CN111395764A CN202010216634.6A CN202010216634A CN111395764A CN 111395764 A CN111395764 A CN 111395764A CN 202010216634 A CN202010216634 A CN 202010216634A CN 111395764 A CN111395764 A CN 111395764A
Authority
CN
China
Prior art keywords
support
hopper
filling
pipe column
bottom plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010216634.6A
Other languages
Chinese (zh)
Inventor
薛楠
孙兴闯
郜锦嫘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN202010216634.6A priority Critical patent/CN111395764A/en
Publication of CN111395764A publication Critical patent/CN111395764A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/025Buckets specially adapted for use with concrete
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction
    • E04G21/30Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a movable one-column one-pile stone filling platform and a construction method, and belongs to the field of building construction. The stone adds irritates the platform and is used for steel-pipe column concreting construction, includes: a hopper and a support structure. The hopper is integrally inclined towards the ground and used for filling the pebbles to the outer side of the steel pipe column, and the hopper is provided with a bottom plane and side walls which are vertical to the bottom plane and extend upwards and correspond to two sides of the bottom plane. The supporting structure is a simple truss structure system formed by welding angle steels and is used for supporting the hopper. In use, the vertical adjusting frame can avoid the steel pipe column, and the filling work of stones on the outer side of the steel pipe column can be smoothly completed. In addition, the movable one-column one-pile stone filling platform is convenient to manufacture, can be used for multiple times and multiple projects, and saves certain materials and construction period cost.

Description

Movable type one-column one-pile stone filling platform and construction method
Technical Field
The invention relates to a movable one-column one-pile stone filling platform and a construction method, and belongs to the field of building construction.
Background
When the steel pipe column is hoisted to finish pouring concrete in one column, in order to guarantee smooth proceeding of welding work of steel beams and steel pipe column concrete packing work in later-stage structure construction of the steel pipe column, a clean and complete steel pipe column outer surface is needed and perpendicularity of the steel pipe column is guaranteed, so that stones are required to be synchronously poured outside the steel pipe column when the concrete on the inner side of the steel pipe column is poured. When the steel pipe column is poured with concrete, the steel pipe column vertical adjusting frame is needed, and certain influence is caused on filling work of stones outside the steel pipe column.
Therefore, it is necessary to develop a mobile one-column one-pile gravel filling platform and a construction method thereof, which can solve the problem that when the outside of a steel pipe column in one-column one-pile gravel is filled with gravel, the filling work of the gravel outside the steel pipe column is affected to a certain extent due to the use of a steel pipe column vertical adjusting frame.
Disclosure of Invention
Aiming at the defect of the accuracy of the conventional paying-off mode of the ultra-thick bottom plate in the prior art, the invention provides the mobile one-column one-pile stone filling platform and the construction method, and the problem that when stones are filled outside a steel pipe column in one-column one-pile, due to the fact that the steel pipe column is used for adjusting the vertical frame, certain influence is caused on the filling work of the stones outside the steel pipe column can be solved.
In order to solve the technical problems, the invention comprises the following technical scheme:
the invention provides a mobile one-column one-pile stone filling platform, which is used for the construction of pouring concrete in a steel pipe column and comprises the following components:
the hopper is integrally inclined towards the ground and used for filling the pebbles to the outer side of the steel pipe column, and the hopper is provided with a bottom plane and side walls which are correspondingly arranged on two sides of the bottom plane, are vertical to the bottom plane and extend upwards; and
the supporting structure is a simple truss structure system formed by welding angle steels and is used for supporting the hopper.
Optionally, the support members are arranged at the bottom, middle and front of the hopper to reduce bending deformation of the hopper caused by heavy stone loads.
Optionally, the support structure comprises:
unilateral supporting component, correspond to be in the bottom plane both sides of hopper and relative bottom plane's centrosymmetric setting, each unilateral supporting component includes: the first support and the second support are supported in the middle and at the bottom of the bottom plane and are vertical to the ground, the third support is connected to the top end of the first support and the bottom end of the second support, and the fourth support is connected between the top end of the second support and the ground and is parallel to the third support, wherein the first support, the third support and the second support form a Z-shaped support structure, the third support, the second support and the fourth support form a Z-shaped support structure, and a first horizontal support is arranged in the middle of the first support and the second support; and
and the second horizontal support is correspondingly supported in the middle of the first support, the middle of the second support and the middle of the fourth support of the two unilateral supporting components.
Optionally, the rear side of the second support of each single-sided support assembly is welded with a vertical support.
Optionally, a reinforcing angle steel is welded in the middle of the bottom plane of the hopper to enhance the strength of the bottom.
Optionally, the hopper has an upper mouth fold.
Optionally, lifting hooks are welded to two side walls of the hopper, so that the hopper can be used for site multipoint hoisting.
The invention also provides a construction method applying the stone filling platform, the stone filling platform is hoisted to the position of the hoisted steel pipe column through the lifting hook, stones are poured into the hopper and fall outside the steel pipe column through the self weight of the stones.
Due to the adoption of the technical scheme, compared with the prior art, the invention has the following advantages and positive effects: the movable type one-column one-pile stone filling platform is matched with the steel pipe column vertical adjusting frame in use, and filling work of stones on the outer side of the steel pipe column can be smoothly completed. In addition, the movable one-column one-pile stone filling platform is convenient to manufacture, can be used for multiple times and multiple projects, and saves certain materials and construction period cost.
Drawings
Fig. 1 is an elevation view of a mobile one-column-one-pile gravel filling platform according to an embodiment of the present invention;
FIG. 2 is a plan view of the mobile one-column-one-pile gravel-filling platform of FIG. 1;
FIG. 3 is a side elevational view of the hopper of FIG. 1;
fig. 4 is an elevation view of a combination of the mobile one-column one-pile gravel grouting platform and the steel pipe column according to an embodiment of the present invention.
The numbers in the figures are as follows:
1 mobile one-column one-pile stone filling platform, 2 steel pipe column
10 hoppers, 11 bottom planes, 12 side walls, 13 reinforcing angle steels, 14 upper opening folding parts,
20 a support structure for supporting the structure of the device,
21 single-sided support assembly, 211 first support, 212 second support, 213 third support, 214 fourth support, 215 first horizontal support, 216 vertical support,
22 a second horizontal support for the second of the supports,
23 hook.
Detailed Description
The following describes the mobile one-column one-pile stone filling platform and the construction method provided by the present invention in further detail with reference to the accompanying drawings and the specific embodiments. The advantages and features of the present invention will become more apparent in conjunction with the following description. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention.
Example one
As shown in fig. 1 to 4, the mobile one-column one-pile gravel grouting platform 1 provided in this embodiment is used for steel pipe column concreting construction, and includes: a hopper 10 and a support structure 20. The hopper 10 is wholly inclined towards the ground and is used for filling the outside of the steel pipe column with stones. More specifically, the hopper 10 is made of a steel plate. The hopper 10 has a bottom plane 11 and side walls 12 extending vertically and upwardly from the bottom plane 11 at both sides of the bottom plane 11. The support structure 20 is a simple truss structure system formed by welding and combining angle steels and is used for supporting the hopper 10. The welding part of the angle steel and the side wall 12 of the hopper 10 adopts three-side girth welding, and the connecting part of the angle steel and the bottom plane 11 of the hopper 10 adopts lap welding.
Due to the adoption of the technical scheme, compared with the prior art, the invention has the following advantages and positive effects: the movable one-column one-pile stone filling platform 1 is matched with the steel pipe column vertical adjusting frame in use, and filling of stones on the outer side of the steel pipe column can be smoothly completed. In addition, the movable one-column one-pile stone filling platform 1 is convenient to manufacture, can be used for multiple times and multiple projects, and saves certain materials and construction period cost. Optionally, the support members are arranged at the bottom, middle and front of the hopper 10 to reduce bending deformation of the hopper 10 caused by heavy stone loads.
In this embodiment, as shown in fig. 1, the support structure 20 includes: a single-sided support assembly 21 and a second horizontal support 22. The single-sided support members 21 are disposed symmetrically with respect to the center of the bottom plane 11 corresponding to both sides of the bottom plane 11 of the hopper 10. Each one-sided support assembly 21 includes: the first support 211 and the second support 212 are supported at the middle part and the bottom part of the bottom plane 11 and are vertical to the ground, the third support 213 is connected between the top end of the first support 211 and the bottom end of the second support 212, and the fourth support 214 is connected between the top end of the second support 212 and the ground and is parallel to the third support 213. Wherein the first support 211, the third support 213 and the second support 212 form a zigzag support structure. The third support 213, the second support 212, and the fourth support 214 form a zigzag support structure. A first horizontal support 215 is arranged in the middle of the first support 211 and the second support 212. As shown in fig. 2, the second horizontal support 22 is supported at the middle of the first support 211, the second support 212 and the fourth support 214 of the two single-sided support assemblies 21. Through the structure, a stable supporting system is formed.
More specifically, as shown in fig. 1, the rear side of the second support 212 of each single-sided support assembly 21 is welded with a vertical support 216.
More specifically, as shown in fig. 1, a reinforcement angle 13 is welded to the middle of the bottom plane 11 of the hopper 10 to enhance the strength of the bottom.
More specifically, as shown in fig. 1, the hopper 10 has an upper mouth fold 14. And welding angle steel is added at the 14 position of the upper opening folding part as a support.
More specifically, as shown in fig. 1, hooks 23 are welded to the two side walls 12 of the hopper 10 for on-site multi-point hoisting.
Example two
Referring to fig. 4, the invention further provides a construction method applying the stone filling platform, the stone filling platform is lifted to a lifted steel pipe column through a lifting hook 23, a column-pile vertical adjusting frame is matched for stone filling, and specifically, stones are poured into the hopper 10 and fall outside the steel pipe column through the self weight of the stones.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (8)

1. The utility model provides a platform is irritated with adding to portable a post a stake stone for steel-pipe column concreting construction, a serial communication port, include:
the hopper is integrally inclined towards the ground and used for filling the pebbles to the outer side of the steel pipe column, and the hopper is provided with a bottom plane and side walls which are correspondingly arranged on two sides of the bottom plane, are vertical to the bottom plane and extend upwards; and
the supporting structure is a simple truss structure system formed by welding angle steels and is used for supporting the hopper.
2. A stone watering platform as claimed in claim 1 wherein support members are provided at the bottom, middle and front of the hopper to reduce bending of the hopper caused by heavy stone loads.
3. A pebble filling and irrigating platform according to claim 2, wherein the support structure comprises:
unilateral supporting component, correspond to be in the bottom plane both sides of hopper and relative bottom plane's centrosymmetric setting, each unilateral supporting component includes: the first support and the second support are supported in the middle and at the bottom of the bottom plane and are vertical to the ground, the third support is connected to the top end of the first support and the bottom end of the second support, and the fourth support is connected between the top end of the second support and the ground and is parallel to the third support, wherein the first support, the third support and the second support form a Z-shaped support structure, the third support, the second support and the fourth support form a Z-shaped support structure, and a first horizontal support is arranged in the middle of the first support and the second support; and
and the second horizontal support is correspondingly supported in the middle of the first support, the middle of the second support and the middle of the fourth support of the two unilateral supporting components.
4. A pebble filling and irrigating platform according to claim 3, wherein the vertical supports are welded to the rear side of the second support of each single-sided support assembly.
5. A pebble filling and irrigating platform according to claim 1, wherein a reinforcing angle steel is welded to the middle of the bottom plane of the hopper to enhance the bottom strength.
6. A stone filling platform as claimed in claim 1 wherein the hopper has an upper mouth fold.
7. A pebble filling and irrigating platform according to any one of claims 1 to 6, wherein lifting hooks are welded at two side walls of the hopper so as to facilitate on-site multi-point lifting and irrigating.
8. The construction method of the stone filling and irrigating platform according to claim 7, wherein the stone filling and irrigating platform is hoisted to the position of the hoisted steel pipe column through a lifting hook, stones are poured into the hopper and fall outside the steel pipe column through the self weight of the stones.
CN202010216634.6A 2020-03-25 2020-03-25 Movable type one-column one-pile stone filling platform and construction method Pending CN111395764A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010216634.6A CN111395764A (en) 2020-03-25 2020-03-25 Movable type one-column one-pile stone filling platform and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010216634.6A CN111395764A (en) 2020-03-25 2020-03-25 Movable type one-column one-pile stone filling platform and construction method

Publications (1)

Publication Number Publication Date
CN111395764A true CN111395764A (en) 2020-07-10

Family

ID=71427532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010216634.6A Pending CN111395764A (en) 2020-03-25 2020-03-25 Movable type one-column one-pile stone filling platform and construction method

Country Status (1)

Country Link
CN (1) CN111395764A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB943583A (en) * 1961-04-14 1963-12-04 Rolf Harry Lennqvist Transportable hopper for receiving concrete mix and the like
CN204199708U (en) * 2014-09-24 2015-03-11 中国核工业第二二建设有限公司 Concrete divides hopper
CN104746875A (en) * 2015-03-16 2015-07-01 广州建筑股份有限公司 Pouring device for movable type block waste concrete
CN205150751U (en) * 2015-10-28 2016-04-13 成都嘉新科技集团有限公司 Raw material storage storehouse
CN109296051A (en) * 2018-09-14 2019-02-01 中国冶集团有限公司 A kind of orbit movable retractable chute
CN209053437U (en) * 2018-06-28 2019-07-02 武汉美好绿色建筑科技有限公司 A kind of Prefabricated superposed beam structure concrete casting device
CN110565536A (en) * 2019-10-18 2019-12-13 中冶建工集团有限公司 Hollow thin-wall high-pier discharging device
CN212642146U (en) * 2020-03-25 2021-03-02 上海建工一建集团有限公司 Movable type one-column one-pile stone filling platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB943583A (en) * 1961-04-14 1963-12-04 Rolf Harry Lennqvist Transportable hopper for receiving concrete mix and the like
CN204199708U (en) * 2014-09-24 2015-03-11 中国核工业第二二建设有限公司 Concrete divides hopper
CN104746875A (en) * 2015-03-16 2015-07-01 广州建筑股份有限公司 Pouring device for movable type block waste concrete
CN205150751U (en) * 2015-10-28 2016-04-13 成都嘉新科技集团有限公司 Raw material storage storehouse
CN209053437U (en) * 2018-06-28 2019-07-02 武汉美好绿色建筑科技有限公司 A kind of Prefabricated superposed beam structure concrete casting device
CN109296051A (en) * 2018-09-14 2019-02-01 中国冶集团有限公司 A kind of orbit movable retractable chute
CN110565536A (en) * 2019-10-18 2019-12-13 中冶建工集团有限公司 Hollow thin-wall high-pier discharging device
CN212642146U (en) * 2020-03-25 2021-03-02 上海建工一建集团有限公司 Movable type one-column one-pile stone filling platform

Similar Documents

Publication Publication Date Title
CN110453613B (en) Full-section one-step suspension casting construction method for large-span beam bridge box girder
CN109296051A (en) A kind of orbit movable retractable chute
CN203668833U (en) Steel web locating device
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN108532466A (en) A kind of bridge pier over-form construction technique
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN208280003U (en) A kind of bridge pier over-form construction system
CN108252220A (en) A kind of construction method of super-large span stiff skeleton
CN109235280A (en) The operation platform and construction method of bridge coping
CN204418198U (en) A kind of pin-connected panel open caisson foundation of punching block structure
CN202064281U (en) Slip form frame
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN212642146U (en) Movable type one-column one-pile stone filling platform
CN202401753U (en) Sliding die device
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN103046462B (en) Steel box component and steel box-concrete combined U-shaped girder composed of same
CN205889488U (en) Steel sleeve box's precast reinforced concrete back cover template and hoist device thereof
CN205660891U (en) Modular standardized support frame of laying of beam slab steel bones RACK
CN209194347U (en) The operation platform of bridge coping
CN111395764A (en) Movable type one-column one-pile stone filling platform and construction method
CN207794322U (en) A kind of built-in fitting
CN208039297U (en) A kind of tower crane differential settlement bracing means
CN109629465A (en) It is a kind of for cover board culvert or the trolley of passage construction
CN215947924U (en) Support bearing structure for pier stud bent cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination