CN111354071A - Internet + -based augmented reality transformer substation and visual archive management method - Google Patents

Internet + -based augmented reality transformer substation and visual archive management method Download PDF

Info

Publication number
CN111354071A
CN111354071A CN201811631442.0A CN201811631442A CN111354071A CN 111354071 A CN111354071 A CN 111354071A CN 201811631442 A CN201811631442 A CN 201811631442A CN 111354071 A CN111354071 A CN 111354071A
Authority
CN
China
Prior art keywords
transformer substation
internet
augmented reality
maintenance
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811631442.0A
Other languages
Chinese (zh)
Inventor
张峰
付涛
张桓闻
吴淑娥
曹健
孙熙明
王莹
陈向华
张伟
王亚萍
梁快
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shaanxi Electric Power Company Weinan Power Supply Co
Original Assignee
State Grid Shaanxi Electric Power Company Weinan Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shaanxi Electric Power Company Weinan Power Supply Co filed Critical State Grid Shaanxi Electric Power Company Weinan Power Supply Co
Priority to CN201811631442.0A priority Critical patent/CN111354071A/en
Publication of CN111354071A publication Critical patent/CN111354071A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics
    • G06T19/20Editing of 3D images, e.g. changing shapes or colours, aligning objects or positioning parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Graphics (AREA)
  • Human Resources & Organizations (AREA)
  • Software Systems (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Architecture (AREA)
  • Tourism & Hospitality (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Geometry (AREA)
  • Processing Or Creating Images (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an augmented reality transformer substation and a visual archive management method based on Internet +, which comprises the following steps: designing a background for supervisory maintenance; acquiring related image information; preprocessing the acquired data image information; on the basis of successful panoramic simulation construction, equipment and operation conditions of a maintenance transformer substation are monitored through the internet +; constructing a three-dimensional panoramic digital data room by an augmented reality technology; the built three-dimensional panorama of the digital data room and the transformer substation is combined. The invention can effectively improve the management efficiency of the transformer team and reduce the operation cost, and realizes comprehensive visualization of operation and maintenance and real-time information updating.

Description

Internet + -based augmented reality transformer substation and visual archive management method
Technical Field
The invention relates to an augmented reality transformer substation based on the Internet + and a visual archive management method. Meanwhile, the structure, the layout, the field environment, all production data, design drawings and the like of the transformer substation can be known through the Internet and the technology. Meanwhile, the powerful retrieval function can greatly reduce the complexity and time for people to search data and provide convenience for work.
Technical Field
In the electric power construction, a transformer operation and maintenance team is a basic level and first line unit of the electric power operation and maintenance, and the construction and management of the transformer operation and maintenance team are an important link of the electric power production. The issuing of the work tasks of the existing transformer teams and groups mostly depends on paper notification, and detailed geographic information of work places and image information of key work cannot be provided; the reporting of the result after the work is finished is also to submit a simple work card, and a more detailed work report cannot be provided. The existing working mode is backward, periodic inspection is basically carried out in modes of manual handwriting work book inspection or inspection application based on bar code identification and the like, the working efficiency is low, and the requirements of quick and real-time information flow cannot be met; meanwhile, the inspection mode is limited by the environment, so that the upper layer door cannot effectively supervise inspection personnel, and particularly whether the safety specification of field construction is strictly implemented and implemented or not. Therefore, an informationized, digitalized and intelligent substation intelligent team is established to be more suitable for the objective requirements of the development of the future intelligent power grid.
With the development and maturity of the internet and the virtual reality technology, the management efficiency of the transformer teams and groups can be effectively improved, the operation cost is reduced, the comprehensive visualization of operation and maintenance and real-time updating of information are realized, the transformer teams and groups are more finely managed, the working states and the problem occurrence conditions of personnel can be monitored in real time, a national network is helped to establish an advanced, normative and intensive management mechanism, the safe production and the benefit improvement are carried out to each aspect of the construction of the transformer teams and groups, and the comprehensive competitiveness is enhanced.
From publicly published papers, news and network information, no case exists in China at present about building intelligent transformer teams. The invention of applying a three-dimensional scene to the visual management work of electric power facilities is invented by both the Beijing electric power company of the national grid and the Yanan power supply company of the national grid, but the invention is essentially different from the research content of the invention. The invention only simply carries out intelligent transformation on the electric power facilities, does not carry out intelligent and systematic management on the power transformation operation and maintenance personnel and the data of the power transformation station, and does not form a completely intelligent power transformation team management system, which is one of the most important innovation points of the invention.
Therefore, the augmented reality transformer substation based on the internet + and the visual archive management method cater to popularization and application of a large number of intelligent devices and devices in intelligent power grid construction, improve the intellectualization of a front-line basic team and team, and can intellectualize not only the devices and the system but also the staff.
Disclosure of Invention
The invention provides an augmented reality transformer substation based on the Internet + and a visual archive management method, aiming at the defects of the functions of the existing transformer substation in operation, maintenance, management and the like. According to the method, the IBR technology is used for realizing three-dimensional panoramic construction of the real-scene environment of the transformer substation at the background, transformer substation equipment is monitored and maintained in real time through the Internet + technology, and safe and normal operation of the equipment is guaranteed. Meanwhile, a three-dimensional panorama-based digital data room is established by using an augmented reality technology, so that corresponding electronic documents can be consulted by arbitrarily clicking one folder in a graphical interface.
The invention comprises the following steps:
(1) the background is designed for regulatory maintenance. And the user logs in through the account to acquire the use permission of the system and enters the system.
(2) And acquiring related image information. And performing three-dimensional panoramic display on the real-scene environment of the transformer substation by using a modern panoramic view technology, and adding each device as a device hot-spot view.
(3) And preprocessing the acquired image information. And according to the preprocessed pictures, performing panoramic simulation on the transformer substation by using the Stage3D technology supported by the latest Flash version.
(4) On the basis of successful panoramic simulation construction, substation equipment is monitored and maintained through the internet plus technology, and the running condition of the equipment is known. When a fault occurs, a background worker can guide the worker to operate by analyzing the operation condition of the panoramic view of the transformer substation, and the maintenance result is fed back to the mobile equipment of the worker.
(5) A three-dimensional panoramic digital data room is built through an augmented reality technology. Each folder is a hotspot. And arbitrarily clicking one folder in the graphical interface to refer to the corresponding electronic document.
(6) And combining the built three-dimensional panoramic view of the digital data room and the transformer substation. The operation parameters of each device can be grasped timely in the maintenance and management process.
The invention has the beneficial effects that: the invention relates to an augmented reality transformer substation based on the Internet + and a visual archive management method. The transformer substation and the data room are built in a three-dimensional panoramic mode through the augmented reality technology, a manager can supervise the transformer substation through the background system, and the operation parameters of transformer substation equipment can be checked in the digital data room. In the operation and maintenance process, the system is convenient for guiding the working personnel, mastering the maintenance condition constantly and feeding back the maintenance result.
Drawings
FIG. 1 is a block diagram of the system architecture of the present invention
FIG. 2 is a three-dimensional panoramic view of a data room
FIG. 3 is a three-dimensional panoramic effect diagram of a substation
The specific implementation mode is as follows:
the invention will be further described with reference to the accompanying drawings
(1) Fig. 1 is a block diagram of a system structure of the present invention, and as shown in the figure i, the present invention includes a manager login interface, a three-dimensional panoramic substation model building system, a database system, a three-dimensional panoramic digital data room system, and a data interaction system. The database system stores preprocessed image data for building panoramic views of the transformer substation and the data room, and real-time monitoring and maintenance are achieved under the support of the panoramic views. When the substation equipment fails, the background management personnel can guide the working personnel to operate and feed back the maintenance result to the mobile terminal. The invention relates to an augmented reality transformer substation based on the Internet + and a visual archive management method, which comprises the following steps:
(2) and acquiring related picture information of the transformer substation and the database for establishing a three-dimensional panoramic view. Including configuration, layout, site environment, overall manufacturing data, design drawings, and equipment operating parameters, among others.
(3) Preprocessing the acquired related information of the transformer substation and the database by pictures
a) And finding out the corresponding positions of the templates or the characteristic points in the images to be spliced in the reference image by adopting a certain matching strategy, and further determining the transformation relation between the images.
b) And establishing a transformation model. And calculating various parameter values in the mathematical model according to the corresponding relation between the template or the image characteristics so as to establish a mathematical transformation model of the image.
c) And (5) unified coordinate transformation. And converting the images to be spliced into a coordinate system of the reference image according to the established mathematical conversion model to finish unified coordinate transformation.
d) And (5) fusion and reconstruction. And fusing the overlapped areas with the spliced images to obtain a spliced and reconstructed smooth seamless panoramic image.
(4) And building a three-dimensional panoramic model. The three-dimensional graphic processing is processed by a GPU by using the Stage3D technology in the latest Flash version. The system uses the Away 3D.1.0 library developed based on Stage 3D.
(5) And the successfully built three-dimensional panoramic transformer substation and the digital data room are associated through the internet plus technology in the background. When maintenance operation is carried out, data inquired in the digital data room are fed back to the three-dimensional panoramic transformer substation, operation and maintenance results are transmitted to a mobile terminal of a worker, and real-time interaction is carried out.
The implementation effect is as follows:
1. as can be seen from the three-dimensional panoramic effect diagram of the digital data room shown in the attached figure 2, the data in the data room is digitized by the virtual reality technology, and managers can perform operations such as adding, deleting, checking and the like on the data in the data room. The efficiency of data management has been improved, the time that the managers looked for the data has been reduced.
2. According to the three-dimensional panoramic effect diagram of the transformer substation shown in the attached figure 3, the background management personnel can clearly observe the operation condition of each device through the user interface, and the working efficiency of supervision and maintenance of the working personnel is improved. By clicking on the equipment in the three-dimensional map, the equipment operation can be checked with reference to the operation parameters stored in the digital data room. In the fault maintenance process, under the monitoring of the three-dimensional panorama, a background worker can guide a maintenance worker to operate and feed back a maintenance result in real time.

Claims (5)

1. An augmented reality transformer substation based on Internet + and a visual archive management method are characterized by comprising the following steps:
(1) the background is designed for regulatory maintenance. And the user logs in through the account to acquire the use permission of the system and enters the system.
(2) And acquiring related image information. And performing three-dimensional panoramic display on the real-scene environment of the transformer substation by using a modern panoramic view technology, and adding each device as a device hot-spot view.
(3) And preprocessing the acquired image information. And according to the preprocessed pictures, performing panoramic simulation on the transformer substation by using the Stage3D technology supported by the latest Flash version.
(4) On the basis of successful panoramic simulation construction, substation equipment is monitored and maintained through the internet plus technology, and the running condition of the equipment is known. When a fault occurs, a background worker can guide the worker to operate by analyzing the operation condition of the panoramic view of the transformer substation, and the maintenance result is fed back to the mobile equipment of the worker.
(5) A three-dimensional panoramic digital data room is built through an augmented reality technology. Each folder is a hotspot. And arbitrarily clicking one folder in the graphical interface to refer to the corresponding electronic document.
(6) And combining the built three-dimensional panoramic view of the digital data room and the transformer substation. The operation parameters of each device can be grasped timely in the maintenance and management process.
2. The internet + -based augmented reality substation and visual archive management method according to claim 1 is characterized in that: the obtained relevant information of the transformer substation and the database comprises a structure, a layout, a field environment, all production data, a design drawing, equipment operation parameters and the like.
3. The internet + -based augmented reality substation and visual archive management method according to claim 1 is characterized in that: the acquired picture information needs to be preprocessed through a matching strategy, establishment of a transformation model, unified coordinate transformation and fusion reconstruction.
4. The internet + -based augmented reality substation and visual archive management method according to claim 1 is characterized in that: the three-dimensional panoramic model is built by adopting the Stage3D technology in the latest Flash version, so that the operation efficiency is greatly improved.
5. The internet + -based augmented reality substation and visual archive management method according to claim 1 is characterized in that: through the internet plus technology, when maintenance operation is carried out, data inquired in the digital data room are fed back to the three-dimensional panoramic transformer substation, operation and maintenance results are fed back to a mobile terminal of a worker, and real-time interaction is carried out.
CN201811631442.0A 2018-12-21 2018-12-21 Internet + -based augmented reality transformer substation and visual archive management method Pending CN111354071A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811631442.0A CN111354071A (en) 2018-12-21 2018-12-21 Internet + -based augmented reality transformer substation and visual archive management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811631442.0A CN111354071A (en) 2018-12-21 2018-12-21 Internet + -based augmented reality transformer substation and visual archive management method

Publications (1)

Publication Number Publication Date
CN111354071A true CN111354071A (en) 2020-06-30

Family

ID=71196964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811631442.0A Pending CN111354071A (en) 2018-12-21 2018-12-21 Internet + -based augmented reality transformer substation and visual archive management method

Country Status (1)

Country Link
CN (1) CN111354071A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112906225A (en) * 2021-02-23 2021-06-04 国网山东省电力公司宁阳县供电公司 Virtual live-action simulation training system for transformer substation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104268939A (en) * 2014-09-28 2015-01-07 国家电网公司 Transformer substation virtual-reality management system based on three-dimensional panoramic view and implementation method of transformer substation virtual-reality management system based on three-dimensional panoramic view

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104268939A (en) * 2014-09-28 2015-01-07 国家电网公司 Transformer substation virtual-reality management system based on three-dimensional panoramic view and implementation method of transformer substation virtual-reality management system based on three-dimensional panoramic view

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112906225A (en) * 2021-02-23 2021-06-04 国网山东省电力公司宁阳县供电公司 Virtual live-action simulation training system for transformer substation

Similar Documents

Publication Publication Date Title
CN109710696B (en) System and method for power equipment checking and transaction moving operation
US12079252B2 (en) Modeling analysis method for device management network and electronic device
CN111597231B (en) Intelligent substation inspection system based on multi-source heterogeneous system data mining
CN109299908A (en) A kind of remote visualization assistance system
CN104766173A (en) Digital water supply management system and method
CN112306233A (en) Inspection method, inspection system and inspection management platform
CN103118114A (en) BIM (building information modeling) collaborative designing system based on cloud servers
CN109462736B (en) Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling
CN110135598A (en) A kind of high-speed railway electricity business maintenance auxiliary system of knowledge based service
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN107123172A (en) A kind of intelligent cruising inspection system
CN106845834A (en) Transmission line of electricity hidden danger management method and system based on mobile phone A PP
CN105262227A (en) Fool-proof lockout system
CN112598815A (en) Distribution network inspection method based on Internet
CN117154935A (en) Digital twinning-based remote optimal control method and system for transformer substation
CN110751454A (en) Cable accessory installation process control system and method
CN107748902A (en) A kind of method for matching somebody with somebody insertion data acquisition based on scene battalion
CN113487192B (en) Work order processing system, work order processing method, electronic device and computer-readable storage medium
CN105469324A (en) Data acquisition and entering and operation and maintenance management system and data entering method of power distribution network
Wang et al. Research on intelligent monitoring and maintenance technology of substation based on digital twin
CN111354071A (en) Internet + -based augmented reality transformer substation and visual archive management method
CN102810211B (en) Flex-based residential district power distribution room maintainable panoramic 3D (three-dimensional) modeling method
CN112288171A (en) Data processing method, device and system
CN103559652A (en) Communication work-ticket management system based on unattended substation and operation method of communication work-ticket management system
CN110909091A (en) Marketing and distribution through data acquisition system and method based on AR identification technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200630