CN111074703B - Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed - Google Patents

Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed Download PDF

Info

Publication number
CN111074703B
CN111074703B CN202010016362.5A CN202010016362A CN111074703B CN 111074703 B CN111074703 B CN 111074703B CN 202010016362 A CN202010016362 A CN 202010016362A CN 111074703 B CN111074703 B CN 111074703B
Authority
CN
China
Prior art keywords
steel
steel groove
ballast bed
groove
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010016362.5A
Other languages
Chinese (zh)
Other versions
CN111074703A (en
Inventor
罗炯
杨刚
刘光胜
田骥
吴刚
苗彩霞
崔逸鹏
任志江
郑洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Transportation Technology Co ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CN202010016362.5A priority Critical patent/CN111074703B/en
Publication of CN111074703A publication Critical patent/CN111074703A/en
Application granted granted Critical
Publication of CN111074703B publication Critical patent/CN111074703B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B37/00Making, maintaining, renewing, or taking-up the ballastway or the track, not provided for in a single one of groups E01B27/00 - E01B35/00

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a maintenance method for uneven settlement of an embedded track steel groove type ballast bed subgrade, which comprises the following steps: the method comprises the following steps: preparing; step two: cleaning pavement; step three: chiseling concrete ballast beds on two sides of the steel groove; step four: fine adjustment of a steel groove: cutting the ballast bed steel bars connected with the steel groove, and lifting the steel groove by adopting a steel groove connecting device, a reaction frame and a jack; the height adjusting cushion block is placed at the bottom of the steel tank and the steel tank adjusting tool, so that the geometric shape and position of the steel tank are adjusted; step five: fixing a steel groove: implanting reinforcing steel bars into the ballast beds on the two sides of the steel tank at intervals longitudinally, and fixing the implanted reinforcing steel bars and the steel tank; step six: pouring a filling material; step seven: and recovering pavement paving. The invention realizes the precision restoration of the steel rail by finely adjusting the steel groove, has large adjustment amount and small operation difficulty, reduces the damage to the ballast bed to the maximum extent, greatly reduces the maintenance work amount and shortens the maintenance period. The method is also suitable for the reconstruction construction of the embedded track on the existing line.

Description

Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed
Technical Field
The invention relates to a maintenance method for uneven settlement of an embedded track steel groove type ballast bed subgrade, and belongs to the technical field of track traffic.
Background
The uneven settlement of the roadbed is a common disease and is often found in ground lines of municipal traffic and rail transit. The reason for the uneven settlement of the roadbed is more, such as the erosion of underground water and the loss of roadbed sandy soil; due to insufficient construction backfill and compaction; due to the damage and the failure of the underpass pipeline; due to road surface load overrun and the like. The uneven settlement of the roadbed in the rail running area can influence the precision of the rail and reduce the riding comfort, and in severe cases, the side turning, the car jumping and the like of the train can be caused, so that great potential safety hazards exist. In the line operation stage, after the subgrade is unevenly settled, the common maintenance methods for the track major are adjusting steel rails, grouting a track bed and re-paving the track bed. The scheme for adjusting the steel rail has strong operability, but the adjustment amount is limited. The ballast bed grouting method is only applicable to ballast bed structures provided with isolation layers. The paving of the road bed is time-consuming and labor-consuming, and causes the line to be stopped.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: aiming at the existing problems, the maintenance method for the uneven settlement of the roadbed of the embedded track steel groove type ballast bed is provided, and the steel rail precision restoration is realized by finely adjusting the steel groove.
The technical scheme adopted by the invention is as follows:
a maintenance method for uneven settlement of an embedded track steel groove type ballast bed subgrade comprises the following steps:
the method comprises the following steps: preparation work:
marking a maintenance area by marking lines by adopting a conventional measurement lofting method, and installing a fence along the maintenance area;
step two: cleaning pavement:
cleaning pavement and conveying construction waste to off-site treatment;
step three: chiseling part of the concrete ballast bed:
chiseling concrete ballast beds on two sides of the steel groove; when chiseling, reserving a fine adjustment steel groove and a fixed steel groove to form an operation space; and transporting the construction waste to off-site disposal;
step four: fine adjustment of a steel groove:
cutting a ballast bed reinforcing steel bar connected with the steel groove, and removing the constraint of the ballast bed on the steel groove; then calculating the lifting amount of the steel tank point by point and marking, and lifting the steel tank by adopting a steel tank connecting device, a reaction frame and a jack; the height adjusting cushion block is placed at the bottom of the steel tank and the steel tank adjusting tool, so that the geometric shape and position of the steel tank are adjusted;
step five: fixing a steel groove:
implanting reinforcing steel bars into the ballast beds on the two sides of the steel tank at intervals longitudinally, and fixing the implanted reinforcing steel bars and the steel tank;
step six: pouring a filling material:
erecting a formwork along the contour of the ballast bed on two sides of the steel groove, and pouring a filling material;
step seven: and (3) recovering pavement:
and after the filling material is cured and the formwork is removed, the original pavement is restored.
In one embodiment, the steel channel in the embedded track steel channel type ballast bed is made of steel, glass fiber reinforced plastic or nylon, and the material is selected according to material strength and technological properties.
In one embodiment, in step four, the steel slot connecting device is selected according to the connecting mode and comprises a steel wire rope sleeve lock or a steel bar welding connection.
In one embodiment, in the fourth step, the height-adjusting cushion block is selected according to the material and the shape, and comprises a steel sheet, a steel block, a concrete block, a mortar block or a high polymer material.
In one embodiment, in step five, the method for fixing the steel groove can be replaced by the following method: the steel bars are welded by lapping the steel bars of the existing ballast bed and the steel grooves.
In one embodiment, in step six, the material of the filling material is selected according to the material strength and the process performance, and the method includes: mortar, concrete or polymer materials.
In one embodiment, in step six, the filling material is poured by starting from the same side and pouring the filling material in one piece after the filling material flows to the other side.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
the invention realizes the precision restoration of the steel rail by finely adjusting the steel groove, has large adjustment amount and small operation difficulty, reduces the damage to the ballast bed to the maximum extent, greatly reduces the maintenance work amount and shortens the maintenance period. Meanwhile, the integrity of the structure in the groove is ensured, and the performance index and the operation quality of the circuit are ensured. The method is also suitable for the reconstruction construction of the embedded track on the existing line.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a block flow diagram of a maintenance method for uneven settlement of an embedded track steel trough type ballast bed subgrade according to an embodiment of the invention.
Fig. 2 is a schematic view of the structure of an embedded track steel channel bed.
Fig. 3 is a schematic diagram of removing ballast bed concrete on both sides of the steel channel by chiseling in step three according to the embodiment of the present invention.
FIG. 4 is a schematic view of the fourth step of the method of the present invention for removing the steel bath from the ballast bed.
Fig. 5 is a schematic view of a steel groove for fixing a steel bar in step five of the embodiment of the invention.
Fig. 6 is a schematic view of a pouring filler material in step six according to the embodiment of the present invention.
The labels in the figure are: 1-in-groove structure; 2-steel rail; 3-a steel groove; 4, paving the pavement; 5-a track bed; 6-existing ballast bed steel bars; 7-implanting steel bars; 8-welding points of the implanted steel bars and the steel grooves; 9-schematic drawing of pouring filling material.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the detailed description and specific examples, while indicating the preferred embodiment of the invention, are intended for purposes of illustration only and are not intended to limit the scope of the invention. The components of embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present invention without making any creative effort, shall fall within the protection scope of the present invention.
The features and properties of the present invention are described in further detail below with reference to examples.
As shown in fig. 1, the maintenance method for uneven settlement of a roadbed of an embedded track steel trough type ballast bed provided by the embodiment is provided, wherein the structure of the embedded track steel trough type ballast bed is shown in fig. 2;
the method comprises the following steps:
the method comprises the following steps: preparation work:
marking a maintenance area by marking lines by adopting a conventional measurement lofting method, and installing a fence along the maintenance area;
step two: cleaning pavement:
cleaning pavement and conveying construction waste to off-site treatment;
step three: chiseling part of the concrete ballast bed:
as shown in fig. 3, removing concrete ballast beds on both sides of the steel channel; when chiseling, reserving a fine adjustment steel groove and a fixed steel groove to form an operation space; and transporting the construction waste to off-site disposal;
step four: fine adjustment of a steel groove:
as shown in fig. 4, the bed steel bars connected with the steel groove are cut to remove the restriction of the bed to the steel groove; then calculating the lifting amount of the steel tank point by point and marking, and lifting the steel tank by adopting a steel tank connecting device, a reaction frame and a jack; the height adjusting cushion block is placed at the bottom of the steel tank and the steel tank adjusting tool, so that the geometric shape and position of the steel tank are adjusted;
step five: fixing a steel groove:
as shown in fig. 5, reinforcing steel bars are implanted into the ballast beds on the two sides of the steel tank at intervals in the longitudinal direction, and the implanted reinforcing steel bars and the steel tank are fixed;
step six: pouring a filling material:
as shown in fig. 6, formwork is erected on two sides of the steel channel along the contour of the ballast bed, and filling materials are poured;
step seven: and (3) recovering pavement:
and after the filling material is cured and the formwork is removed, the original pavement is restored.
In one embodiment, the steel channel in the embedded track steel channel type ballast bed is made of steel, glass fiber reinforced plastic or nylon, and the material is selected according to material strength and technological properties.
In one embodiment, in step four, the steel slot connecting device is selected according to the connecting mode and comprises a steel wire rope sleeve lock or a steel bar welding connection.
In one embodiment, in the fourth step, the height-adjusting cushion block is selected according to the material and the shape, and comprises a steel sheet, a steel block, a concrete block, a mortar block or a high polymer material.
In one embodiment, in step five, the method for fixing the steel groove can be replaced by the following method: the steel bars are welded by lapping the steel bars of the existing ballast bed and the steel grooves.
In one embodiment, in step six, the material of the filling material is selected according to the material strength and the process performance, and the method includes: mortar, concrete or polymer materials.
In one embodiment, in step six, the filling material is poured by starting from the same side and pouring the filling material in one piece after the filling material flows to the other side.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (6)

1. A maintenance method for uneven settlement of an embedded track steel groove type ballast bed subgrade is characterized by comprising the following steps:
the method comprises the following steps: preparation work:
marking a maintenance area by marking lines by adopting a conventional measurement lofting method, and installing a fence along the maintenance area;
step two: cleaning pavement:
cleaning pavement and conveying construction waste to off-site treatment;
step three: chiseling part of the concrete ballast bed:
chiseling concrete ballast beds on two sides of the steel groove; when chiseling, reserving a fine adjustment steel groove and a fixed steel groove to form an operation space; and transporting the construction waste to off-site disposal;
step four: fine adjustment of a steel groove:
cutting a ballast bed reinforcing steel bar connected with the steel groove, and removing the constraint of the ballast bed on the steel groove; then calculating the lifting amount of the steel tank point by point and marking, and lifting the steel tank by adopting a steel tank connecting device, a reaction frame and a jack; the height adjusting cushion block is placed at the bottom of the steel tank and the steel tank adjusting tool, so that the geometric shape and position of the steel tank are adjusted;
step five: fixing a steel groove:
the existing ballast bed steel bars and steel grooves are used for lap welding steel bars;
step six: pouring a filling material:
erecting a formwork along the contour of the ballast bed on two sides of the steel groove, and pouring a filling material;
step seven: and (3) recovering pavement:
and after the filling material is cured and the formwork is removed, the original pavement is restored.
2. The method of claim 1, wherein the steel channel in the steel channel bed is selected from steel, glass fiber reinforced plastic or nylon according to material strength and processing performance.
3. The method for repairing the uneven settlement of the roadbed of the embedded track steel groove type track according to claim 1, wherein in the fourth step, the steel groove connecting device is selected according to a connecting mode and comprises a steel wire rope sleeve lock or a steel bar welding connection.
4. The maintenance method for the uneven settlement of the roadbed of the embedded track steel groove type track bed as claimed in claim 1, wherein in the fourth step, the height-adjusting cushion blocks are selected according to materials and shapes, and comprise steel sheets, steel blocks, concrete blocks, mortar blocks or high polymer materials.
5. The maintenance method for uneven settlement of the roadbed of the embedded track steel groove type track bed as claimed in claim 1, wherein in the sixth step, the material of the filling material is selected according to the material strength and the process performance, and the method comprises the following steps: mortar, concrete or polymer materials.
6. The method for repairing the uneven settlement of the roadbed of the embedded track steel groove type ballast bed as claimed in claim 1, wherein in the sixth step, the filling material is poured, starting from the same side, and the filling material is poured in a whole body after flowing to the other side.
CN202010016362.5A 2020-01-08 2020-01-08 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed Active CN111074703B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010016362.5A CN111074703B (en) 2020-01-08 2020-01-08 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010016362.5A CN111074703B (en) 2020-01-08 2020-01-08 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed

Publications (2)

Publication Number Publication Date
CN111074703A CN111074703A (en) 2020-04-28
CN111074703B true CN111074703B (en) 2021-08-17

Family

ID=70323033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010016362.5A Active CN111074703B (en) 2020-01-08 2020-01-08 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed

Country Status (1)

Country Link
CN (1) CN111074703B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663385A (en) * 2020-06-24 2020-09-15 中铁二院工程集团有限责任公司 Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
CN112458802A (en) * 2020-12-01 2021-03-09 通号建设集团有限公司 Track and method suitable for treating uneven settlement of track

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007247356A (en) * 2006-03-20 2007-09-27 Railway Technical Res Inst Repairing method of settled ground
CN103352400A (en) * 2013-07-25 2013-10-16 成都市新筑路桥机械股份有限公司 Prefabricated embedded type rail plate
KR101434911B1 (en) * 2012-11-01 2014-08-29 화성궤도 주식회사 Reclamation of the linear adjusting form of a rail track configuration settings for the rail assembly equipment
CN204185728U (en) * 2014-09-23 2015-03-04 中铁二院工程集团有限责任公司 Ballast bed of track regulation repair structure
KR20150062284A (en) * 2013-11-29 2015-06-08 한국철도기술연구원 Rail Track Structure Using Beam having Embedded Rail and Supporting Pile, and Constructing Method of Rail Track Structure
KR101582901B1 (en) * 2014-12-03 2016-01-07 (주)철도안전연구소 Method for restoration of subsided railroad track
CN204959479U (en) * 2015-09-25 2016-01-13 中铁二十三局集团轨道交通工程有限公司 Embedded frame track board and track structure thereof
CN105463955A (en) * 2015-12-29 2016-04-06 成都市新筑路桥机械股份有限公司 Embedded track structure convenient to maintain
CN105507094A (en) * 2015-12-18 2016-04-20 成都市新筑路桥机械股份有限公司 Embedded rail replacing method
CN105568795A (en) * 2015-12-18 2016-05-11 成都市新筑路桥机械股份有限公司 Method for repairing polymer composite for embedded track
CN106638172A (en) * 2017-03-14 2017-05-10 成都市新筑路桥机械股份有限公司 Rail ditch fine adjustment device
CN106835864A (en) * 2017-03-17 2017-06-13 中铁三局集团有限公司 The maintenance solid concrete roabed cutting transportation resources of high ferro non-fragment orbit
CN206396559U (en) * 2016-12-23 2017-08-11 成都市新筑路桥机械股份有限公司 A kind of embedded tracks system for curved section
CN207130542U (en) * 2017-09-08 2018-03-23 成都市新筑路桥机械股份有限公司 A kind of novel embedded rail system in tunnel
CN108130833A (en) * 2017-12-22 2018-06-08 中铁四院集团岩土工程有限责任公司 The method for correcting error of sedimentation offset non-fragment orbit
CN207512517U (en) * 2017-11-15 2018-06-19 成都市新筑路桥机械股份有限公司 A kind of novel embedded rail system convenient for construction and maintenance
WO2018150167A1 (en) * 2017-02-16 2018-08-23 Embedded Rail Technology Limited Rail installation method and rail system
CN209428851U (en) * 2018-12-25 2019-09-24 成都市新筑路桥机械股份有限公司 A kind of novel embedded continuous bearing ballastless track structure

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4203493A1 (en) * 1992-02-07 1992-08-13 Guenter Dr Ing Habil Drescher Foundations with subsidence compensation - consists of jacket with adjustable filling and support piston
WO2003012203A2 (en) * 2001-08-02 2003-02-13 Balfour Beatty Plc Rail arrangement
GB2400879A (en) * 2003-04-23 2004-10-27 Wickham Land Ltd Railway track maintenance
JP4463137B2 (en) * 2005-03-30 2010-05-12 財団法人鉄道総合技術研究所 Sleeper with automatic settlement function
CN103757993B (en) * 2013-12-27 2016-02-17 北京中铁瑞威基础工程有限公司 High-speed railway subgrade sedimentation repair system and method
CN104131498B (en) * 2014-08-12 2016-03-16 中国铁道科学研究院铁道建筑研究所 A kind of for curved section sedimentation non-fragment orbit lifting restorative procedure
CN104452484A (en) * 2014-11-10 2015-03-25 中国铁道科学研究院铁道建筑研究所 Repair method for ballastless track foundation settlement
CN205012173U (en) * 2015-06-18 2016-02-03 董明 Ballastless track lifting deviation correcting device and system
CN106049193B (en) * 2016-05-17 2018-08-17 中国铁道科学研究院铁道建筑研究所 One kind being used for roadbed section ballastless track of high-speed railway center line method for correcting error
CN207259874U (en) * 2017-06-21 2018-04-20 中国铁路设计集团有限公司 A kind of integral, flexible embedded tracks plate
CN107354826B (en) * 2017-09-08 2019-01-25 成都市新筑路桥机械股份有限公司 The rapid constructing method of tunnel built-in type rail system
CN108385455B (en) * 2018-03-07 2021-11-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Construction and maintenance operation method for cast-in-situ ballast bed slab ballastless track

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007247356A (en) * 2006-03-20 2007-09-27 Railway Technical Res Inst Repairing method of settled ground
KR101434911B1 (en) * 2012-11-01 2014-08-29 화성궤도 주식회사 Reclamation of the linear adjusting form of a rail track configuration settings for the rail assembly equipment
CN103352400A (en) * 2013-07-25 2013-10-16 成都市新筑路桥机械股份有限公司 Prefabricated embedded type rail plate
KR20150062284A (en) * 2013-11-29 2015-06-08 한국철도기술연구원 Rail Track Structure Using Beam having Embedded Rail and Supporting Pile, and Constructing Method of Rail Track Structure
CN204185728U (en) * 2014-09-23 2015-03-04 中铁二院工程集团有限责任公司 Ballast bed of track regulation repair structure
KR101582901B1 (en) * 2014-12-03 2016-01-07 (주)철도안전연구소 Method for restoration of subsided railroad track
CN204959479U (en) * 2015-09-25 2016-01-13 中铁二十三局集团轨道交通工程有限公司 Embedded frame track board and track structure thereof
CN105507094A (en) * 2015-12-18 2016-04-20 成都市新筑路桥机械股份有限公司 Embedded rail replacing method
CN105568795A (en) * 2015-12-18 2016-05-11 成都市新筑路桥机械股份有限公司 Method for repairing polymer composite for embedded track
CN105463955A (en) * 2015-12-29 2016-04-06 成都市新筑路桥机械股份有限公司 Embedded track structure convenient to maintain
CN206396559U (en) * 2016-12-23 2017-08-11 成都市新筑路桥机械股份有限公司 A kind of embedded tracks system for curved section
WO2018150167A1 (en) * 2017-02-16 2018-08-23 Embedded Rail Technology Limited Rail installation method and rail system
CN106638172A (en) * 2017-03-14 2017-05-10 成都市新筑路桥机械股份有限公司 Rail ditch fine adjustment device
CN106835864A (en) * 2017-03-17 2017-06-13 中铁三局集团有限公司 The maintenance solid concrete roabed cutting transportation resources of high ferro non-fragment orbit
CN207130542U (en) * 2017-09-08 2018-03-23 成都市新筑路桥机械股份有限公司 A kind of novel embedded rail system in tunnel
CN207512517U (en) * 2017-11-15 2018-06-19 成都市新筑路桥机械股份有限公司 A kind of novel embedded rail system convenient for construction and maintenance
CN108130833A (en) * 2017-12-22 2018-06-08 中铁四院集团岩土工程有限责任公司 The method for correcting error of sedimentation offset non-fragment orbit
CN209428851U (en) * 2018-12-25 2019-09-24 成都市新筑路桥机械股份有限公司 A kind of novel embedded continuous bearing ballastless track structure

Also Published As

Publication number Publication date
CN111074703A (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN201850505U (en) Rigid-flexible transition structure capable of preventing bumping at bridge-head
CN108999045A (en) A kind of subgrade strengthening structure and its construction method preventing and treating bumping at bridge-head
KR101011502B1 (en) Speedy Recovering Method for Concrete Track
CN111074703B (en) Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed
KR100838227B1 (en) Structure of high-strength and rapidly-hardening prepacked concrete track for carrying out mechanization and working method thereof
KR100768777B1 (en) Earth reinforcement method for railway track on the concrete base
CN209891043U (en) Rigid bridge head connecting structure
CN204370297U (en) A kind of structure receiving seamless bridge attachment strap end stress
KR101780224B1 (en) Concrete long sleeper block of fast-hardening track for improving rail track considering train operation construction method
CN111663385A (en) Construction method for completing rapid restoration of settlement of integral ballast bed in skylight period
KR101076029B1 (en) Replacing Method of Old Train Track using Twin-Block Type Train Track
CN112376448A (en) Bridge repairing and maintaining structure and construction method thereof
CN108385451A (en) Board-like ballastless track boards replacing options under a kind of special operation condition
CN111576093A (en) Structure for treating railway slurry pumping and construction method
CN117758549A (en) Construction process of ballastless track of urban railway
CN110670420A (en) Underground excavation maintenance method for ballastless track subgrade of operation railway
CN215925474U (en) Pile plate roadbed structure of underpass railway bridge highway
CN106283973B (en) Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail beam transition section structure
KR102314401B1 (en) Construction method of fast-hardening rail track for improving ballast rail track
CN210886927U (en) Railway bridge integral steel bridge deck slab ballast groove
CN210507402U (en) Compensation roadbed construction structure of plastic drainage plate and CFG pile soft foundation transition section
CN113529516A (en) Pile plate roadbed structure of underpass railway bridge and highway and construction method thereof
CN106283946B (en) The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire excavation location pile foundation
CN219032816U (en) Asphalt pavement quick maintenance structure for rigid platform scale
CN211815270U (en) Quick maintenance structure of road surface infiltration under heavy load traffic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Luo Jiong

Inventor after: Yang Gang

Inventor after: Liu Guangsheng

Inventor after: Tian Ji

Inventor after: Wu Gang

Inventor after: Miao Caixia

Inventor after: Cui Yipeng

Inventor after: Ren Zhijiang

Inventor after: Zheng Jie

Inventor before: Luo Jiong

Inventor before: Yang Gang

Inventor before: Liu Guangsheng

Inventor before: Tian Ji

Inventor before: Wu Gang

Inventor before: Miao Caixia

Inventor before: Cui Yipeng

Inventor before: Ren Zhijiang

Inventor before: Zheng Jie

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240304

Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park)

Patentee after: Chengdu Xinzhu Transportation Technology Co.,Ltd.

Country or region after: China