CN1113876A - 大型钢网架整体提升施工方法 - Google Patents

大型钢网架整体提升施工方法 Download PDF

Info

Publication number
CN1113876A
CN1113876A CN 94110627 CN94110627A CN1113876A CN 1113876 A CN1113876 A CN 1113876A CN 94110627 CN94110627 CN 94110627 CN 94110627 A CN94110627 A CN 94110627A CN 1113876 A CN1113876 A CN 1113876A
Authority
CN
China
Prior art keywords
net frame
rack
engineering
chain block
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 94110627
Other languages
English (en)
Inventor
齐克先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INDUSTRIAL EQUIPMENT INSTALLATION Co ZIBO CITY BUILDING ENGINEERING Co
Original Assignee
INDUSTRIAL EQUIPMENT INSTALLATION Co ZIBO CITY BUILDING ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INDUSTRIAL EQUIPMENT INSTALLATION Co ZIBO CITY BUILDING ENGINEERING Co filed Critical INDUSTRIAL EQUIPMENT INSTALLATION Co ZIBO CITY BUILDING ENGINEERING Co
Priority to CN 94110627 priority Critical patent/CN1113876A/zh
Publication of CN1113876A publication Critical patent/CN1113876A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明涉及工程建设中把大型钢网架整体安装 到工程结构物上的提升施工方法。它是借用工程结 构物与网架连接固定处的承重柱作为悬挂点,悬挂手 拉葫芦,利用形成的手拉葫芦组将网架整体提升到安 装位置。本发明改善了施工条件,具有施工工期短、 费用低、提升平稳、就位准确、安全可靠等优点。适合 于大跨度的网架工程,特别是圆形结构工程。

Description

本发明涉及一种工程建设中把大型钢网架安装到工程结构物上而提升钢网架的方法。
随着经济建设的发展,大型网架工程逐渐增多。目前大型钢网架提升吊装方法分为整体吊装法和高空拼装法,整体吊装法一是采用起重吊车联合吊装;二是在网架内搭设多台起重拨杆,利用多台电动卷扬机进行吊装提升。这两种方法都存在吊装准备工作量大,施工费用高,协调指挥难就位不够准确的缺点。高空拼装法是在特定的施工场地条件下,利用吨位较小的吊车将网架单元在空中进行焊接拼装。这种方法的缺点是焊接质量难以保证,工期长,高空作业量大。
本发明的目的是克服上述方法的不足之处而提供一种总工期短、施工费用低、起升平稳、安全可靠的大型钢网架整体提升施工方法。
本发明的目的是这样实现的:
在工程结构物与钢网架固定柱的承重处上固定悬挂杆,其上悬挂有手拉葫芦,所有手拉葫芦吊挂钢网架同步提升到安装位置。
工程结构物与大型钢网架一般都有足够的连接点。连接点处的承重柱上带有牛腿,也是用来支撑固定网架的,在提升网架前先把牛腿割去,待网架提升到规定位置时再把牛腿焊接上。如需要也可以在工程结构物上设置其它的悬挂点,固定悬挂杆。
手拉葫芦的规格一般根据悬挂点的数量、网架重量、安装高度等确定,所有手拉葫芦的起重量之和不小于钢网架重量的1.25倍。
本发明根据网架刚度的要求,也可预先在网架覆盖区内搭设一个或几个起重拨杆,并悬挂手拉葫芦,以保证网架提升过程中各杆件受力合理和上拱要求。
下面以图及实施例来说明本发明:
图1为本发明的示意图,也是一实施例。
图中:1钢网架、2手拉葫芦、3悬挂杆、4承重柱、5工程结构物物壁(岛壁)、6起重拨杆。
辽河油田建造的一个用于浅海采油的人工岛,总耗用钢材850吨,岛壁外径尺寸63米,内径60米,总高度12米。重量为310吨,直径60米的大型钢网架结构平台悬空安装在岛壁6米高的位置,由42个连接点与岛壁承重柱连接固定。岛壁的安装分两次,即在网架平台安装固定后才能安装岛壁的上半部。网架平台的安装提升方法采用了本发明的方法:
整个钢网架平台1在地面上预制组装完毕后,在岛壁5周围与网架1连接处的承重柱上固定1.5米的悬挂杆3,其上垂直悬挂手拉葫芦(又称倒链),在岛壁上设有水平控制线,以控制网架在提升过程中水平上升。在统一指挥下,由42个起重量为10吨的手拉葫芦(10T×6m)组成的手拉葫芦组将钢网架同步吊装就位,整个吊装过程仅用了8个小时,而且每个手拉葫芦的人工用力不足400N。
为使网架周边固定前,其中心位置具有规定数值的上拱量。在钢网架提升之前,预先在网架覆盖区内的中心位置搭设了一个三角起重拨杆6,其上悬挂了6个10T×6m的手拉葫芦,也用来吊挂网架,待网架初步吊装就位时,将网架中心提升到规定上拱位置;然后迅速组织人力将网架与岛壁承重柱焊接固定。
与上述工程类似的90年大港油田建造的第一个人工岛,其网架吊装采用了汽车吊高空拼装的办法,施工工期为25天,施工机械费及辅助措施费约35万元,因此采用本发明的方法施工工期缩短了20天,节约了30多万元的施工费用,并改善了安全施工条件,变大量的高空作业为地面作业,网架焊接质量易于保证。
本发明的优点:
1、改善了安全施工条件,运用手动起重工具将大型钢网架提升到规定安装位置,安全可靠。
2、缩短了工期,大大降低了施工费用。
3、在提升过程中,可以设置多个提升点并设有水平控制线,便于提升平稳,就位准确。
4、适用于大跨度的网架提升安装,特别适合圆形结构工程。对那些无法使用吊车的施工对象,更具有独特的优越性。

Claims (2)

1、一种把大型钢网架整体提升到工程结构物上的提升施工方法,其特征在于在工程结构物与网架(1)连接固定处的若干承重柱(4)上固定悬挂杆(3),其上悬挂手拉葫芦(2),然后所有手拉葫芦(2)吊挂钢网架(1)同步提升到安装位置。
2、根据权利要求1所述的提升施工方法,特征在于预先在网架(1)覆盖区内搭设一个或多个起重拨杆(6),其上也分别悬挂手拉葫芦(7)吊挂网架(1)同步提升或使网架具有规定数值的上拱量。
CN 94110627 1994-06-01 1994-06-01 大型钢网架整体提升施工方法 Pending CN1113876A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94110627 CN1113876A (zh) 1994-06-01 1994-06-01 大型钢网架整体提升施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94110627 CN1113876A (zh) 1994-06-01 1994-06-01 大型钢网架整体提升施工方法

Publications (1)

Publication Number Publication Date
CN1113876A true CN1113876A (zh) 1995-12-27

Family

ID=5034574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94110627 Pending CN1113876A (zh) 1994-06-01 1994-06-01 大型钢网架整体提升施工方法

Country Status (1)

Country Link
CN (1) CN1113876A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101633483B (zh) * 2009-08-13 2012-01-11 上海市第一建筑有限公司 一种钢结构网架整体提升装置
CN102877547A (zh) * 2012-10-16 2013-01-16 北京市机械施工有限公司 一种整体提升高空移动就位的钢网架安装方法
CN103130147A (zh) * 2013-03-12 2013-06-05 中国五冶集团有限公司 一种用于圆形结构液压提升调平的受力吊杆的选取方法
CN103352576A (zh) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 中/小跨度钢结构屋面网架外扩拼装转换提升方法
CN104631839A (zh) * 2015-01-29 2015-05-20 浙江勤业建工集团有限公司 超高超重大跨度空中连廊整体提升施工方法
CN105442853A (zh) * 2015-11-13 2016-03-30 中建六局土木工程有限公司 一种大跨度异形钢网架与落地钢结构安装施工方法
CN105804400A (zh) * 2016-04-05 2016-07-27 中建局钢结构工程有限公司 一种曲面网架提升施工方法
CN111608397A (zh) * 2020-06-09 2020-09-01 贵州建工集团第四建筑工程有限责任公司 一种网架安装施工方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101633483B (zh) * 2009-08-13 2012-01-11 上海市第一建筑有限公司 一种钢结构网架整体提升装置
CN102877547A (zh) * 2012-10-16 2013-01-16 北京市机械施工有限公司 一种整体提升高空移动就位的钢网架安装方法
CN102877547B (zh) * 2012-10-16 2014-07-09 北京市机械施工有限公司 一种整体提升高空移动就位的钢网架安装方法
CN103130147A (zh) * 2013-03-12 2013-06-05 中国五冶集团有限公司 一种用于圆形结构液压提升调平的受力吊杆的选取方法
CN103130147B (zh) * 2013-03-12 2015-04-08 中国五冶集团有限公司 一种用于圆形结构液压提升调平的受力吊杆的选取方法
CN103352576A (zh) * 2013-07-24 2013-10-16 山东锦城钢结构有限责任公司 中/小跨度钢结构屋面网架外扩拼装转换提升方法
CN104631839A (zh) * 2015-01-29 2015-05-20 浙江勤业建工集团有限公司 超高超重大跨度空中连廊整体提升施工方法
CN104631839B (zh) * 2015-01-29 2016-08-24 浙江勤业建工集团有限公司 超高超重大跨度空中连廊整体提升施工方法
CN105442853A (zh) * 2015-11-13 2016-03-30 中建六局土木工程有限公司 一种大跨度异形钢网架与落地钢结构安装施工方法
CN105804400A (zh) * 2016-04-05 2016-07-27 中建局钢结构工程有限公司 一种曲面网架提升施工方法
CN111608397A (zh) * 2020-06-09 2020-09-01 贵州建工集团第四建筑工程有限责任公司 一种网架安装施工方法

Similar Documents

Publication Publication Date Title
CN106812328B (zh) 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法
CN206692235U (zh) 一种钢结构穹顶起吊安装装置
CN101210418A (zh) 悬索桥塔架横梁无落地支架施工方法
CN104863362A (zh) 设置拱形钢网格胎架滑移安装的拱形筒状网壳施工工艺
CN1113876A (zh) 大型钢网架整体提升施工方法
CN114873497A (zh) 一种变径非平衡载荷类设备垂直提升安装装置及方法
CN201362953Y (zh) 浇注混凝土筒仓顶板的施工平台
CN109162437A (zh) 用于多筒钢板剪力墙的整体钢平台及其施工方法
CN1057973C (zh) 一种四连杆臂架自升式门座起重机
CN205224050U (zh) 一种钢筋笼挂放装置
CN115538792A (zh) 一种住宅造楼机安装施工方法及结构
CN111350359B (zh) 一种可用于大跨度结构整体提升的方法及菱形装置
CN108545629B (zh) 利用塔式起重机顶升桁架梁的施工方法
CN216787874U (zh) 一种大跨度高空大型环式桁架提升结构
CN203684708U (zh) 液压多点同步提升装置
CN114134991B (zh) 一种带转换结构的高层建筑建造方法
CN216616216U (zh) 一种大型高层钢桁架连体结构
CN215254700U (zh) 一种垃圾库屋面螺栓球网架滑移施工系统
CN201128882Y (zh) 桥梁拱肋吊运及支撑支架一体化施工装置
CN212562460U (zh) 一种钢筋混凝土筒仓穹顶新型模板支撑杆件
CN213509662U (zh) 一种可用于大跨度结构整体提升的菱形装置
CN220167528U (zh) 一种用于承台梁钢筋绑扎及安装的支架
CN217810527U (zh) 波形钢腹板自承重异步挂篮吊装系统
CN2277433Y (zh) 移动式建筑吊装机
CN218147849U (zh) 一种利用穿心油顶拆除贝雷架的拆除组件

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication