CN111031092A - Property staff interactive operation platform - Google Patents

Property staff interactive operation platform Download PDF

Info

Publication number
CN111031092A
CN111031092A CN201911062422.0A CN201911062422A CN111031092A CN 111031092 A CN111031092 A CN 111031092A CN 201911062422 A CN201911062422 A CN 201911062422A CN 111031092 A CN111031092 A CN 111031092A
Authority
CN
China
Prior art keywords
task
tool
server
tools
list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911062422.0A
Other languages
Chinese (zh)
Inventor
毛碧磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Smart Property Management Co Ltd
Original Assignee
Beijing Smart Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Smart Property Management Co Ltd filed Critical Beijing Smart Property Management Co Ltd
Priority to CN201911062422.0A priority Critical patent/CN111031092A/en
Publication of CN111031092A publication Critical patent/CN111031092A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • H04L67/025Protocols based on web technology, e.g. hypertext transfer protocol [HTTP] for remote control or remote monitoring of applications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/52Network services specially adapted for the location of the user terminal

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • General Factory Administration (AREA)

Abstract

A property worker interactive working platform is used for tool distribution among multiple property workers and comprises a server and multiple task terminals connected with the server. When the task terminal acquires the task list, the property staff is explained to take the task, if tools needed by the relative work appear and the tools which are lacked in the carrying tool list exist at the moment, the fact that the tools carried by the property staff are insufficient is explained, the server plans a path of the task terminal to the task place through the positions of the lacked tools, the time wasted by the property staff for searching the tools is saved, and the efficiency of finishing the work of the property staff is improved.

Description

Property staff interactive operation platform
Technical Field
The invention relates to the technical field of property management platforms, in particular to a property worker interactive working platform.
Background
Property management is an indispensable part of daily maintenance of a garden, and perfect property management systems are needed to maintain daily work operations in residential districts, hospitals, factories and the like. However, as an important component of the property work, the equipment maintenance includes the maintenance and update of the equipment and facilities in the garden, and as the property personnel, the maintenance of various equipment in the garden, such as air conditioners, lighting lamps, doors and windows, water pipes, etc., is required.
However, the work activities are generally simple and easy to complete, the technical requirements on property workers are not high, and a common worker can perform the work activities such as bulb replacement, air conditioner condensate pipe ventilation, guardrail maintenance and the like. Thus, most of the existing property maintenance teams will be recruited with the workers at the bottom of each industry, and each of them needs to face various work activities during the work process, so that the actual classification of electricians, bricklayers and woodworkers will only delegate the professional personnel to go when some problems with high professional requirements are met. This has led to the prior art requiring the use of various tools, such as heat fuses, welding machines, test pens, etc., by the property worker. The tools are huge in quantity, all the tools can not be brought together by one time, and meanwhile, the tools required by various workers are different in types, so that the situation that in the process of daily equipment maintenance and repair, property workers need to replace tools when going to the next worker after completing one worker, but need to return to a warehouse to take the tools because the property workers do not carry the tools often occurs, and when the required tools are taken out by other property workers, the required tools can not be taken even if the property workers return to the warehouse. This situation causes a reduction in the efficiency of completion of the work and increases the amount of ineffective activity of the property worker.
Disclosure of Invention
The invention aims to provide a property worker interactive working platform which can realize the use planning of tools according to task allocation, avoid the reduction of work completion efficiency caused by searching for the tools and reduce the invalid activity of property workers.
The above object of the present invention is achieved by the following technical solutions:
a property worker interactive working platform is used for tool distribution among multiple property workers and comprises a server and multiple task terminals connected with the server;
the server is used for acquiring a work and activity information table corresponding to each work and activity, and the work and activity information table at least comprises work and activity contents and tools required by the work and activity;
the task terminal is used for acquiring a task list of a single task and a carrying tool list and outputting positioning information of the task terminal, wherein the task list at least comprises a work information table, a task time and a task place corresponding to the type of the work of the task;
the task terminal issues tools required by work and tools superposed in the carried tool list as used tools, and issues the rest tools in the carried tools as unused tools;
when the task terminal acquires the task list, if tools needed by the relative work and tools which are lacked in the carried tool list appear, the server plans a path of the task terminal to the task place through the position of the lacked tool according to the current position of the task terminal, the task place and the position of the lacked tool, wherein the lacked tool is a tool needed by the relative work and a tool which is lacked in the carried tool list and is released as an unused tool.
By adopting the technical scheme, when the task terminal acquires the task list, the property staff is explained to take the task, at the moment, if tools needed by the relative work and tools lacking in the carrying tool list appear, the property staff is explained to carry the tools insufficiently, and at the moment, the server plans the path of the task terminal to the task place through the missing tool position, so that the time wasted by the property staff for searching the tools is saved, and the efficiency of finishing the property staff by the work is improved.
As an improvement of the invention, each tool is configured with a unique tool code, and the list of tools to carry includes the type of tool and the tool code.
By adopting the technical scheme, the information monitoring of each tool can be realized by setting the tool code, and the property safety of the property tool is ensured.
As an improvement of the invention, each tool is configured with a two-dimensional code corresponding to the tool type and the tool code, and the task terminal adds the tool to a tool carrying list by scanning the two-dimensional code.
By adopting the technical scheme, the tools are added into the carrying tool list in a mode of scanning the two-dimensional code, so that the data in the carrying tool list is more accurate.
As an improvement of the present invention, when the missing tool has a plurality of, the paths correspond to the missing tools one to one.
By adopting the technical scheme, because the paths correspond to the missing tools one to one, planning of multiple paths is realized, and multiple path selections of property workers are provided.
As an improvement of the invention, the server is connected with the task terminal through a regional Internet of things.
By adopting the technical scheme, the setting of the regional Internet of things not only ensures the safety of the information of the interactive working platform in a single park, but also can improve the effective connection between the server and the task terminal.
As an improvement of the invention, the task list is stored in the server, and the task terminal accesses the server and obtains the task list of the single task from the server.
By adopting the technical scheme, the unified management of all task lists is realized.
As an improvement of the invention, the tool carrying list of each task terminal is updated to the server in real time, and after the server generates a new task, the tools required by the task and the tool carrying list of the task and the task are compared;
when the carrying tool list of the intention task terminal contains all tools required by the work and activity, the server pushes the task to the intention task terminal; otherwise, the server broadcasts the tasks to all task terminals; the intention task terminal is a task terminal which carries all tools in the tool list including the tools required by the work and activities.
By adopting the technical scheme, when a new task appears, the server can judge the task terminal with all the tools required by the task and the task terminal with the tools required by the missing task according to the tool carrying list of each task terminal, and preferentially push the task to the intended task terminal, so that the time for searching the missing tools, which is wasted due to incomplete tools after the property staff receives orders, is reduced.
As an improvement of the invention, when the server does not receive the order receiving instruction output by the intention task terminal within the continuous reserved time after pushing the task to the intention task terminal, the server broadcasts the task to all the task terminals, and the order receiving instruction is an instruction output to the server when the task terminal acquires the task list.
By adopting the technical scheme, the reasonable distribution of the tasks can be realized, and the tasks are prevented from being accumulated at the intended task terminal.
In conclusion, the beneficial technical effects of the invention are as follows:
due to the fact that the path planning that the task terminal reaches the task place through the position of the missing tool is achieved, property workers can find the missing tool in time and reach the task place in time in a reasonable path, and therefore the work completion efficiency of property work is improved.
Drawings
FIG. 1 is a block diagram of components of an interworking platform;
FIG. 2 is a flow chart of a property worker using the interworking platform.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the invention discloses a property worker interactive working platform for tool allocation among a plurality of property workers, which comprises a server and a plurality of task terminals connected with the server. The property staff accesses the tasks published on the server through the task terminal, so that the work completion state of each task is monitored on the basis of improving the work enthusiasm of the property staff.
Furthermore, in order to save property expenses of the garden, the server and the task terminal communicate through the regional internet of things in the garden, and the server is configured with a data interface, so that external equipment can acquire data in the server through the data interface.
The tasks published on the server may be provided by all persons on the campus, which is not limited herein, but the following schemes are preferred in this embodiment:
the server is connected with a task issuing terminal, the task issuing terminal is configured on all people in the garden, such as resident people in residential districts, doctors in hospitals and the like, and when people in the garden find that problems needing to be solved by property personnel occur in the garden, tasks are issued to the server through the regional Internet of things through the task issuing terminal. The task issuing terminal is an APP installed on the mobile device.
Referring to fig. 2, the process of using the interactive work platform by property workers is as follows:
the first step is as follows: when the property worker starts working, the property worker selects a portable tool used by the worker in daily work habit, and inputs tool information into the task terminal to generate a portable tool list.
In order to realize uniform management of the tools, a unique tool code is configured for each tool, and a carrying tool list is composed of the tool code and the tool type. Each tool is configured with a two-dimensional code, and the property worker adds the tool code and the tool type of the tool to the list of the carried tools by scanning the two-dimensional code.
The second step is that: and accessing the server through the task terminal, acquiring the task release information to be accessed, accessing the task, and planning a path from the task terminal to a task place through the server.
Each task terminal can only access one task once, and obtains a task list of the tasks from the server, wherein the task list comprises a work information table corresponding to the types of the work of the tasks, task time and task places, and the task list is stored in the server.
Furthermore, a work and activity information table corresponding to each work and activity is stored in the server, and the work and activity information table at least comprises work and activity contents and tools required by the work and activity.
Meanwhile, in order to realize the planning of the path, each task terminal is provided with a positioning module, the positioning module is preferably a Beidou positioning module, and positioning information of the task terminal is uploaded to the server through the positioning module. The server stores a garden three-dimensional map, and when planning a path, firstly, the following judgment is made: if tools needed by the relative activities appear and the tools are absent in the carried tool list, judging that the tools are absent in the executed task, and planning a path of the task terminal to the task site through the position of the absent tool by the server according to the garden three-dimensional map, the positioning information, the task site and the absent tool; and otherwise, the server directly plans a path from the task terminal to the task place according to the park three-dimensional map, the positioning information and the task place. In the initial state, the location of the missing tool is the park warehouse.
Because the field conditions in the garden are different, when the server carries out path planning, the path corresponds to the missing tool one, if the missing tool is a hot melting machine and five idle hot melting machines exist, five path plans are arranged corresponding to the position of each hot melting machine.
The third step: and completing the task work according to the task path to the task site.
The fourth step: and accessing the server through the task terminal, acquiring the task release information to be accessed, accessing the task, and planning a path from the task terminal to a task place through the server.
The path planning method is the same as that in step two, and is not described herein again. If tools needed by the relative activities appear and the tools are absent in the carried tool list, judging that the tools are absent in the executed task, and planning a path of the task terminal to the task site through the position of the absent tool by the server according to the garden three-dimensional map, the positioning information, the task site and the absent tool; and otherwise, the server directly plans a path from the task terminal to the task place according to the park three-dimensional map, the positioning information and the task place. Here, the missing tool is located at the position of the task terminal having the missing tool.
The fifth step: and after the tool required by the work and the tool superposed in the carried tool list are issued as the used tool and transmitted to the server through the task terminal after the tool is sent to the task place according to the task path, and the rest tools in the carried tools are issued as the unused tools and transmitted to the server.
Here, the missing tools in the second step and the fourth step, which are tools required for relative activities and which are tools missing from the carried tool list and released as unused tools, are explained
And a sixth step: and finishing the task work and returning to the fourth step.
Further, in order to prevent an error between a task location and a task terminal position, the tool carrying list of each task terminal is updated to the server in real time, and after the server generates a new task, the tools required by the task of the task and the tool carrying list are compared: when the carrying tool list of the intention task terminal contains all tools required by the work and activity, the server pushes the task to the intention task terminal; otherwise, the server broadcasts the tasks to all task terminals; the intention task terminal is a task terminal which carries all tools in the tool list including the tools required by the work and activities.
Meanwhile, when the server pushes the task to the intended task terminal and does not receive the order receiving instruction output by the intended task terminal within the continuous reserved time, the server broadcasts the task to all the task terminals, and the order receiving instruction is a confirmation instruction output to the server when the task terminal acquires the task list. The reserved time is preferably five minutes, and each task terminal can access at most one task at the same time.
From the above, when a plurality of property workers need to complete a plurality of tasks, the tasks issued by the server can be accessed one by one through the task terminals and the work is completed. Because the carried tool list is updated to the server in real time, the tools in use and the tools not in use in the carried tool list can realize networked unified management through the server, if the carried tools lack necessary tools for completing tasks, the server automatically plans a path of the task terminal to the task place through the position of the missing tool, so that property workers can find the missing tools in time and reach the task place in time in a reasonable path, and the work completion efficiency of the property work is improved.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. A property worker interactive working platform is used for tool distribution among multiple property workers and is characterized by comprising a server and multiple task terminals connected with the server;
the server is used for acquiring a work and activity information table corresponding to each work and activity, and the work and activity information table at least comprises work and activity contents and tools required by the work and activity;
the task terminal is used for acquiring a task list of a single task and a carrying tool list and outputting positioning information of the task terminal, wherein the task list at least comprises a work information table, a task time and a task place corresponding to the type of the work of the task;
the task terminal issues tools required by work and tools superposed in the carried tool list as used tools, and issues the rest tools in the carried tools as unused tools;
when the task terminal acquires the task list, if tools needed by the relative work and tools which are lacked in the carried tool list appear, the server plans a path of the task terminal to the task place through the position of the lacked tool according to the current position of the task terminal, the task place and the position of the lacked tool, wherein the lacked tool is a tool needed by the relative work and a tool which is lacked in the carried tool list and is released as an unused tool.
2. The property personnel interworking platform of claim 1, wherein: each tool is configured with a unique tool code, and the list of tools to carry includes a tool type and a tool code.
3. The property personnel interworking platform of claim 2, wherein: each tool is configured with a two-dimensional code corresponding to the tool type and the tool code, and the task terminal adds the tool to a tool carrying list by scanning the two-dimensional code.
4. The property personnel interworking platform of claim 1, wherein: when the missing tool has a plurality of, the path corresponds to the missing tool one to one.
5. The property personnel interworking platform of claim 1, wherein: the server is connected with the task terminal through a regional Internet of things.
6. The property personnel interworking platform of claim 1, wherein: and the task list is stored in the server, and the task terminal accesses the server and acquires the task list of the single task from the server.
7. The property personnel interworking platform of claim 6, wherein: the tool carrying list of each task terminal is updated to the server in real time, and after the server generates a new task, tools required by the tasks of the tasks and the tool carrying list are compared;
when the carrying tool list of the intention task terminal contains all tools required by the work and activity, the server pushes the task to the intention task terminal; otherwise, the server broadcasts the tasks to all task terminals; the intention task terminal is a task terminal which carries all tools in the tool list including the tools required by the work and activities.
8. The property personnel interaction platform of claim 7, wherein: when the server does not receive an order receiving instruction output by an intended task terminal within a continuous reserved time after pushing a task to the intended task terminal, the server broadcasts the task to all task terminals, and the order receiving instruction is an instruction output to the server when the task terminal acquires the task list.
CN201911062422.0A 2019-11-02 2019-11-02 Property staff interactive operation platform Pending CN111031092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911062422.0A CN111031092A (en) 2019-11-02 2019-11-02 Property staff interactive operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911062422.0A CN111031092A (en) 2019-11-02 2019-11-02 Property staff interactive operation platform

Publications (1)

Publication Number Publication Date
CN111031092A true CN111031092A (en) 2020-04-17

Family

ID=70204687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911062422.0A Pending CN111031092A (en) 2019-11-02 2019-11-02 Property staff interactive operation platform

Country Status (1)

Country Link
CN (1) CN111031092A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111866193A (en) * 2020-09-24 2020-10-30 绿漫科技有限公司 System and method for receiving and sending information without network for property personnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106295431A (en) * 2016-08-04 2017-01-04 杜海宽 A kind of aeronautical maintenance tool positioning device based on RFID
WO2017186096A1 (en) * 2016-04-25 2017-11-02 苏州宝时得电动工具有限公司 Tool sharing platform and method, tool and self-moving robot
CN107679629A (en) * 2016-08-01 2018-02-09 冯波 A kind of electric power apparatus examination instrument intelligent management system
CN108416490A (en) * 2018-01-15 2018-08-17 全球能源互联网研究院有限公司 A kind of electric communication operation and maintenance information-pushing method and system
CN108924764A (en) * 2018-07-20 2018-11-30 重庆蓝岸通讯技术有限公司 Lose article intelligence tracing system and its method for tracing
CN109685603A (en) * 2018-11-30 2019-04-26 芜湖茂坤网络科技有限公司 A kind of we rent tools method, system and terminal
CN109911578A (en) * 2019-02-21 2019-06-21 余海晏 A kind of automotive service set automation transmission system and its method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017186096A1 (en) * 2016-04-25 2017-11-02 苏州宝时得电动工具有限公司 Tool sharing platform and method, tool and self-moving robot
CN107679629A (en) * 2016-08-01 2018-02-09 冯波 A kind of electric power apparatus examination instrument intelligent management system
CN106295431A (en) * 2016-08-04 2017-01-04 杜海宽 A kind of aeronautical maintenance tool positioning device based on RFID
CN108416490A (en) * 2018-01-15 2018-08-17 全球能源互联网研究院有限公司 A kind of electric communication operation and maintenance information-pushing method and system
CN108924764A (en) * 2018-07-20 2018-11-30 重庆蓝岸通讯技术有限公司 Lose article intelligence tracing system and its method for tracing
CN109685603A (en) * 2018-11-30 2019-04-26 芜湖茂坤网络科技有限公司 A kind of we rent tools method, system and terminal
CN109911578A (en) * 2019-02-21 2019-06-21 余海晏 A kind of automotive service set automation transmission system and its method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111866193A (en) * 2020-09-24 2020-10-30 绿漫科技有限公司 System and method for receiving and sending information without network for property personnel
CN111866193B (en) * 2020-09-24 2021-03-16 绿漫科技有限公司 System and method for receiving and sending information without network for property personnel

Similar Documents

Publication Publication Date Title
CN102708699B (en) WebGIS (Web Geographic Information System)-based traffic light fault supervision system
KR20170105828A (en) Method and system based on online service for building remodeling
Liu et al. Automatically updating maintenance information from a BIM database
CN104102981A (en) Electronic work order processing method of power distribution equipment management system
CN1841437A (en) Remote management of portable construction device
CN107886287A (en) A kind of decoration construction work Self management system and its control method
JP6167971B2 (en) Remote management system
CN110689957A (en) Intelligent operation and maintenance management platform for hospital environment facilities
JP2002041124A (en) Production control system and production control information using system
CN107945307A (en) A kind of railway equipment tracing management system
CN205862379U (en) Electric power equipment inspection system
CN111610765A (en) Distributed message control device and method and building control system
CN111031092A (en) Property staff interactive operation platform
CN108389009B (en) Live monitored control system in door and window workshop
CN104731062A (en) Intelligent network management system and method used for monitoring state and dispatching for instruments
CN102736589A (en) Intelligent building control system
JP5915685B2 (en) Equipment management system
CN109902942A (en) Change management method, device and storage medium on a kind of cell house decoration inspection line
DE102016105480A1 (en) Method and system for installing, managing and / or maintaining components in a building complex
CN109656589A (en) A kind of secondary equipment of intelligent converting station software harnesses method and system
CN104854589A (en) System for integrated design of electric plant of industrial site
CN107491024A (en) Multiple Computer Classroom Management and method
JP2007133503A (en) Method of sharing information and system for sharing information in distributed system
CN102968679A (en) Automatic guiding method and system of engineer operation
CN202978420U (en) Automatic identification system for distribution network topology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200417