CN102031770A - 地下连续墙槽壁局部稳定性及泥浆容重确定方法 - Google Patents
地下连续墙槽壁局部稳定性及泥浆容重确定方法 Download PDFInfo
- Publication number
- CN102031770A CN102031770A CN 201010564666 CN201010564666A CN102031770A CN 102031770 A CN102031770 A CN 102031770A CN 201010564666 CN201010564666 CN 201010564666 CN 201010564666 A CN201010564666 A CN 201010564666A CN 102031770 A CN102031770 A CN 102031770A
- Authority
- CN
- China
- Prior art keywords
- soil body
- unit weight
- wall
- mud
- cell wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
Description
技术领域
本发明涉及一种建筑工程技术领域的方法,具体是一种地下连续墙槽壁局部稳定性及泥浆容重确定方法。
背景技术
地下连续墙施工方法,就是利用成槽机械,采用泥浆进行护壁,向地下钻挖具有一定长度和深度的沟槽,然后在槽段内放入预制的钢筋笼,灌注水下砼筑成一段钢筋砼墙段,并逐段连接起来形成一道连续封闭的地下墙体。地下连续墙由于其整体性好、墙体刚度大,支护结构变形较小;墙身具有良好的抗渗能力;可作为地下结构外墙;可用于多种地质条件下施工等诸多特点,是基坑围护工程中普遍使用的围护型式。在地下连续墙成槽施工全过程中泥浆需始终充满槽段,起着液体支撑、保持槽壁土体的稳定等作用,使墙体在筑成之前不会出现槽壁坍塌的危险。
经对现有国内外技术文献的检索,徐殿祥在《中国土木工程学会第三届年会论文集》1986,No11,pp.12-16上发表的“论地下连续墙施工中槽壁稳定与泥浆”,研究了泥浆、地下水、土压力三者的相互作用,通过力的平衡,分析了槽壁的整体稳定性。刘建航、侯学渊主编的《基坑工程手册》(1997),介绍了抛物线圆柱体法、梅耶霍夫经验公式法以及非粘性土的经验公式法。抛物线圆柱体法是利用极限平衡方法,假设滑动体为抛物线圆柱体,通过力的平衡,得出槽壁的安全系数。梅耶霍夫经验公式法是根据现场试验获得的公式。以上三种方法都是整体失稳模式。
Filz G M,等,在《Journal of Geotechnical and Geoenvironmental Engineering》2004,No130(9),pp.915-921上发表的“Stability of long trenches in sand supported by bentonite-water slurry”,该文介绍了用槽壁面上(竖向)土粒间的摩擦力与土粒有效容重的比值来定义局部失稳的方法,也是通过力的平衡建立起来的公式。
在进一步文献的检索中,尚没发现类似本发明的方法来解决地下连续墙成槽过程中槽壁局部稳定性及泥浆容重确定方法的文献。
发明内容
本发明针对现有槽壁局部稳定性及泥浆容重确定方法中存在的不足,提出了一种地下连续墙槽壁局部稳定性及泥浆容重确定方法。该方法具有确定精度高和分析效率高等优点,大大提高的了确定地下连续墙成槽施工中槽壁局部稳定性及泥浆容重的精度和效率,具有较强的实用性。
本发明通过以下技术方案实现的,
本发明包括以下步骤:
第二步,确定泥浆的容重γw,每层土体到泥浆表面的距离hn;
第三步,把各参数代入到槽壁局部失稳安全系数公式;
第四步,根据安全系数的大小,判断槽壁的局部稳定性,如果安全系数小于1,调整泥浆容重,直至槽壁局部安全系数大于1。
二、一种地下连续墙成槽过程中槽壁局部稳定性的确定方法,其特征是通过地质资料以及试验资料,确定工作区的土体参数,通过施工方案,确定槽段及泥浆参数,通过确定公式以及确定方法,求出地下连续墙成槽过程中槽壁局部失稳安全系数,并作出槽壁局部稳定性的判断。
所述的地质资料,充分收集工作区地质资料,分析资料的可利用程度,重点对钻孔资料进行分类整理和分析研究,重视对钻孔资料的分层和岩性描述研究。
所述的成槽参数,根据制定的连续墙施工方案,确定泥浆的容重γw,每层土体到泥浆表面的距离hn。
所述的确定公式,为下面确定各层土体安全系数Fn的公式
式中:c——土的粘聚力(kPa);
——土的内摩擦角(度);
γ——土体的容重(kN/m3);
γw——泥浆的容重(kN/m3);
h′n——第n层土体厚度(m);
hn——第n层土到泥浆面的距离(m);
以及相邻多层土体参数求解公式
式中:cm——相邻多层土体的粘聚力(kPa);
cn——第n层土体的粘聚力(kPa);
γm——相邻多层土体的容重(kN/m3);
γn——第n层土体的容重(kN/m3);
h′n——第n层土体厚度(m);
H——相邻多层土体厚度(m);
把相邻多层土体的参数代入公式(1),求出相邻多层土体的安全系数Fm,比较各层土体及相邻组合土体的安全系数大小,最小值F即为地下连续墙成槽过程中槽壁局部失稳的安全系数。
所述的稳定性判断方法,如果F大于1,说明槽壁处于稳定状态,不会发生局部失稳现象,如果F小于1,说明槽壁处于不稳定状态,会发生局部失稳现象,调整泥浆容重,直至槽壁局部安全系数大于1。
本发明具有确定精度高和分析效率高等优点,大大提高的了确定地下连续墙成槽施工中槽壁局部稳定性及泥浆容重的精度和效率,具有较强的实用性,工程应用方便,确定量小,结果可靠,应用前景广泛。
附图说明
图1为本发明槽壁局部失稳示意图
图2为本发明的实施例当c=20kPa、γ=17.5kN/m3、hn=10m、h′n=4m时F随γw/γ变化关系曲线
具体实施方式
下面结合附图对本发明的实施例作详细说明:本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
实施例:
以上海市某地区综合改造(一期)工程实例。该工程的施工场地东侧为黄浦江防汛墙,防汛墙为20世纪70年代建设,并于90年代初期经过加高加固。场地西侧为交通繁忙的马路,且有地下管线分布,新建临时防汛墙已将施工区域和管线、道路有效隔离。
本工程陆域范围建筑物的基坑工程分为A、B、C和D共4个施工区,围护结构采用800mm厚、27m~28m深地下连续墙,坑内采用三道水平钢筋混凝土支撑,基坑开挖方式为常规顺作施工,基坑开挖深度13.5m,基坑总延长1200m,属一级基坑,基坑变形控制标准严格。
为检查地下连续墙的成槽过程中槽壁局部稳定性,采用如图1所示的三棱柱体局部失稳滑动模型。具体方法及步骤如下:
1)充分收集工作区地质资料,对钻孔资料的分层和岩性描述研究,工程各区段浅部填土的填料成分复杂,差异较大。水域表部分布有近期沉积的厚薄不等的淤泥,土质不均,其厚度约为0.2~7.2m;陆域浅部杂填土普遍较厚,其组成成分复杂;拟建场地近黄浦江现有防汛墙区域,均有抛石分布,其厚度不均,抛石最厚处约6.0m左右,其宽度约18.0m左右。
3)根据工程项目地下连续墙设计深度及施工方案,泥浆的容重γw=12kN/m3,根据工作区地质资料,第二层土体的厚度h′n=7m,到泥浆表面的距离hn=3m,第三层土体的厚度h′n=16m,到泥浆表面的距离hn=10m,。
4)把各参数代入到由槽壁局部失稳推导出的求解安全系数公式(1)。求得第二层土体安全系数F2=2.635,第三层土体安全系数F3=3.089。由公式(2)求出第二、三层土体的参数,c2,3=12.086,γ2,3=18.139,由公式(1)求出相邻两层土体的安全系数F2,3=1.996。由于F2,3<F2<F3,所以F=1.996
5)由于F大于1,说明槽壁处于稳定状态,不会发生局部失稳现象。
为便于进行确定结果的对比和分析,分别制作图2和图3。图2为当c=20kPa、γ=17.5kN/m3、hn=1m、h′n=19m时F随γw/γ变化关系曲线,由图可以看出,安全系数F随泥浆容重与土体容重之比γw/γ的增加而增加,随土体内摩擦角的增加而加。
由实施例可以看出,槽壁局部安全系数与各层土体的粘聚力、内摩擦角、容重、厚度、到泥浆表面的距离以及泥浆的容重有关,通过调整以上各参数,可以控制槽壁稳定,确定泥浆的配置容重。
本实施例提高的了确定地下连续墙成槽施工中槽壁局部稳定性及泥浆容重的精度和效率,工程应用方便,确定量小,结果可靠。
Claims (5)
3.根据权利要求1所述的地下连续墙槽壁局部稳定性及泥浆容重确定方法,其特征是,第二步中,根据制定的连续墙施工方案,确定泥浆的容重γw,和每层土体到泥浆表面的距离hn。
4.根据权利要求1所述的地下连续墙槽壁局部稳定性及泥浆容重确定方法,其特征是,第三步中,把各层土体参数代入公式
求出各层土体的安全系数Fn,如果是单层土体,取h′n为槽底到导墙底面的距离,hn为水面到导墙底面的距离;
相邻多层土体的参数可由以下公式求得
式中:cm——相邻多层土体的粘聚力(kPa);cn——第n层土体的粘聚力(kPa);——相邻多层土体的内摩擦角(度);——第n层土体的内摩擦角(度);γm——相邻多层土体的容重(kN/m3);γn——第n层土体的容重(kN/m3);h′n——第n层土体厚度(m);H——相邻多层土体厚度(m);
把相邻多层土体的参数代入公式(1),求出相邻多层土体的安全系数Fm,比较各层土体及相邻组合土体的安全系数大小,最小值F即为地下连续墙成槽过程中槽壁局部失稳的安全系数。
5.根据权利要求1所述的地下连续墙槽壁局部稳定性及泥浆容重确定方法,其特征是,第四步中,如果F大于1,说明槽壁处于稳定状态,不会发生局部失稳现象,如果F小于1,说明槽壁处于不稳定状态,会发生局部失稳现象,调整泥浆容重,直至槽壁局部安全系数大于1。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105646661A CN102031770B (zh) | 2010-11-30 | 2010-11-30 | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105646661A CN102031770B (zh) | 2010-11-30 | 2010-11-30 | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102031770A true CN102031770A (zh) | 2011-04-27 |
CN102031770B CN102031770B (zh) | 2012-07-18 |
Family
ID=43885172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105646661A Expired - Fee Related CN102031770B (zh) | 2010-11-30 | 2010-11-30 | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102031770B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111368358A (zh) * | 2020-01-06 | 2020-07-03 | 中铁二局集团有限公司 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
CN113279415A (zh) * | 2021-05-09 | 2021-08-20 | 苏州中车建设工程有限公司 | 地下连续墙成槽的高压泥浆护壁施工方法 |
CN113673019A (zh) * | 2021-09-12 | 2021-11-19 | 中铁五局集团电务工程有限责任公司 | 一种超深圆形地下连续墙双折角形槽段泥浆重度确定方法 |
-
2010
- 2010-11-30 CN CN2010105646661A patent/CN102031770B/zh not_active Expired - Fee Related
Non-Patent Citations (6)
Title |
---|
《土木工程学报》 20001231 张厚美等 地下连续墙泥浆槽壁稳定的三维分析 第33卷, 第1期 2 * |
《山西建筑》 20100530 徐永浩 地铁车站地下连续墙泥浆槽壁的稳定性分析 第36卷, 第5期 2 * |
《岩土工程技术》 20071231 郑玉辉 地下连续墙槽壁稳定的研究 第21卷, 第1期 2 * |
《建筑施工》 20031231 徐伟等 地下连续墙泥浆护壁稳定分析理论探讨 , 第5期 2 * |
《石家庄铁道学院学报》 20061231 颜恒 地下连续墙槽壁稳定及护壁泥浆性能研究 第19卷, 2 * |
《科学技术与工程》 20061231 刘海卿等 深层地下连续墙槽壁稳定机理研究 第6卷, 第8期 2 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111368358A (zh) * | 2020-01-06 | 2020-07-03 | 中铁二局集团有限公司 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
CN111368358B (zh) * | 2020-01-06 | 2024-01-19 | 中铁二局集团有限公司 | 一种有限宽土体地下连续墙槽壁稳定性计算方法 |
CN113279415A (zh) * | 2021-05-09 | 2021-08-20 | 苏州中车建设工程有限公司 | 地下连续墙成槽的高压泥浆护壁施工方法 |
CN113279415B (zh) * | 2021-05-09 | 2022-07-15 | 苏州中车建设工程有限公司 | 地下连续墙成槽的高压泥浆护壁施工方法 |
CN113673019A (zh) * | 2021-09-12 | 2021-11-19 | 中铁五局集团电务工程有限责任公司 | 一种超深圆形地下连续墙双折角形槽段泥浆重度确定方法 |
CN113673019B (zh) * | 2021-09-12 | 2023-11-24 | 中铁五局集团电务工程有限责任公司 | 一种超深圆形地下连续墙双折角形槽段泥浆重度确定方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102031770B (zh) | 2012-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Ng et al. | Ground deformations and soil–structure interaction of a multi-propped excavation in Shanghai soft clays | |
CN103215960B (zh) | 高聚物垂直支护体系注浆方法 | |
CN106649931B (zh) | 一种矩形顶管隧道施工工后地表沉降计算方法 | |
CN102108707A (zh) | 超大超深基坑精确沉降及环保施工方法 | |
CN105804761A (zh) | 适用于液化砂土地层盾构近距离穿越建筑物的施工方法 | |
CN102031791B (zh) | 地下连续墙槽壁整体稳定性及泥浆容重确定方法 | |
WO2020087880A1 (zh) | 基于露天矿坑的半地下抽水蓄能电站及其形成方法 | |
CN201250408Y (zh) | 回收式钢结构基坑围护装置 | |
Feng et al. | Mechanism and law analysis on ground settlement caused by shield excavation of small-radius curved tunnel | |
CN103015429A (zh) | 长螺旋旋喷搅拌水泥土型钢桩基坑止水支护方法 | |
CN109594575A (zh) | 一种沉井周边注浆加固土体施工方法 | |
CN102031770B (zh) | 地下连续墙槽壁局部稳定性及泥浆容重确定方法 | |
WO2020087881A1 (zh) | 基于塌陷区的半地下抽水蓄能电站及其形成方法 | |
Zhu et al. | Numerical Simulation Study on Construction Effect of Top‐Down Construction Method of Suspended Diaphragm Wall for Deep and Large Foundation Pit in Complex Stratum | |
WO2020087882A1 (zh) | 一种全地下抽水蓄能电站及其形成方法 | |
Liu et al. | Numerical simulation and field monitoring of deformation characteristics of TRD composite supporting structure for deep foundation pit in quaternary stratum: a case study in Qingdao | |
Zeng et al. | A case study of vacuum tube-well dewatering technology for improving deep soft soil in Yangtze River floodplain | |
CN111877365A (zh) | 一种h型钢组合钢板桩连续墙组合支护体系及其施工方法 | |
CN102061686B (zh) | 地下连续墙纯粘性槽壁局部稳定性及泥浆容重确定方法 | |
WO2020087883A1 (zh) | 一种梯级抽水蓄能电站及其形成方法 | |
Wu et al. | Corner effects in deep excavations-establishment of a forecast model for taipei basin T2 zone | |
WANG et al. | Excavation response analysis of prefabricated recyclable support structure for water-rich silt foundation pit | |
He et al. | Study on Mechanism and Control Technology of Asymmetric Floor Heave in a Deep Soft Rock Main Roadway | |
Sun et al. | Research on Numerical Simulation of Top‐Down Construction Effect of Diaphragm Wall of Deep and Large Foundation Pit under Different Working Conditions in Complex Stratum | |
CN102094416B (zh) | 基于稳定阳角处槽壁的地下连续墙成槽优化施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120718 Termination date: 20141130 |
|
EXPY | Termination of patent right or utility model |