CN111058880B - 一种新型快插式吊机结构 - Google Patents
一种新型快插式吊机结构 Download PDFInfo
- Publication number
- CN111058880B CN111058880B CN202010052785.2A CN202010052785A CN111058880B CN 111058880 B CN111058880 B CN 111058880B CN 202010052785 A CN202010052785 A CN 202010052785A CN 111058880 B CN111058880 B CN 111058880B
- Authority
- CN
- China
- Prior art keywords
- telescopic shaft
- cutting ferrule
- cavity
- adjusting bolt
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003780 insertion Methods 0.000 title claims abstract description 10
- 230000000694 effects Effects 0.000 claims description 5
- 239000000428 dust Substances 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 4
- 239000004677 Nylon Substances 0.000 description 2
- 230000002146 bilateral effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 229920001778 nylon Polymers 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010052785.2A CN111058880B (zh) | 2020-01-17 | 2020-01-17 | 一种新型快插式吊机结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010052785.2A CN111058880B (zh) | 2020-01-17 | 2020-01-17 | 一种新型快插式吊机结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111058880A CN111058880A (zh) | 2020-04-24 |
CN111058880B true CN111058880B (zh) | 2021-09-03 |
Family
ID=70307555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010052785.2A Active CN111058880B (zh) | 2020-01-17 | 2020-01-17 | 一种新型快插式吊机结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111058880B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205241058U (zh) * | 2015-12-04 | 2016-05-18 | 北方重工集团有限公司 | 一种盾构机管片吊具 |
CN205370602U (zh) * | 2016-03-09 | 2016-07-06 | 中铁工程装备集团有限公司 | 一种适应多种管片直径的管片吊机平衡梁 |
CN106761857A (zh) * | 2017-02-15 | 2017-05-31 | 中铁工程装备集团有限公司 | 一种盾构机隧道异型管片吊运装置 |
CN207001996U (zh) * | 2017-08-04 | 2018-02-13 | 中船重型装备有限公司 | 一种卡特盾构机管片吊起吊装置 |
CN108483239A (zh) * | 2018-05-08 | 2018-09-04 | 梁溪区旭中通用机械设计工作室 | 一种起重机吊臂用挂钩 |
CN209411606U (zh) * | 2018-12-28 | 2019-09-20 | 魏炜 | 一种起重机的防脱吊钩 |
-
2020
- 2020-01-17 CN CN202010052785.2A patent/CN111058880B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205241058U (zh) * | 2015-12-04 | 2016-05-18 | 北方重工集团有限公司 | 一种盾构机管片吊具 |
CN205370602U (zh) * | 2016-03-09 | 2016-07-06 | 中铁工程装备集团有限公司 | 一种适应多种管片直径的管片吊机平衡梁 |
CN106761857A (zh) * | 2017-02-15 | 2017-05-31 | 中铁工程装备集团有限公司 | 一种盾构机隧道异型管片吊运装置 |
CN207001996U (zh) * | 2017-08-04 | 2018-02-13 | 中船重型装备有限公司 | 一种卡特盾构机管片吊起吊装置 |
CN108483239A (zh) * | 2018-05-08 | 2018-09-04 | 梁溪区旭中通用机械设计工作室 | 一种起重机吊臂用挂钩 |
CN209411606U (zh) * | 2018-12-28 | 2019-09-20 | 魏炜 | 一种起重机的防脱吊钩 |
Also Published As
Publication number | Publication date |
---|---|
CN111058880A (zh) | 2020-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111058880B (zh) | 一种新型快插式吊机结构 | |
CN206533501U (zh) | 一种多用新闻采访话筒固定装置 | |
CN110255530B (zh) | 一种约束电爆石墨制备低维纳米碳的装置 | |
CN212553747U (zh) | 一种多功能机械设备检修台装置 | |
CN212297381U (zh) | 一种高弹性弹簧管 | |
CN220575947U (zh) | 一种抓取稳定的机械手 | |
CN219730295U (zh) | 一种起重机用防脱落的勾取机构 | |
CN210419031U (zh) | 一种料台侧向吊装升降机构 | |
CN220637970U (zh) | 一种升降式碳纤维抗扭助力臂 | |
CN106207514B (zh) | 一种电力接地装置 | |
CN219217177U (zh) | 一种对重导轨支架脚 | |
CN219473540U (zh) | 一种台灯底座 | |
CN214167084U (zh) | 带有自动平衡装置的d型焊接吊耳 | |
CN216881391U (zh) | 气动铆接枪 | |
CN216009867U (zh) | 一种冶金安全输送管道 | |
CN215208029U (zh) | 一种吊装装置的重心调整结构 | |
CN214519949U (zh) | 一种简易的设备安装定位销拔出装置 | |
CN211082450U (zh) | 一种液压式快速连接释放装置 | |
CN220449050U (zh) | 用于生产挡渣锥头的机械手夹具 | |
CN218145394U (zh) | 一种用于离心式离合器组装的吊装装置 | |
CN214247846U (zh) | 一种具有自锁结构的旋转液压油缸 | |
CN217669029U (zh) | 一种制动器总成装配用定位工装 | |
CN214146830U (zh) | 一种基于水利的管道支撑连接装置 | |
CN221396891U (zh) | 一种高安全性的发动机整流罩吊具 | |
CN219449064U (zh) | 一种锂电池加工用炭电极吊装吊具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A New Type of Quick Plug Crane Structure Effective date of registration: 20221226 Granted publication date: 20210903 Pledgee: China Construction Bank Corporation Zhengzhou Railway Sub Branch Pledgor: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd. Registration number: Y2022980029005 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20210903 Pledgee: China Construction Bank Corporation Zhengzhou Railway Sub Branch Pledgor: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd. Registration number: Y2022980029005 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right |