CN207130542U - A kind of novel embedded rail system in tunnel - Google Patents
A kind of novel embedded rail system in tunnel Download PDFInfo
- Publication number
- CN207130542U CN207130542U CN201721148024.7U CN201721148024U CN207130542U CN 207130542 U CN207130542 U CN 207130542U CN 201721148024 U CN201721148024 U CN 201721148024U CN 207130542 U CN207130542 U CN 207130542U
- Authority
- CN
- China
- Prior art keywords
- cast
- concrete
- railway roadbed
- rail
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 claims abstract description 51
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 35
- 239000010959 steel Substances 0.000 claims abstract description 35
- 241001669679 Eleotris Species 0.000 claims abstract description 11
- 238000013016 damping Methods 0.000 claims abstract description 9
- 239000000463 material Substances 0.000 claims abstract description 7
- 229920000642 polymer Polymers 0.000 claims abstract description 7
- 238000000926 separation method Methods 0.000 claims abstract description 6
- 239000011178 precast concrete Substances 0.000 claims abstract description 4
- 238000003466 welding Methods 0.000 claims description 4
- 230000011664 signaling Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Railway Tracks (AREA)
Abstract
The utility model discloses a kind of novel embedded rail system in tunnel, including tunnel duct piece, concrete bed and cast-in-place railway roadbed, separation layer is set between the contact surface of the concrete bed and cast-in-place railway roadbed, it is also movable in the cast-in-place railway roadbed to be inserted with some Prefabricated Concrete intermediate mass vertically, Prefabricated Concrete intermediate mass bottom is coordinated with concrete bed in the form of convex-concave, the cast-in-place railway roadbed is also horizontally disposed with embedded sleeve barrel at the position of corresponding Prefabricated Concrete intermediate mass side, the cast-in-place railway roadbed both sides are respectively embedded into the U-shaped steel tank that the longitudinally disposed bottom of formula is connected with precast concrete sleeper, fixed setting rail in U-shaped steel tank, connected between two concrete sleepers by some steel bar girders, U-shaped steel tank, rail, concrete sleeper and steel bar girder integrate an integral unit in advance in factory.The utility model is safeguarded very convenient when tunnel duct piece settles, and due to avoiding cast-in-site polymer damping material and live accurate adjustment gauge, the site operation cycle is shorter.
Description
Technical field
A kind of novel embedded rail system in tunnel is the utility model is related to, belongs to technology of track traffic neck
Domain.
Background technology
In recent years, batch production is prefabricated, pattern of on-site consolidation is increasingly promoted in China's building trade, at the same the pattern through
In city track traffic engineering and system product exploitation, prefabricated floating plate track, ladder-type sleepers track in such as city rail traffic.
New integrated products of the embedded tracks as a kind of Rail Transit System, with effect of vibration and noise reduction is good, wheel-rail wear is low, makes
With long lifespan, good insulation preformance and ride comfort are good the advantages that, field of urban rail progressively attracts attention at home.
It is domestic at present a plurality of to found a capital or planning that circuit has the application demand of embedded tracks, it is contemplated that fast with urban track traffic
Speed development, a kind of embedded tracks rail system more excellent as performance will subway, tramcars even in high ferro at home
It is used widely.
Traditional underground railway track structure is generally sleeper type solid concrete roabed, and this track structure railway roadbed maintenance difficulties are higher, subtract
The noise reduction that shakes need to take particular design or special Damping fastening system;There are some novel track systems in other urban track traffic
System, such as floating plate damper rail, ladder-type sleepers track, embedded tracks.
Utility model content
Goal of the invention of the present utility model is:For above-mentioned problem, there is provided a kind of for new in tunnel
Embedded tracks system.
The technical solution adopted in the utility model is such:
A kind of novel embedded rail system in tunnel, including tunnel duct piece, concrete bed and cast-in-place road
Bed, forms gutter, concrete bed contact with cast-in-place railway roadbed between the concrete bed both sides and tunnel duct piece
Separation layer is set between face, it is also movable in the cast-in-place railway roadbed to be inserted with some Prefabricated Concrete intermediate mass, Prefabricated Concrete intermediate mass vertically
Bottom is coordinated with concrete bed in the form of convex-concave, and the cast-in-place railway roadbed is also horizontal at the position of corresponding Prefabricated Concrete intermediate mass side
Embedded sleeve barrel is set, and the cast-in-place railway roadbed both sides are respectively embedded into the U-shaped that the longitudinally disposed bottom of formula is connected with precast concrete sleeper
Steel tank, fixed setting rail in U-shaped steel tank, connected by some steel bar girders between two concrete sleepers, U-shaped steel tank, rail,
Concrete sleeper and steel bar girder integrate an integral unit in advance in factory.
Prefabricated Concrete intermediate mass in above-mentioned technical proposal coordinates with concrete bed, realizes to the horizontal, vertical of cast-in-place railway roadbed
To constraint.The purpose for setting embedded sleeve barrel is, can be by after the taking-up of Prefabricated Concrete intermediate mass, using pre- when tunnel duct piece settle
Sleeve is buried as the tool interface for jacking cast-in-place railway roadbed.Because separation layer has separated cast-in-place railway roadbed and concrete bed,
The rail top mark height that cast-in-place railway roadbed recovers rail has been jacked, concrete mortar has been then injected into and fixes cast-in-place railway roadbed.Cast-in-place railway roadbed is
It is modular, leave plate stitch between each two unit, water supply and sewage and other cross the use of rail interface.
After two U-shaped steel tanks mix up track geometry in advance in factory, it is integrated into by concrete sleeper and steel bar girder
One integral unit, so as to effectively reduce on-site construction processes, shorten construction period, improve efficiency of construction.Rail also exists
Direct embedded is fixed in U-shaped steel tank in factory, reduces the cast process of polymer damping material at the scene.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, the design feature that embedded tracks continuously support is remained, effect of vibration and noise reduction is good;
2nd, when tunnel duct piece settles, prefabricated limited block is taken out, and cast-in-place railway roadbed is jacked, recovers the rail top mark of rail
Height, safeguard very convenient;
3rd, cast-in-place railway roadbed good integrity, beneficial to track structure stability;
4th, reduce the cast process of polymer damping material at the scene, shorten the site operation cycle, improve construction effect;
5th, left and right U-shaped steel tank is connected by steel bar girder in factory, forms the section of track, flash welding can be carried out between the section of track
Connect, the accurate gauge for ensureing left and right track, reduce rail system accurate adjustment number, shorten the site operation cycle.
Preferably, the outside of the U-shaped steel tank two welding U-shaped dowel.U-shaped dowel can further strengthen consolidating for U-shaped steel tank
It is set for using.
Preferably, the contact surface between the Prefabricated Concrete intermediate mass and cast-in-place railway roadbed is additionally provided with buffer plate.At some
There is the location of special vibration damping demand, level 2 buffering backing plate can also be set.
Preferably, the rail is fixedly installed in U-shaped steel tank by polymer damping material.
Preferably, the position at the top of the cast-in-place railway roadbed between two rails is recessed and set for attachment rail signal
Standby concave shaped space.
Preferably, sink to forming the peace for attachment rail power supply unit on the outside of two rails at the top of the cast-in-place railway roadbed
Fill space.
Brief description of the drawings
Fig. 1 is Prefabricated Concrete intermediate mass top view of the present utility model;
Fig. 2 is cross-sectional view of the utility model in Prefabricated Concrete intermediate mass position;
Fig. 3 is the utility model in the cross-sectional view without Prefabricated Concrete intermediate mass position;
Marked in figure:1 is tunnel duct piece, and 2 be concrete bed, and 3 be Prefabricated Concrete intermediate mass, and 4 be U-shaped dowel, and 5 be U-shaped
Steel tank, 6 be cast-in-place railway roadbed, and 7 be separation layer, and 8 be gutter, and 9 be buffer plate, and 10 be polymer damping material, and 11 be rail,
12 be concave shaped space, and 13 be installing space, and 14 be embedded sleeve barrel, and 15 be concrete sleeper, and 16 be steel bar girder.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
Embodiment:
As shown in Figure 1, 2, 3, a kind of novel embedded rail system in tunnel, including tunnel duct piece 1, concrete
Base 2 and cast-in-place railway roadbed 6, gutter 8, the concrete bottom are formed between the both sides of concrete bed 2 and tunnel duct piece 1
Separation layer 7 is set between seat 2 and the contact surface of cast-in-place railway roadbed 6, in the cast-in-place railway roadbed 6 also it is movable be inserted with vertically it is some prefabricated
Concrete intermediate mass 3, the bottom of Prefabricated Concrete intermediate mass 3 are coordinated with concrete bed 2 in the form of convex-concave, and the cast-in-place railway roadbed 6 is also corresponding
The position of the side of Prefabricated Concrete intermediate mass 3 is horizontally disposed with embedded sleeve barrel 14, and it is longitudinally disposed that the cast-in-place both sides of railway roadbed 6 are respectively embedded into formula
Bottom is connected with the U-shaped steel tank 5 of precast concrete sleeper 15, and rail 11, two concrete sleepers 15 are fixedly installed in U-shaped steel tank 5
Between connected by some steel bar girders 16, U-shaped steel tank 5, rail 11, concrete sleeper 15 and steel bar girder 16 are pre- in factory
First integrate an integral unit.
Described 5 liang of outside welding U-shaped dowels 4 of U-shaped steel tank.
Contact surface between the Prefabricated Concrete intermediate mass 3 and cast-in-place railway roadbed 6 is additionally provided with buffer plate 9.
The rail 11 is fixedly installed in U-shaped steel tank 5 by polymer damping material 10.
Position of the top of cast-in-place railway roadbed 6 between two rails 11 is recessed for the recessed of attachment rail signalling arrangement
Shape space 12.
The top of cast-in-place railway roadbed 6 sinks to forming the installing space for attachment rail power supply unit in the outside of two rails 11
13。
Claims (6)
1. a kind of novel embedded rail system in tunnel, including tunnel duct piece(1), concrete bed(2)It is and existing
Pour railway roadbed(6), the concrete bed(2)Both sides and tunnel duct piece(1)Between form gutter(8), it is characterised in that:It is described
Concrete bed(2)With cast-in-place railway roadbed(6)Contact surface between separation layer is set(7), the cast-in-place railway roadbed(6)In it is also movable
Some Prefabricated Concrete intermediate mass are inserted with vertically(3), Prefabricated Concrete intermediate mass(3)Bottom and concrete bed(2)Coordinated in the form of convex-concave,
The cast-in-place railway roadbed(6)Also in corresponding Prefabricated Concrete intermediate mass(3)The position of side is horizontally disposed with embedded sleeve barrel(14), it is described cast-in-place
Railway roadbed(6)Both sides are respectively embedded into the longitudinally disposed bottom of formula and are connected with precast concrete sleeper(15)U-shaped steel tank(5), U-shaped steel tank
(5)Interior fixed setting rail(11), two concrete sleepers(15)Between pass through some steel bar girders(16)Connection, U-shaped steel tank
(5), rail(11), concrete sleeper(15)And steel bar girder(16)Integrate an integral unit in advance in factory.
A kind of 2. novel embedded rail system in tunnel according to claim 1, it is characterised in that:The U
Shape steel tank(5)Two outside welding U-shaped dowels(4).
A kind of 3. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described pre-
Concrete intermediate mass processed(3)With cast-in-place railway roadbed(6)Between contact surface be additionally provided with buffer plate(9).
A kind of 4. novel embedded rail system in tunnel according to claim 1, it is characterised in that:The steel
Rail(11)Pass through polymer damping material(10)It is fixedly installed on U-shaped steel tank(5)It is interior.
A kind of 5. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described existing
Pour railway roadbed(6)Top is in two rails(11)Between position be recessed concave shaped space for attachment rail signalling arrangement
(12).
A kind of 6. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described existing
Pour railway roadbed(6)Top is in two rails(11)Outside sinks the installing space to be formed for attachment rail power supply unit(13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721148024.7U CN207130542U (en) | 2017-09-08 | 2017-09-08 | A kind of novel embedded rail system in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721148024.7U CN207130542U (en) | 2017-09-08 | 2017-09-08 | A kind of novel embedded rail system in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207130542U true CN207130542U (en) | 2018-03-23 |
Family
ID=61638092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721148024.7U Active CN207130542U (en) | 2017-09-08 | 2017-09-08 | A kind of novel embedded rail system in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207130542U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111074703A (en) * | 2020-01-08 | 2020-04-28 | 成都市新筑路桥机械股份有限公司 | Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed |
-
2017
- 2017-09-08 CN CN201721148024.7U patent/CN207130542U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111074703A (en) * | 2020-01-08 | 2020-04-28 | 成都市新筑路桥机械股份有限公司 | Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed |
CN111074703B (en) * | 2020-01-08 | 2021-08-17 | 成都市新筑路桥机械股份有限公司 | Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103352400B (en) | Prefabricated embedded tracks plate | |
CN204000469U (en) | A kind of pile formula box road structure | |
CN204455724U (en) | For the integral structure of Deep Thick Soft Ground Area roadbed track | |
CN206396566U (en) | A kind of U-shaped embankment structure of pile of the anti-ground collapse in karst area | |
KR20110089991A (en) | Vibration-proof track for railroads and this construction technique | |
CN104631221A (en) | High-speed railway widening subgrade structure | |
CN204059109U (en) | Modern tram solid concrete roabed integral structure | |
CN204959479U (en) | Embedded frame track board and track structure thereof | |
CN109440571A (en) | The construction method for building road is faced in a kind of laying of prefabricated board | |
CN104120686A (en) | High elastic die cushion type composite dam | |
CN204112169U (en) | City rail system | |
CN204343108U (en) | A kind of split type continuous support ballast bed system | |
CN107354826B (en) | The rapid constructing method of tunnel built-in type rail system | |
CN207512517U (en) | A kind of novel embedded rail system convenient for construction and maintenance | |
CN207159712U (en) | A kind of novel embedded rail system in tunnel | |
CN106400613A (en) | Ballastless track | |
CN105133493A (en) | Embedded track structure suitable for middle-span and small-span bridge and construction method | |
CN105780612B (en) | A kind of prefabricated subway assembled track plate and its construction method | |
CN208604416U (en) | A kind of continuous supporting track structure of assemblyization | |
CN207130542U (en) | A kind of novel embedded rail system in tunnel | |
CN104947566A (en) | Assembled grade crossing | |
CN110359375A (en) | The construction method of precast segment girder precast field under a kind of bridge | |
CN101967782A (en) | Ladder-shaped rail construction method for urban rail transit | |
CN203487418U (en) | Subgrade surface reinforcement waterproof structure of ballastless track high speed railway | |
CN104762851B (en) | A kind of composite material sleeper with insulation shirt rim |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240115 Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park) Patentee after: Chengdu Xinzhu Transportation Technology Co.,Ltd. Address before: 611430 Xinjin Industrial Park, Sichuan, Chengdu Patentee before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd. |