CN110977219A - 一种抽水蓄能座环装配焊接方法 - Google Patents
一种抽水蓄能座环装配焊接方法 Download PDFInfo
- Publication number
- CN110977219A CN110977219A CN201911279049.4A CN201911279049A CN110977219A CN 110977219 A CN110977219 A CN 110977219A CN 201911279049 A CN201911279049 A CN 201911279049A CN 110977219 A CN110977219 A CN 110977219A
- Authority
- CN
- China
- Prior art keywords
- welding
- ring
- assembling
- plate
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
本发明公开一种抽水蓄能座环装配焊接方法。根据抽水蓄能座环的结构特点,将环板与导叶部分、止堆环部分、下法兰部分分别叠装焊接,之后在完成舌板、过渡段、蜗壳装焊及止堆环、下法兰部分与座环的装焊。采用叠装的方式增加结构强度进而控制焊接变形;分装焊接完成后再完成总装,可显现部分焊接变形进而提高装配精度;环板与导叶采用立位焊接,用立焊或爬坡焊来取代横焊,可极大的提高焊接质量,缩短焊接周期。本发明能够促进产品质量得到极大的提升,装焊方法简明、制造周期短、成本低等优点。
Description
技术领域:
本发明涉及抽水蓄能领域,尤其涉及一种抽水蓄能座环装配焊接方法。
背景技术:
抽水蓄能电站是利用电力负荷低谷时的电能抽水至水库,在电力负荷高峰期在放水至下水库发电,它可将电网负荷低时的多余电能,转变为电网高峰时期的高价值电能;近年来,随着我国抽水蓄能技术的不断发展,装机容量越来也大,水头也也来越高;这使得蓄能座环产品结构发生变化,流道间距不断变小,给座环环板与导叶的焊接工作带来了很大的难度;以往采用横焊的方式,受操作空间及视线的影响,焊接质量较差,探伤UT效果不理想,返修量较大;止堆环部分结构刚性较差,逐一装配到座环上之后,焊接变形难以控制,且可操作空间狭小,焊接难度大;因此以往的座环装焊方法,已经不适应现阶段的抽水蓄能座环的制造。
发明内容
本发明是一种抽水蓄能座环装配焊接方法;根据抽水蓄能座环的结构特点,分3部分分别叠装焊接后,再整体装焊的方法,进而提高产品质量、缩短生产周期;本发明的技术方案为:
1)抽水蓄能座环为满足运输要求,以180°分为两瓣装配焊接;
2)环板与导叶装配:在平台上吊放下环板(1)调整平度不大于1mm,以下环板(1)外圆为基准,结合内圆及合缝面加工量确定圆心;划出X、Y轴线及固定导叶(2)定位线,并做好样冲标记,按定位线装配固定导叶(2)确保垂直度不大于1mm;吊装上环板(3),保证过流面装配高度+8~+10mm,同轴度不大于1mm;将两瓣座环叠装固定,并分别支撑径向、弦向拉筋;
3)环板与导叶立位焊接:焊接时采用两面错开焊接及清根,先在座环仰放时焊接导叶进水端一半长度的焊缝至1/2破口深;将座环翻身扣倒,焊接导叶出水端开始一半长度焊缝,同时将进水端开始一半长度坡口进行清根,充分打磨后进行pt探伤,然后焊接1/2坡口深度;将座环再次翻身仰放,对导叶出水边开始一半长度坡口进行清根、打磨及pt探伤,然后焊接2/3坡口深度;两面轮流交替施焊,直至将两面坡口焊满;UT探伤合格后,焊接角焊过渡;
4)止堆环分装焊接:在平台上吊放止堆环法兰板(4),调整平面度不大于3mm,确定圆心并打好合缝线样冲标记;根据图纸装配立圈(5)、加强版(6)及吊耳(7),然后搭焊固定;将2瓣分装好的止堆环叠装,并装焊径向、弦向拉筋;焊接完成后退火之后拆分备用;
5)下法兰与立圈筋板分装焊接:根据图纸将下法兰(8)、下围板(9)、筋板(10)、吊耳(11)分装,将2瓣分装好的下法兰部分叠装,并装焊径向、弦向拉筋;焊接完成后退火之后拆分备用;6)舌板、过渡段及蜗壳装焊:将焊接完成的环板与导叶平吊至支墩上,调整平度后生根牢固;确认圆心及十字中心线后,根据图纸画出舌板、过渡段(12)及蜗壳(13)的地样投影线,根据地样线先装配舌板及过渡段(12),焊接完成后再装配焊接蜗壳(13);7)止堆环及下法兰部分装焊:蜗壳焊接完成后,根据图纸分别吊装、焊接止堆环及下法兰部分。
技术效果:
本发明是一种抽水蓄能座环装配焊接方法。根据抽水蓄能座环的结构特点,将环板与导叶部分、止堆环部分、下法兰部分分别叠装焊接,之后完成舌板、过渡段、蜗壳装焊及止堆环、下法兰部分与座环的装焊。本发明的技术效果如下:
1)环板与导叶分装后,叠装焊接,可提高结构强度,减少焊接变形对过流面平面度的影响,可显著提升产品质量;
2)环板与导叶采用立位焊接,用立焊或爬坡焊来取代横焊,视线好、焊接可操作性强,可极大的提高焊接质量,减少返修成本、缩短生产周期;
3)止堆环分装焊接,解放了焊接操作空间狭小的束缚,提高了工作效率,分装焊接后结构强度的提高,也可更好的控制其与座环焊接时的焊接变形;
4)采用分装焊接完成后,再整体装配,可显现部分焊接变形,使得装配尺寸更加可控,可提高装配精度,进而提高产品质量;
5)环板与导叶、止堆环部分、下法兰部分分别叠装焊接,可同时操作,可极大的缩短直线生产周期.
附图说明:
图1是抽水蓄能座环结构示意图。
图2是抽水蓄能座环蜗壳示意图。
具体实施方式:
一种抽水蓄能座环装配焊接方法,包括如下步骤:
1)抽水蓄能座环为满足运输要求,以180°分为两瓣装配焊接;
2)环板与导叶装配(如图1):在平台上吊放下环板1调整平度不大于1mm,以下环板1外圆为基准,结合内圆及合缝面加工量确定圆心;划出X、Y轴线及固定导叶2定位线,并做好样冲标记,按定位线装配固定导叶2确保垂直度不大于1mm;吊装上环板3,保证过流面装配高度+8~+10mm,同轴度不大于1mm;将两瓣座环叠装固定,并分别支撑径向、弦向拉筋;
3)环板与导叶焊接:焊接时采用两面错开焊接及清根,先在座环仰放时焊接导叶进水端一半长度的焊缝至1/2破口深;将座环翻身扣倒,焊接导叶出水端开始一半长度焊缝,同时将进水端开始一半长度坡口进行清根,充分打磨后进行pt探伤,然后焊接1/2坡口深度;将座环再次翻身仰放,对导叶出水边开始一半长度坡口进行清根、打磨及pt探伤,然后焊接2/3坡口深度;两面轮流交替施焊,直至将两面坡口焊满;UT探伤合格后,焊接角焊过渡;
4)止堆环分装焊接(如图1):在平台上吊放止堆环法兰板4,调整平面度不大于3mm,确定圆心并打好合缝线样冲标记;根据图纸装配立圈5、加强版6及吊耳7,然后搭焊固定;将2瓣分装好的止堆环叠装,并装焊径向、弦向拉筋;焊接完成后退火之后拆分备用;
5)下法兰与立圈筋板分装焊接(如图1):根据图纸将下法兰8、下围板9、筋板10、吊耳11分装,将2瓣分装好的下法兰部分叠装,并装焊径向、弦向拉筋;焊接完成后退火之后拆分备用;
6)舌板、过渡段及蜗壳装焊(如图2):将焊接完成的环板与导叶平吊至支墩上,调整平度后生根牢固;确认圆心及十字中心线后,根据图纸画出舌板、过渡段12及蜗壳13的地样投影线,根据地样线先装配舌板、过渡段12,焊接完成后再装配焊接蜗壳13;
7)止堆环及下法兰部分装焊(如图1):蜗壳焊接完成后,根据图纸分别吊装、焊接止堆环及下法兰部分。
Claims (1)
1.一种抽水蓄能座环装配焊接方法,其特征是:包括如下步骤:
1)抽水蓄能座环为满足运输要求,以180°分为两瓣装配焊接;
2)环板与导叶装配:在平台上吊放下环板(1),调整平度不大于1mm,以下环板(1)外圆为基准,结合内圆及合缝面加工量确定圆心;划出X、Y轴线及固定导叶(2)定位线,并做好样冲标记,按定位线装配固定导叶(2)确保垂直度不大于1mm;吊装上环板(3),保证过流面装配高度+8~+10mm,同轴度不大于1mm;将两瓣座环叠装固定,并分别支撑径向、弦向拉筋;
3)环板与导叶立位焊接:焊接时采用两面错开焊接及清根,先在座环仰放时焊接导叶进水端一半长度的焊缝至1/2破口深;将座环翻身扣倒,焊接导叶出水端开始一半长度焊缝,同时将进水端开始一半长度坡口进行清根,充分打磨后进行pt探伤,然后焊接1/2坡口深度;将座环再次翻身仰放,对导叶出水边开始一半长度坡口进行清根、打磨及pt探伤,然后焊接2/3坡口深度;两面轮流交替施焊,直至将两面坡口焊满;UT探伤合格后,焊接角焊过渡;
4)止堆环分装焊接:在平台上吊放止堆环法兰板(4),调整平面度不大于3mm,确定圆心并打好合缝线样冲标记;根据图纸装配立圈(5)、加强版(6)及吊耳(7),然后搭焊固定;将2瓣分装好的止堆环叠装,并装焊径向、弦向拉筋;焊接完成退火之后拆分备用;
5)下法兰与立圈筋板分装焊接:根据图纸将下法兰(8)、下围板(9)、筋板(10)、吊耳(11)分装,将2瓣分装好的下法兰部分叠装,并装焊径向、弦向拉筋;焊接完成后退火之后拆分备用;
6)舌板、过渡段及蜗壳装焊:将焊接完成的环板与导叶平吊至支墩上,调整平度后生根牢固;确认圆心及十字中心线后,根据图纸画出舌板、过渡段(12)及蜗壳(13)的地样投影线,根据地样线先装配舌板及过渡段(12),焊接完成后再装配焊接蜗壳(13);
7)止堆环及下法兰部分装焊:蜗壳焊接完成后,根据图纸分别吊装、焊接止堆环及下法兰部分。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911279049.4A CN110977219A (zh) | 2019-12-13 | 2019-12-13 | 一种抽水蓄能座环装配焊接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911279049.4A CN110977219A (zh) | 2019-12-13 | 2019-12-13 | 一种抽水蓄能座环装配焊接方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110977219A true CN110977219A (zh) | 2020-04-10 |
Family
ID=70093034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911279049.4A Pending CN110977219A (zh) | 2019-12-13 | 2019-12-13 | 一种抽水蓄能座环装配焊接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110977219A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114473302A (zh) * | 2022-02-24 | 2022-05-13 | 浙江振兴阿祥集团有限公司 | 一种水轮机蜗壳座环的生产工艺 |
CN114473377A (zh) * | 2022-01-05 | 2022-05-13 | 东方电气集团东方电机有限公司 | 一种水轮机分瓣式蜗壳座环的制造方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002310053A (ja) * | 2001-04-10 | 2002-10-23 | Mitsubishi Heavy Ind Ltd | 水車のランナ及びその製造方法並びに水車 |
CN102363258A (zh) * | 2011-07-01 | 2012-02-29 | 哈尔滨电机厂有限责任公司 | 带有不锈钢固定导叶的水轮机座环装配焊接工艺方法 |
CN103658940A (zh) * | 2013-11-18 | 2014-03-26 | 哈尔滨电机厂有限责任公司 | 大型水轮机导叶的制造工艺 |
CN105057855A (zh) * | 2015-08-31 | 2015-11-18 | 哈尔滨电机厂有限责任公司 | 带有基础板单上环式大型分瓣座环装配焊接工艺方法 |
CN107243704A (zh) * | 2017-08-07 | 2017-10-13 | 哈尔滨电机厂有限责任公司 | 大型全焊接结构水轮机球阀的焊接制造工艺方法 |
-
2019
- 2019-12-13 CN CN201911279049.4A patent/CN110977219A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002310053A (ja) * | 2001-04-10 | 2002-10-23 | Mitsubishi Heavy Ind Ltd | 水車のランナ及びその製造方法並びに水車 |
CN102363258A (zh) * | 2011-07-01 | 2012-02-29 | 哈尔滨电机厂有限责任公司 | 带有不锈钢固定导叶的水轮机座环装配焊接工艺方法 |
CN103658940A (zh) * | 2013-11-18 | 2014-03-26 | 哈尔滨电机厂有限责任公司 | 大型水轮机导叶的制造工艺 |
CN105057855A (zh) * | 2015-08-31 | 2015-11-18 | 哈尔滨电机厂有限责任公司 | 带有基础板单上环式大型分瓣座环装配焊接工艺方法 |
CN107243704A (zh) * | 2017-08-07 | 2017-10-13 | 哈尔滨电机厂有限责任公司 | 大型全焊接结构水轮机球阀的焊接制造工艺方法 |
Non-Patent Citations (1)
Title |
---|
李荣生等: "糯扎渡水轮机座环装焊工艺过程", 《科技创业家》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114473377A (zh) * | 2022-01-05 | 2022-05-13 | 东方电气集团东方电机有限公司 | 一种水轮机分瓣式蜗壳座环的制造方法 |
CN114473302A (zh) * | 2022-02-24 | 2022-05-13 | 浙江振兴阿祥集团有限公司 | 一种水轮机蜗壳座环的生产工艺 |
CN114473302B (zh) * | 2022-02-24 | 2024-01-30 | 浙江振兴阿祥集团有限公司 | 一种水轮机蜗壳座环的生产工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110977219A (zh) | 一种抽水蓄能座环装配焊接方法 | |
Hazel et al. | Field repair and construction of large hydropower equipment with a portable robot | |
CN110805528A (zh) | 一种叶轮式风机的吊装工艺 | |
CN103912435B (zh) | 一种小水电轴流式水轮机转轮 | |
CN114313144B (zh) | 一种大型集装箱船上建的升降过桥方法 | |
CN108103501B (zh) | 一种适用于水电站机组转轮室表面的激光熔覆和检测设备及操作方法 | |
CN113523721B (zh) | 三瓣式定子构件的制造方法及三瓣式定子构件 | |
CN104846174A (zh) | 一种圆柱形桩腿焊缝残余应力消除装置及方法 | |
CN112318015A (zh) | 特大型水环真空泵叶轮机器人焊接的工艺方法及实现设备 | |
WO2020234585A1 (en) | A type of submerged tidal generating platform and energy storage generating system | |
CN204783141U (zh) | 中低压合缸用的隔板 | |
CN109018196B (zh) | 一种自升式平台与多艘船舶共同进坞维修的定位方法 | |
CN114102052B (zh) | 一种水轮机转轮装焊三角块的方法 | |
CN203783826U (zh) | 一种新型的风力发电预制混凝土塔架构件的横缝结构 | |
CN104422125B (zh) | 苯加氢工程有机热载体燃气加热炉安装方法 | |
CN102360783A (zh) | 电流互感器铁芯叠片结构 | |
CN102938302B (zh) | 铁心下轭拼片工艺 | |
CN204458519U (zh) | 一种改进型的立式长轴泵出水座 | |
CN105317054A (zh) | 一种带过渡段单桩风机基础结构及施工方法 | |
CN209583525U (zh) | 高空行车电机安装操作台 | |
CN205639058U (zh) | 一种核电站常规岛用小流量高扬程离心泵 | |
CN208712651U (zh) | 一种冲裁级进模具 | |
CN206814256U (zh) | 一种用于桩腿的吊装工装 | |
CN203875540U (zh) | 塔式起重机下支座定位工装 | |
CN204825951U (zh) | 一种带过渡段单桩风机基础结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |