CN107886287A - A kind of decoration construction work Self management system and its control method - Google Patents
A kind of decoration construction work Self management system and its control method Download PDFInfo
- Publication number
- CN107886287A CN107886287A CN201610870767.9A CN201610870767A CN107886287A CN 107886287 A CN107886287 A CN 107886287A CN 201610870767 A CN201610870767 A CN 201610870767A CN 107886287 A CN107886287 A CN 107886287A
- Authority
- CN
- China
- Prior art keywords
- construction
- module
- work
- management
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/109—Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/1091—Recording time for administrative or management purposes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention relates to computer information management system field, disclose a kind of decoration construction work Self management system and control method, including multiple mobile phone terminals, one network, one cloud management platform, one Cloud Server, wherein pass through network connection between Cloud Server and multiple mobile phone terminals, the Cloud Server includes project construction module, construction waiting setup module, task management module, delivery receiving acceptance module, prompting message module, the control method of information inquiry module and command determination module decoration construction work Self management system, include establishment work order, send construction worker, generate engineering waiting, task management, message real-time reminding and delivery receiving acceptance.Thereby using the client terminal of user by network attached server, real-time construction working management directly can be carried out by client terminal, so as to reduce the workload of engineering department, Optimizing Flow improves operating efficiency, and real time data synchronization reduces unnecessary loss.
Description
Technical field
It is related to computer information management system field, more particularly to a kind of decoration construction flow work Self management system.
Background technology
Internet+continuous development, contacting between every profession and trade is increasingly close, and finishing is that each house purchaser is required for face
To a big problem, and finishing be one need real-time communication exchange follow-up engineering progress project, but at present finishing row
In industry, because the work habit of the processing step difference and workmen itself of workmen is different, work progress lacks unified
Standardized stream thread management, understand follow-up in real time for client or modification finishing plan add many unnecessary complicated procedures
And unnecessary loss.And for the manager for the team that constructs, due to lacking the flow of standard and reality can not be carried out
When link up, cause manager to need to arrive each building site in real time and linked up, virtually add human cost and unnecessary
Time, waste economically, also reduce operating efficiency.
Traditional labor management Construction Mode is summarized, is generally required by largely manually being confirmed, it is synchronous corresponding
, problems with easily be present in construction speed situation:First, the construction progress that can not follow up in real time is many unnecessary to engineering department's increase
Workload, and because details present in project under construction is more, easily occur due to can not real-time synchronization data, cause data
Lack the unnecessary loss caused by accuracy.The 2nd, although Some Enterprises introduce the working mechanism of standardized management, internally
After the address and flow of unified construction link, although the time linked up and confirm flow can be shortened to a certain extent, with
Construction site is increased, and such management method is difficult to meet variation of the enterprise for workmen and construction site and simultaneously
Manage the demand of follow-up.3rd, in the enterprise for being introduced into standardization management work mechanism, by communication way such as phone, wechats, hold
Easily occur do not answer the call in time, the situation of return information, cause construction speed renewal not in time the problems such as, simultaneously because existing
Communication way has certain limitation and one-sidedness, thus relevant staff still can not be to oneself work at present at hand
There is a clearly optimal design-aside for cognition and project flow as task order, can not be to existing standardization management work machine
System provides corresponding link up and supported.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of decoration construction flow work Self management system and control
Method can effectively provide the standardized management and effective progress follow-up and communication in real time of engineering.
In order to solve the above technical problems, the technical solution of the present invention is:
A kind of decoration construction work Self management system, using the design of B/S frameworks, including multiple mobile phone terminals, a cloud
Server, a network, a cloud service management platform, mobile phone terminal are used to provide graphic user interface to user, are easy to
User carries out inputting required data information, and operation application program, Cloud Server pass through net with multiple mobile phone terminals
Connected between network, Cloud Server is used for the storage, calculating and transmission for realizing data, and the Cloud Server is characterized in that including 7
Master project:Construction module, waiting setup module of constructing, task management module, delivery receiving acceptance module, prompting message module,
Information inquiry module and command determination module.
The project construction template:According to house type and design selection construction stage, link;
The construction waiting is set:Duration is calculated according to different construction stages, link automatically;
The task management:Worker, GPS is assigned to register management, work order list;
The delivery receiving acceptance module:Upload and check and accept picture, check and accept content check;
The prompting message module:According to it is overdue, wait to check and accept, the state transformation such as completed is reminded;
Described information enquiry module:For exporting the inquiry data occurred in use using user;
The command determination module:For to being judged using the operational order of user.
Described a kind of decoration construction work Self management system, it is characterised in that described project construction module includes user
House type identification module, construction formwork storage module and design creation module.
Described a kind of decoration construction work Self management system, it is characterised in that described task management module includes
Worker block, GPS is assigned to register management module and work order list block.
Described a kind of decoration construction work Self management system, it is characterised in that described delivery receiving acceptance module includes uploading
Picture module, check and accept module and content check module.
Described a kind of decoration construction work Self management system, it is characterised in that described prompting message module includes engineering
State analyzing module and real-time messages prompting module.
Described a kind of decoration construction work Self management system, it is characterised in that information inquiry module is through total system and respectively
Intermodule is connected, so as to reach the real-time output to inquiring about message.
A kind of control method of decoration construction work Self management system, it is characterised in that comprise the following steps, wherein ordering
All operational orders of the judge module through use user:
Step 1:Fit up platform and construction order is created according to user's request;
Step 2:The processing step of construction is carried out unified standard by construction management platform, and it is construction formwork to export, dress
Equating platform generates corresponding construction formwork according to the order number, and the corresponding construction stage is created according to Construction Design Schemes;
Step 3:Different constructions is created the standard link of construction and checked and accepted and marked by construction management platform according to the construction stage
Standard, return to link and check and accept subitem standard content;
Step 4:Platform is fitted up according to the order construction stage, workmen corresponding to work post is assigned in construction management platform,
Workmen and construction stage are bound;
Step 5:Fit up platform setting starting date;
Step 6:Construction management platform stage according to corresponding to starting date and construction stage and each link is time-consuming, intersects and applies
Between man-hour, it is ranked automatically the duration;
Step 7:Workmen registers at scene, and construction mobile phone terminal returns the GPS location information for the personnel that register;
Step 8:Construction management platform obtains staff's GPS location and information of registering;
Step 9:Staff uploads Contraction in Site and checks and accepts figure;
Step 10:Construction management platform obtains construction operation and checks and accepts figure and according to the examination picture ratio of stage all links
Construction speed data are automatically converted to, state demarcation is carried out to the construction stage;
Step 11:Construction management platform changes according to the state of newest generation, by pushing APP message and short message prompt phase
Close workmen and administrative staff carry out corresponding work in next step;
Step 12:Workmen checks all task statuses and the arrangement of time of current generation by the mobile phone terminal APP that constructs,
And Self management arrangement is operated according to the processing priority of system recommendation;
Step 13:Administrative staff carry out delivery receiving acceptance according to the examination subitem of construction stage link to scene, in construction hand
Generator terminal APP can choose examination subitem data up to standard, and examination is evaluated;
Step 14:Construction mobile phone terminal APP obtains check and acceptance result and returns to corresponding product acceptance data to construction management platform;
Step 15:Finishing management platform obtains product acceptance data and prompts to complete work;
Step 16:Construction is completed, finishing management platform carries out collecting presentation to work progress and result data.
A kind of control method of described decoration construction work Self management system, it is characterised in that applying described in step 2
Work phase data include the stage time-consuming, the crossed construction time, whether needs assessment, binding work post type, construction service type.
A kind of control method of described decoration construction work Self management system, it is characterised in that applying described in step 10
The state demarcation in work stage is:(waiting to check and accept) in (overdue), construction in (normal) in construction, construction, it has been completed.
It can find that the workmen of existing repairs profession is during operation, due to construction compared with prior art
Processing step difference and workmen itself work habit it is different, cause work progress can not use the flow of unified standardization
Situation about being managed.
The invention provides a kind of work of the system of standardization, realizes workmen's work Self management, saves custodian
The substantial amounts of checking work amount of member, and significantly improve the accuracy of construction supervision data, promptness.It is and more in finishing platform
During the Rapid Expansion of city, the present invention can provide stable and standardization execution management method therefor, and to administrative staff and constructor
The current task priority of member carries out intelligent sequencing management, for standardization management work mechanism provide corresponding technology and
System is supported.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural representation of the decoration construction work Self management system of the present invention;
Fig. 3 is the structural representation of the project construction module of the present invention;
Fig. 4 is the structural representation of the task management module of the present invention;
Fig. 5 is the structural representation of the delivery receiving acceptance module of the present invention;
Fig. 6 is the structural representation of the prompting message module of the present invention;
Fig. 7 is the operating procedure schematic diagram of the present invention.
Embodiment
With reference to specific embodiment, the present invention is described in detail.Following examples will be helpful to the technology of this area
Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill to this area
For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the present invention
Protection domain.
As shown in figure 1, according to a kind of finishing work Self management method provided by the invention, include the dress positioned at server
Repair work Self management system, by the finishing work Self management system connection of network and server and towards the client using user
End.
As shown in Fig. 2 it is respectively to include being used for according to family in finishing work Self management system that the service, which includes 7 primary modules,
Type and the project construction template of design selection construction stage and link;By according to different construction stages, link automatically based on
Calculate the construction waiting setup module of duration;For assign worker, GPS register management, work order list management task pipe
Manage module;Picture is checked and accepted for uploading, confirms to check and accept the delivery receiving acceptance module of content;For reminding the prompting message of working condition
Module;For exporting the information inquiry module of the inquiry data occurred in use using user;For to using user
The command determination module that is judged of operational order.
As shown in figure 3, project construction module includes user's house type identification module, construction formwork storage module and design side
Case creation module.
As shown in figure 4, task management module includes assigning worker block, GPS to register management module and work order
List block.
As shown in figure 5, delivery receiving acceptance module includes uploading pictures module, checks and accepts module and content check module.
As shown in fig. 6, including engineering state analysis module and real-time messages prompting module.
It is a kind of as described above finishing work Self management system control method, comprise the following steps as shown in fig. 7, its
All operational orders of the middle command determination module through use user:
Step 1:Fit up platform and construction order is created according to user's request;
Step 2:The processing step of construction is carried out unified standard by construction management platform, and it is construction formwork to export, dress
Equating platform generates corresponding construction formwork according to the order number, can create the corresponding construction stage according to Construction Design Schemes,
Phase data include the stage time-consuming, the crossed construction time, whether needs assessment, binding work post type, construction service type;
Step 3:Different constructions is created the standard link of construction and checked and accepted and marked by construction management platform according to the construction stage
Standard, return to link and check and accept subitem standard content;
Step 4:Platform is fitted up according to the order construction stage, workmen corresponding to work post is assigned in construction management platform,
Workmen and construction stage are bound;
Step 5:Fit up platform setting starting date;
Step 6:Construction management platform stage according to corresponding to starting date and construction stage and each link is time-consuming, intersects and applies
Between man-hour, it is ranked automatically the duration;
Step 7:Workmen registers at scene, and construction mobile phone terminal returns the GPS location information for the personnel that register;
Step 8:Construction management platform obtains staff's GPS location and information of registering;
Step 9:Staff uploads Contraction in Site and checks and accepts figure;
Step 10:Construction management platform obtains construction operation and checks and accepts figure and according to the examination picture ratio of stage all links
Construction speed data are automatically converted to, finishing platform is conveniently intuitively carried out progress control to each construction site;
Step 11:Construction management platform is following several states to the state demarcation of construction stage:(normal) in construction, apply
(waiting to check and accept) in (overdue) in work, construction, be completed, and changed according to the state of newest generation, by push APP message and
Short message prompt associated construction personnel and administrative staff carry out corresponding work in next step;
Step 12:Workmen can check all task statuses and the time of current generation by the mobile phone terminal APP that constructs
Arrange, and Self management arrangement is operated according to the processing priority of system recommendation;
Step 13:Administrative staff carry out delivery receiving acceptance according to the examination subitem of construction stage link to scene, in construction hand
Generator terminal APP can choose examination subitem data up to standard, and examination is evaluated;
Step 14:Construction mobile phone terminal APP obtains check and acceptance result and returns to corresponding product acceptance data to construction management platform;
Step 15:Finishing management platform obtains product acceptance data and prompts to complete work;
Step 16:Construction is completed, finishing management platform carries out collecting presentation to work progress and result data, to help to fill
Equating platform administrative staff summarize construction working, and the design of later stage work stream is optimized;
The specific embodiment of the present invention is described above.It is to be appreciated that the invention is not limited in above-mentioned
Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow
Ring the substantive content of the present invention.
Claims (9)
- The Self management system 1. a kind of decoration construction works, using the design of B/S frameworks, including multiple mobile phone terminals, a cloud clothes Business device, a network, a cloud service management platform, mobile phone terminal are used to provide graphic user interface to user, are easy to make User carries out inputting required data information, and operation application program, Cloud Server pass through network with multiple mobile phone terminals Between connect, Cloud Server is used to realize the storage, calculating and transmission of data, and the Cloud Server is characterized in that to be applied including project Work module, waiting setup module of constructing, task management module, delivery receiving acceptance module, prompting message module, information inquiry mould Block and command determination module;The project construction template:According to house type and design selection construction stage, link;It is described Waiting of constructing is set:Duration is calculated according to different construction stages, link automatically;The task management:Appointment worker, GPS registers management, work order list;The delivery receiving acceptance module:Upload and check and accept picture, check and accept content check;The message carries Awake module:According to it is overdue, wait to check and accept, the state transformation such as completed is reminded;Described information enquiry module is used for real-time query Information;The command determination module is used for being judged using the operational order of user.
- A kind of 2. decoration construction work Self management system according to claim 1, it is characterised in that described project construction Module includes user's house type identification module, construction formwork storage module and design creation module.
- A kind of 3. decoration construction work Self management system according to claim 1, it is characterised in that described task Management module includes appointment worker block, GPS registers management module and work order list block.
- A kind of 4. decoration construction work Self management system according to claim 1, it is characterised in that described delivery receiving acceptance Module includes uploading pictures module, checks and accepts module and content check module.
- A kind of 5. decoration construction work Self management system according to claim 1, it is characterised in that described prompting message Module includes engineering state analysis module and real-time messages prompting module.
- A kind of 6. decoration construction work Self management system according to claim 1, it is characterised in that described information inquiry Module runs through total system, is connected with each other with each intermodule.
- A kind of a kind of 7. control method of decoration construction work Self management system as described in claim 1-6, it is characterised in that Comprise the following steps, wherein all operational orders of the command determination module through use user:Step 1:Fit up platform and construction order is created according to user's request;Step 2:The processing step of construction is carried out unified standard by construction management platform, and it is construction formwork to export, and finishing is flat Platform generates corresponding construction formwork according to the order number, and the corresponding construction stage is created according to Construction Design Schemes;Step 3:Construction management platform creates different constructions according to the construction stage standard link and acceptance criteria of construction, returns Winding section checks and accepts subitem standard content;Step 4:Platform is fitted up according to the order construction stage, in workmen corresponding to construction management platform appointment work post, will be applied Worker person is bound with the construction stage;Step 5:Fit up platform setting starting date;Step 6:Construction management platform stage according to corresponding to starting date and construction stage and each link is time-consuming, crossed construction when Between, it is ranked automatically the duration;Step 7:Workmen registers at scene, and construction mobile phone terminal returns the GPS location information for the personnel that register;Step 8:Construction management platform obtains staff's GPS location and information of registering;Step 9:Staff uploads Contraction in Site and checks and accepts figure;Step 10:Construction management platform acquisition construction operation examination figure is simultaneously automatic according to the examination picture ratio of stage all links Construction speed data are converted into, state demarcation is carried out to the construction stage;Step 11:Construction management platform changes according to the state of newest generation, is applied by pushing APP message and short message prompt correlation Worker person and administrative staff carry out corresponding work in next step;Step 12:Workmen checks all task statuses and the arrangement of time of current generation, and root by the mobile phone terminal APP that constructs Self management arrangement is operated according to the processing priority of system recommendation;Step 13:Administrative staff carry out delivery receiving acceptance according to the examination subitem of construction stage link to scene, in construction mobile phone terminal APP can choose examination subitem data up to standard, and examination is evaluated;Step 14:Construction mobile phone terminal APP obtains check and acceptance result and returns to corresponding product acceptance data to construction management platform;Step 15:Finishing management platform obtains product acceptance data and prompts to complete work;Step 16:Construction is completed, finishing management platform carries out collecting presentation to work progress and result data.
- A kind of 8. control method of decoration construction work Self management system as claimed in claim 7, it is characterised in that step 2 Described in construction stage data include the stage time-consuming, the crossed construction time, whether needs assessment, binding work post type, construction Service type.
- A kind of 9. control method of decoration construction work Self management system as claimed in claim 7, it is characterised in that step 10 Described in the state demarcation of construction stage be:(waiting to check and accept) in (overdue), construction in (normal) in construction, construction, complete Work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610870767.9A CN107886287A (en) | 2016-09-30 | 2016-09-30 | A kind of decoration construction work Self management system and its control method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610870767.9A CN107886287A (en) | 2016-09-30 | 2016-09-30 | A kind of decoration construction work Self management system and its control method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107886287A true CN107886287A (en) | 2018-04-06 |
Family
ID=61769995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610870767.9A Pending CN107886287A (en) | 2016-09-30 | 2016-09-30 | A kind of decoration construction work Self management system and its control method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107886287A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108681840A (en) * | 2018-07-06 | 2018-10-19 | 北京地厚云图科技有限公司 | Constructing tunnel management method and storage medium |
CN109034550A (en) * | 2018-07-03 | 2018-12-18 | 广州供电局有限公司 | Project survey and construction field monitoring method, system and computer equipment |
CN109064139A (en) * | 2018-08-08 | 2018-12-21 | 深圳市弘景装饰工程有限公司 | A kind of building decoration engineering management system |
CN109190947A (en) * | 2018-08-20 | 2019-01-11 | 深圳供电局有限公司 | A kind of traffic control evaluation system |
CN109242319A (en) * | 2018-09-15 | 2019-01-18 | 广东麟辉建设工程有限公司 | A kind of intelligence finishing management system |
CN109376430A (en) * | 2018-10-23 | 2019-02-22 | 河北省建筑材料工业设计研究院 | Assembled architecture execution management method therefor |
CN109902974A (en) * | 2019-04-11 | 2019-06-18 | 北京拓疆者智能科技有限公司 | A kind of generation method and device of arrangement and method for construction |
CN110197319A (en) * | 2019-03-14 | 2019-09-03 | 杭州恋家网络科技有限公司 | A kind of fitting-out work managing and control system based on big data model |
CN111091345A (en) * | 2019-11-18 | 2020-05-01 | 深圳市彬讯科技有限公司 | Decoration scheduling method and device, computer equipment and storage medium |
CN112101801A (en) * | 2020-09-21 | 2020-12-18 | 三门核电有限公司 | Construction quality unified supervision method and system based on Internet of things technology |
CN112862511A (en) * | 2019-11-28 | 2021-05-28 | 贝壳技术有限公司 | Engineering cost calculation method and system |
CN113190901A (en) * | 2021-04-29 | 2021-07-30 | 武汉艺豆装饰设计工程有限公司 | Intelligent visual indoor decoration engineering on-line design management system for green building |
CN117440023A (en) * | 2023-12-19 | 2024-01-23 | 南京昊天路桥工程有限公司 | Roadbed project construction data processing method and system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103745303A (en) * | 2013-12-19 | 2014-04-23 | 镇江锐捷信息科技有限公司 | Engineering project management method based on cloud end |
CN105046534A (en) * | 2015-08-27 | 2015-11-11 | 北京明兰网络科技有限公司 | Internet aided design (iAD) |
CN105117833A (en) * | 2015-08-14 | 2015-12-02 | 国家电网公司 | PDA application system for construction project field management |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105335882A (en) * | 2015-10-27 | 2016-02-17 | 宁波英蓝网络科技有限公司 | Electronic transaction system and transaction method thereof |
CN105930973A (en) * | 2016-04-22 | 2016-09-07 | 广州硕品物联网科技有限公司 | BIM-based construction site griddization management system and control method thereof |
CN106055819A (en) * | 2016-06-13 | 2016-10-26 | 湖南鸿扬家网电子商务有限公司 | Architectural decoration configuration device and method based on computer |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
-
2016
- 2016-09-30 CN CN201610870767.9A patent/CN107886287A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103745303A (en) * | 2013-12-19 | 2014-04-23 | 镇江锐捷信息科技有限公司 | Engineering project management method based on cloud end |
CN105117833A (en) * | 2015-08-14 | 2015-12-02 | 国家电网公司 | PDA application system for construction project field management |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105046534A (en) * | 2015-08-27 | 2015-11-11 | 北京明兰网络科技有限公司 | Internet aided design (iAD) |
CN105335882A (en) * | 2015-10-27 | 2016-02-17 | 宁波英蓝网络科技有限公司 | Electronic transaction system and transaction method thereof |
CN105930973A (en) * | 2016-04-22 | 2016-09-07 | 广州硕品物联网科技有限公司 | BIM-based construction site griddization management system and control method thereof |
CN106055819A (en) * | 2016-06-13 | 2016-10-26 | 湖南鸿扬家网电子商务有限公司 | Architectural decoration configuration device and method based on computer |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109034550A (en) * | 2018-07-03 | 2018-12-18 | 广州供电局有限公司 | Project survey and construction field monitoring method, system and computer equipment |
CN108681840A (en) * | 2018-07-06 | 2018-10-19 | 北京地厚云图科技有限公司 | Constructing tunnel management method and storage medium |
CN109064139A (en) * | 2018-08-08 | 2018-12-21 | 深圳市弘景装饰工程有限公司 | A kind of building decoration engineering management system |
CN109190947A (en) * | 2018-08-20 | 2019-01-11 | 深圳供电局有限公司 | A kind of traffic control evaluation system |
CN109242319A (en) * | 2018-09-15 | 2019-01-18 | 广东麟辉建设工程有限公司 | A kind of intelligence finishing management system |
CN109376430A (en) * | 2018-10-23 | 2019-02-22 | 河北省建筑材料工业设计研究院 | Assembled architecture execution management method therefor |
CN110197319A (en) * | 2019-03-14 | 2019-09-03 | 杭州恋家网络科技有限公司 | A kind of fitting-out work managing and control system based on big data model |
CN109902974A (en) * | 2019-04-11 | 2019-06-18 | 北京拓疆者智能科技有限公司 | A kind of generation method and device of arrangement and method for construction |
CN111091345A (en) * | 2019-11-18 | 2020-05-01 | 深圳市彬讯科技有限公司 | Decoration scheduling method and device, computer equipment and storage medium |
CN112862511A (en) * | 2019-11-28 | 2021-05-28 | 贝壳技术有限公司 | Engineering cost calculation method and system |
CN112101801A (en) * | 2020-09-21 | 2020-12-18 | 三门核电有限公司 | Construction quality unified supervision method and system based on Internet of things technology |
CN113190901A (en) * | 2021-04-29 | 2021-07-30 | 武汉艺豆装饰设计工程有限公司 | Intelligent visual indoor decoration engineering on-line design management system for green building |
CN117440023A (en) * | 2023-12-19 | 2024-01-23 | 南京昊天路桥工程有限公司 | Roadbed project construction data processing method and system |
CN117440023B (en) * | 2023-12-19 | 2024-02-23 | 南京昊天路桥工程有限公司 | Roadbed project construction data processing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107886287A (en) | A kind of decoration construction work Self management system and its control method | |
CN101388904B (en) | GIS service aggregating method, device and system | |
CN110599007A (en) | Project progress management system | |
CN104572444A (en) | Cloud testing platform for game performance and testing method for cloud testing platform | |
CN108492034B (en) | Oil field oil recovery production management system | |
CN113258669B (en) | Networked intelligent scheduling method and terminal based on distribution network maintenance | |
CN104636868A (en) | Application management system for nuclear power station equipment maintenance information and application method thereof | |
CN104751305A (en) | Trouble analysis and repair-based intelligent interaction system and control method thereof | |
CN104468778A (en) | Cloud manufacturing execution system and method based on cloud services | |
CN108520361A (en) | Process task management method, device and computer readable storage medium | |
CN106295993A (en) | Curtain wall GRC Three-dimensional Visualization Management System based on wechat platform and using method thereof | |
CN107784429A (en) | construction quality management platform based on intelligent terminal data collection | |
CN107748902A (en) | A kind of method for matching somebody with somebody insertion data acquisition based on scene battalion | |
CN107071013A (en) | A kind of the service response method and service system of intelligent substation access regulation and control main website | |
CN109302459B (en) | Service compiling device and method of service-oriented intelligent power grid dispatching control system | |
CN109978380A (en) | A kind of workflow processing method and device | |
CN109118087A (en) | Power Material based on electronic order mode is prefabricated and allocator | |
CN109886576B (en) | Digital delivery task management method, device and storage medium | |
CN108153621B (en) | Cloud disaster backup emergency switching management system | |
CN110290177A (en) | A kind of cloud service system towards power scheduling | |
CN110007901A (en) | A kind of development system collecting regimental wind-powered electricity generation monitor supervision platform and its operation method and development approach | |
CN115719207A (en) | Super-automation platform system | |
CN114327392A (en) | Data processing method and device and electronic equipment | |
CN103164776A (en) | Medicine tracing system, medicine tracing method and process monitoring method | |
CN111652466B (en) | Table box repairing application method based on work order management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |