CN111119213A - 一种开口刃脚双壁钢围堰及其施工方法 - Google Patents
一种开口刃脚双壁钢围堰及其施工方法 Download PDFInfo
- Publication number
- CN111119213A CN111119213A CN201911308977.9A CN201911308977A CN111119213A CN 111119213 A CN111119213 A CN 111119213A CN 201911308977 A CN201911308977 A CN 201911308977A CN 111119213 A CN111119213 A CN 111119213A
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- groove
- construction
- double
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种开口刃脚双壁钢围堰及其施工方法,根据河床岩层情况及特定的环保要求,通过设置围堰定位槽,使围堰稳定在薄覆盖层河床上,并通过堰内壁间清槽并浇筑混凝土,使其有效锚固在河床内。使得围堰既能满足度洪安全要求,又能保证围堰在不封底的情况下有效止水的要求。本发明简化了特定地质条件下桥梁深水基础施工工艺,围堰内抽水后,形成干作业环境,易于操作,有效缩短施工工期,减少了施工成本。
Description
技术领域
本发明属于桥梁施工技术领域,具体涉及一种开口刃脚双壁钢围堰及其施工方法。
背景技术
目前,在水上桥梁基础施工遇河床覆盖层薄的岩层地质条件下,一般采用锁扣钢管桩围堰。此种施工方法是利用钢管桩作为护筒,下放到位后施工入岩锚桩。此种施工方案止水效果差,施工效率低,施工成本高。
发明内容
为了克服现有技术中锁扣钢管桩围堰止水效果差、施工效率低、施工成本高的的技术缺陷,本发明提供了一种开口刃脚双壁钢围堰及其施工方法,通过设置围堰定位槽,使围堰稳定在薄覆盖层河床上,并通过堰内壁间清槽并浇筑混凝土,将其有效锚固在河床内,使得围堰既能满足度洪安全要求,又能保证围堰在不封底的情况下有效止水的要求,解决了上述技术问题。
本发明通过以下技术方案来实现上述目的,一种开口刃脚双壁钢围堰的施工方法,包括以下施工步骤:
S1:搭设钢平台,作为材料运输通道和铣槽平台,下放桩基钢护筒,护筒之间用型钢进行焊接,形成稳定结构,型钢上搭设贝雷梁、分配梁及面板,作为桩基钻孔平台;
S2:在钻孔平台上安装冲击钻进行工程桩施工,在钢平台上安装旋挖钻机进行围堰定位槽施工,工程桩与定位槽同时进行施工,定位槽施工技术标准:①旋挖采用咬合设计,保证成槽尺寸大于围堰内外壁板之间的厚度;②旋挖铣槽技术采用,跳桩法施工,减少定位槽岩壁扰动;③铣槽至中风化岩层以下,铣槽深度需考虑具体工程岩层裂隙发育情况和承台埋深,保证封槽之后围堰止水满足施工要求,定位槽施工完成后,安排潜水员对槽内情况进行摸探,打捞出影响围堰下放的孤石、块石等杂物;
S3:定位槽和工程桩施工完成后,接长钢护筒并将钻孔平台改装成围堰拼装平台,在平台上拼装开口刃脚双壁钢围堰,开口刃脚双壁钢围堰特点为,围堰底以上50cm不设置内外面板;
S4:在桩基钢护筒顶部安装围堰下放系统和导向装置,完成围堰下放;
S5:采用泥砂泵从围堰壁间将淤积泥砂抽出,完成清槽工作;
S6:完成清槽后,在围堰壁间下放混凝土导管,进行封槽,以围堰内两块竖向隔板为一个封槽单元,首批混凝土灌注量满足导管首次埋置深度1.0m以上的需要,最终混凝土浇筑至河床岩面以上50cm;
S7:封槽混凝土强度满足要求后,对围堰内进行安装内支撑及抽水。
上述的一种开口刃脚双壁钢围堰的施工方法,所述步骤S2中的定位槽采用旋挖钻进行跳桩施工,铣槽深度需考虑具体工程岩层裂隙发育情况和承台埋深,保证封槽之后围堰止水满足施工要求;铣槽宽度满足围堰下放要求。
上述的一种开口刃脚双壁钢围堰的施工方法,所述步骤S3中的双壁钢围堰为无刃脚双壁钢围堰,且底部高度为2m范围内无内外面板。
上述的一种开口刃脚双壁钢围堰的施工方法,所述步骤S5中封槽前先用泥砂泵从围堰壁间将淤积泥砂抽出,减少槽内泥砂对封槽质量的影响。
上述的一种开口刃脚双壁钢围堰的施工方法,所述步骤S6中封槽混凝土的灌注要求是:在围堰壁间下放混凝土导管,以围堰内两块竖向隔板为一个封槽单元,首批混凝土灌注量满足导管首次埋置深度1.0m以上的需要,最终混凝土浇筑至河床岩面以上50cm,保证封槽混凝土的止水效果。
总体而言,通过本发明所构思的以上技术方案与现有技术相比,可以达到以下有益效果:本发明一种开口刃脚双壁钢围堰,根据河床岩层情况及特定的环保要求,通过设置围堰定位槽,使围堰稳定在薄覆盖层河床上,并通过堰内壁间清槽并浇筑混凝土,将其有效锚固在河床内,使得围堰既能满足度洪安全要求,又能保证围堰在不封底的情况下有效止水的要求,简化了特定地质条件下桥梁深水基础施工工艺,围堰内抽水后,形成干作业环境,易于操作,有效缩短施工工期,减少了施工成本。
附图说明
下面结合附图对本发明的具体实施方式做进一步详细的说明,其中:
图1为本发明一种开口刃脚双壁钢围堰施工方法的流程框图;
图2为本发明中铣槽及工程桩的施工示意图;
图3为本发明中开口刃脚双壁钢围堰拼装下放过程的施工示意图;
图4为本发明中清槽的施工示意图;
图5为本发明中封槽的施工示意图;
图6为本发明中围堰内抽水安装内支撑干作业的施工示意图;
图中:1-河床,2-钢平台,3-旋挖钻机,4-围堰下放定位槽,5-钢护筒,6-工程桩钻孔平台,7-冲击钻,8-围堰拼装平台,9-开口刃脚双壁钢围堰,10-围堰下放系统,11-泥砂泵,12-封槽混凝土,13-水下混凝土浇筑导管。
具体实施方式
参阅图1所示,为本发明一种开口刃脚双壁钢围堰施工方法的流程框图,该施工方法包括以下施工步骤:
步骤一:下放桩基钢护筒5,护筒之间用型钢进行焊接,形成稳定结构,型钢上搭设贝雷梁、分配梁及面板,作为桩基钻孔平台;
步骤二:在钻孔平台上安装冲击钻7进行工程桩施工,在钢平台2上安装旋挖钻机3进行围堰下放定位槽4施工,工程桩与围堰下放定位槽4同时进行施工,如图2所示,围堰下放定位槽4施工的技术标准为:①旋挖采用咬合设计,保证成槽尺寸大于围堰内外壁板之间的厚度;②旋挖铣槽技术采用,跳桩法施工,围堰下放定位槽4对岩壁的扰动;③铣槽深度需考虑具体工程岩层裂隙发育情况和承台埋深,保证封槽之后围堰止水满足施工要求,保证封槽之后的止水效果,围堰下放定位槽4施工完成后,安排潜水员对槽内情况进行摸探,打捞出影响围堰下放的孤石、块石等杂物;
步骤三:围堰下放定位槽4和工程桩施工完成后,接长钢护筒5并将工程桩钻孔平台6改装成围堰拼装平台8,在平台上拼装开口刃脚双壁钢围堰9;
步骤四:在桩基钢护筒5顶部安装围堰下放系统10和导向装置,完成围堰下放,如图3所示。
步骤五:采用泥砂泵11从围堰壁间将淤积泥砂抽出,完成清槽工作,如图4所示。
步骤六:完成清槽后,在围堰壁间下放水下混凝土浇筑导管13,进行封槽作业,如图5所示,以围堰内两块竖向隔板为一个封槽单元,首批混凝土灌注量满足导管首次埋置深度1.0m以上的需要,最终混凝土浇筑至河床1岩面以上50cm,如图6所示。
本领域的技术人员容易理解,以上所述仅为本发明的较佳实施例而已,并不用于限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种开口刃脚双壁钢围堰及其施工方法,其特征在于,包括以下施工步骤:
S1:下放桩基钢护筒(5),护筒之间用型钢进行焊接,形成稳定结构,型钢上搭设贝雷梁、分配梁及面板,作为桩基钻孔平台;
S2:在钻孔平台上安装冲击钻(7)进行工程桩施工,在钢平台(2)上安装旋挖钻机(3)进行围堰下放定位槽(4)施工,工程桩与围堰下放定位槽(4)同时进行施工,围堰下放定位槽(4)施工技术标准:①旋挖采用咬合设计,保证成槽尺寸大于围堰内外壁板之间的厚度;②旋挖铣槽技术采用,跳桩法施工,减少围堰下放定位槽(4)岩壁扰动;③铣槽至中风化岩层顶面以下1m位置,保证封槽之后的止水效果,围堰下放定位槽(4)施工完成后,安排潜水员对槽内情况进行摸探,打捞出影响围堰下放的孤石、块石;
S3:定位槽和工程桩施工完成后,接长钢护筒(5)并将工程桩钻孔平台(6)改装成围堰拼装平台(8),在平台上拼装开口刃脚双壁钢围堰(9),开口刃脚双壁钢围堰(9)底部以上50cm不设置内外面板;
S4:在桩基钢护筒(5)顶部安装围堰下放系统(10)和导向装置,完成围堰下放;
S5:采用泥砂泵(11)从围堰壁间将淤积泥砂抽出,完成清槽工作;
S6:完成清槽后,在围堰壁间下放水下混凝土浇筑导管(13),进行封槽,以围堰内两块竖向隔板为一个封槽单元,首批混凝土灌注量满足导管首次埋置深度1.0m以上的要求,最终混凝土浇筑至河床(1)岩面以上50cm;
S7:封槽混凝土(12)强度满足要求后,对围堰内进行安装内支撑及抽水;
S8:抽水完成后,围堰内形成干作业条件,破除桩头,进行承台施工。
2.根据权利1所述的一种开口刃脚双壁钢围堰及其施工方法,其特征在于:所述步骤S2中,围堰下放定位槽(4)采用旋挖钻进行跳桩施工至中风化岩面以下1m位置,保证槽宽满足围堰下放要求且槽深在封槽后满足止水要求。
3.根据权利1所述的一种开口刃脚双壁钢围堰及其施工方法,其特征在于:所述步骤S3中,双壁钢围堰为无刃脚双壁钢围堰,且底部高度为2m范围内无内外面板。
4.根据权利1所述的一种开口刃脚双壁钢围堰及其施工方法,其特征在于:所述步骤S5中,封槽前先用泥砂泵(11)从围堰壁间将淤积泥砂抽出,减少槽内泥砂对封槽质量的影响。
5.根据权利1所述的一种开口刃脚双壁钢围堰及其施工方法,其特征在于:所述步骤S6中,封槽混凝土(12)的灌注要求是,在围堰壁间下放混凝土导管,以围堰内两块竖向隔板为一个封槽单元,首批混凝土灌注量满足导管首次埋置深度1.0m以上的需要,最终混凝土浇筑至河床(1)岩面以上50cm,保证封槽混凝土(12)的止水效果。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911308977.9A CN111119213A (zh) | 2019-12-18 | 2019-12-18 | 一种开口刃脚双壁钢围堰及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911308977.9A CN111119213A (zh) | 2019-12-18 | 2019-12-18 | 一种开口刃脚双壁钢围堰及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111119213A true CN111119213A (zh) | 2020-05-08 |
Family
ID=70499550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911308977.9A Pending CN111119213A (zh) | 2019-12-18 | 2019-12-18 | 一种开口刃脚双壁钢围堰及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111119213A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113550340A (zh) * | 2021-07-23 | 2021-10-26 | 广州市市政工程机械施工有限公司 | 一种深水入岩条件下无封底双壁钢围堰深水基础施工方法 |
CN113585302A (zh) * | 2021-07-22 | 2021-11-02 | 中交第二航务工程局有限公司 | 用于深水裸岩地质无封底混凝土双壁钢围堰的施工方法 |
CN114541439A (zh) * | 2022-03-22 | 2022-05-27 | 中交路桥建设有限公司 | 一种无封底双壁钢围堰结构的施工方法 |
CN115162366A (zh) * | 2022-08-05 | 2022-10-11 | 广州市市政工程机械施工有限公司 | 一种深水双壁钢围堰在卵石层河床上预成槽、槽内清理卵石的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4793634B2 (ja) * | 2006-02-03 | 2011-10-12 | 清水建設株式会社 | 仮締め切り工法 |
CN106968176A (zh) * | 2017-03-24 | 2017-07-21 | 中建三局基础设施工程有限公司 | 一种桥梁深水嵌岩基础施工方法 |
CN107869144A (zh) * | 2017-11-17 | 2018-04-03 | 中铁二十二局集团第四工程有限公司 | 一种预掏槽环封双壁钢围堰深水基础综合施工方法 |
CN108179759A (zh) * | 2017-12-29 | 2018-06-19 | 重庆华力建设有限公司 | 导向井水下钻芯掏槽无封底方法 |
CN108222041A (zh) * | 2018-03-06 | 2018-06-29 | 中铁二十四局集团新余工程有限公司 | 大型深水基础单壁钢套箱围堰施工工法 |
CN109469084A (zh) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | 深水硬质岩嵌入式承台施工方法 |
-
2019
- 2019-12-18 CN CN201911308977.9A patent/CN111119213A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4793634B2 (ja) * | 2006-02-03 | 2011-10-12 | 清水建設株式会社 | 仮締め切り工法 |
CN106968176A (zh) * | 2017-03-24 | 2017-07-21 | 中建三局基础设施工程有限公司 | 一种桥梁深水嵌岩基础施工方法 |
CN107869144A (zh) * | 2017-11-17 | 2018-04-03 | 中铁二十二局集团第四工程有限公司 | 一种预掏槽环封双壁钢围堰深水基础综合施工方法 |
CN108179759A (zh) * | 2017-12-29 | 2018-06-19 | 重庆华力建设有限公司 | 导向井水下钻芯掏槽无封底方法 |
CN108222041A (zh) * | 2018-03-06 | 2018-06-29 | 中铁二十四局集团新余工程有限公司 | 大型深水基础单壁钢套箱围堰施工工法 |
CN109469084A (zh) * | 2018-09-21 | 2019-03-15 | 中交武汉港湾工程设计研究院有限公司 | 深水硬质岩嵌入式承台施工方法 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113585302A (zh) * | 2021-07-22 | 2021-11-02 | 中交第二航务工程局有限公司 | 用于深水裸岩地质无封底混凝土双壁钢围堰的施工方法 |
CN113550340A (zh) * | 2021-07-23 | 2021-10-26 | 广州市市政工程机械施工有限公司 | 一种深水入岩条件下无封底双壁钢围堰深水基础施工方法 |
CN114541439A (zh) * | 2022-03-22 | 2022-05-27 | 中交路桥建设有限公司 | 一种无封底双壁钢围堰结构的施工方法 |
CN114541439B (zh) * | 2022-03-22 | 2023-09-26 | 中交路桥建设有限公司 | 一种无封底双壁钢围堰结构的施工方法 |
CN115162366A (zh) * | 2022-08-05 | 2022-10-11 | 广州市市政工程机械施工有限公司 | 一种深水双壁钢围堰在卵石层河床上预成槽、槽内清理卵石的施工方法 |
CN115162366B (zh) * | 2022-08-05 | 2023-09-15 | 广州市市政工程机械施工有限公司 | 一种深水双壁钢围堰在卵石层河床上预成槽、槽内清理卵石的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111119213A (zh) | 一种开口刃脚双壁钢围堰及其施工方法 | |
CN106013052B (zh) | 钢板桩与沉井组合式地下停车库的施工方法 | |
JP2018162655A (ja) | 沈埋トンネルの最終継手、プレハブ工法及び設置方法 | |
CN102720140B (zh) | 大跨度预应力砼连续梁深水桥墩施工工艺 | |
CN103924978B (zh) | 冻结法凿井内层井壁的施工方法 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN111593728A (zh) | 植入式嵌岩桩的“先桩法”内插式导管架基础施工系统 | |
CN108396780B (zh) | 一种既有检查井改建方法 | |
CN112727466A (zh) | 一种无支护预制拼装式盾构隧道风井结构施工方法 | |
CN110820765A (zh) | 一种狭小深基坑预制围护结构及施工方法 | |
US20110116868A1 (en) | Method for constructing an underground tunnel or hole to create an impervious plug for the storage of hazardous, particularly radioactive, waste | |
CN114892690B (zh) | 一种双壁钢套箱围堰施工方法 | |
CN110985042A (zh) | 城市综合管廊与地下浅埋暗挖隧道联合支护体系及工艺 | |
CN103133004A (zh) | 一种冻结井筒内井壁地面预制及安装工艺方法 | |
CN102619521B (zh) | 一种立井基岩段井壁结构的施工方法 | |
CN111809662B (zh) | 地铁车站地下结构组合建造方法 | |
CN111827349B (zh) | 采用组合结构技术快速构建地铁车站地下结构的方法 | |
CN211646415U (zh) | 一种狭小深基坑预制围护结构 | |
WO2018177304A1 (zh) | 一种装配式地下建筑及其施工法 | |
CN203834809U (zh) | 一种用于钢管柱混凝土侧浇方法的钢管柱结构 | |
CN114277818B (zh) | 一种深水承台矩形钢板桩围堰结构及其施工方法 | |
CN113202106B (zh) | 深基坑开挖方法 | |
CN104074234A (zh) | 电厂循环水系统的内河水取水口结构及其施工方法 | |
CN110144903B (zh) | 一种基坑支护遇防空洞的施工工法 | |
CN104278665B (zh) | 钢沉井侧壁与刃脚土压力计水下埋设装置及其埋设方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200508 |