CN111375717B - Forging process of besides-star wheel with handle - Google Patents

Forging process of besides-star wheel with handle Download PDF

Info

Publication number
CN111375717B
CN111375717B CN202010399658.XA CN202010399658A CN111375717B CN 111375717 B CN111375717 B CN 111375717B CN 202010399658 A CN202010399658 A CN 202010399658A CN 111375717 B CN111375717 B CN 111375717B
Authority
CN
China
Prior art keywords
forging
blank
cooling
box
star wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010399658.XA
Other languages
Chinese (zh)
Other versions
CN111375717A (en
Inventor
林象
张俊俊
王振洲
王欢
陈国良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Changte Forging Co ltd
Original Assignee
Shanghai Changte Forging Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Changte Forging Co ltd filed Critical Shanghai Changte Forging Co ltd
Priority to CN202010399658.XA priority Critical patent/CN111375717B/en
Publication of CN111375717A publication Critical patent/CN111375717A/en
Application granted granted Critical
Publication of CN111375717B publication Critical patent/CN111375717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/002Hybrid process, e.g. forging following casting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C25/00Profiling tools for metal extruding
    • B21C25/02Dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J17/00Forge furnaces
    • B21J17/02Forge furnaces electrically heated
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • B21J5/02Die forging; Trimming by making use of special dies ; Punching during forging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/28Making machine elements wheels; discs
    • B21K1/30Making machine elements wheels; discs with gear-teeth
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K27/00Handling devices, e.g. for feeding, aligning, discharging, Cutting-off means; Arrangement thereof
    • B21K27/06Cutting-off means; Arrangements thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K29/00Arrangements for heating or cooling during processing

Abstract

The invention discloses a forging process of a besides-star wheel with a handle, which relates to the technical field of forging and comprises the following specific steps: blanking, heating, sub-hot extrusion, sectional cooling and cold finishing, wherein the sub-hot extrusion further comprises a pre-forming stage and a finish forging forming stage, and the sectional cooling comprises primary section cooling, middle section cooling and rear section cooling. The invention has the effects of uniformly radiating the forging and reducing the possibility of cracks generated on the forging.

Description

Forging process of besides-star wheel with handle
Technical Field
The invention relates to the technical field of forging, in particular to a forging process of a besides-star wheel with a handle.
Background
At present, the external star wheel is a main stressed part of an automobile transmission shaft, the working condition is extremely complex, and the reliability and the safety of automobile transmission are directly influenced by the quality of the performance of the external star wheel. Forging is a processing method which utilizes forging machinery to apply pressure on a metal blank to enable the metal blank to generate plastic deformation so as to obtain a forging with certain mechanical property, certain shape and certain size, and one of two major components of forging is adopted. The defects of as-cast porosity and the like generated in the smelting process of metal can be eliminated through forging, the microstructure is optimized, and meanwhile, because the complete metal streamline is preserved, the mechanical property of the forging is generally superior to that of a casting made of the same material.
The prior Chinese patent with the publication number of CN105695703A discloses a heat treatment process for die steel, and discloses a two-fire direct heat treatment process method for the preliminary heat treatment, quenching and tempering of 7Cr7Mo2V2Si high-strength and high-toughness cold-work die steel.
The above prior art solutions have the following drawbacks: after the forge piece is heated and forged, the forge piece needs to be subjected to heat treatment, and when the forge piece is cooled, the temperature inside and outside the forge piece is difficult to keep consistent, so that the temperature inside and outside the forge piece is easily inconsistent, the forge piece is not uniform in expansion with heat and contraction with cold, internal stress is caused, and cracks are easily generated on the surface of the forge piece.
Disclosure of Invention
The invention aims to provide a forging process of a besides-star wheel with a handle, which can uniformly radiate a forged piece and reduce the possibility of cracks of the forged piece.
The technical purpose of the invention is realized by the following technical scheme:
the forging process of the outer star wheel with the handle is used for carrying out sectional cooling treatment on a forged piece and comprises the following processing steps:
firstly, placing a forged forging piece in a cooling box, wherein two rows of fan sets are uniformly arranged on one side of the cooling box in the length direction, and three fans are arranged at equal intervals on each fan set; the models of the six fans are the same;
preliminarily cooling the forge piece, starting a fan positioned at the middle in each exhaust unit, exhausting air in the cooling box for 6-7min, and preserving heat for 2min after exhausting air;
after primary cooling, performing middle-section cooling on the forging, turning off fans positioned at the middlemost in each exhaust unit, starting two fans positioned at the outermost sides in each exhaust unit, exhausting for 4-6min, and preserving heat for 2min after exhausting;
and continuing to cool the rear section of the forging, starting the six fans, exhausting for 3-4min, and keeping the temperature for 2min after exhausting.
By adopting the technical scheme, the forged forging is cooled in sections, so that the internal temperature of the forging can tend to be consistent, the generation of internal stress is reduced, and the possibility of cracks generated in the forging is reduced. The method comprises the following steps that firstly, the fan at the middle is started, the fans at the middle in the two rows of fan sets are close to the upper side and the lower side of a forge piece respectively, through air draft, air flow in a cooling box can be accelerated, the temperature of the surface of the forge piece is taken away, and the two fans can enable air flow passing through the surface of the forge piece to be uniform, so that the temperature of the surface of the forge piece is reduced uniformly. The two fans are insulated after working for 6-7min, the temperature of the outer surface of the forge piece is reduced by a certain range, the temperature inside the forge piece can be transmitted to the surface of the forge piece, and the stress generated inside the forge piece due to overlarge difference of the temperature difference inside and outside the forge piece is avoided. And then the fans on the two sides of the two rows of fan units are opened, the air speed in the cooling box is increased by increasing the number of the fans, so that the cooling speed can be gradually increased, and the cooling effect on the forge piece is further improved. And finally, the wind speed is increased to the maximum, and because the temperature inside and outside the forge piece tends to lower after the forge piece is cooled for the first two times, the wind speed is increased, the forge piece cannot generate stress defect, the cooling speed can be increased, and the working efficiency is improved.
The present invention in a preferred example may be further configured to: before the forging is subjected to cooling treatment, the method further comprises the following steps:
blanking, namely cutting the blank into blanks with required lengths by a shearing machine;
heating, namely heating the blank at the temperature of 980-1000 ℃;
performing sub-hot extrusion, namely performing sub-hot extrusion forming on the blank by adopting a single-point press machine to process the blank into a required shape of a forge piece;
further comprising after the cooling treatment:
and cold finishing, namely performing cold finishing treatment on the forging.
By adopting the technical scheme, the outer star wheel is forged by adopting a sub-hot extrusion means, and the forming temperature is controlled between warm forming and hot forming, so that the method has the advantages of simplifying the process and saving energy. In the forging process, because the heating temperature is low, the process of single normalizing treatment can be eliminated, and the formed product can be cooled by utilizing the preheating control, thereby obtaining excellent internal structure and higher comprehensive mechanical property. The allowance and the oxide skin on the surface of the forged piece are removed by machining after the hot forming in the original process, and the cold-static finishing is adopted at present, so that the flow can be simplified, the deformation of the forged piece is uniform, and cracks are not easy to generate.
The present invention in a preferred example may be further configured to: the wind speed of the fan is kept at a constant speed and is 2-8 m/s.
By adopting the technical scheme, the air flow is uniform due to the uniform air speed, and the heat dissipation effect on the surface of the forging piece is uniform.
The present invention in a preferred example may be further configured to: the gas pumped into the cooling box by the fan is inert gas.
Through adopting above-mentioned technical scheme, let in inert gas in the cooler bin, not only can take away the heat on the forging surface in the cooler bin through the flow of gas, can also reduce the possibility that the oxidation takes place in the forging surface, simplified the process.
The present invention in a preferred example may be further configured to: a first scavenging air box and a second scavenging air box are respectively arranged on two sides of the cooling box; the first air exchange box is communicated with an air inlet of the cooling box; the second air exchange box is communicated with an air outlet of the cooling box; the first air exchange box is connected with the second air exchange box through an air duct; the gas guide pipe is provided with a heat exchanger.
Through adopting above-mentioned technical scheme, set up first scavenging box and second scavenging box, be favorable to realizing cooling gas's circulation for the air current takes away the heat on forging surface, and sets up the heat exchanger on the air duct, can carry out the heat transfer with the gas through the cooler bin, reduces cooling gas's temperature, and the gas temperature when making next circulative cooling can reduce, plays better cooling effect, can also recycle the heat in the cooler bin, environmental protection more.
The present invention in a preferred example may be further configured to: the step of sub-hot extrusion comprises the following specific steps:
in the preforming stage, the blank is processed through a single-point press, a male die and a female die are arranged on the single-point press, when the blank is preformed, the blank is firstly placed in the female die, the blank is subjected to pre-forging extrusion through the male die, and the initial forging temperature of the pre-forging extrusion is 950-;
and in the final forging forming stage, the blank is extruded and punched through a male die, so that the blank forms a forging piece with a required shape, the extrusion starting temperature is 910-.
By adopting the technical scheme, the composite forming of the outer star wheel is basically divided into two stages, namely firstly upsetting the head part and reversely extruding the cup part, and then positively extruding the rod part to finally finish the deformation. In the initial cup backward extrusion stage, the blank also moves along with the movement of the male die at the outlet of the taper angle of the female die, when the deformation is carried out to a certain degree, the cup backward extrusion and the stem forward extrusion exist simultaneously, and in the final stage, the deformation is mainly represented as the stem forward extrusion due to the limitation of the male die. In the latter phase of the deformation, the temperature drop is greater due to the contact of the edge of the cup with the punch, the surface temperature being about 774 ℃ at the end of the deformation. Since the metal of the part is not deformed and only moves rigidly, the lower temperature does not have a great influence on the whole deformation. The core of the blank has high deformation speed, the male die has less heat dissipation, and the plastic deformation enables the temperature to rise to some extent, about above 850 ℃, so that better deformation can be ensured. The sub-thermal compound extrusion can achieve the forming effect of parts, and can combine two processes of forward extrusion head and backward extrusion rod into one process, thereby simplifying the process, and achieving the purposes of saving energy, reducing cost and improving efficiency.
The present invention in a preferred example may be further configured to: the gas pumped into the cooling box by the fan is inert gas.
Through adopting above-mentioned technical scheme, nitrogen gas is a colorless tasteless gas under the general condition, and nitrogen gas accounts for 78.08% of atmosphere total amount, is one of the principal ingredients of air for because the inertia of nitrogen gas for the difficult oxidation that takes place in forging surface, in addition, nitrogen gas is heat absorption type gas, can take away the heat on forging surface more effectively, reduces the temperature of forging.
The present invention in a preferred example may be further configured to: and in the heating step, a medium-frequency induction heating furnace is adopted to heat the blank.
By adopting the technical scheme, the intermediate frequency heating furnace is used for placing the blank into an inductor, and the inductor is generally a hollow copper pipe for inputting intermediate frequency or high frequency alternating current (300-. The alternating magnetic field is generated to generate induced current with the same frequency in the workpiece, the blank is rapidly heated, and the heating speed can be effectively improved and the possibility of generating oxides on the surface of the blank is reduced due to the small size of the blank.
In conclusion, the invention has the following beneficial effects:
1. in the invention, the forged forging is cooled in sections, so that the internal temperature of the forging can tend to be consistent, the generation of internal stress is reduced, and the possibility of cracks of the forging is reduced;
2. the outer star wheel is forged by adopting a sub-hot extrusion method, and the forming temperature is controlled between warm forming and hot forming, so that the method has the advantages of simplifying the process and saving energy;
3. the inert gas is introduced into the cooling box, so that not only can the heat on the surface of the forged piece in the cooling box be taken away through the flowing of the gas, but also the possibility of oxidation on the surface of the forged piece can be reduced, and the process is simplified.
Drawings
FIG. 1 is a flow chart of a forging process for a handled besides-star wheel according to the present invention;
FIG. 2 is a detailed flow chart of the embodiment of the billet to be sub-hot extruded;
FIG. 3 is a detailed flow diagram of the forging segment cooling of the embodiment;
fig. 4 is a schematic view showing a connection structure of the cooling tank and the first and second transfer boxes of the embodiment;
FIG. 5 is a schematic view of the installation position of the fan of the embodiment.
Reference numerals: 1. a cooling tank; 11. a fan; 2. a first ventilation box; 3. a second ventilation box; 4. an air duct; 5. a heat exchanger.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, which is a flowchart of a forging process of a handled besides-star wheel in an embodiment of the present invention, fig. 2 is a flowchart of a blank in an embodiment of the present invention for performing sub-hot extrusion, fig. 3 is a flowchart of a forging piece in a segmented cooling in an embodiment of the present invention, fig. 4 is a schematic structural diagram of a cooling box 1, and the following detailed description is provided by combining specific steps of the forging process of the handled besides-star wheel in fig. 1 to 4:
s1, blanking, namely cutting the blank into blanks with required length through a shearing machine;
s2, heating, namely heating the blank by adopting an intermediate frequency induction heating furnace, wherein the heating temperature is 980-;
s3, performing sub-hot extrusion, and performing sub-hot extrusion forming on the forging by using a single-point press to enable the blank to be processed into the required forging shape;
s301, in the preforming stage, processing of the blank is achieved through a press machine, a convex die and a concave die are arranged on the press machine, when the blank is preformed, the blank is firstly placed in the concave die, the blank is subjected to pre-forging extrusion through the convex die, the blank is preformed to form a cup-shaped structure, and the initial forging temperature of the preforming is 950-;
s302, in the final forging forming stage, the blank is extruded and punched through a male die, so that the blank forms a forging piece with a required shape, the rod part is positively extruded under the limitation of a die cavity, the die cavity is filled with the blank, the forging piece with the same shape as the forging die is obtained, the extrusion starting temperature is 910-.
S4, cooling in sections, namely, firstly, placing the forged piece into a cooling box 1, uniformly arranging two rows of fan sets on one side of the cooling box 1 in the length direction, and arranging three fans 11 in each exhaust fan set at equal intervals (refer to FIG. 5); the models of the six fans 11 are the same, the wind speed of the fans 11 is kept constant, and the wind speed is 2-8 m/s;
s401, performing primary cooling on the forged piece, starting a fan 11 located at the middle of each exhaust unit, exhausting air in the cooling box 1 for 6-7min, and preserving heat for 2min after exhausting air;
s402, after primary cooling, performing middle-section cooling on the forged piece, turning off fans 11 positioned in the middle of each exhaust unit, starting two fans 11 positioned on the outermost sides of each exhaust unit, exhausting for 4-6min, and preserving heat for 2min after exhausting;
and S403, continuing to cool the rear section of the forging, starting the six fans 11, exhausting for 3-4min, and keeping the temperature for 2min after exhausting.
And S5, cold finishing, namely, carrying out cold finishing treatment on the forge piece, and placing the forge piece into a die of a press machine for forging, so that the size of the forge piece is more accurate.
Referring to fig. 4 and 5, the gas pumped into the cooling box 1 by the fan 11 is an inert gas, preferably nitrogen, which can reduce oxidation of the surface of the forging. A first scavenging air box 2 and a second scavenging air box 3 are respectively arranged on two sides of the cooling box 1. First scavenging box 2 is linked together with the air intake of cooler bin 1, second scavenging box 3 is linked together with the air outlet of the air exhauster 11 of cooler bin 1, and first scavenging box 2 passes through air duct 4 with second scavenging box 3 and is connected, install heat exchanger 5 on air duct 4, a gaseous heat for after will cooling is replaced, make the heat that has the gas of high temperature through cooler bin 1 can be recycled, can reduce the heat of nitrogen gas simultaneously, make nitrogen gas can cool off the forging once more with lower temperature. The heat exchanger 5 preferably adopts a spiral plate type heat exchanger 5, two steel plates which are parallel to each other are coiled into mutually separated spiral flow passages, cover plates are welded at two ends of the spiral plate, and cooling gas and cold water for heat exchange respectively flow in the two spiral flow passages. The heat exchanger 5 has high heat transfer efficiency and high sealing performance, so that the heat exchanger and the heat exchanger are not easy to mix.
The outer star wheel is forged by adopting the sub-thermal composite extrusion process, the head part is upset, the cup part is reversely extruded, then the forward extrusion rod part is finally deformed, the forming effect of parts can be achieved, two processes of forward extrusion of the head part and reverse extrusion of the rod part can be combined into one process, and the process is simplified. After forging, the forging is cooled in sections, so that the internal temperature of the forging can tend to be consistent, the generation of internal stress is reduced, and the possibility of cracks of the forging is reduced.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (6)

1. The forging process of the besides-star wheel with the handle is characterized in that: the forging after forging is subjected to segmented cooling treatment, and the method comprises the following processing steps:
firstly, a forged forging piece is placed in a cooling box (1), two rows of fan sets are uniformly arranged on one side of the cooling box (1), and three fans (11) are arranged on each fan set at equal intervals; the models of the six fans (11) are the same;
preliminarily cooling the forge piece, starting a fan (11) positioned at the middle in each exhaust unit, exhausting air in the cooling box (1), wherein the exhausting time is 6-7min, and keeping the temperature for 2min after exhausting air;
after primary cooling, performing middle-section cooling on the forging, turning off fans (11) located at the middlemost in each exhaust unit, starting two fans (11) located at the outermost sides in each exhaust unit, exhausting for 4-6min, and preserving heat for 2min after exhausting;
continuing to carry out rear-section cooling on the forge piece, starting the six fans (11), exhausting for 3-4min, and keeping the temperature for 2min after exhausting;
before the forging is subjected to cooling treatment, the method further comprises the following steps:
blanking, namely cutting the blank into blanks with required lengths by a shearing machine;
heating, namely heating the blank at the temperature of 980-1000 ℃;
the method comprises the following steps of performing sub-hot extrusion, namely performing sub-hot extrusion forming on a blank by adopting a single-point press to process the blank into a required forging shape, wherein the sub-hot extrusion comprises the following specific steps:
in the preforming stage, the blank is processed through a single-point press, a male die and a female die are arranged on the single-point press, when the blank is preformed, the blank is firstly placed in the female die, the blank is subjected to pre-forging extrusion through the male die, and the initial forging temperature of the pre-forging extrusion is 950-;
in the final forging forming stage, the blank is extruded and punched through a male die, so that the blank forms a forging piece with a required shape, the extrusion starting temperature is 910-;
further comprising after the cooling treatment: and cold finishing, namely performing cold finishing treatment on the forging.
2. The forging process of the besides-star wheel with the handle as claimed in claim 1, wherein the forging process comprises the following steps: the wind speed of the fan (11) is kept constant and is 2-8 m/s.
3. The forging process of the besides-star wheel with the handle as claimed in claim 1, wherein the forging process comprises the following steps: the gas pumped into the cooling box (1) by the fan (11) is inert gas.
4. The forging process of the besides-star wheel with the handle as claimed in claim 1, wherein the forging process comprises the following steps: a first scavenging box (2) and a second scavenging box (3) are respectively arranged on two sides of the cooling box (1); the first air exchange box (2) is communicated with an air inlet of the cooling box (1); the second air exchange box (3) is communicated with an air outlet of the cooling box (1); the first air exchange box (2) is connected with the second air exchange box (3) through an air duct (4); and a heat exchanger (5) is arranged on the air duct (4).
5. The forging process of the besides-star wheel with the handle as claimed in claim 1, wherein the forging process comprises the following steps: the gas pumped into the cooling box (1) by the fan (11) is nitrogen.
6. The forging process of the besides-star wheel with the handle as claimed in claim 1, wherein the forging process comprises the following steps: and in the heating step, a medium-frequency induction heating furnace is adopted to heat the blank.
CN202010399658.XA 2020-05-13 2020-05-13 Forging process of besides-star wheel with handle Active CN111375717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010399658.XA CN111375717B (en) 2020-05-13 2020-05-13 Forging process of besides-star wheel with handle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010399658.XA CN111375717B (en) 2020-05-13 2020-05-13 Forging process of besides-star wheel with handle

Publications (2)

Publication Number Publication Date
CN111375717A CN111375717A (en) 2020-07-07
CN111375717B true CN111375717B (en) 2022-02-22

Family

ID=71214373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010399658.XA Active CN111375717B (en) 2020-05-13 2020-05-13 Forging process of besides-star wheel with handle

Country Status (1)

Country Link
CN (1) CN111375717B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114309442B (en) * 2021-11-16 2023-08-11 上海纳铁福传动系统有限公司 Milling-free machining method for ball channel of inner star wheel of automobile universal joint

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1257029C (en) * 2004-07-22 2006-05-24 上海交通大学 Sub-heat control fine forging process for automobile spline shaft
CN101880760A (en) * 2010-07-09 2010-11-10 中国第一汽车集团公司 Vacuum isothermal heat treatment process of large die-casting mould
CN102989950B (en) * 2011-09-19 2016-01-20 上海交大中京锻压有限公司 A kind of automobile out star wheel Forging Technology
CN103103326A (en) * 2011-11-15 2013-05-15 昆山鑫昌泰模具科技有限公司 Vacuum isothermal treatment technology for hot work die steel
CN105132638A (en) * 2015-10-15 2015-12-09 白城中一精锻股份有限公司 Method and device for eliminating internal stress of non-quenched and tempered steel automobile engine connecting rod forge piece
CN107442722A (en) * 2017-08-22 2017-12-08 江西江锻重工有限公司 Non-hardened and tempered steel forging multiple spot strengthens controlled cooling device
CN108145049B (en) * 2017-11-14 2019-05-31 杭州万鼎实业有限公司 Automotive hub flange proceeding closed fine die forging method
CN109058310A (en) * 2018-07-26 2018-12-21 江苏威鹰机械有限公司 Automobile gimbal out star wheel and its manufacturing process and cold-finishing mold

Also Published As

Publication number Publication date
CN111375717A (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN110722078B (en) Synchronous forging scrap-removing and weight-reducing forging process
CN105108456B (en) The manufacture method of new-energy automobile motor axle
CN102500740A (en) Manufacturing process for lambdoidal control arm
CN102989942A (en) Forging method of single-throw crank shaft
CN104707927B (en) A kind of improve variable cross-section aluminum alloy die forgings tissue and the hot-working method of performance
US10022769B2 (en) Method for producing a shaped part from an aluminum alloy sheet
CN111375717B (en) Forging process of besides-star wheel with handle
CN106734465A (en) Based on the hot press-formed method for making automobile B-column of multilayer common metal composite plate
CN103071751B (en) Forging method for six throw crankshaft
CN104550306A (en) Method for producing strips for aluminum flat tubes for automobile radiator made of 3003 alloy by casting and rolling method
CN112359300A (en) Method for reducing quenching residual stress of die forging
CN101549459B (en) Manufacturing technology of individual hydraulic prop piston
CN111974921B (en) Forging method for common die beta forging of TC17 alloy
CN113976789A (en) Hollow reducing extrusion forming process method for titanium alloy thin-wall super-large cone angle special-shaped ring forging with inner and outer flange structures
CN105563044A (en) H-shaped aluminum alloy wheel forging and forming process
CN111604642B (en) Preparation method of elastic wheel core
CN111545697B (en) Forging process of besides-star wheel
CN110586823B (en) Aluminum alloy over-temperature forging method
CN112676506A (en) Universal joint cross shaft closed forging and forging residual heat normalizing processing technology
CN111482515B (en) High-strength aluminum alloy cylindrical deep-drawing part die and matched extrusion-drawing-quenching process
CN111408681B (en) Method for tempering non-quenched and tempered steel connecting rod of engine by using waste heat after forging
CN110788576A (en) Forging process of bearing ring
CN110129696B (en) Small-radius bending and edge-curling method for magnesium alloy plate
CN113305166B (en) Diameter-expanding hot extrusion process for bimetal alloy steel composite pipe
CN113798420B (en) Forging method of non-magnetic retaining ring of 1Mn18Cr18N of turbogenerator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Forging technology of an alien wheel with handle

Effective date of registration: 20220624

Granted publication date: 20220222

Pledgee: Shanghai Rural Commercial Bank Co.,Ltd. Jinshan sub branch

Pledgor: SHANGHAI CHANGTE FORGING Co.,Ltd.

Registration number: Y2022310000088

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230706

Granted publication date: 20220222

Pledgee: Shanghai Rural Commercial Bank Co.,Ltd. Jinshan sub branch

Pledgor: SHANGHAI CHANGTE FORGING Co.,Ltd.

Registration number: Y2022310000088

PC01 Cancellation of the registration of the contract for pledge of patent right