CN111368358B - 一种有限宽土体地下连续墙槽壁稳定性计算方法 - Google Patents
一种有限宽土体地下连续墙槽壁稳定性计算方法 Download PDFInfo
- Publication number
- CN111368358B CN111368358B CN202010010211.9A CN202010010211A CN111368358B CN 111368358 B CN111368358 B CN 111368358B CN 202010010211 A CN202010010211 A CN 202010010211A CN 111368358 B CN111368358 B CN 111368358B
- Authority
- CN
- China
- Prior art keywords
- soil
- limited
- width
- safety
- stability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002689 soil Substances 0.000 title claims abstract description 77
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000006073 displacement reaction Methods 0.000 claims abstract description 26
- 238000009412 basement excavation Methods 0.000 claims abstract description 21
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000004364 calculation method Methods 0.000 claims abstract description 9
- 238000005259 measurement Methods 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 4
- 230000003321 amplification Effects 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 3
- 238000003199 nucleic acid amplification method Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开一种有限宽土体地下连续墙槽壁稳定性计算方法,其特征是:包括以下步骤:步骤一、通过地勘报告得到有限宽土体的内摩擦角黏聚力d,通过现场量测得到有限宽土体宽度d;步骤二、计算安全系数F s和开挖面最大位移Δ:步骤三、通过安全系数F s值和开挖面最大位移Δ值评估安全性。该计算方法能够对有限宽土体地下连续墙槽壁稳定性进行精确计算,能够科学合理地指导施工。
Description
技术领域
本发明涉及一种有限宽土体地下连续墙槽壁稳定性计算方法,属于岩土工程技术领域,适用于有限范围内土体地下连续墙槽壁稳定性计算。
背景技术
随着工程建设不断向地下空间发展,许多新建的地下连续墙临近已有地下构筑物,当地下连续墙土体开挖高度远大于新旧地下连续墙之间土体宽度时,新旧地下连续墙之间的土体称为有限宽土体。有限宽土体宽度小,容易出现地下连续墙槽壁失去稳定性问题。工程中往往对地下连续墙槽壁进行加固以确保槽壁的稳定性,但没有相对应且符合实际情况的计算方法,故针对有限宽土体地下连续墙槽壁稳定性问题提供了一种有限宽土体地下连续墙槽壁稳定性计算方法。
发明内容
为了克服上述问题,本发明提供一种有限宽土体地下连续墙槽壁稳定性计算方法,该计算方法能够对有限宽土体地下连续墙槽壁稳定性进行精确计算,能够科学合理地指导施工。
本发明的技术解决方案如下:
1.一种有限宽土体地下连续墙槽壁稳定性计算方法,其特征是:包括以下步骤:
步骤一、通过地勘报告得到有限宽土体的内摩擦角黏聚力d,通过现场量测得到有限宽土体宽度d;
步骤二、计算安全系数F s和开挖面最大位移Δ:
(1)有限宽土体加固前后土体的粘聚力差值和土体内摩擦角对槽壁稳定性的影响的计算如下:其中为内摩擦角,Fs为安全系数,Δd为加固前后土体的粘聚力差值,其计算式为:
(2)有限宽土体内摩擦角和土体黏聚力对槽壁稳定性的影响的计算如下:其中为加固前后土体的内摩擦角差值,d为土体黏聚力,Fs为安全系数,其计算式为:
(3)有限宽土体宽度d对槽壁稳定性的影响的计算如下:考虑到土的不稳定性,取安全放大系数1.2,其中Δ为开挖面的最大位移,单位mm,d为有限宽土宽度,单位m,其余符号含义同上;
地下连续墙左侧开挖面计算式:
Δ=1.2×(0.19e 2-2.20e+9.56)
地下连续墙右侧开挖面计算式:
Δ=1.2×(0.02e 2-0.19e+3.55);
步骤三、通过安全系数F s值和开挖面最大位移Δ值评估安全性。
进一步的,安全性评估方式如下:
1)、安全系数Fs取值范围在1到5之间,被认定为相对安全,安全系数范围在5以上,被认定为绝对安全,安全系数范围在1以下,则被认定为不安全;被认定为相对安全和绝对安全可继续进行施工,被认定为不安全不得继续施工;
2)所述的开挖面的最大位移Δ不得大于50mm。最大位移范围在50mm之内,被认定为安全;最大位移范围在50mm以上,被认定为不安全,被认定安全可继续进行施工,被认定为不安全就不得继续施工。
进一步的,所述开挖面的最大位移Δ不大于30mm,则认定为高度安全值。
本发明的有益效果如下:
1、本发明通过对有限宽土体地下连续墙槽壁稳定性计算,给出较为精确计算公式,具有很高的应用价值;
2、本发明有限宽土体地下连续墙槽壁稳定性计算方法结合了实际的情况,能够科学合理的指导施工。
附图说明
图1是安全系数随加固前后土体的粘聚力差值和内摩擦角变化图。
图2是安全系数随土体粘聚力和加固前后土体的内摩擦角差值变化图。
图3是新建地下连续墙槽壁左右两侧位移随有限宽土宽度d变化曲线图。
图4是一种有限宽土体地下连续墙槽壁稳定性计算方法的示意图。
图中:1、既有构筑物;2、新建地下连续墙;3、有限宽土体。
具体实施方式
下面结合附图对本发明做进一步地说明。
参照图1-4所示,本发明提供的一种有限宽土体地下连续墙槽壁稳定性计算方法,其中有限宽土体3为既有构筑物1与新建地下连续墙2之间的间距,该计算方法包括以下步骤:
步骤一、通过地勘报告得到有限宽土体3的内摩擦角黏聚力d,通过现场量测得到有限宽土体3宽度d;
步骤二、计算安全系数F s和开挖面最大位移Δ:
(1)有限宽土体3加固前后土体的粘聚力差值和土体内摩擦角对槽壁稳定性的影响的计算如下:其中为内摩擦角,Fs为安全系数,Δd为加固前后土体的粘聚力差值,其计算式为:
(2)有限宽土体3内摩擦角和土体黏聚力对槽壁稳定性的影响的计算如下:其中为加固前后土体的内摩擦角差值,d为土体黏聚力,Fs为安全系数,其计算式为:
(3)参照图3、4所示,有限土体宽度d与有限土体产生的位移之间的关系,通过土体宽度能够快速知道槽壁两侧土体产生的位移,给施工一定的科学指导;有限宽土体3宽度d对槽壁稳定性的影响的计算如下:考虑到土的不稳定性,取安全放大系数1.2,其中Δ为开挖面的最大位移,单位mm,d为有限宽土宽度,单位m,其余符号含义同上;
地下连续墙左侧开挖面计算式:
Δ=1.2×(0.19e 2-2.20e+9.56)
地下连续墙右侧开挖面计算式:
Δ=1.2×(0.02e 2-0.19e+3.55);
步骤三、通过安全系数F s值和开挖面最大位移Δ值评估安全性。
步骤三中,安全性评估方式如下:
1)、安全系数Fs取值范围在1到5之间,被认定为相对安全,安全系数范围在5以上,被认定为绝对安全,安全系数范围在1以下,则被认定为不安全;被认定为相对安全和绝对安全可继续进行施工,被认定为不安全不得继续施工;2)所述的开挖面的最大位移Δ不得大于50mm。最大位移范围在50mm之内,被认定为安全;最大位移范围在50mm以上,被认定为不安全,被认定安全可继续进行施工,被认定为不安全就不得继续施工。所述开挖面的最大位移Δ不大于30mm,则认定为高度安全值。
Claims (3)
1.一种有限宽土体地下连续墙槽壁稳定性计算方法,其特征是:包括以下步骤:
步骤一、通过地勘报告得到有限宽土体的内摩擦角黏聚力d,通过现场量测得到有限宽土体宽度d;
步骤二、计算安全系数Fs和开挖面最大位移Δ:
(1)有限宽土体加固前后土体的粘聚力差值和土体内摩擦角对槽壁稳定性的影响的计算如下:其中为内摩擦角,Fs为安全系数,Δd为加固前后土体的粘聚力差值,其计算式为:
(2)有限宽土体内摩擦角和土体黏聚力对槽壁稳定性的影响的计算如下:其中为加固前后土体的内摩擦角差值,d为土体黏聚力,Fs为安全系数,其计算式为:
(3)有限宽土体宽度d对槽壁稳定性的影响的计算如下:考虑到土的不稳定性,取安全放大系数1.2,其中Δ为开挖面的最大位移,单位mm,d为有限宽土宽度,单位m,其余符号含义同上;
地下连续墙左侧开挖面计算式:
Δ=1.2×(0.19e2-2.20e+9.56)
地下连续墙右侧开挖面计算式:
Δ=1.2×(0.02e2-0.19e+3.55);
步骤三、通过安全系数Fs值和开挖面最大位移Δ值评估安全性。
2.根据权利要求1所述的有限宽土体地下连续墙槽壁稳定性计算方法,其特征是:安全性评估方式如下:
1)、安全系数Fs取值范围在1到5之间,被认定为相对安全,安全系数范围在5以上,被认定为绝对安全,安全系数范围在1以下,则被认定为不安全;被认定为相对安全和绝对安全可继续进行施工,被认定为不安全不得继续施工;
2)所述的开挖面的最大位移Δ不得大于50mm,最大位移范围在50mm之内,被认定为安全;最大位移范围在50mm以上,被认定为不安全,被认定安全可继续进行施工,被认定为不安全就不得继续施工。
3.根据权利要求2所述的有限宽土体地下连续墙槽壁稳定性计算方法,其特征是:所述开挖面的最大位移Δ不大于30mm,则认定为高度安全值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010010211.9A CN111368358B (zh) | 2020-01-06 | 2020-01-06 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010010211.9A CN111368358B (zh) | 2020-01-06 | 2020-01-06 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111368358A CN111368358A (zh) | 2020-07-03 |
CN111368358B true CN111368358B (zh) | 2024-01-19 |
Family
ID=71208037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010010211.9A Active CN111368358B (zh) | 2020-01-06 | 2020-01-06 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111368358B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113673019B (zh) * | 2021-09-12 | 2023-11-24 | 中铁五局集团电务工程有限责任公司 | 一种超深圆形地下连续墙双折角形槽段泥浆重度确定方法 |
CN114088812B (zh) * | 2021-11-18 | 2024-05-28 | 中铁电气化局集团有限公司 | 一种盾构隧道施工对周围土体振动评价方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031770A (zh) * | 2010-11-30 | 2011-04-27 | 上海交通大学 | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 |
CN102031791A (zh) * | 2010-11-30 | 2011-04-27 | 上海交通大学 | 地下连续墙槽壁整体稳定性及泥浆容重确定方法 |
CN104573319A (zh) * | 2014-12-03 | 2015-04-29 | 中南大学 | 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法 |
JP2017025654A (ja) * | 2015-07-27 | 2017-02-02 | 株式会社大林組 | 掘削壁面の安定性評価方法 |
CN106381866A (zh) * | 2016-08-31 | 2017-02-08 | 中铁二局工程有限公司 | 一种富水软土地区超深地下连续墙施工方法 |
-
2020
- 2020-01-06 CN CN202010010211.9A patent/CN111368358B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102031770A (zh) * | 2010-11-30 | 2011-04-27 | 上海交通大学 | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 |
CN102031791A (zh) * | 2010-11-30 | 2011-04-27 | 上海交通大学 | 地下连续墙槽壁整体稳定性及泥浆容重确定方法 |
CN104573319A (zh) * | 2014-12-03 | 2015-04-29 | 中南大学 | 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法 |
JP2017025654A (ja) * | 2015-07-27 | 2017-02-02 | 株式会社大林組 | 掘削壁面の安定性評価方法 |
CN106381866A (zh) * | 2016-08-31 | 2017-02-08 | 中铁二局工程有限公司 | 一种富水软土地区超深地下连续墙施工方法 |
Non-Patent Citations (4)
Title |
---|
土体宽度非对称基坑变形特性分析;方焘等;《华东交通大学学报》;20191215(第06期);全文 * |
基于上限分析法的有限宽度土体土压力计算;廖俊展等;《地下空间与工程学报》;20161215;全文 * |
基于强度折减法土质边坡安全系数与土体抗剪强度关系的探讨;白成富;《山东交通科技》;20171225(第06期);全文 * |
廖俊展等.基于上限分析法的有限宽度土体土压力计算.《地下空间与工程学报》.2016, * |
Also Published As
Publication number | Publication date |
---|---|
CN111368358A (zh) | 2020-07-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111368358B (zh) | 一种有限宽土体地下连续墙槽壁稳定性计算方法 | |
Zhang et al. | A new model to predict soil pressure acting on deep burial jacked pipes | |
CN102519790B (zh) | 确定泥水盾构隧道开挖面支护压力的方法 | |
CN106202766B (zh) | 地面出入式盾构法隧道施工引起的土体垂直变形计算方法 | |
CN107315879B (zh) | 富水隧道掌子面突水破坏临界水压及临界厚度的确定方法 | |
Cao et al. | Analytical solutions for nonlinear consolidation of soft soil around a shield tunnel with idealized sealing linings | |
Hong et al. | Deformation control method of a large cross-section tunnel overlaid by a soft-plastic loess layer: a case study | |
CN106777974B (zh) | 一种基坑开挖对周围临近建筑物的沉降计算方法 | |
Sun et al. | Stability analysis for nonhomogeneous slopes subjected to water drawdown | |
CN115575598A (zh) | 考虑隧道塑性区和径向应力的岩爆倾向性预测方法 | |
CN112200445B (zh) | 一种新建隧道注浆环对既有盾构隧道防护效果的评估方法 | |
CN102031791B (zh) | 地下连续墙槽壁整体稳定性及泥浆容重确定方法 | |
CN105586974A (zh) | 一种基坑支挡结构设计方法 | |
CN104573319A (zh) | 基于槽壁整体稳定性的富水砂卵地层地下连续墙成槽施工泥浆参数设计方法 | |
Zhao et al. | Fracture controlling of vertical shaft lining using grouting into neighboring soil deposits: A case study | |
CN116796396A (zh) | 一种基坑开挖及降水引起下卧隧道变形的解析方法 | |
CN201933516U (zh) | 钻孔桩静载荷试验双层钢套管 | |
Gorska et al. | An analysis of excavation support safety based on experimental studies | |
CN114961751B (zh) | 一种土岩复合地层中盾构掘进引起的土体位移预测方法 | |
CN114818082A (zh) | 一种评估深埋隧道超挖对拱部塌方影响的方法 | |
Tong | Research on application of multi-factor surrounding rock pressure calculation theory in engineering | |
CN112884292A (zh) | 砂卵石地层盾构施工参数控制对地表沉降影响的分析方法 | |
Zhong et al. | Stability analysis of 3D deep tunnel face under steady seepage flow condition | |
CN110568477A (zh) | 一种隧洞施工时滞型岩爆时空预警方法 | |
CN110397092B (zh) | 砂卵石基坑位移预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |