on the inner side of the butt plate, and the protective pad is a component made of foam.
As a further aspect of the invention: the connecting lug is connected with the connecting ring, the connecting ring is connected with the connecting ring through the connecting lug, the connecting lug is connected.
As a further aspect of the invention: the first limiting clamp and the second limiting clamp are both made of heat-resistant ABS materials, and are both n-shaped.
Compared with the prior art, the invention has the beneficial effects that: the fixing device is novel in design and simple in structure, the straight pipe part and the elbow part can be fixed in a right angle mode by adopting two fixing modes, the practicability is improved, the fixing effect is improved, the clamping mechanism is inserted into the heat insulation layer, the auxiliary fixing effect can be achieved by utilizing the barb and the heat insulation layer, the abutting plate is always attached to the upper side of the floor heating pipe under the effect of the telescopic mechanism, the auxiliary limiting effect is achieved, and the assembly of the floor heating pipes with different diameters is met.
Drawings
Fig. 1 is a schematic structural view of a floor heating pipe arrangement fixing device for building construction;
fig. 2 is a schematic structural diagram of a first form of a ground heating pipe arrangement fixing device for building construction;
fig. 3 is an enlarged schematic view of a floor heating pipe arrangement fixing device for building construction at a position a in fig. 1;
fig. 4 is a side view of a first limiting clamp and a supporting plate in the floor heating pipe arrangement fixing device for building construction;
fig. 5 is an enlarged view of a floor heating pipe arrangement fixing device for building construction, shown at B in fig. 4;
fig. 6 is a schematic structural diagram of a second form of the ground heating pipe arrangement fixing device for building construction.
In the figure: 1. a fixed cylinder; 2. a long nail; 3. connecting lugs; 4. a fixed block; 5. a resisting plate; 6. a first limit card; 7. a second limit card; 8. a through hole; 9. a connecting ring; 10. a pin rod; 11. inserting a rod; 12. a barb; 13. a plug; 14. a buffer spring; 15. a barrel; 16. a guide block; 17. briquetting; 18. a pressure lever.
Detailed Description
Referring to fig. 1 to 6, in an embodiment of the present invention, a ground heating pipe arrangement fixing device for building construction includes a fixing cylinder 1, a spike 2 is disposed on an upper surface of the fixing cylinder 1 in a penetrating manner, a through hole 8 is vertically formed in a position of the upper surface of the fixing cylinder 1 corresponding to the spike 2, two connecting lugs 3 are fixed on a side wall of the fixing cylinder 1 and distributed up and down, a second limiting clamp 7 and a first limiting clamp 6 are disposed on one side of the fixing cylinder 1 side by side, the first limiting clamp 6 and the second limiting clamp 7 are both made of heat-resistant ABS material, and the first limiting clamp 6 and the second limiting clamp 7 are both in an "n" shape structure.
The inboard of second spacing card 7 and first spacing card 6 all is provided with to board 5, and to board 5 is the arc structure, and supports the inboard of board 5 and be provided with the protection and fill up, and the protection is filled up the component of a bubble cotton material, can reduce the injury to the ground heating coil.
Two support plates 5 and first spacing card 6 and second spacing card 7 between all link to each other through telescopic machanism, telescopic machanism sets up in the barrel 15 on first spacing card 6 and the inboard top of second spacing card 7 including the embedding, the inside of barrel 15 is provided with buffer spring 14, and the inside below that is located buffer spring 14 of barrel 15 is provided with briquetting 17, the bottom of briquetting 17 is provided with the depression bar 18 that runs through barrel 15 and support plate 5 outside middle section and link to each other, when ground heating coil diameter is less, buffer spring 14 drives through briquetting 17 and depression bar 18 and supports plate 5 and support the surface at ground heating coil through self tension effect down, when ground heating coil diameter is great, support plate 5 passes through depression bar 18 under ground heating coil's effect and to buffer spring 14 application of force, buffer spring 14 can contract after the atress and provide the stroke space for depression bar 18, and then can satisfy the spacing of large diameter ground heating coil.
The bilateral symmetry of briquetting 17 is provided with guide block 16, and the guide way has all been seted up to the inboard position department that corresponds guide block 16 of barrel 15, and the internal diameter of guide way and the external diameter looks adaptation of guide block 16 can play the effect of stable direction.
First spacing card 6 and the one end below of the spacing card 7 of second all are fixed with latch mechanism, latch mechanism is including being fixed in the inserted bar 11 of the spacing card 7 one end of first spacing card 6 and second respectively, the bottom of inserted bar 11 is provided with the plug 13 that is the structure of falling triangle-shaped, and the both sides of inserted bar 11 all are fixed with tilt up's barb 12, barb 12 is 40 contained angles with the vertical direction of inserted bar 11, and be equidistant staggered arrangement between the barb 12 of both sides, the inserted bar 11 has during the one end of plug 13 inserts the heat preservation during fixed, barb 12 also can insert simultaneously, the shape of barb 12 can be blocked in the heat preservation, can play supplementary fixed effect.
The outer sides of one ends of a first limiting clamp 6 and a second limiting clamp 7 are respectively fixed with a fixed block 4, one end of the fixed block 4 is respectively fixed with a connecting ring 9 connected with a connecting lug 3, the connecting lug 3 is rotatably connected with the connecting ring 9 through a pin rod 10, through holes are respectively arranged at positions of the surfaces of the connecting lug 3 and the connecting ring 9 corresponding to the pin rod 10, the inner diameter of each through hole is matched with the outer diameter of the pin rod 10, two ends of the pin rod 10 are respectively provided with a limiting sheet, the size of each limiting sheet is larger than that of each through hole, when a straight pipe is fixed, the first limiting clamp 6 and the second limiting clamp 7 are combined, the first limiting clamp 6 and the second limiting clamp 7 are further clamped outside a ground heating pipe, a long nail 2 is hammered by a blunt to penetrate through a heat insulation layer to be fixed with the ground, when an elbow is fixed, the first limiting clamp 6 and the second limiting clamp 7 are rotated along the pin rod 10 until an included angle of 90 degrees is formed between the first limiting clamp 6 and the second limiting clamp 7, the fixing of the elbow can be completed.
The working principle of the invention is as follows: firstly, when a straight pipe is fixed, a first limit clamp 6 and a second limit clamp 7 are combined, the first limit clamp 6 and the second limit clamp 7 are further clamped outside a ground heating pipe, a blunt is used for hammering a long nail 2 to enable the long nail to penetrate through a heat insulation layer and be fixed with the ground, when an elbow is fixed, the first limit clamp 6 and the second limit clamp 7 are rotated along a pin rod 10 until an included angle of 90 degrees is formed between the first limit clamp and the second limit clamp, the first limit clamp 6 and the second limit clamp 7 are further clamped at two ends of the elbow part of the ground heating pipe respectively, the fixing of the elbow part can be completed, secondly, when the fixing is performed, one end of an inserting rod 11 with a plug 13 is inserted into the heat insulation layer, meanwhile, an agnail 12 is inserted, the shape of the agnail 12 can be clamped into the heat insulation layer, the auxiliary fixing effect can be achieved, in addition, when the diameter of the ground heating pipe is small, a buffer spring 14 drives a support plate 5 to be supported on, when the ground heating coil diameter is great, support board 5 through the depression bar 18 to buffer spring 14 application of force under the effect of ground heating coil, buffer spring 14 can contract after the atress and provide the stroke space for depression bar 18, and then can satisfy the spacing of the ground heating coil of major diameter.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention are equivalent to or changed within the technical scope of the present invention.

Claims (8)

1. A ground heating coil arrangement fixing device for building construction comprises a fixing cylinder (1) and is characterized in that a long nail (2) penetrates through the upper surface of the fixing cylinder (1), a through hole (8) is vertically formed in the position, corresponding to the long nail (2), of the upper surface of the fixing cylinder (1), two connecting lugs (3) which are vertically distributed are fixed on one side wall of the fixing cylinder (1), a second limiting clamp (7) and a first limiting clamp (6) are arranged on one side of the fixing cylinder (1) side by side, abutting plates (5) are arranged on the inner sides of the second limiting clamp (7) and the first limiting clamp (6), the two abutting plates (5) are connected with the first limiting clamp (6) and the second limiting clamp (7) through telescopic mechanisms, and clamping mechanisms are fixed below one ends of the first limiting clamp (6) and the second limiting clamp (7), and the one end outside of first spacing card (6) and second spacing card (7) all is fixed with fixed block (4), the one end of fixed block (4) all is fixed with go-between (9) that link to each other with engaging lug (3), rotate through pin rod (10) between engaging lug (3) and go-between (9) and link to each other.
2. The arrangement and fixation device for the floor heating pipes for house construction according to claim 1, wherein the clamping mechanism comprises an insertion rod (11) fixed at one end of the first limiting clamp (6) and one end of the second limiting clamp (7) respectively, a plug (13) in an inverted triangle structure is arranged at the bottom of the insertion rod (11), and barbs (12) which are inclined upwards are fixed at two sides of the insertion rod (11).
3. The arrangement and fixation device for the floor heating pipes for house construction according to claim 2, wherein the barbs (12) are at an angle of 40 degrees with the vertical direction of the inserted rod (11), and the barbs (12) on both sides are arranged in an equidistant and staggered sequence.
4. The arrangement and fixation device for the floor heating pipes for house construction according to claim 1, wherein the telescopic mechanism comprises a cylinder (15) embedded in the top ends of the inner sides of the first limiting clamp (6) and the second limiting clamp (7), the inside of the cylinder (15) is provided with a buffer spring (14), a pressing block (17) is arranged in the cylinder (15) below the buffer spring (14), and the bottom of the pressing block (17) is provided with a pressing rod (18) which penetrates through the cylinder (15) and is connected with the middle section of the outer side of the abutting plate (5).
5. The arrangement and fixation device for the floor heating pipes for house construction according to claim 4, wherein the pressing block (17) is symmetrically provided with guide blocks (16) at two sides, the inner side of the cylinder (15) is provided with guide grooves at positions corresponding to the guide blocks (16), and the inner diameters of the guide grooves are matched with the outer diameters of the guide blocks (16).
6. The arrangement and fixation device for the floor heating pipes for building construction according to claim 1, wherein the supporting plate (5) is of an arc structure, and a protective pad is arranged on the inner side of the supporting plate (5), and the protective pad is a member made of foam.
7. The arrangement and fixation device for the floor heating pipes for house construction according to claim 1, wherein through holes are formed in the surfaces of the connecting lugs (3) and the connecting rings (9) at positions corresponding to the pin rods (10), the inner diameters of the through holes are matched with the outer diameters of the pin rods (10), limiting pieces are arranged at two ends of the pin rods (10), and the size of each limiting piece is larger than the inner diameter of each through hole.
8. The arrangement and fixation device for the floor heating pipes for house construction according to claim 1, wherein the first limiting clamp (6) and the second limiting clamp (7) are both made of heat-resistant ABS material, and the first limiting clamp (6) and the second limiting clamp (7) are both in an "n" shaped structure.
CN202010309079.1A 2020-04-19 2020-04-19 A ground heating coil fixing device that arranges for house construction Active CN111561726B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010309079.1A CN111561726B (en) 2020-04-19 2020-04-19 A ground heating coil fixing device that arranges for house construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010309079.1A CN111561726B (en) 2020-04-19 2020-04-19 A ground heating coil fixing device that arranges for house construction

Publications (2)

Publication Number Publication Date
CN111561726A true CN111561726A (en) 2020-08-21
CN111561726B CN111561726B (en) 2021-11-05

Family

ID=72074434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010309079.1A Active CN111561726B (en) 2020-04-19 2020-04-19 A ground heating coil fixing device that arranges for house construction

Country Status (1)

Country Link
CN (1) CN111561726B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113757757A (en) * 2021-08-18 2021-12-07 山东铁信建设集团有限公司 A mounting structure warms up with energy-saving for assembly type structure for green building

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29702410U1 (en) * 1997-02-12 1997-04-10 Trox Gmbh Geb Area element for the thermal treatment of a room
DE29702121U1 (en) * 1997-02-07 1997-04-17 Thermoval Systemheizungen Deut Holding device
DE19922233C1 (en) * 1999-05-14 2000-09-07 Roth Werke Gmbh Holder for under-floor heating pipes is U-shaped to fit over the pipe with barbs at the legs to anchor the holder when pushed into the insulation and plates to cover the insulation anchor holes
EP1855062A1 (en) * 2006-05-10 2007-11-14 Eurotherm S.P.A. Retaining clip for pipes
EP2474765A1 (en) * 2011-01-11 2012-07-11 Roth Werke GmbH Tube holder for fixing a heating pipe and/or cooling pipe and heating and/or cooling assembly
FR2972780A1 (en) * 2011-03-14 2012-09-21 Fabrice Philippe Thierry Chappuis Clip assembly for fixing e.g. electric heating cables of floor heating installation to insulating slab in residential premises, has clips movable from neutral configuration to tightened configuration in which recesses retain fixing units
DE102017001233A1 (en) * 2017-02-09 2018-08-09 Poly Plast Gmbh Underfloor heating pipe fastening system in which a plastic needle is stapled with a setting device via the pipe in the underlying insulation
CN109898794A (en) * 2017-12-09 2019-06-18 西安盖沃热能科技有限公司 A kind of energy conservation heating floor

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29702121U1 (en) * 1997-02-07 1997-04-17 Thermoval Systemheizungen Deut Holding device
DE29702410U1 (en) * 1997-02-12 1997-04-10 Trox Gmbh Geb Area element for the thermal treatment of a room
DE19922233C1 (en) * 1999-05-14 2000-09-07 Roth Werke Gmbh Holder for under-floor heating pipes is U-shaped to fit over the pipe with barbs at the legs to anchor the holder when pushed into the insulation and plates to cover the insulation anchor holes
EP1855062A1 (en) * 2006-05-10 2007-11-14 Eurotherm S.P.A. Retaining clip for pipes
EP2474765A1 (en) * 2011-01-11 2012-07-11 Roth Werke GmbH Tube holder for fixing a heating pipe and/or cooling pipe and heating and/or cooling assembly
FR2972780A1 (en) * 2011-03-14 2012-09-21 Fabrice Philippe Thierry Chappuis Clip assembly for fixing e.g. electric heating cables of floor heating installation to insulating slab in residential premises, has clips movable from neutral configuration to tightened configuration in which recesses retain fixing units
DE102017001233A1 (en) * 2017-02-09 2018-08-09 Poly Plast Gmbh Underfloor heating pipe fastening system in which a plastic needle is stapled with a setting device via the pipe in the underlying insulation
CN109898794A (en) * 2017-12-09 2019-06-18 西安盖沃热能科技有限公司 A kind of energy conservation heating floor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113757757A (en) * 2021-08-18 2021-12-07 山东铁信建设集团有限公司 A mounting structure warms up with energy-saving for assembly type structure for green building
CN113757757B (en) * 2021-08-18 2022-10-28 山东铁信建设集团有限公司 A mounting structure warms up with energy-saving for assembly type structure for green building

Also Published As

Publication number Publication date
CN111561726B (en) 2021-11-05

Similar Documents

Publication Publication Date Title
CN111561726B (en) A ground heating coil fixing device that arranges for house construction
JP5962232B2 (en) Manufacturing method of underground heat exchanger and underground heat exchanger
CN209726308U (en) A kind of floor heating pipe mounting structure
CN210227482U (en) Folding type light furniture
CN211341169U (en) Anti-seismic buffering base steel structure for constructional engineering
CN207350982U (en) Buried pipe heat exchange system
CN210985487U (en) Tube bank clamp convenient for size adjustment
CN211145597U (en) Novel buried pipe guide support structure
KR101030218B1 (en) Fixing structure for pipe of under-floor heating system
CN213827994U (en) Supporting seat for steel processing
CN108443645B (en) A kind of anti-seismic heat-preservation heat supply pipeline and preparation method thereof
CN208221779U (en) A kind of New-type heating pipe sliding pallet
CN219827949U (en) Pipeline supporting structure
CN214525309U (en) Pile foundation fixing device for civil engineering
CN215446956U (en) Seawater source cooling and heating type heat pump unit
CN212153474U (en) Shock attenuation formula building house
TW198739B (en) Shock-proof construction and structure
CN218343988U (en) Cavity glass solidification storage rack
CN113328394B (en) Pressing type self-locking convenient wire bundling mechanism for grid bridge
CN212511342U (en) Ground heating coil that heat transfer performance is good
CN213040792U (en) Ground source heat pump fixing structure
CN219432761U (en) Pipeline anti-seismic reinforcing structure for civil engineering construction
CN214245797U (en) Connecting mechanism for improving stability of pile foundation
CN214783649U (en) Inclined river retaining wall
CN211228927U (en) Building steel structure connecting piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210517

Address after: 323000 No.96, Lihe village, Bihu Town, Liandu District, Lishui City, Zhejiang Province

Applicant after: Lishui Junxiang Information Technology Co.,Ltd.

Address before: 323700 NO.175, Anfu village, Anren Town, Longquan City, Lishui City, Zhejiang Province

Applicant before: Jin Chenggao

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211019

Address after: 252000 station Q, room 212, second floor, office building of Liaocheng Industrial Technology Research Institute, No. 88, Huanghe Road, Jiuzhou street, high tech Zone, Liaocheng City, Shandong Province

Applicant after: Shandong Shenjiang Construction Engineering Co.,Ltd. Liaocheng branch

Address before: 323000 No.96, Lihe village, Bihu Town, Liandu District, Lishui City, Zhejiang Province

Applicant before: Lishui Junxiang Information Technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230719

Address after: Room 312, Business Room, Building 11 #, Haihai Mingyue, Tengzhou City, Zaozhuang, 277500 Shandong Province

Patentee after: Shandong Shenjiang Construction Engineering Co.,Ltd.

Address before: 252000 station Q, room 212, second floor, office building of Liaocheng Industrial Technology Research Institute, No. 88, Huanghe Road, Jiuzhou street, high tech Zone, Liaocheng City, Shandong Province

Patentee before: Shandong Shenjiang Construction Engineering Co.,Ltd. Liaocheng branch