CN207130542U - A kind of novel embedded rail system in tunnel - Google Patents

A kind of novel embedded rail system in tunnel Download PDF

Info

Publication number
CN207130542U
CN207130542U CN201721148024.7U CN201721148024U CN207130542U CN 207130542 U CN207130542 U CN 207130542U CN 201721148024 U CN201721148024 U CN 201721148024U CN 207130542 U CN207130542 U CN 207130542U
Authority
CN
China
Prior art keywords
cast
concrete
railway roadbed
rail
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721148024.7U
Other languages
Chinese (zh)
Inventor
钱振地
杨刚
刘光胜
郑洁
罗炯
张松
任志江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Transportation Technology Co ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CN201721148024.7U priority Critical patent/CN207130542U/en
Application granted granted Critical
Publication of CN207130542U publication Critical patent/CN207130542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model discloses a kind of novel embedded rail system in tunnel, including tunnel duct piece, concrete bed and cast-in-place railway roadbed, separation layer is set between the contact surface of the concrete bed and cast-in-place railway roadbed, it is also movable in the cast-in-place railway roadbed to be inserted with some Prefabricated Concrete intermediate mass vertically, Prefabricated Concrete intermediate mass bottom is coordinated with concrete bed in the form of convex-concave, the cast-in-place railway roadbed is also horizontally disposed with embedded sleeve barrel at the position of corresponding Prefabricated Concrete intermediate mass side, the cast-in-place railway roadbed both sides are respectively embedded into the U-shaped steel tank that the longitudinally disposed bottom of formula is connected with precast concrete sleeper, fixed setting rail in U-shaped steel tank, connected between two concrete sleepers by some steel bar girders, U-shaped steel tank, rail, concrete sleeper and steel bar girder integrate an integral unit in advance in factory.The utility model is safeguarded very convenient when tunnel duct piece settles, and due to avoiding cast-in-site polymer damping material and live accurate adjustment gauge, the site operation cycle is shorter.

Description

A kind of novel embedded rail system in tunnel
Technical field
A kind of novel embedded rail system in tunnel is the utility model is related to, belongs to technology of track traffic neck Domain.
Background technology
In recent years, batch production is prefabricated, pattern of on-site consolidation is increasingly promoted in China's building trade, at the same the pattern through In city track traffic engineering and system product exploitation, prefabricated floating plate track, ladder-type sleepers track in such as city rail traffic. New integrated products of the embedded tracks as a kind of Rail Transit System, with effect of vibration and noise reduction is good, wheel-rail wear is low, makes With long lifespan, good insulation preformance and ride comfort are good the advantages that, field of urban rail progressively attracts attention at home. It is domestic at present a plurality of to found a capital or planning that circuit has the application demand of embedded tracks, it is contemplated that fast with urban track traffic Speed development, a kind of embedded tracks rail system more excellent as performance will subway, tramcars even in high ferro at home It is used widely.
Traditional underground railway track structure is generally sleeper type solid concrete roabed, and this track structure railway roadbed maintenance difficulties are higher, subtract The noise reduction that shakes need to take particular design or special Damping fastening system;There are some novel track systems in other urban track traffic System, such as floating plate damper rail, ladder-type sleepers track, embedded tracks.
Utility model content
Goal of the invention of the present utility model is:For above-mentioned problem, there is provided a kind of for new in tunnel Embedded tracks system.
The technical solution adopted in the utility model is such:
A kind of novel embedded rail system in tunnel, including tunnel duct piece, concrete bed and cast-in-place road Bed, forms gutter, concrete bed contact with cast-in-place railway roadbed between the concrete bed both sides and tunnel duct piece Separation layer is set between face, it is also movable in the cast-in-place railway roadbed to be inserted with some Prefabricated Concrete intermediate mass, Prefabricated Concrete intermediate mass vertically Bottom is coordinated with concrete bed in the form of convex-concave, and the cast-in-place railway roadbed is also horizontal at the position of corresponding Prefabricated Concrete intermediate mass side Embedded sleeve barrel is set, and the cast-in-place railway roadbed both sides are respectively embedded into the U-shaped that the longitudinally disposed bottom of formula is connected with precast concrete sleeper Steel tank, fixed setting rail in U-shaped steel tank, connected by some steel bar girders between two concrete sleepers, U-shaped steel tank, rail, Concrete sleeper and steel bar girder integrate an integral unit in advance in factory.
Prefabricated Concrete intermediate mass in above-mentioned technical proposal coordinates with concrete bed, realizes to the horizontal, vertical of cast-in-place railway roadbed To constraint.The purpose for setting embedded sleeve barrel is, can be by after the taking-up of Prefabricated Concrete intermediate mass, using pre- when tunnel duct piece settle Sleeve is buried as the tool interface for jacking cast-in-place railway roadbed.Because separation layer has separated cast-in-place railway roadbed and concrete bed, The rail top mark height that cast-in-place railway roadbed recovers rail has been jacked, concrete mortar has been then injected into and fixes cast-in-place railway roadbed.Cast-in-place railway roadbed is It is modular, leave plate stitch between each two unit, water supply and sewage and other cross the use of rail interface.
After two U-shaped steel tanks mix up track geometry in advance in factory, it is integrated into by concrete sleeper and steel bar girder One integral unit, so as to effectively reduce on-site construction processes, shorten construction period, improve efficiency of construction.Rail also exists Direct embedded is fixed in U-shaped steel tank in factory, reduces the cast process of polymer damping material at the scene.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, the design feature that embedded tracks continuously support is remained, effect of vibration and noise reduction is good;
2nd, when tunnel duct piece settles, prefabricated limited block is taken out, and cast-in-place railway roadbed is jacked, recovers the rail top mark of rail Height, safeguard very convenient;
3rd, cast-in-place railway roadbed good integrity, beneficial to track structure stability;
4th, reduce the cast process of polymer damping material at the scene, shorten the site operation cycle, improve construction effect;
5th, left and right U-shaped steel tank is connected by steel bar girder in factory, forms the section of track, flash welding can be carried out between the section of track Connect, the accurate gauge for ensureing left and right track, reduce rail system accurate adjustment number, shorten the site operation cycle.
Preferably, the outside of the U-shaped steel tank two welding U-shaped dowel.U-shaped dowel can further strengthen consolidating for U-shaped steel tank It is set for using.
Preferably, the contact surface between the Prefabricated Concrete intermediate mass and cast-in-place railway roadbed is additionally provided with buffer plate.At some There is the location of special vibration damping demand, level 2 buffering backing plate can also be set.
Preferably, the rail is fixedly installed in U-shaped steel tank by polymer damping material.
Preferably, the position at the top of the cast-in-place railway roadbed between two rails is recessed and set for attachment rail signal Standby concave shaped space.
Preferably, sink to forming the peace for attachment rail power supply unit on the outside of two rails at the top of the cast-in-place railway roadbed Fill space.
Brief description of the drawings
Fig. 1 is Prefabricated Concrete intermediate mass top view of the present utility model;
Fig. 2 is cross-sectional view of the utility model in Prefabricated Concrete intermediate mass position;
Fig. 3 is the utility model in the cross-sectional view without Prefabricated Concrete intermediate mass position;
Marked in figure:1 is tunnel duct piece, and 2 be concrete bed, and 3 be Prefabricated Concrete intermediate mass, and 4 be U-shaped dowel, and 5 be U-shaped Steel tank, 6 be cast-in-place railway roadbed, and 7 be separation layer, and 8 be gutter, and 9 be buffer plate, and 10 be polymer damping material, and 11 be rail, 12 be concave shaped space, and 13 be installing space, and 14 be embedded sleeve barrel, and 15 be concrete sleeper, and 16 be steel bar girder.
Embodiment
Below in conjunction with the accompanying drawings, the utility model is described in detail.
Embodiment:
As shown in Figure 1, 2, 3, a kind of novel embedded rail system in tunnel, including tunnel duct piece 1, concrete Base 2 and cast-in-place railway roadbed 6, gutter 8, the concrete bottom are formed between the both sides of concrete bed 2 and tunnel duct piece 1 Separation layer 7 is set between seat 2 and the contact surface of cast-in-place railway roadbed 6, in the cast-in-place railway roadbed 6 also it is movable be inserted with vertically it is some prefabricated Concrete intermediate mass 3, the bottom of Prefabricated Concrete intermediate mass 3 are coordinated with concrete bed 2 in the form of convex-concave, and the cast-in-place railway roadbed 6 is also corresponding The position of the side of Prefabricated Concrete intermediate mass 3 is horizontally disposed with embedded sleeve barrel 14, and it is longitudinally disposed that the cast-in-place both sides of railway roadbed 6 are respectively embedded into formula Bottom is connected with the U-shaped steel tank 5 of precast concrete sleeper 15, and rail 11, two concrete sleepers 15 are fixedly installed in U-shaped steel tank 5 Between connected by some steel bar girders 16, U-shaped steel tank 5, rail 11, concrete sleeper 15 and steel bar girder 16 are pre- in factory First integrate an integral unit.
Described 5 liang of outside welding U-shaped dowels 4 of U-shaped steel tank.
Contact surface between the Prefabricated Concrete intermediate mass 3 and cast-in-place railway roadbed 6 is additionally provided with buffer plate 9.
The rail 11 is fixedly installed in U-shaped steel tank 5 by polymer damping material 10.
Position of the top of cast-in-place railway roadbed 6 between two rails 11 is recessed for the recessed of attachment rail signalling arrangement Shape space 12.
The top of cast-in-place railway roadbed 6 sinks to forming the installing space for attachment rail power supply unit in the outside of two rails 11 13。

Claims (6)

1. a kind of novel embedded rail system in tunnel, including tunnel duct piece(1), concrete bed(2)It is and existing Pour railway roadbed(6), the concrete bed(2)Both sides and tunnel duct piece(1)Between form gutter(8), it is characterised in that:It is described Concrete bed(2)With cast-in-place railway roadbed(6)Contact surface between separation layer is set(7), the cast-in-place railway roadbed(6)In it is also movable Some Prefabricated Concrete intermediate mass are inserted with vertically(3), Prefabricated Concrete intermediate mass(3)Bottom and concrete bed(2)Coordinated in the form of convex-concave, The cast-in-place railway roadbed(6)Also in corresponding Prefabricated Concrete intermediate mass(3)The position of side is horizontally disposed with embedded sleeve barrel(14), it is described cast-in-place Railway roadbed(6)Both sides are respectively embedded into the longitudinally disposed bottom of formula and are connected with precast concrete sleeper(15)U-shaped steel tank(5), U-shaped steel tank (5)Interior fixed setting rail(11), two concrete sleepers(15)Between pass through some steel bar girders(16)Connection, U-shaped steel tank (5), rail(11), concrete sleeper(15)And steel bar girder(16)Integrate an integral unit in advance in factory.
A kind of 2. novel embedded rail system in tunnel according to claim 1, it is characterised in that:The U Shape steel tank(5)Two outside welding U-shaped dowels(4).
A kind of 3. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described pre- Concrete intermediate mass processed(3)With cast-in-place railway roadbed(6)Between contact surface be additionally provided with buffer plate(9).
A kind of 4. novel embedded rail system in tunnel according to claim 1, it is characterised in that:The steel Rail(11)Pass through polymer damping material(10)It is fixedly installed on U-shaped steel tank(5)It is interior.
A kind of 5. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described existing Pour railway roadbed(6)Top is in two rails(11)Between position be recessed concave shaped space for attachment rail signalling arrangement (12).
A kind of 6. novel embedded rail system in tunnel according to claim 1, it is characterised in that:It is described existing Pour railway roadbed(6)Top is in two rails(11)Outside sinks the installing space to be formed for attachment rail power supply unit(13).
CN201721148024.7U 2017-09-08 2017-09-08 A kind of novel embedded rail system in tunnel Active CN207130542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721148024.7U CN207130542U (en) 2017-09-08 2017-09-08 A kind of novel embedded rail system in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721148024.7U CN207130542U (en) 2017-09-08 2017-09-08 A kind of novel embedded rail system in tunnel

Publications (1)

Publication Number Publication Date
CN207130542U true CN207130542U (en) 2018-03-23

Family

ID=61638092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721148024.7U Active CN207130542U (en) 2017-09-08 2017-09-08 A kind of novel embedded rail system in tunnel

Country Status (1)

Country Link
CN (1) CN207130542U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074703A (en) * 2020-01-08 2020-04-28 成都市新筑路桥机械股份有限公司 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074703A (en) * 2020-01-08 2020-04-28 成都市新筑路桥机械股份有限公司 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed
CN111074703B (en) * 2020-01-08 2021-08-17 成都市新筑路桥机械股份有限公司 Maintenance method for uneven settlement of roadbed of embedded track steel groove type ballast bed

Similar Documents

Publication Publication Date Title
CN103352400B (en) Prefabricated embedded tracks plate
CN204000469U (en) A kind of pile formula box road structure
CN204455724U (en) For the integral structure of Deep Thick Soft Ground Area roadbed track
CN206396566U (en) A kind of U-shaped embankment structure of pile of the anti-ground collapse in karst area
KR20110089991A (en) Vibration-proof track for railroads and this construction technique
CN104631221A (en) High-speed railway widening subgrade structure
CN204059109U (en) Modern tram solid concrete roabed integral structure
CN204959479U (en) Embedded frame track board and track structure thereof
CN109440571A (en) The construction method for building road is faced in a kind of laying of prefabricated board
CN104120686A (en) High elastic die cushion type composite dam
CN204112169U (en) City rail system
CN204343108U (en) A kind of split type continuous support ballast bed system
CN107354826B (en) The rapid constructing method of tunnel built-in type rail system
CN207512517U (en) A kind of novel embedded rail system convenient for construction and maintenance
CN207159712U (en) A kind of novel embedded rail system in tunnel
CN106400613A (en) Ballastless track
CN105133493A (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN105780612B (en) A kind of prefabricated subway assembled track plate and its construction method
CN208604416U (en) A kind of continuous supporting track structure of assemblyization
CN207130542U (en) A kind of novel embedded rail system in tunnel
CN104947566A (en) Assembled grade crossing
CN110359375A (en) The construction method of precast segment girder precast field under a kind of bridge
CN101967782A (en) Ladder-shaped rail construction method for urban rail transit
CN203487418U (en) Subgrade surface reinforcement waterproof structure of ballastless track high speed railway
CN104762851B (en) A kind of composite material sleeper with insulation shirt rim

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240115

Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park)

Patentee after: Chengdu Xinzhu Transportation Technology Co.,Ltd.

Address before: 611430 Xinjin Industrial Park, Sichuan, Chengdu

Patentee before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd.