CN111558593A - Building decoration garbage sorting process - Google Patents

Building decoration garbage sorting process Download PDF

Info

Publication number
CN111558593A
CN111558593A CN201910114381.9A CN201910114381A CN111558593A CN 111558593 A CN111558593 A CN 111558593A CN 201910114381 A CN201910114381 A CN 201910114381A CN 111558593 A CN111558593 A CN 111558593A
Authority
CN
China
Prior art keywords
materials
crushed
building decoration
garbage
plate chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910114381.9A
Other languages
Chinese (zh)
Inventor
贾成俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910114381.9A priority Critical patent/CN111558593A/en
Publication of CN111558593A publication Critical patent/CN111558593A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • B09B3/80Destroying solid waste or transforming solid waste into something useful or harmless involving an extraction step
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B5/00Operations not covered by a single other subclass or by a single other group in this subclass
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Processing Of Solid Wastes (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

The invention discloses a building decoration garbage sorting process, which comprises the following steps: the method comprises the steps of line selection, crushing feeding line, feeding by a plate chain machine, screening and secondary screening, wherein building decoration garbage is finely screened by the plate chain machine, a disc machine, a bouncing machine, a star disc screen and other equipment, and meanwhile, the screening line is adjusted according to the properties of materials, so that the method is more efficient in sorting the building decoration garbage and saves a large amount of energy.

Description

Building decoration garbage sorting process
Technical Field
The invention relates to the field of building garbage treatment, in particular to a building decoration garbage sorting process.
Background
The building decoration garbage mainly refers to various wastes such as soil, waste residues, mortar and the like generated in the process of building, repairing and dismantling various structures, buildings and the like by construction units or individuals and house decoration. The garbage is recycled after being sorted, and is a disposal mode which is economic and environment-friendly. At present, a plurality of processes or devices for sorting the building decoration garbage are adopted, but the processes or the devices are relatively extensive, fine sorting cannot be achieved, the sorting process is not targeted, and resource waste and low sorting efficiency are caused.
CN201510039967.5 discloses a process and an apparatus for separating construction waste, the process comprising: the brick and tile blocks, the concrete blocks and the mortar blocks screened from the construction waste are forced to move regularly at a high speed in a relatively closed container, and then are respectively screened out according to the specific gravity and the movement speed of different materials, so that the separation of the brick and tile blocks, the concrete blocks and the mortar blocks is realized. An apparatus for use in the process is also disclosed. The process and the device solve the problem that the brick and tile blocks, the concrete blocks and the mortar blocks in the construction waste are difficult to sort, and have low investment cost, simple process and low energy consumption.
CN201510610341.5 the invention discloses a building rubbish sorting and recycling process and a device thereof, the process is a complete process aiming at building rubbish fine sorting and recycling of a system, and raw rubbish passes through a heavy-load impact-resistant stepless speed-regulating uniform feeding machine, a large material separator, a first output machine, an intelligent grab bucket sorting platform, a water washing system, a water washing material discharging machine, a second output machine, a fine material separator, comprehensive winnowing, a pure material collector and a comprehensive winnowing sundry discharging machine, so that the resource utilization of the building rubbish is realized.
The sorting process of the construction waste is relatively extensive, fine and targeted sorting is not achieved, the sorted materials are difficult to recycle, and the efficiency of the sorting process is low.
Disclosure of Invention
A building decoration garbage sorting process comprises the following steps:
(1) line selection: selectively adjusting a sorting route according to the volume of the building decoration garbage, and if the supplied materials comprise materials such as bagged materials, large concrete and the like, crushing the supplied materials on a feeding line; if the material has no large blocks and a small amount of bagged objects, the plate chain machine can be automatically switched;
(2) crushing and feeding line: materials such as bagged materials, bulk concrete and the like are conveyed to a coarse crusher to be crushed, and the materials enter a plate chain machine after being treated and screened;
(3) feeding by a plate chain machine: directly feeding the small building decoration garbage in bulk into a plate chain conveyor through a loader, and conveying the materials by the plate chain conveyor;
(4) screening: bulk small building decoration garbage or materials crushed by a crushing feeding line are conveyed to a disc sieve, materials below the disc sieve are fed by a belt conveyor to be conveyed to a bouncing sieve, and 3 materials can be obtained by sieving the bouncing sieve, wherein the materials are respectively 50-200mm2D materials, 50-200mm 3D materials and 0-50mm below the bouncing sieve;
(5) secondary screening: after entering a star disk auxiliary sorting system, 0-50mm undersize materials are divided into three materials again, 0-3mm sandy soil, 3-50mm light materials are directly converged into a belt line together with a bouncing screen 2D material through a belt conveyor and enter a packing machine, 3-50mm heavy materials (small-particle sand and stone materials) are converged into a manual sorting belt line together with a bouncing screen 3D material and a bar screen oversize material to be subjected to impurity removal and then enter a reverse impact crusher, all aggregates are crushed into materials with the particle size of 0-10mm through an ore crusher, and 10-30mm melon seed materials and oversize materials with the particle size of more than 30mm are crushed into materials with the particle size of 0-10mm through a return material feeding crusher again.
Preferably, the building decoration garbage is pretreated before being sorted in the step (1).
Preferably, the building decoration garbage pretreatment process comprises the steps of placing building garbage in an open field, spraying water by using a high-pressure water gun, and setting the pressure to be the garbage accumulation volume (m) according to the garbage accumulation volume3) 10-30 times Kpa.
Preferably, the specific process of the crushing and feeding line in the step (2) is as follows: and (3) crushing materials such as bagged materials and large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into materials of 50-200mm, the crushed materials are sieved through a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, and the materials with the particle size larger than 200mm enter the coarse crusher again for secondary crushing until the materials are completely smaller than 200 mm.
Preferably, the feeding mode of the plate chain machine in the step (3) is a uniform feeding mode for material conveying, and the conveying speed of the material is 0.2-0.5m3/min。
Preferably, the oversize materials 50-200mm2D materials and 50-200mm 3D materials in the step (4) are separated through water separation, namely the 2D and 3D materials are washed in 20-50cm/s running water, the 3D heavy materials are deposited at the bottom of the water body, and the 2D light materials are separated from the 3D materials under the drive of the water body.
Preferably, the material finally obtained in the process in the step (5) comprises: sand of 0-3mm, light material of 3-50mm, mixture of materials of 50-200mm2D and heavy material particles of 0-10 mm.
Has the advantages that: the invention provides a process for sorting building decoration garbage,the process comprises the following steps: the method comprises the steps of line selection, crushing feeding line, feeding by a plate chain machine, screening and secondary screening, wherein building decoration garbage is finely screened by the plate chain machine, a disc machine, a bouncing machine, a star disc screen and other equipment, meanwhile, the screening route is adjusted according to the properties of materials, so that the method is more efficient in sorting the building decoration garbage and saves a large amount of energy, the building decoration garbage is firstly pretreated before being sorted in the step (1), the building decoration garbage is pretreated by placing the building garbage in a wide open site, water spraying treatment is carried out by using a high-pressure water gun, the pressure is determined according to the garbage accumulation volume, and the garbage accumulation volume (m) is set according to the garbage accumulation volume3) The pressure of 10-30 times Kpa, the process can wet the construction waste through the water body, and dust is prevented from being generated in the sorting process, so that the process is more environment-friendly, and the specific process of crushing the feeding line in the step (2) is as follows: bagging and crushing materials such as large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into 50-200mm materials, the crushed materials are sieved by a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, the materials with the particle size larger than 200mm enter the coarse crusher again to be crushed again until the materials are completely smaller than 200mm, the process can ensure that all building decoration garbage can enter the sorting process to be sorted, the 2D materials with the oversize materials of 50-200mm and the 3D materials with the particle size of 50-200mm in the step (4) are separated by water sorting, namely, 2D and 3D materials are washed in flowing water of 20-50cm/s, the 3D heavy materials are deposited at the bottom of a water body, and the 2D light materials are separated from the 3D materials by the water body, the process replaces the traditional manual sorting, the separation of 2D and 3D materials can be realized more efficiently, and the materials finally obtained by the process in the step (5) comprise: the sand soil of 0-3mm, the light material of 3-50mm and the mixture of materials of 50-200mm2D, the heavy material particle of 0-10mm, the final sorted product is sorted according to the property and the particle size, which is more delicate and scientific.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
Example 1:
a building decoration garbage sorting process comprises the following steps:
(1) line selection: before the building decoration rubbish is selected separately, at first carry out the preliminary treatment, be about to building rubbish and place open area in, use high-pressure squirt to carry out water spray treatment, pressure is decided according to rubbish pile up volume, sets for rubbish pile up volume (m)3) The pressure of 10 times Kpa, the sorting route is selectively adjusted according to the volume of the materials of the building decoration garbage, and if the incoming materials comprise materials such as bagged materials, large concrete and the like, the incoming materials are crushed and fed into a feeding line; if the material has no large blocks and a small amount of bagged objects, the plate chain machine can be automatically switched;
(2) crushing and feeding line: materials such as bagging and bulk concrete are conveyed to a coarse crusher for crushing treatment, and the materials enter a plate link machine after being treated and screened, wherein the specific process of the crushing feed line is as follows: crushing materials such as bagged materials and large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into 50-200mm materials, the crushed materials are sieved through a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, and the materials with the particle size larger than 200mm enter the coarse crusher again to be crushed again until the materials are completely smaller than 200 mm;
(3) feeding by a plate chain machine: the bulk small building decoration garbage is directly fed into the plate chain conveyor through the loader, the feeding mode of the plate chain conveyor is a uniform feeding mode for material conveying, and the conveying speed of the materials is 0.2m3Min, conveying the materials by a plate link chain machine;
(4) screening: bulk small building decoration garbage or materials crushed by a crushing feeding line are conveyed to a disc sieve, materials below the disc sieve are fed by a belt conveyor to convey the materials to a bouncing sieve, and through the sieving of the bouncing sieve, 3 materials can be obtained, namely 50-200mm2D materials, 50-200mm 3D materials and 0-50mm undersize materials, 50-200mm2D materials and 50-200mm 3D materials on the oversize materials are separated by water separation, namely, the 2D and 3D materials are washed in 20cm/s flowing water, 3D heavy materials are deposited at the bottom of a water body, and 2D light materials are separated from the 3D materials under the driving of the water body;
(5) secondary screening: after entering a star disk auxiliary sorting system, 0-50mm undersize materials are divided into three materials again, 0-3mm sandy soil, 3-50mm light materials are directly converged into a belt line together with a bouncing screen 2D material through a belt conveyor to enter a packing machine, 3-50mm heavy materials (small-particle sand and stone materials) are converged into a manual sorting belt line together with a bouncing screen 3D material and a bar screen oversize material to be subjected to impurity removal and then enter a reverse impact crusher, all aggregates are crushed into materials with the particle size of 0-10mm through an ore crusher, 10-30mm melon seeds and oversize materials with the particle size of more than 30mm need to be fed back into the crusher to be crushed again into materials with the particle size of 0-10mm, and finally the materials obtained by the process comprise: sand of 0-3mm, light material of 3-50mm, mixture of materials of 50-200mm2D and heavy material particles of 0-10 mm.
Example 2:
a building decoration garbage sorting process comprises the following steps:
(1) line selection: before the building decoration rubbish is selected separately, at first carry out the preliminary treatment, be about to building rubbish and place open area in, use high-pressure squirt to carry out water spray treatment, pressure is decided according to rubbish pile up volume, sets for rubbish pile up volume (m)3) The pressure of 25 times Kpa, the sorting route is selectively adjusted according to the volume of the materials of the building decoration garbage, and if the incoming materials comprise materials such as bagged materials, large concrete and the like, the incoming materials are crushed and fed into a feeding line; if the material has no large blocks and a small amount of bagged objects, the plate chain machine can be automatically switched;
(2) crushing and feeding line: materials such as bagging and bulk concrete are conveyed to a coarse crusher for crushing treatment, and the materials enter a plate link machine after being treated and screened, wherein the specific process of the crushing feed line is as follows: crushing materials such as bagged materials and large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into 50-200mm materials, the crushed materials are sieved through a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, and the materials with the particle size larger than 200mm enter the coarse crusher again to be crushed again until the materials are completely smaller than 200 mm;
(3) feeding by a plate chain machine: the bulk small building decoration garbage is directly fed into the plate chain conveyor through the loader, the feeding mode of the plate chain conveyor is a uniform feeding mode for material conveying, and the conveying speed of the materials is 0.35m3Min, conveying the materials by a plate link chain machine;
(4) screening: bulk small building decoration garbage or materials crushed by a crushing feeding line are conveyed to a disc sieve, materials below the disc sieve are fed by a belt conveyor to convey the materials to a bouncing sieve, and through the sieving of the bouncing sieve, 3 materials can be obtained, namely 50-200mm2D materials, 50-200mm 3D materials and 0-50mm undersize materials, 50-200mm2D materials and 50-200mm 3D materials on the oversize materials are separated by water separation, namely, the 2D and 3D materials are washed in 35cm/s flowing water, 3D heavy materials are deposited at the bottom of a water body, and 2D light materials are separated from the 3D materials under the driving of the water body;
(5) secondary screening: after entering a star disk auxiliary sorting system, 0-50mm undersize materials are divided into three materials again, 0-3mm sandy soil, 3-50mm light materials are directly converged into a belt line together with a bouncing screen 2D material through a belt conveyor to enter a packing machine, 3-50mm heavy materials (small-particle sand and stone materials) are converged into a manual sorting belt line together with a bouncing screen 3D material and a bar screen oversize material to be subjected to impurity removal and then enter a reverse impact crusher, all aggregates are crushed into materials with the particle size of 0-10mm through an ore crusher, 10-30mm melon seeds and oversize materials with the particle size of more than 30mm need to be fed back into the crusher to be crushed again into materials with the particle size of 0-10mm, and finally the materials obtained by the process comprise: sand of 0-3mm, light material of 3-50mm, mixture of materials of 50-200mm2D and heavy material particles of 0-10 mm.
Example 3:
a building decoration garbage sorting process comprises the following steps:
(1) line selection: before the building decoration rubbish is selected separately, at first carry out the preliminary treatment, be about to building rubbish and place open area in, use high-pressure squirt to carry out water spray treatment, pressure is decided according to rubbish pile up volume, sets for rubbish pile up volume (m)3) The pressure of 30 times Kpa is selectively adjusted according to the material volume of the building decoration garbageA sorting line, wherein if the incoming materials comprise materials such as bags, large concrete and the like, the incoming materials are crushed and fed into the line; if the material has no large blocks and a small amount of bagged objects, the plate chain machine can be automatically switched;
(2) crushing and feeding line: materials such as bagging and bulk concrete are conveyed to a coarse crusher for crushing treatment, and the materials enter a plate link machine after being treated and screened, wherein the specific process of the crushing feed line is as follows: crushing materials such as bagged materials and large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into 50-200mm materials, the crushed materials are sieved through a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, and the materials with the particle size larger than 200mm enter the coarse crusher again to be crushed again until the materials are completely smaller than 200 mm;
(3) feeding by a plate chain machine: the bulk small building decoration garbage is directly fed into the plate chain conveyor through the loader, the feeding mode of the plate chain conveyor is a uniform feeding mode for material conveying, and the conveying speed of the materials is 0.5m3Min, conveying the materials by a plate link chain machine;
(4) screening: bulk small building decoration garbage or materials crushed by a crushing feeding line are conveyed to a disc sieve, materials below the disc sieve are fed by a belt conveyor to convey the materials to a bouncing sieve, and through the sieving of the bouncing sieve, 3 materials can be obtained, namely 50-200mm2D materials, 50-200mm 3D materials and 0-50mm undersize materials, 50-200mm2D materials and 50-200mm 3D materials on the oversize materials are separated by water separation, namely, the 2D and 3D materials are washed in 50cm/s running water, 3D heavy materials are deposited at the bottom of a water body, and 2D light materials are separated from the 3D materials under the driving of the water body;
(5) secondary screening: after entering a star disk auxiliary sorting system, 0-50mm undersize materials are divided into three materials again, 0-3mm sandy soil, 3-50mm light materials are directly converged into a belt line together with a bouncing screen 2D material through a belt conveyor to enter a packing machine, 3-50mm heavy materials (small-particle sand and stone materials) are converged into a manual sorting belt line together with a bouncing screen 3D material and a bar screen oversize material to be subjected to impurity removal and then enter a reverse impact crusher, all aggregates are crushed into materials with the particle size of 0-10mm through an ore crusher, 10-30mm melon seeds and oversize materials with the particle size of more than 30mm need to be fed back into the crusher to be crushed again into materials with the particle size of 0-10mm, and finally the materials obtained by the process comprise: sand of 0-3mm, light material of 3-50mm, mixture of materials of 50-200mm2D and heavy material particles of 0-10 mm.
Samples of each example were taken for assay analysis and compared to the prior art to yield the following data:
Figure BDA0001969555210000091
according to the data in the table, when the parameters of the embodiment 2 are adopted, the process parameters of the building decoration garbage sorting process are that the energy saving rate is 18%, the sorting resource conversion rate is 95%, the impact resistance of the produced regenerated brick is 72MPa, and the density of the brick body is 23.3g/cm3, while the prior art standard is that the energy saving rate is 5%, the sorting resource conversion rate is 80%, the impact resistance of the produced regenerated brick is 60MPa, and the density of the brick body is 18.6g/cm 3.
The invention provides a building decoration garbage sorting process, which comprises the following steps: the method comprises the steps of line selection, crushing feeding line, feeding by a plate chain machine, screening and secondary screening, wherein building decoration garbage is finely screened by the plate chain machine, a disc machine, a bouncing machine, a star disc screen and other equipment, meanwhile, the screening route is adjusted according to the properties of materials, so that the method is more efficient in sorting the building decoration garbage and saves a large amount of energy, the building decoration garbage is firstly pretreated before being sorted in the step (1), the building decoration garbage is pretreated by placing the building garbage in a wide open site, water spraying treatment is carried out by using a high-pressure water gun, the pressure is determined according to the garbage accumulation volume, and the garbage accumulation volume (m) is set according to the garbage accumulation volume3) The pressure of 10-30 times Kpa, the process can wet the construction waste through the water body, and prevent dust generation in the sorting process, so that the process is more convenientAdding environment protection, wherein the specific process of the crushing feeding line in the step (2) comprises the following steps: bagging and crushing materials such as large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into 50-200mm materials, the crushed materials are sieved by a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, the materials with the particle size larger than 200mm enter the coarse crusher again to be crushed again until the materials are completely smaller than 200mm, the process can ensure that all building decoration garbage can enter the sorting process to be sorted, the 2D materials with the oversize materials of 50-200mm and the 3D materials with the particle size of 50-200mm in the step (4) are separated by water sorting, namely, 2D and 3D materials are washed in flowing water of 20-50cm/s, the 3D heavy materials are deposited at the bottom of a water body, and the 2D light materials are separated from the 3D materials by the water body, the process replaces the traditional manual sorting, the separation of 2D and 3D materials can be realized more efficiently, and the materials finally obtained by the process in the step (5) comprise: the sand soil of 0-3mm, the light material of 3-50mm and the mixture of materials of 50-200mm2D, the heavy material particle of 0-10mm, the final sorted product is sorted according to the property and the particle size, which is more delicate and scientific.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, various changes and modifications can be made without departing from the inventive concept of the present invention, and these changes and modifications are all within the scope of the present invention.

Claims (7)

1. A building decoration garbage sorting process is characterized by comprising the following steps:
(1) line selection: selectively adjusting a sorting route according to the volume of the building decoration garbage, and if the supplied materials comprise materials such as bagged materials, large concrete and the like, crushing the supplied materials on a feeding line; if the material has no large blocks and a small amount of bagged objects, the plate chain machine can be automatically switched;
(2) crushing and feeding line: materials such as bagged materials, bulk concrete and the like are conveyed to a coarse crusher to be crushed, and the materials enter a plate chain machine after being treated and screened;
(3) feeding by a plate chain machine: directly feeding the small building decoration garbage in bulk into a plate chain conveyor through a loader, and conveying the materials by the plate chain conveyor;
(4) screening: bulk small building decoration garbage or materials crushed by a crushing feeding line are conveyed to a disc sieve, materials below the disc sieve are fed by a belt conveyor to be conveyed to a bouncing sieve, and 3 materials can be obtained by sieving the bouncing sieve, wherein the materials are respectively 50-200mm2D materials, 50-200mm 3D materials and 0-50mm below the bouncing sieve;
(5) secondary screening: after entering a star disk auxiliary sorting system, 0-50mm undersize materials are divided into three materials again, 0-3mm sandy soil, 3-50mm light materials are directly converged into a belt line together with a bouncing screen 2D material through a belt conveyor and enter a packing machine, 3-50mm heavy materials (small-particle sand and stone materials) are converged into a manual sorting belt line together with a bouncing screen 3D material and a bar screen oversize material to be subjected to impurity removal and then enter a reverse impact crusher, all aggregates are crushed into materials with the particle size of 0-10mm through an ore crusher, and 10-30mm melon seed materials and oversize materials with the particle size of more than 30mm are crushed into materials with the particle size of 0-10mm through a return material feeding crusher again.
2. The building finishing waste sorting process of claim 1, wherein the building finishing waste sorting in the step (1) is preceded by a pretreatment.
3. The building finishing garbage sorting process according to claim 2, wherein the building finishing garbage pretreatment process comprises placing the building garbage in an open field, spraying water by using a high-pressure water gun, and setting the pressure to be garbage accumulation volume (m) according to the garbage accumulation volume3) 10-30 times Kpa.
4. The building decoration garbage sorting process according to claim 1, wherein the crushing and feeding line in the step (2) is prepared by the following specific processes: and (3) crushing materials such as bagged materials and large concrete in a coarse crusher, wherein the bagged materials are crushed into bulk materials, the large concrete materials are crushed into materials of 50-200mm, the crushed materials are sieved through a coarse sieve, the materials with the particle size smaller than 200mm enter a plate chain machine, and the materials with the particle size larger than 200mm enter the coarse crusher again for secondary crushing until the materials are completely smaller than 200 mm.
5. The building decoration garbage sorting process of claim 1, wherein the feeding mode of the plate chain machine in the step (3) is a uniform feeding mode for material conveying, and the conveying speed of the material is 0.2-0.5m3/min。
6. The building decoration garbage sorting process according to claim 1, wherein the 2D material with the size of 50-200mm and the 3D material with the size of 50-200mm screened in the step (4) are separated through water separation, namely, the 2D material and the 3D material are washed in 20-50cm/s running water, the 3D heavy material is deposited at the bottom of the water body, and the 2D light material is separated from the 3D material under the driving of the water body.
7. The building finishing waste sorting process of claim 1, wherein the final material obtained in the step (5) comprises: sand of 0-3mm, light material of 3-50mm, mixture of materials of 50-200mm2D and heavy material particles of 0-10 mm.
CN201910114381.9A 2019-02-14 2019-02-14 Building decoration garbage sorting process Pending CN111558593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910114381.9A CN111558593A (en) 2019-02-14 2019-02-14 Building decoration garbage sorting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910114381.9A CN111558593A (en) 2019-02-14 2019-02-14 Building decoration garbage sorting process

Publications (1)

Publication Number Publication Date
CN111558593A true CN111558593A (en) 2020-08-21

Family

ID=72069551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910114381.9A Pending CN111558593A (en) 2019-02-14 2019-02-14 Building decoration garbage sorting process

Country Status (1)

Country Link
CN (1) CN111558593A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112427124A (en) * 2020-10-30 2021-03-02 北京建工资源循环利用投资有限公司 Construction waste recycling method and equipment
CN113843253A (en) * 2021-09-01 2021-12-28 泉州容大机械有限公司 Domestic garbage screening treatment production line and process flow thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4217479A1 (en) * 1992-05-22 1993-11-25 Noell Abfall & Energietech Grading of building site rubble - by preliminary coarse crushing followed by sieving, with medium sized pieces passing through magnetic separator and classifiers
CN105198257A (en) * 2015-09-06 2015-12-30 越艳 Construction waste crushing and screening line method
CN107362977A (en) * 2017-08-30 2017-11-21 江苏科选环境科技有限公司 Decoration rubbish automatic sorting line
CN108080397A (en) * 2017-12-15 2018-05-29 上海第二工业大学 A kind of doping separating device for construction wastes and its separation method
CN108188149A (en) * 2017-12-29 2018-06-22 上海浦东路桥建设股份有限公司 A kind of urban building waste treatment process and resource utilization process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4217479A1 (en) * 1992-05-22 1993-11-25 Noell Abfall & Energietech Grading of building site rubble - by preliminary coarse crushing followed by sieving, with medium sized pieces passing through magnetic separator and classifiers
CN105198257A (en) * 2015-09-06 2015-12-30 越艳 Construction waste crushing and screening line method
CN107362977A (en) * 2017-08-30 2017-11-21 江苏科选环境科技有限公司 Decoration rubbish automatic sorting line
CN108080397A (en) * 2017-12-15 2018-05-29 上海第二工业大学 A kind of doping separating device for construction wastes and its separation method
CN108188149A (en) * 2017-12-29 2018-06-22 上海浦东路桥建设股份有限公司 A kind of urban building waste treatment process and resource utilization process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112427124A (en) * 2020-10-30 2021-03-02 北京建工资源循环利用投资有限公司 Construction waste recycling method and equipment
CN112427124B (en) * 2020-10-30 2022-06-07 北京建工资源循环利用投资有限公司 Construction waste recycling method and equipment
CN113843253A (en) * 2021-09-01 2021-12-28 泉州容大机械有限公司 Domestic garbage screening treatment production line and process flow thereof

Similar Documents

Publication Publication Date Title
CN102838307A (en) Method and system for treating construction waste
CN209005920U (en) A kind of cracking and sorting processing system of building waste
CN101549351B (en) Building refuse treatment regeneration system
CN105127176B (en) Construction refuse resource is disposed with utilizing integral treatment method and its processing system
CN110813483A (en) Construction waste crushing and sorting treatment system
CN201442005U (en) Construction waste comprehensive treatment equipment
CN108176697A (en) Build composting sorting total system and processing method
CN201511034U (en) Construction waste treatment regeneration system
CN110976478B (en) Recycling treatment process for demolition and decoration wastes
CN205762923U (en) A kind of construction waste crushing station
CN101544483A (en) Method for producing renewable aggregate by using construction waste
CN202779142U (en) Fixed type building rubbish treatment system
CN206535848U (en) Building waste processing system
CN108311519A (en) A kind of decoration building waste sorting sorting technique and system
CN202849268U (en) Construction waste regeneration cycle production system
CN204294609U (en) A kind of fixed building rubbish process for producing line
CN111922024A (en) Building decoration garbage sorting and crushing treatment process
CN111530597A (en) Dry sand making method by environment-friendly recycling of waste limestone
CN112474712A (en) Building decoration garbage resource utilization system and method
CN108080397A (en) A kind of doping separating device for construction wastes and its separation method
CN104671684A (en) Recovery processing method for construction garbage
CN102974596A (en) Construction waste co-extrusion harmless treatment system and method thereof
CN110394225A (en) A kind of mixed separation joint disposal technique of building refuse brick
CN105478214A (en) Construction waste integration and separation method
CN111558593A (en) Building decoration garbage sorting process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200821