CN110991845B - 一种电-热耦合系统分布式协同调度方法 - Google Patents

一种电-热耦合系统分布式协同调度方法 Download PDF

Info

Publication number
CN110991845B
CN110991845B CN201911164688.6A CN201911164688A CN110991845B CN 110991845 B CN110991845 B CN 110991845B CN 201911164688 A CN201911164688 A CN 201911164688A CN 110991845 B CN110991845 B CN 110991845B
Authority
CN
China
Prior art keywords
period
liquid crystal
display device
crystal display
chp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911164688.6A
Other languages
English (en)
Other versions
CN110991845A (zh
Inventor
白保华
孙宏斌
范滢
郭庆来
王康
王彬
卜令习
薛屹洵
潘昭光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
State Grid Corp of China SGCC
State Grid Energy Conservation Service Co Ltd
Original Assignee
Tsinghua University
State Grid Corp of China SGCC
State Grid Energy Conservation Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University, State Grid Corp of China SGCC, State Grid Energy Conservation Service Co Ltd filed Critical Tsinghua University
Priority to CN201911164688.6A priority Critical patent/CN110991845B/zh
Publication of CN110991845A publication Critical patent/CN110991845A/zh
Application granted granted Critical
Publication of CN110991845B publication Critical patent/CN110991845B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明提出一种电‑热耦合系统分布式协同调度方法,属于含多种能源形式的电网运行和控制技术领域。本方法考虑电‑热系统的紧密耦合与相互影响,实现了电力系统与区域供热系统的分布式协同调度。相比于孤立的考虑电、热系统的经济性进行优化调度分析,不仅实现了电、热系统的协同优化,而且考虑到电力系统与区域供热系统隶属于不同主体,仅需要交互CHP发电功率和边界节点电价即可实现全局最优。该方法可以实际应用于电‑热耦合多能流系统的调度计划制定,适配于原本的电力系统与区域供热系统能量管理系统,有利于减少运行成本,同时提高电‑热耦合多能流系统的用能效率。

Description

一种电-热耦合系统分布式协同调度方法
技术领域
本发明涉及一种电-热耦合系统分布式协同调度方法,属于含多种能源形式的电网运行和控制技术领域。
背景技术
能源是人类赖以生存的物质基础,随着全球变暖,气候变换以及化石能源逐渐走向枯竭,发展风电、光伏等可再生能源成为人类社会的共识。截止2016年底,全球累计风电装机达到486.7GW,累计年增长率超过10%,光伏装机也达到300GW。
然而,由于可再生能源的不确定性与波动性,弃风、弃光问题也逐渐凸显。以中国为例,2015年中国平均弃风率超过15%,宁夏、甘肃等西北省份的弃光率高达30%。为促进可再生能源的持续发展,电力系统迫切需要更多的灵活性资源。传统电力系统的灵活性资源主要包括快速启停机组,潮流调节,电储能等。随着热电联产装置(CHP)的广泛应用及相关示范园区的建设,电-热耦合系统被视为消纳可再生能源的重要途径,相关研究也证明了其可以有效提高能源系统效率、促进可再生能源消纳。
相比于传统电力系统,区域供热系统的加入带来了新的灵活性。一方面,供热系统可以通过建设电锅炉,热泵等,消耗电能以供热,但这种方式需要额外投资;另一方面,不同与电力系统,热力过程较为缓慢,热能从生产到用户侧往往需要多个调度周期。因此,可以利用管道的储热效应以促进可再生能源的消纳。
目前,电力系统(EPS)与区域供热系统(DHS)分别独立运行调度。DHS首先计算供热区域在未来调度时段内的热力需求,根据这一需求结合CHP装置的特性采取“以热定电”的方式确定其电出力,最后在已知DHS上网电量的前提下EPS可制定其调度策略。然而,这一运行方式并不能充分利用DHS能源转换及管道储热的灵活性,不利于可再生能源的消纳。因此,有必要考虑管道的热储效应进行电-热耦合系统协同调度(CHPD)。
然而,目前大多数方法仅能实现集中式的电-热耦合系统协同,这在工程实践中会造成巨大困难。一方面,由于EPS和DHS分别隶属于不同公司,由独立的调度中心进行调度。因此,要交互两者的详细拓扑和运行状态并不实际。另一方面,DHS和EPS在能流类型、数值条件上完全不同,难以进行集中控制。因此,需要一种电-热耦合系统的分布式协同调度方法,实现DHS和EPS的分布式协同。
发明内容
本发明的目的是为填补已有技术的空白之处,提出提出一种电-热耦合系统分布式协同调度方法。本发明可实现DHS和EPS的分布式协同,保证电-热耦合多能流系统的高效运行。
本发明提出一种电-热耦合系统分布式协同调度方法,其特征在于,该方法包括以下步骤:
(1)建立电力系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(1-1)建立电力系统调度模型的目标函数:
Figure GDA0004202091580000021
其中,
Figure GDA0004202091580000022
Figure GDA0004202091580000023
其中,
Figure GDA0004202091580000024
为第i台非CHP发电机组在t时段的发电成本,/>
Figure GDA0004202091580000025
为第i台风电机组在t时段的发电成本,b0,i、b1,i、b2,i分别为第i台非CHP发电机组的成本常数项系数,一次项系数和二次项系数,σi为第i台风电机组的成本系数;
(1-2)确定电力系统调度模型的约束条件;包括:
(1-2-1)电力系统中的直流潮流方程约束,表达式如下:
Figure GDA0004202091580000026
Figure GDA0004202091580000027
其中,κTU表示非CHP发电机组集合,κCHP表示热电联产机组CHP集合,κWD表示风电机组集合,κbus为电力系统节点集合,κline为电力系统线路集合,T为调度时段集合,
Figure GDA0004202091580000028
为与节点n连接的非CHP发电机组集合,/>
Figure GDA0004202091580000029
为与节点n连接的CHP机组集合,/>
Figure GDA00042020915800000210
为与节点n连接的风电机组集合,/>
Figure GDA00042020915800000211
表示第i台非CHP发电机组在t时段的电出力,/>
Figure GDA00042020915800000212
表示第i台CHP机组在t时段的有功功率,/>
Figure GDA00042020915800000213
表示第i台风电机组在t时段的电出力,Dn,t为t时段电网节点n的负荷;SFl,n为电网节点n在线路l的转移因子,Fl为线路l的功率上限;
(1-2-2)电力系统中非CHP发电机组有功功率约束;
Figure GDA0004202091580000031
其中,
Figure GDA0004202091580000032
为第i台非CHP发电机组的有功功率下限,/>
Figure GDA0004202091580000033
为第i台非CHP发电机组的有功功率上限;
(1-2-3)风电机组有功功率约束;
电力系统中t时段第i台风电机组的有功功率不超过风电的预测功率上限
Figure GDA0004202091580000034
Figure GDA0004202091580000035
(1-2-4)电力系统中非CHP发电机组有功功率的爬坡约束:
Figure GDA0004202091580000036
其中,
Figure GDA0004202091580000037
和/>
Figure GDA0004202091580000038
分别为第i台非CHP发电机组有功功率的向上爬坡速率和向下爬坡速率,Δt为相邻两个调度时段的时间间隔,/>
Figure GDA0004202091580000039
和/>
Figure GDA00042020915800000310
分别为第i台非CHP发电机组在t+1时段的有功功率和t时段的有功功率;
(2)建立区域供热系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(2-1)建立区域供热系统调度模型的目标函数:
Figure GDA00042020915800000311
其中,
Figure GDA00042020915800000312
为第i台CHP机组在t时段的运行成本,a0,i、a1,i、a2,i、a3,i、a5,i为第i台CHP机组的成本系数;
(2-2)确定区域供热系统调度模型的约束条件;包括:
(2-2-1)区域供热系统中热电联产机组的运行特性方程约束:
Figure GDA00042020915800000313
Figure GDA00042020915800000314
其中,
Figure GDA00042020915800000315
为第i台CHP机组在t时段的有功功率,/>
Figure GDA00042020915800000316
为第i台CHP机组在t时段的热功率,Pi k为第i台CHP机组运行可行域近似多边形的第k个顶点的横坐标,/>
Figure GDA00042020915800000317
为第i台CHP机组运行可行域近似多边形的第k个顶点的纵坐标,/>
Figure GDA0004202091580000041
为第i台CHP机组在t时段的组合系数,NKi为第i台CHP机组的运行可行域近似多边形的顶点个数;
(2-2-2)区域供热系统中CHP机组的有功功率约束;
Figure GDA0004202091580000042
其中,
Figure GDA0004202091580000043
为第i台CHP机组的有功功率安全运行的下限,/>
Figure GDA0004202091580000044
为第i台CHP机组的有功功率安全运行的上限;
(2-2-3)区域供热系统中热源的热交换方程约束:
Figure GDA0004202091580000045
其中,c为水的比热容,
Figure GDA0004202091580000046
为区域供热系统中流经热网节点n的流量,上标DHS表示区域供热系统,/>
Figure GDA0004202091580000047
为区域供热系统中供水网t时段在热网节点n处的温度,/>
Figure GDA0004202091580000048
为区域供热系统中回水网t时段在热网节点n处的温度,NdHS为区域供热系统中连接热源的节点集合;
(2-2-4)区域供热系统中热源供水温度约束;
Figure GDA0004202091580000049
其中,
Figure GDA00042020915800000410
为热网安全运行热源供水温度下限,/>
Figure GDA00042020915800000411
为热网安全运行热源供水温度上限;
(2-2-5)区域供热系统中热网多管道汇合点的温度方程约束:
Figure GDA00042020915800000412
Figure GDA00042020915800000413
其中,
Figure GDA00042020915800000414
分别为汇入热网节点i的管道集合,/>
Figure GDA00042020915800000415
为自节点i流出的管道集合,/>
Figure GDA00042020915800000416
为供水管道b在t时段流出管道的水的温度,/>
Figure GDA00042020915800000417
为回水管道b在t时段流出管道的水的温度,/>
Figure GDA00042020915800000418
为供水网t时段在多管道汇合点i的水的温度,/>
Figure GDA00042020915800000419
为回水网t时段在多管道汇合点i的水的温度,/>
Figure GDA00042020915800000420
为供水管道b流入多管道汇合点的流量,/>
Figure GDA00042020915800000421
为回水管道b流入多管道汇合点的流量,κnd为区域供热系统中热网节点集合;
(2-2-6)区域供热系统中热网温度关联方程约束:
Figure GDA0004202091580000051
Figure GDA0004202091580000052
其中,
Figure GDA0004202091580000053
为供水管道b在t时段流入管道的水的温度,/>
Figure GDA0004202091580000054
为回水管道b在t时段流入管道的水的温度;
(2-2-7)忽略管道热量损失的区域供热系统中热网温度动态方程约束:
Figure GDA0004202091580000055
Figure GDA0004202091580000056
其中,
Figure GDA0004202091580000057
为热网中供水管道b忽略管道热量损失后在t时段流出管道的水的温度,/>
Figure GDA0004202091580000058
为热网中回水管道b忽略管道热量损失后在t时段流出管道的水的温度,κpipe为热网中管道集合,/>
Figure GDA0004202091580000059
表示向上取整,/>
Figure GDA00042020915800000510
为热网中供水管道b进出口温度时延,/>
Figure GDA00042020915800000511
为热网中回水管道b进出口温度时延,满足/>
Figure GDA00042020915800000512
ρ为水的密度,Ab为管道b的截面积,Lb为管道b的长度;/>
Figure GDA00042020915800000513
为供水管道b在第/>
Figure GDA00042020915800000514
个调度时段流入管道的水的温度,/>
Figure GDA00042020915800000515
为回水管道b在第/>
Figure GDA00042020915800000516
个调度时段流入管道的水的温度;
(2-2-8)区域供热系统中热网管道热量损失方程约束:
Figure GDA00042020915800000517
Figure GDA00042020915800000518
其中,
Figure GDA00042020915800000519
为t时段环境温度,λb为管道b单位长度的传热系数;
(2-2-9)区域供热系统中负荷的热交换方程约束:
Figure GDA00042020915800000520
其中,
Figure GDA00042020915800000521
为热负荷l在t时段的热功率需求,κLD为热负荷集合,/>
Figure GDA00042020915800000522
为与负荷l连接的热网节点集合;
(2-2-10)区域供热系统中热负荷回水温度约束;
Figure GDA00042020915800000523
其中,
Figure GDA0004202091580000061
为热网安全运行热负荷回水温度下限,/>
Figure GDA0004202091580000062
为热网安全运行热负荷回水温度上限;
(3)初始化迭代次数iter_no等于1,给定每台CHP机组对应的
Figure GDA0004202091580000063
作为迭代初值,并将/>
Figure GDA0004202091580000064
作为当前/>
Figure GDA0004202091580000065
(4)利用当前
Figure GDA0004202091580000066
采用内点法,对以步骤(1)建立的模型求解,得到该模型等式约束的拉格朗日乘子λE及不等式约束的拉格朗日乘子wE
(5)根据步骤(4)的结果,求取每一区域供热系统处的节点电价ξ,
Figure GDA0004202091580000067
其中,ABE和BBE分别为电力系统调度模型的等式约束系数矩阵及不等式约束系数矩阵,/>
Figure GDA0004202091580000068
表示矩阵转置;
(6)将步骤(5)节点电价ξ引入区域供热系统,更新的区域供热系统调度模型的目标函数:
Figure GDA0004202091580000069
(7)采用内点法,根据步骤(6)的目标函数和步骤(2)的约束条件,求解更新后的区域供热系统调度模型,得到更新后的的
Figure GDA00042020915800000610
作为当前/>
Figure GDA00042020915800000611
令迭代次数iter_no加1,将当前
Figure GDA00042020915800000612
作为新的/>
Figure GDA00042020915800000613
(8)对
Figure GDA00042020915800000614
进行判定:
若满足
Figure GDA00042020915800000615
其中ε为收敛阈值,则迭代收敛,
Figure GDA00042020915800000616
即为电-热耦合系统最优协同调度方案;若不满足,则重新返回步骤(4)。
本发明提出的一种电-热耦合系统分布式协同调度方法,其特点和有益效果是:
本方法考虑电-热系统的紧密耦合与相互影响,实现了电力系统与区域供热系统的分布式协同经济调度。相比于孤立的考虑电、热系统的经济性进行优化调度分析,不仅实现了电、热系统的协同优化,而且考虑到电力系统与区域供热系统隶属于不同主体,仅需要交互CHP发电功率和边界节点电价即可实现全局最优。该方法可以实际应用于电-热耦合多能流系统的调度计划制定,适配于原本的电力系统与区域供热系统能量管理系统,有利于减少运行成本,同时提高电-热耦合多能流系统的用能效率。
具体实施方式
本发明提出一种电-热耦合系统分布式协同调度方法,下面结合具体实施例对本发明进一步详细说明如下。
本发明提出一种电-热耦合系统分布式协同调度方法,包括以下步骤:
(1)建立电力系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(1-1)以运行成本成本最低(即非CHP发电机组发电成本
Figure GDA0004202091580000071
和风电机组发电成本
Figure GDA0004202091580000072
之和)为目标,建立电力系统调度模型的目标函数:
Figure GDA0004202091580000073
其中,
Figure GDA0004202091580000074
Figure GDA0004202091580000075
其中,
Figure GDA0004202091580000076
为第i台非CHP发电机组在t时段的发电成本,/>
Figure GDA0004202091580000077
为第i台风电机组在t时段的发电成本(实质为弃风成本),b0,i、b1,i、b2,i分别为第i台非CHP发电机组的成本常数项系数,一次项系数和二次项系数,可从非CHP发电机组的出厂说明书中获得,σi为第i台风电机组的成本系数(罚成本因子),可从电力市场规定价格中获得;
(1-2)确定电力系统调度模型的约束条件;
设定电力系统稳态安全运行的等式和不等式约束条件,包括:
(1-2-1)电力系统中的直流潮流方程约束,表达式如下:
Figure GDA0004202091580000078
Figure GDA0004202091580000079
其中,κTU、κCHP和κWD分别表示非CHP发电机组集合、热电联产机组(CHP)集合和风电机组集合,κbus、κline分别为电力系统节点集合、线路集合,T为调度时段集合,
Figure GDA00042020915800000710
分别为与节点n连接的非CHP发电机组集合、热电联产机组(CHP)集合和风电机组集合,/>
Figure GDA00042020915800000711
表示第i台非CHP发电机组在t时段的电出力,/>
Figure GDA00042020915800000712
表示第i台CHP机组在t时段的有功功率,
Figure GDA00042020915800000713
表示第i台风电机组在t时段的电出力,Dn,t为t时段电网节点n的负荷;SFl,n为电网节点n在线路l的转移因子,Fl为线路l的功率上限,SFl,n、Fl可从从电力系统的能量管理系统中获取;
(1-2-2)电力系统中非CHP发电机组有功功率约束;
电力系统中第i台非CHP发电机组的有功功率在设定的电网安全运行上、下限值之间:
Figure GDA0004202091580000081
其中,
Figure GDA0004202091580000082
为第i台非CHP发电机组的有功功率下限,/>
Figure GDA0004202091580000083
为第i台非CHP发电机组的有功功率上限;
(1-2-3)风电机组有功功率约束;
电力系统中t时段第i台风电机组的有功功率不超过风电的预测功率上限
Figure GDA0004202091580000084
从风电预测模块获得:
Figure GDA0004202091580000085
(1-2-4)电力系统中非CHP发电机组有功功率的爬坡约束:
Figure GDA0004202091580000086
其中,
Figure GDA0004202091580000087
和/>
Figure GDA0004202091580000088
分别为第i台非CHP发电机组有功功率的向上爬坡速率和向下爬坡速率,/>
Figure GDA0004202091580000089
和/>
Figure GDA00042020915800000810
从非CHP发电机组的出厂说明书中获得,Δt为相邻两个调度时段的时间间隔,/>
Figure GDA00042020915800000811
和/>
Figure GDA00042020915800000812
分别为第i台非CHP发电机组在t+1时段的有功功率和t时段的有功功率;
(2)建立区域供热系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(2-1)以运行成本成本最低(即CHP发电机组运行成本最低)为目标,建立区域供热系统调度模型的目标函数:
Figure GDA00042020915800000813
其中,
Figure GDA00042020915800000814
为第i台CHP机组在t时段的运行成本,a0,i、a1,i、a2,i、a3,i、a5,i为第i台CHP机组的成本系数,可从该机组出厂说明书中获得;
(2-2)确定区域供热系统调度模型的约束条件;
设定区域供热系统安全运行的等式和不等式约束。考虑到区域供热系统的热惯性,在电力系统已达到稳态时,区域供热系统往往处于动态,因此考虑拟动态(稳态水力过程与动态热力过程)下的区域供热系统约束,包括:
(2-2-1)电力系统与区域供热系统的耦合元件—区域供热系统中热电联产机组(CHP)的运行特性方程约束:
Figure GDA0004202091580000091
Figure GDA0004202091580000092
其中,
Figure GDA0004202091580000093
为第i台CHP机组在t时段的有功功率,/>
Figure GDA0004202091580000094
为第i台CHP机组在t时段的热功率,Pi k为第i台CHP机组运行可行域近似多边形的第k个顶点的横坐标,/>
Figure GDA0004202091580000095
为第i台CHP机组运行可行域近似多边形的第k个顶点的纵坐标,/>
Figure GDA0004202091580000096
为第i台CHP机组在t时段的组合系数,NKi为第i台CHP机组的运行可行域近似多边形的顶点个数,CHP机组运行可行域近似多边形从CHP机组的出厂说明书中获取;
(2-2-2)区域供热系统中CHP机组的有功功率约束;
t时段区域供热系统中第i台CHP机组的有功功率在设定的安全运行上、下限值之间:
Figure GDA0004202091580000097
其中,
Figure GDA0004202091580000098
为第i台CHP机组的有功功率安全运行的下限,/>
Figure GDA0004202091580000099
为第i台CHP机组的有功功率安全运行的上限;
(2-2-3)区域供热系统中热源的热交换方程约束:
Figure GDA00042020915800000910
其中,c为水的比热容,比热容的取值为4182焦耳/(千克·摄氏度),
Figure GDA00042020915800000911
为区域供热系统中流经热网节点n的流量,上标DHS表示区域供热系统,/>
Figure GDA00042020915800000912
分别为区域供热系统中供水网、回水网t时段在热网节点n处的温度,NdHS为区域供热系统中连接热源的节点集合;
(2-2-4)区域供热系统中热源供水温度约束;
t时段区域供热系统中热源供水温度在设定的热网安全运行热源供水温度上下限之间:
Figure GDA00042020915800000913
其中,
Figure GDA00042020915800000914
为热网安全运行热源供水温度下限,/>
Figure GDA00042020915800000915
为热网安全运行热源供水温度上限;
(2-2-5)区域供热系统中热网多管道汇合点的温度方程约束:
Figure GDA0004202091580000101
Figure GDA0004202091580000102
其中,
Figure GDA0004202091580000103
分别为汇入热网节点i的管道集合和自节点i流出的管道集合,/>
Figure GDA0004202091580000104
Figure GDA0004202091580000105
分别为供水管道b、回水管道b在t时段流出管道(即流入多管道汇合点)的水的温度,
Figure GDA0004202091580000106
分别为供水网和回水网t时段在多管道汇合点i的水的温度,/>
Figure GDA0004202091580000107
分别为供水管道b、回水管道b流入多管道汇合点的流量,κnd为区域供热系统中热网节点集合;
(2-2-6)区域供热系统中热网温度关联方程约束:
Figure GDA0004202091580000108
Figure GDA0004202091580000109
其中,
Figure GDA00042020915800001010
分别为供水管道b、回水管道b在t时段流入管道的水的温度;
(2-2-7)忽略管道热量损失的区域供热系统中热网温度动态方程约束:
Figure GDA00042020915800001011
Figure GDA00042020915800001012
其中,
Figure GDA00042020915800001013
为热网中供水管道b、回水管道b忽略管道热量损失后在t时段流出管道的水的温度,κpipe为热网中管道集合,/>
Figure GDA00042020915800001014
表示向上取整,/>
Figure GDA00042020915800001015
分别为热网中供水管道b、回水管道b进出口温度时延,满足/>
Figure GDA00042020915800001016
(ρ为水的密度,取值为1000kg/m3,Ab为管道b的截面积,Lb为管道b的长度,Ab、Lb可经测量获得);/>
Figure GDA00042020915800001017
为供水管道b在第/>
Figure GDA00042020915800001018
个调度时段流入管道的水的温度,/>
Figure GDA00042020915800001019
为回水管道b在第
Figure GDA00042020915800001020
个调度时段流入管道的水的温度;
(2-2-8)在(2-2-7)基础上进一步考虑热网管道热量损失,区域供热系统中热网管道热量损失方程约束:
Figure GDA00042020915800001021
Figure GDA0004202091580000111
其中,
Figure GDA0004202091580000112
为t时段环境温度,λb为管道b单位长度的传热系数,λb从电-热耦合多能流系统的能量管理系统中获取;
(2-2-9)区域供热系统中负荷的热交换方程约束:
Figure GDA0004202091580000113
其中,
Figure GDA0004202091580000114
为热负荷l在t时段的热功率需求,κLD为热负荷集合,Ndl LD为与负荷l连接的热网节点集合;
(2-2-10)区域供热系统中热负荷回水温度约束;
区域供热系统中热负荷回水温度在设定的热网安全运行热负荷回水温度上下限之间:
Figure GDA0004202091580000115
其中,
Figure GDA0004202091580000116
为热网安全运行热负荷回水温度下限,/>
Figure GDA0004202091580000117
为热网安全运行热负荷回水温度上限;
(3)初始化迭代:
Figure GDA0004202091580000118
为电力系统调度与区域供热系统调度的耦合变量,为实现电力系统调度与区域供热系统调度的解耦计算,首先初始化耦合变量/>
Figure GDA0004202091580000119
初始化迭代次数iter_no等于1,根据电力系统能量管理系统历史数据给定每台CHP机组对应的
Figure GDA00042020915800001110
作为迭代初值,并将/>
Figure GDA00042020915800001111
作为当前/>
Figure GDA00042020915800001112
(4)利用当前
Figure GDA00042020915800001113
采用内点法,对以步骤(1)建立的模型求解,,得到该模型等式约束的拉格朗日乘子λE及不等式约束的拉格朗日乘子wE
(5)根据步骤(4)的结果,求取每一区域供热系统处的节点电价ξ,
Figure GDA00042020915800001114
其中,ABE和BBE分别为电力系统调度模型的等式约束系数矩阵及不等式约束系数矩阵,/>
Figure GDA00042020915800001115
表示矩阵转置。
(6)将步骤(5)节点电价ξ引入区域供热系统,更新的区域供热系统调度模型的目标函数:
Figure GDA00042020915800001116
(7)采用内点法,根据步骤(6)更新后的目标函数和步骤(2)的约束条件,求解更新后的区域供热系统调度模型,得到更新后的
Figure GDA0004202091580000121
作为当前/>
Figure GDA0004202091580000122
更新迭代次数,令迭代次数iter_no加1,将当前/>
Figure GDA0004202091580000123
作为新的/>
Figure GDA0004202091580000124
(8)判断收敛性:检查
Figure GDA0004202091580000125
是否满足,其中ε为收敛阈值,可设置为0.001或更小。若满足,则算法收敛,/>
Figure GDA0004202091580000126
即为电-热耦合系统最优协同调度方案;若不满足,则重新返回步骤(4)。/>

Claims (1)

1.一种电-热耦合系统分布式协同调度方法,其特征在于,该方法包括以下步骤:
(1)建立电力系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(1-1)建立电力系统调度模型的目标函数:
Figure FDA0004202091570000011
其中,
Figure FDA0004202091570000012
Figure FDA0004202091570000013
其中,
Figure FDA0004202091570000014
为第i台非CHP发电机组在t时段的发电成本,/>
Figure FDA0004202091570000015
为第i台风电机组在t时段的发电成本,b0,i、b1,i、b2,i分别为第i台非CHP发电机组的成本常数项系数,一次项系数和二次项系数,σi为第i台风电机组的成本系数;
(1-2)确定电力系统调度模型的约束条件;包括:
(1-2-1)电力系统中的直流潮流方程约束,表达式如下:
Figure FDA0004202091570000016
Figure FDA0004202091570000017
其中,κTU表示非CHP发电机组集合,κCHP表示热电联产机组CHP集合,κWD表示风电机组集合,κbus为电力系统节点集合,κline为电力系统线路集合,T为调度时段集合,
Figure FDA0004202091570000018
为与节点n连接的非CHP发电机组集合,/>
Figure FDA0004202091570000019
为与节点n连接的CHP机组集合,/>
Figure FDA00042020915700000110
为与节点n连接的风电机组集合,/>
Figure FDA00042020915700000111
表示第i台非CHP发电机组在t时段的电出力,/>
Figure FDA00042020915700000112
表示第i台CHP机组在t时段的有功功率,/>
Figure FDA00042020915700000113
表示第i台风电机组在t时段的电出力,Dn,t为t时段电网节点n的负荷;SFl,n为电网节点n在线路l的转移因子,Fl为线路l的功率上限;
(1-2-2)电力系统中非CHP发电机组有功功率约束;
Figure FDA00042020915700000114
其中,
Figure FDA0004202091570000021
为第i台非CHP发电机组的有功功率下限,/>
Figure FDA0004202091570000022
为第i台非CHP发电机组的有功功率上限;
(1-2-3)风电机组有功功率约束;
电力系统中t时段第i台风电机组的有功功率不超过风电的预测功率上限
Figure FDA0004202091570000023
Figure FDA0004202091570000024
(1-2-4)电力系统中非CHP发电机组有功功率的爬坡约束:
Figure FDA0004202091570000025
其中,
Figure FDA0004202091570000026
和/>
Figure FDA0004202091570000027
分别为第i台非CHP发电机组有功功率的向上爬坡速率和向下爬坡速率,Δt为相邻两个调度时段的时间间隔,/>
Figure FDA0004202091570000028
和/>
Figure FDA0004202091570000029
分别为第i台非CHP发电机组在t+1时段的有功功率和t时段的有功功率;
(2)建立区域供热系统调度模型,该模型由目标函数和约束条件构成;具体如下:
(2-1)建立区域供热系统调度模型的目标函数:
Figure FDA00042020915700000210
其中,
Figure FDA00042020915700000211
为第i台CHP机组在t时段的运行成本,a0,i、a1,i、a2,i、a3,i、a5,i为第i台CHP机组的成本系数;
(2-2)确定区域供热系统调度模型的约束条件;包括:
(2-2-1)区域供热系统中热电联产机组的运行特性方程约束:
Figure FDA00042020915700000212
Figure FDA00042020915700000213
其中,
Figure FDA00042020915700000214
为第i台CHP机组在t时段的有功功率,/>
Figure FDA00042020915700000215
为第i台CHP机组在t时段的热功率,Pi k为第i台CHP机组运行可行域近似多边形的第k个顶点的横坐标,/>
Figure FDA00042020915700000216
为第i台CHP机组运行可行域近似多边形的第k个顶点的纵坐标,/>
Figure FDA00042020915700000217
为第i台CHP机组在t时段的组合系数,NKi为第i台CHP机组的运行可行域近似多边形的顶点个数;
(2-2-2)区域供热系统中CHP机组的有功功率约束;
Figure FDA00042020915700000218
其中,
Figure FDA00042020915700000219
为第i台CHP机组的有功功率安全运行的下限,/>
Figure FDA00042020915700000220
为第i台CHP机组的有功功率安全运行的上限;
(2-2-3)区域供热系统中热源的热交换方程约束:
Figure FDA0004202091570000031
其中,c为水的比热容,
Figure FDA0004202091570000032
为区域供热系统中流经热网节点n的流量,上标DHS表示区域供热系统,/>
Figure FDA0004202091570000033
为区域供热系统中供水网t时段在热网节点n处的温度,/>
Figure FDA0004202091570000034
为区域供热系统中回水网t时段在热网节点n处的温度,NdHS为区域供热系统中连接热源的节点集合;
(2-2-4)区域供热系统中热源供水温度约束;
Figure FDA0004202091570000035
其中,
Figure FDA0004202091570000036
为热网安全运行热源供水温度下限,/>
Figure FDA0004202091570000037
为热网安全运行热源供水温度上限;
(2-2-5)区域供热系统中热网多管道汇合点的温度方程约束:
Figure FDA0004202091570000038
Figure FDA0004202091570000039
其中,
Figure FDA00042020915700000310
分别为汇入热网节点i的管道集合,/>
Figure FDA00042020915700000311
为自节点i流出的管道集合,/>
Figure FDA00042020915700000312
为供水管道b在t时段流出管道的水的温度,/>
Figure FDA00042020915700000313
为回水管道b在t时段流出管道的水的温度,
Figure FDA00042020915700000314
为供水网t时段在多管道汇合点i的水的温度,/>
Figure FDA00042020915700000315
为回水网t时段在多管道汇合点i的水的温度,/>
Figure FDA00042020915700000316
为供水管道b流入多管道汇合点的流量,/>
Figure FDA00042020915700000317
为回水管道b流入多管道汇合点的流量,κnd为区域供热系统中热网节点集合;
(2-2-6)区域供热系统中热网温度关联方程约束:
Figure FDA00042020915700000318
Figure FDA00042020915700000319
其中,
Figure FDA00042020915700000320
为供水管道b在t时段流入管道的水的温度,/>
Figure FDA00042020915700000321
为回水管道b在t时段流入管道的水的温度;
(2-2-7)忽略管道热量损失的区域供热系统中热网温度动态方程约束:
Figure FDA0004202091570000041
Figure FDA0004202091570000042
其中,
Figure FDA0004202091570000043
为热网中供水管道b忽略管道热量损失后在t时段流出管道的水的温度,/>
Figure FDA0004202091570000044
为热网中回水管道b忽略管道热量损失后在t时段流出管道的水的温度,κpipe为热网中管道集合,/>
Figure FDA0004202091570000045
表示向上取整,/>
Figure FDA0004202091570000046
为热网中供水管道b进出口温度时延,/>
Figure FDA0004202091570000047
为热网中回水管道b进出口温度时延,满足/>
Figure FDA0004202091570000048
ρ为水的密度,Ab为管道b的截面积,Lb为管道b的长度;/>
Figure FDA0004202091570000049
为供水管道b在第/>
Figure FDA00042020915700000410
个调度时段流入管道的水的温度,/>
Figure FDA00042020915700000411
为回水管道b在第/>
Figure FDA00042020915700000412
个调度时段流入管道的水的温度;
(2-2-8)区域供热系统中热网管道热量损失方程约束:
Figure FDA00042020915700000413
Figure FDA00042020915700000414
其中,
Figure FDA00042020915700000415
为t时段环境温度,λb为管道b单位长度的传热系数;
(2-2-9)区域供热系统中负荷的热交换方程约束:
Figure FDA00042020915700000416
其中,
Figure FDA00042020915700000417
为热负荷l在t时段的热功率需求,κLD为热负荷集合,/>
Figure FDA00042020915700000418
为与负荷l连接的热网节点集合;
(2-2-10)区域供热系统中热负荷回水温度约束;
Figure FDA00042020915700000419
其中,
Figure FDA00042020915700000420
为热网安全运行热负荷回水温度下限,/>
Figure FDA00042020915700000421
为热网安全运行热负荷回水温度上限;
(3)初始化迭代次数iter_no等于1,给定每台CHP机组对应的
Figure FDA00042020915700000422
作为迭代初值,并将/>
Figure FDA00042020915700000423
作为当前/>
Figure FDA00042020915700000424
(4)利用当前
Figure FDA00042020915700000425
采用内点法,对以步骤(1)建立的模型求解,得到该模型等式约束的拉格朗日乘子λE及不等式约束的拉格朗日乘子wE
(5)根据步骤(4)的结果,求取每一区域供热系统处的节点电价ξ,
Figure FDA0004202091570000051
其中,ABE和BBE分别为电力系统调度模型的等式约束系数矩阵及不等式约束系数矩阵,/>
Figure FDA0004202091570000052
表示矩阵转置;
(6)将步骤(5)节点电价ξ引入区域供热系统,更新的区域供热系统调度模型的目标函数:
Figure FDA0004202091570000053
(7)采用内点法,根据步骤(6)的目标函数和步骤(2)的约束条件,求解更新后的区域供热系统调度模型,得到更新后的的
Figure FDA0004202091570000054
作为当前/>
Figure FDA0004202091570000055
令迭代次数iter_no加1,将当前/>
Figure FDA0004202091570000056
作为新的/>
Figure FDA0004202091570000057
(8)对
Figure FDA0004202091570000058
进行判定:
若满足
Figure FDA0004202091570000059
其中ε为收敛阈值,则迭代收敛,/>
Figure FDA00042020915700000510
即为电-热耦合系统最优协同调度方案;若不满足,则重新返回步骤(4)。
CN201911164688.6A 2019-11-25 2019-11-25 一种电-热耦合系统分布式协同调度方法 Active CN110991845B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911164688.6A CN110991845B (zh) 2019-11-25 2019-11-25 一种电-热耦合系统分布式协同调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911164688.6A CN110991845B (zh) 2019-11-25 2019-11-25 一种电-热耦合系统分布式协同调度方法

Publications (2)

Publication Number Publication Date
CN110991845A CN110991845A (zh) 2020-04-10
CN110991845B true CN110991845B (zh) 2023-06-23

Family

ID=70086333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911164688.6A Active CN110991845B (zh) 2019-11-25 2019-11-25 一种电-热耦合系统分布式协同调度方法

Country Status (1)

Country Link
CN (1) CN110991845B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111969588B (zh) * 2020-07-20 2022-11-04 国电南瑞科技股份有限公司 一种多能流系统最优能流的求解方法、存储介质及设备
CN115438847A (zh) * 2021-04-12 2022-12-06 三峡大学 随机电热耦合系统信息间隙鲁棒优化调度模型

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056251A (zh) * 2016-06-12 2016-10-26 清华大学 一种电‑热耦合多能流系统的优化调度方法
CN106339794A (zh) * 2016-08-16 2017-01-18 清华大学 一种电‑热耦合多能流网络节点能价计算方法
CN106815661A (zh) * 2017-02-22 2017-06-09 清华大学 一种热电联合系统的分解协调调度方法
CN106992555A (zh) * 2017-04-25 2017-07-28 国网吉林省电力有限公司 一种辅助服务市场环境下的热电联合系统分布式调度方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102506519B (zh) * 2011-10-23 2013-12-11 重庆市电力公司电力科学研究院 热电联产机组与风力发电联合供热系统及调度方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106056251A (zh) * 2016-06-12 2016-10-26 清华大学 一种电‑热耦合多能流系统的优化调度方法
CN106339794A (zh) * 2016-08-16 2017-01-18 清华大学 一种电‑热耦合多能流网络节点能价计算方法
CN106815661A (zh) * 2017-02-22 2017-06-09 清华大学 一种热电联合系统的分解协调调度方法
CN106992555A (zh) * 2017-04-25 2017-07-28 国网吉林省电力有限公司 一种辅助服务市场环境下的热电联合系统分布式调度方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓莉荣 等.面向能源互联网的热电联供系统节点能价研究.电网技术.2016,第40卷(第11期),全文. *

Also Published As

Publication number Publication date
CN110991845A (zh) 2020-04-10

Similar Documents

Publication Publication Date Title
CN108154309B (zh) 计及冷热电多负荷动态响应的能源互联网经济调度方法
CN110188492B (zh) 一种考虑热网特性的冷热电联供微网优化调度方法
CN105447599A (zh) 基于储热热电联产机组与电锅炉的弃风消纳协调调度模型
CN111324849B (zh) 一种考虑热网特性的电热联合系统优化调度方法
CN111324850B (zh) 一种考虑热网特性和热负荷可调度性的电热联合调度方法
CN110991845B (zh) 一种电-热耦合系统分布式协同调度方法
CN111400937B (zh) 一种综合能源系统潮流计算方法
CN113725915A (zh) 一种考虑可再生能源不确定性和热惰性的乡村电热综合能源系统运行优化方法
CN110620403A (zh) 计及可再生能源的能源系统协同运行日前调度方法及系统
CN106712033A (zh) 一种热电厂消纳弃风的方法
CN113792969A (zh) 考虑气网动态特性和电转气综合能源系统优化调度方法
CN110797917A (zh) 一种电热联合系统的调度模型
CN112785065A (zh) 基于混合人工鱼群算法的综合能源系统规划方法及系统
CN115860412A (zh) 一种电热耦合系统的协同规划方法及终端
CN112214883A (zh) 一种微能源网综合能源系统运行优化方法和系统
CN114387129B (zh) 考虑天然气管网的综合能源调度方法、装置、设备及介质
CN113761727B (zh) 一种含分布式电热泵的热电联合系统优化调度模型构建方法
CN113610305B (zh) 一种综合能源系统的优化调度方法
CN114757469A (zh) 考虑多能流设备的区域综合能源系统日前优化调度方法
CN114386256A (zh) 一种考虑电热设备灵活性约束及热网特性的区域电热系统优化调度方法
CN113794242A (zh) 一种计及天然气网动态特性的区间优化调度方法
Chen et al. A multi-energy microgrid modelling and optimization method based on exergy theory
CN112926835A (zh) 一种考虑热网动态特性的综合能源系统优化调度方法
Yu et al. A New Model of CCHP system with various new energy integration
CN113689043B (zh) 一种考虑机组启停的电热联合调度方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant