一种滑膜施工中的钢筋保护装置及方法 Download PDFInfo
- Publication number
- CN111119468A CN111119468A CN202010051069.2A CN202010051069A CN111119468A CN 111119468 A CN111119468 A CN 111119468A CN 202010051069 A CN202010051069 A CN 202010051069A CN 111119468 A CN111119468 A CN 111119468A
- Authority
- CN
- China
- Prior art keywords
- steel
- main support
- protection
- steel bar
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/22—Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor
- E04G11/24—Construction of lifting jacks or climbing rods for sliding forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/12—Mounting of reinforcing inserts; Prestressing
Abstract
本发明公开了一种滑膜施工中的钢筋保护装置及方法,包括主支架和钢模板,主支架呈开字型结构,钢模板固定在主支架两边的内侧;还包括7字型结构的保护杆,保护杆具有两个,位于两侧钢模板的内部;所述保护杆的水平部分固定在主支架上,竖直部分与钢模板贴合。本发明在现有的滑膜支架和钢模板上增加了7字型保护杆,保证钢模板与绑扎好的钢筋之间存在距离相等的保护层,保证滑模混凝土的施工质量。
Description
技术领域
本发明属于建筑施工技术领域,特别涉及一种滑膜施工中的钢筋保护装置及方法。
背景技术
滑模工程技术是我国现浇混凝土结构工程施工中机械化程度高、施工速度快、现场场地占用少、结构整体性强、抗震性能好、安全作业有保障、环境与经济综合效益显著的一种施工技术。在滑模施工滑升过程中,容易出现钢筋一边保护层过大,一边保护层过小的问题,从而影响滑模混凝土的施工质量。
发明内容
本发明的目的是提供一种结构简单、无需配套设备就可以保证钢筋保护层大小稳定的滑膜施工中的钢筋保护装置及方法。
为此,本发明的第一个技术方案是:一种滑膜施工中的钢筋保护装置,包括主支架和钢模板,主支架呈开字型结构,钢模板固定在主支架两边的内侧;其特征在于:还包括7字型结构的保护杆,保护杆具有两个,位于两侧钢模板的内部;所述保护杆的水平部分固定在主支架上,竖直部分与钢模板贴合。
本发明的第二个技术方案是:一种滑膜施工中的钢筋保护方法,使用上述装置,在钢筋绑扎完成的基础上安装开字型主支架,将两个钢模板安装至主支架内侧,并按照放样尺寸将主支架及钢模板调整到位后固定;在已固定到位的主支架两边内侧安装7字型保护杆;7字型保护杆位于钢模板与绑扎好的钢筋之间,在滑模滑升过程中,7字型保护杆构成钢筋保护层。
本发明在现有的滑膜支架和钢模板上增加了7字型保护杆,7字型保护杆由圆钢制成,7字型保护杆的竖直部分位于钢模板内侧,保证钢模板与绑扎好的钢筋之间存在距离相等的间隔(保护层),该距离由7字型圆钢的直径决定,避免出现钢筋一边保护层过大,一边保护层过小的问题,保证滑模混凝土的施工质量。
附图说明
以下结合附图和本发明的实施方式来作进一步详细说明
图1为本发明的结构示意图。
图中标记为:主支架1、千斤顶2、钢模板3、7字型保护杆4、钢筋5。
具体实施方式
参见附图。本实施例所述的钢筋保护装置,包括主支架1,主支架呈开字型结构,架设在千斤顶2上,可被千斤顶带动升降;主支架1内部的两侧固定有钢模板3,而钢模板与绑扎好的钢筋之间的间隔为保护层,而这个间隔大小不稳定,因此,主支架1内部两侧各设置一7字型保护杆4,由圆钢制成,7字型保护杆4的水平部分固定在主支架1上,竖直部分位于两侧钢模板3的内部。
使用时,在钢筋5绑扎完成的基础上安装开字型主支架1,将两个钢模板3安装至主支架1内侧,并按照放样尺寸将主支架1及钢模板3调整到位后固定;在已固定到位的主支架1两边内侧安装7字型保护杆4;将整个绑扎好的钢筋5均匀分段,每段安装一组主支架、钢模板和7字型保护杆;而后千斤顶2将主支架1顶起,滑模滑升过程中,7字型保护杆4将钢模板3与绑扎好的钢筋5隔离开,构成钢筋保护层。
Claims (2)
1.一种滑膜施工中的钢筋保护装置,包括主支架和钢模板,主支架呈开字型结构,钢模板固定在主支架两边的内侧;其特征在于:还包括7字型结构的保护杆,保护杆具有两个,位于两侧钢模板的内部;所述保护杆的水平部分固定在主支架上,竖直部分与钢模板贴合。
2.一种滑膜施工中的钢筋保护方法,其特征在于:使用权利要求1所述的装置,在钢筋绑扎完成的基础上安装开字型主支架,将两个钢模板安装至主支架内侧,并按照放样尺寸将主支架及钢模板调整到位后固定;在已固定到位的主支架两边内侧安装7字型保护杆;7字型保护杆位于钢模板与绑扎好的钢筋之间,在滑模滑升过程中,7字型保护杆构成钢筋保护层。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010051069.2A CN111119468A (zh) | 2020-01-17 | 2020-01-17 | 一种滑膜施工中的钢筋保护装置及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010051069.2A CN111119468A (zh) | 2020-01-17 | 2020-01-17 | 一种滑膜施工中的钢筋保护装置及方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111119468A true CN111119468A (zh) | 2020-05-08 |
Family
ID=70489792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010051069.2A Pending CN111119468A (zh) | 2020-01-17 | 2020-01-17 | 一种滑膜施工中的钢筋保护装置及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111119468A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203701434U (zh) * | 2013-12-24 | 2014-07-09 | 山东万鑫建设有限公司 | 剪力墙钢筋水平定位梯 |
CN105239775A (zh) * | 2015-09-08 | 2016-01-13 | 广州市恒盛建设工程有限公司 | 一种用于筒仓滑模施工的钢筋安装质量动态控制方法 |
CN205077856U (zh) * | 2015-09-08 | 2016-03-09 | 广州市恒盛建设工程有限公司 | 一种用于筒仓滑模施工的混凝土保护层控制及水平钢筋定位装置 |
CN108166751A (zh) * | 2018-01-08 | 2018-06-15 | 广西壮族自治区冶金建设公司 | 一种滑模施工中用于确保筒壁钢筋保护层厚度的定位杆 |
CN211850811U (zh) * | 2020-01-17 | 2020-11-03 | 浙江省三建建设集团有限公司 | 一种滑膜施工中的钢筋保护装置 |
-
2020
- 2020-01-17 CN CN202010051069.2A patent/CN111119468A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203701434U (zh) * | 2013-12-24 | 2014-07-09 | 山东万鑫建设有限公司 | 剪力墙钢筋水平定位梯 |
CN105239775A (zh) * | 2015-09-08 | 2016-01-13 | 广州市恒盛建设工程有限公司 | 一种用于筒仓滑模施工的钢筋安装质量动态控制方法 |
CN205077856U (zh) * | 2015-09-08 | 2016-03-09 | 广州市恒盛建设工程有限公司 | 一种用于筒仓滑模施工的混凝土保护层控制及水平钢筋定位装置 |
CN108166751A (zh) * | 2018-01-08 | 2018-06-15 | 广西壮族自治区冶金建设公司 | 一种滑模施工中用于确保筒壁钢筋保护层厚度的定位杆 |
CN211850811U (zh) * | 2020-01-17 | 2020-11-03 | 浙江省三建建设集团有限公司 | 一种滑膜施工中的钢筋保护装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106065577B (zh) | 一种新的桩基托换的结构与方法 | |
CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
CN205296873U (zh) | 一种实时校正格构柱垂直度的装置及格构柱安装机构 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN106368245A (zh) | 一种易清理的后浇带支模施工方法 | |
CN211850811U (zh) | 一种滑膜施工中的钢筋保护装置 | |
CN103291065B (zh) | 一种装配式混凝土用支撑装置及吊装定位方法 | |
CN203547124U (zh) | 一种滑模保护层控制装置 | |
CN204098486U (zh) | 浇筑地下室顶板后浇带的混凝土吊模 | |
CN203867082U (zh) | 负弯矩筋保护层控制脚架 | |
CN203334190U (zh) | 薄壁空心墩整体提升翻模装置 | |
CN111119468A (zh) | 一种滑膜施工中的钢筋保护装置及方法 | |
CN104314013B (zh) | 一种极不对称组合梁的双悬臂施工方法 | |
CN104164882B (zh) | 在边坡上构建支护结构梁基础的施工方法及结构 | |
CN107299640A (zh) | 一种变截面井筒式地下连续墙基础及其施工方法 | |
CN213297130U (zh) | 一种电动升降滑模装置 | |
CN105386447A (zh) | 一种施工现场后浇带换撑的施工方法 | |
CN205975995U (zh) | 现浇混凝土楼板压槽钢管支撑架 | |
CN203361170U (zh) | 一种建筑基坑围护用的支撑立柱桩 | |
CN207553620U (zh) | 一种临时立柱施工用限位装置 | |
CN103397779B (zh) | 一种大高度剪力墙模板的支撑方法 | |
CN102094391B (zh) | 铁路桥梁承台中顶层钢筋网片的定位施工方法 | |
CN109138484A (zh) | 一种顶升增层钢管混凝土柱与基础连接施工方法 | |
CN206053345U (zh) | 一种泵管支撑装置 | |
CN217326440U (zh) | 一种用于城市地铁轨行区交叉施工的简易门式支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |