CN111560946A - 一种预制导墙及其施工方法 - Google Patents
一种预制导墙及其施工方法 Download PDFInfo
- Publication number
- CN111560946A CN111560946A CN202010443799.7A CN202010443799A CN111560946A CN 111560946 A CN111560946 A CN 111560946A CN 202010443799 A CN202010443799 A CN 202010443799A CN 111560946 A CN111560946 A CN 111560946A
- Authority
- CN
- China
- Prior art keywords
- guide wall
- unit
- piece
- unit piece
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 238000009434 installation Methods 0.000 claims description 6
- 230000000149 penetrating effect Effects 0.000 claims description 4
- 230000006872 improvement Effects 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 238000000034 method Methods 0.000 description 12
- 230000008569 process Effects 0.000 description 9
- 239000004567 concrete Substances 0.000 description 5
- 239000011150 reinforced concrete Substances 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010443799.7A CN111560946A (zh) | 2020-05-22 | 2020-05-22 | 一种预制导墙及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010443799.7A CN111560946A (zh) | 2020-05-22 | 2020-05-22 | 一种预制导墙及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111560946A true CN111560946A (zh) | 2020-08-21 |
Family
ID=72069189
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010443799.7A Pending CN111560946A (zh) | 2020-05-22 | 2020-05-22 | 一种预制导墙及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111560946A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113279392A (zh) * | 2021-06-10 | 2021-08-20 | 中煤江南(佛山)建设发展有限公司 | 一种地下连续墙预制导墙 |
CN113529697A (zh) * | 2021-07-07 | 2021-10-22 | 福建东寰建设有限公司 | 一种预制导墙及使用该预制导墙的咬合桩施工工艺 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM287828U (en) * | 2005-08-19 | 2006-02-21 | Jung-Yu Huang | Improved structure of gabion |
KR20080050110A (ko) * | 2006-12-01 | 2008-06-05 | 김범수 | 인장력이 도입된 프리캐스트 콘크리트 옹벽 |
CN201901960U (zh) * | 2010-04-13 | 2011-07-20 | 周文华 | 一种带拼装式插孔接口的墙体预制件 |
CN109826194A (zh) * | 2019-01-29 | 2019-05-31 | 江苏省水利建设工程有限公司 | 混凝土地连墙的安装式导墙及其施工方法 |
CN210013079U (zh) * | 2019-01-16 | 2020-02-04 | 贵州中昇东浩科技有限公司 | 一种预制路肩单元体 |
CN212358270U (zh) * | 2020-05-22 | 2021-01-15 | 广东水电二局股份有限公司 | 一种预制导墙 |
-
2020
- 2020-05-22 CN CN202010443799.7A patent/CN111560946A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWM287828U (en) * | 2005-08-19 | 2006-02-21 | Jung-Yu Huang | Improved structure of gabion |
KR20080050110A (ko) * | 2006-12-01 | 2008-06-05 | 김범수 | 인장력이 도입된 프리캐스트 콘크리트 옹벽 |
CN201901960U (zh) * | 2010-04-13 | 2011-07-20 | 周文华 | 一种带拼装式插孔接口的墙体预制件 |
CN210013079U (zh) * | 2019-01-16 | 2020-02-04 | 贵州中昇东浩科技有限公司 | 一种预制路肩单元体 |
CN109826194A (zh) * | 2019-01-29 | 2019-05-31 | 江苏省水利建设工程有限公司 | 混凝土地连墙的安装式导墙及其施工方法 |
CN212358270U (zh) * | 2020-05-22 | 2021-01-15 | 广东水电二局股份有限公司 | 一种预制导墙 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113279392A (zh) * | 2021-06-10 | 2021-08-20 | 中煤江南(佛山)建设发展有限公司 | 一种地下连续墙预制导墙 |
CN113529697A (zh) * | 2021-07-07 | 2021-10-22 | 福建东寰建设有限公司 | 一种预制导墙及使用该预制导墙的咬合桩施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100939535B1 (ko) | 지하연속벽체 시공용 가이드 | |
KR100975948B1 (ko) | 프리캐스트 패널 및 이를 이용한 지중 연속벽 시공방법 | |
KR101708760B1 (ko) | 돌출리브를 구비한 프리캐스트 콘크리트 벽체의 시공 방법 | |
CN110268124B (zh) | 一种预浇筑加强重型混凝土护土墙 | |
CN212358270U (zh) | 一种预制导墙 | |
KR101161332B1 (ko) | 지하터널의 시공방법 | |
CN111560946A (zh) | 一种预制导墙及其施工方法 | |
KR101012916B1 (ko) | 시트파일유닛 중 지주파일의 시공장치 | |
CN217870407U (zh) | 一种拼接式导墙 | |
CN114134898B (zh) | 一种逆作法一桩一柱的连接结构及其施工方法 | |
CN213682833U (zh) | 一种混凝土预制墙板 | |
KR20220155696A (ko) | 흙막이벽의 프리캐스트 외장 패널 시공 구조 및 그의 시공 방법 | |
CN218541128U (zh) | 一种装配式楼板拼缝处模板连接加固结构 | |
CN219952020U (zh) | 一种互扣式的预制承台侧模 | |
CN220927887U (zh) | 一种聚氨酯拉挤型材防护式坑道 | |
KR102633929B1 (ko) | 흙막이 벽체 시공용 케이싱 및 이를 이용한 흙막이 벽체 시공방법 | |
CN214993023U (zh) | 一种框架墩墩体结构 | |
CN212153404U (zh) | 一种基坑围护结构 | |
JP4036178B2 (ja) | コンクリートブロックの設置方法および移動装置 | |
CN215830076U (zh) | 一种后砌非承重隔墙稳定结构 | |
CN211849476U (zh) | 一种分区施工建筑的基坑支护结构 | |
JP2019157397A (ja) | トンネルインバートの施工方法とトンネルインバート用プレキャスト板 | |
CN114396283B (zh) | 装配式顶管工作井施工方法 | |
CN221277745U (zh) | 一种在不良地质条件下浅埋暗挖法施工用的格栅拱架 | |
JP3563128B2 (ja) | プレキャストコンクリート基礎構造及びプレキャストコンクリート基礎並びに基礎の施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant after: Guangdong Construction Engineering Group Co.,Ltd. Address before: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant before: GUANGDONG NO. 2 HYDROPOWER ENGINEERING Co.,Ltd. Country or region before: China |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20240614 Address after: Room 1201-1208, Building 1, No. 1 Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province, 511340 Applicant after: Guangdong Hydropower Second Bureau Group Co.,Ltd. Country or region after: China Applicant after: Guangdong Construction Engineering Group Co.,Ltd. Address before: 511340 20 / F, A-1 business center, Shuidian Plaza, building 1, Guangshen Avenue West, Xintang Town, Zengcheng District, Guangzhou City, Guangdong Province Applicant before: Guangdong Construction Engineering Group Co.,Ltd. Country or region before: China |