CN110976053A - Garbage recycling machine for engineering construction - Google Patents
Garbage recycling machine for engineering construction Download PDFInfo
- Publication number
- CN110976053A CN110976053A CN201911352289.2A CN201911352289A CN110976053A CN 110976053 A CN110976053 A CN 110976053A CN 201911352289 A CN201911352289 A CN 201911352289A CN 110976053 A CN110976053 A CN 110976053A
- Authority
- CN
- China
- Prior art keywords
- stone
- base
- adaptor
- adapter
- conveying rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C21/00—Disintegrating plant with or without drying of the material
- B02C21/02—Transportable disintegrating plant
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/08—Separating or sorting of material, associated with crushing or disintegrating
- B02C23/10—Separating or sorting of material, associated with crushing or disintegrating with separator arranged in discharge path of crushing or disintegrating zone
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C2201/00—Codes relating to disintegrating devices adapted for specific materials
- B02C2201/06—Codes relating to disintegrating devices adapted for specific materials for garbage, waste or sewage
Landscapes
- Engineering & Computer Science (AREA)
- Food Science & Technology (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
The invention provides a garbage recycling machine for engineering construction, which comprises: conveying mechanism, breaker and flatbed. The conveying mechanism comprises a first adapter, a second adapter, a base, a stone conveying rail, a sediment conveying rail, a first vibrator and a second vibrator. The first adapter is rotationally connected with the second adapter, and the second adapter is rotationally connected with the base. The crusher is communicated with the first adapter, and the first adapter is communicated with the second adapter. A screening net is arranged in the first transfer piece. The stone conveying rail is movably connected with the first adaptor, and the silt conveying rail is movably connected with the second adaptor. The first straight vibration device is connected with the stone conveying rail, and the second straight vibration device is connected with the sediment conveying rail. The locomotive includes wheelset and trailer, and the base sets up on the trailer. Above-mentioned machine is retrieved to rubbish for engineering building has realized the centralized processing to building rubbish to the completion is to the classification of stone and silt, and area is little, easy operation, and convenient to use has promoted work efficiency.
Description
Technical Field
The invention relates to the technical field of construction waste treatment devices, in particular to a waste recycling machine for engineering construction.
Background
The construction waste mainly refers to reinforced concrete blocks, bricks and tiles and other materials generated by removing houses and the like in the urban construction process, along with the acceleration of urban construction pace in China, the construction waste is more and more, most of the construction waste is not treated and directly buried or placed in the open, a large amount of cultivated land is occupied, resource waste is caused, and dust can be generated in the transportation and stacking processes to cause environmental pollution.
In order to solve the problems, the conventional treatment method for the construction waste is to classify the construction waste and sort out and recycle plastic, wood and iron materials. The rest concrete and brick and tile are crushed, screened and cleaned to be made into building aggregate and sand, and the building aggregate and sand can be used for making concrete or baking-free bricks and the like. The construction waste is scattered, and is treated after being transported and concentrated, dust is generated in the transportation process to cause environmental pollution, meanwhile, the cost of construction waste treatment is increased, and resource waste is caused.
However, the existing garbage recycling machines for engineering construction usually have two or more mobile construction garbage treatment devices to complete the whole process flow of construction garbage treatment, and the devices have large floor area and high manufacturing, transporting and using costs. In addition, although some of the garbage collection machines for construction have independent treatment capability, the garbage collection machines for construction need to be assembled in a complicated manner before use, and are inconvenient to use and have an adverse effect on work efficiency.
Disclosure of Invention
Therefore, it is necessary to provide a garbage recycling machine for engineering construction aiming at the technical problems of large occupied area and inconvenient use.
A garbage recycling machine for engineering construction comprises: conveying mechanism, crusher and flatbed; the conveying mechanism and the crusher are respectively arranged on the flat car; the conveying mechanism comprises a first adapter, a second adapter, a base, a stone conveying rail, a sediment conveying rail, a first vibrator and a second vibrator; the first adapter is rotationally connected with the second adapter, and the second adapter is rotationally connected with the base; the output end of the crusher is communicated with the input end of the first adaptor, and the first adaptor is communicated with the second adaptor; a stone outlet is formed in the side surface of the first adaptor, a sediment outlet is formed in the side surface of the second adaptor, the stone outlet is communicated with the sediment outlet, and a screening channel is formed between the stone outlet and the sediment outlet; a screening net is arranged in the first rotating piece and is positioned in the screening channel between the stone block outlet and the sediment outlet; the stone conveying rail is movably connected with the first adaptor at the stone outlet, and the sediment conveying rail is movably connected with the second adaptor at the sediment outlet; the stone conveying rail is provided with a first fixed rope, and the tail end of the first fixed rope is connected with the crusher; the silt conveying rail is provided with a second fixed rope, and the tail end of the second fixed rope is connected with the crusher; the first straight vibrator is connected with the stone conveying rail, and the second straight vibrator is connected with the sediment conveying rail; the flat car comprises a wheel set and a base, wherein the wheel set comprises four moving wheels, the four moving wheels are respectively and rotatably connected with the base, two moving wheels are arranged on one side of the base, and two moving wheels are arranged on the other side of the base; the base is arranged on the base; the first adapter piece and the second adapter piece are both of cylindrical structures, the first adapter piece is provided with a first annular sliding block, the second adapter piece is provided with a first annular sliding groove, and the first annular sliding block is inserted into the first annular sliding groove and is rotatably connected with the second adapter piece.
In one embodiment, the second adaptor is further provided with a second annular sliding block, the base is provided with a second annular sliding groove, and the second annular sliding block is inserted into the second annular sliding groove and is rotatably connected with the base.
In one embodiment, the second vibrator is located at an end of the stone transport rail distal from the second adaptor block.
In one embodiment, the conveyor mechanism further comprises a first hinge, and the stone block conveying rail is movably connected with the first transfer piece through the first hinge.
Above-mentioned garbage recovery machine for engineering building utilizes the relation of rotating the connection between first adaptor, second adaptor and the base, and the user can use the base to rotate as the centre of a circle respectively with stone transport rail and silt transport rail to leave from the flatbed. Through untieing first fixed rope and the fixed rope of second for stone transport rail and silt transport rail are transferred and are fallen to the ground. The construction waste to be treated enters from the input end of the crusher, and the crushed construction waste enters the first conversion piece. The broken construction waste is mainly divided into stone blocks and silt, the stone blocks are isolated by the screening net and move to the stone block conveying rail from the stone block outlet, and the stone blocks move along the stone block conveying rail under the vibration action of the first vibrator so as to be stacked in piles. And silt will pass the screening net, drop to the second and rotate the piece to from silt export to silt delivery rail motion, under the vibrations effect of second straight oscillator, silt moves along silt delivery rail, stacks in piles. This machine is retrieved to rubbish for engineering building has realized the centralized processing to building rubbish to the completion is to the classification of stone and silt, and area is little, easy operation, and convenient to use has promoted work efficiency.
Drawings
FIG. 1 is a schematic structural diagram of a waste recycling machine for engineering construction in one embodiment;
FIG. 2 is a schematic view of a disassembled structure of the garbage recycling machine for engineering construction in one embodiment;
FIG. 3 is another schematic structural diagram of the construction waste recycling machine in one embodiment;
fig. 4 is a partial structural schematic diagram of the garbage recycling machine for engineering construction in one embodiment.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
In the description of the present invention, it is to be understood that the terms "central," "longitudinal," "lateral," "length," "width," "thickness," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," "clockwise," "counterclockwise," "axial," "radial," "circumferential," and the like are used in the orientations and positional relationships indicated in the drawings for convenience in describing the invention and to simplify the description, and are not intended to indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and are not to be considered limiting of the invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
It will be understood that when an element is referred to as being "secured to" or "disposed on" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "upper," "lower," "left," "right," and the like as used herein are for illustrative purposes only and do not denote a unique embodiment.
Referring to fig. 1 to 4 together, the present invention provides a garbage recycling machine 10 for engineering construction, wherein the garbage recycling machine 10 for engineering construction comprises: conveying mechanism 100, crusher 200, and flat car 300. The conveying mechanism 100 and the crusher 200 are respectively provided on the flat car 300. The transport mechanism 100 includes a first adapter 110, a second adapter 120, a base 130, a stone transport rail 140, a silt transport rail 150, a first vibrator 160, and a second vibrator 170. The first adaptor 110 is rotatably connected to the second adaptor 120, and the second adaptor 120 is rotatably connected to the base 130. The output of the crusher 200 communicates with the input of the first adaptor 110, and the first adaptor 110 communicates with the second adaptor 120. Stone export 111 has been seted up to first adaptor 110's side, and stone export 111 and silt export 121 intercommunication have sieve material passageway 1211 between stone export 111 and the silt export 121, and silt export 121 has been seted up to the side of second adaptor 120. A screening net 112 is arranged in the first transition piece 110, and the screening net 112 is located in the screening passage 1211 between the stone outlet 111 and the sediment outlet 121. Stone transport rail 140 is movably connected to first adaptor 110 at stone outlet 111, and silt transport rail 150 is movably connected to second adaptor 120 at silt outlet 121. The stone transport rail 140 is provided with a first fixing rope 141, and the end of the first fixing rope 141 is connected with the crusher 200. The silt conveying rail 150 is provided with a second fixing rope 151, and the end of the second fixing rope 151 is connected with the crusher 200. A first vibrator 160 is connected to the stone conveyor rail 140 and a second vibrator 170 is connected to the silt conveyor rail 150. The flat car 300 comprises a wheel set 310 and a base 320, wherein the wheel set 310 comprises four moving wheels, the four moving wheels are respectively and rotatably connected with the base 320, two moving wheels are arranged on one side of the base 320, and two moving wheels are arranged on the other side of the base 320; the base is disposed on the base 320.
In the garbage collector 10 for engineering and construction, the user can rotate the stone conveying rail 140 and the sediment conveying rail 150 around the base 130 to leave from the trailer 320 by using the relationship of the rotational connection among the first adaptor 110, the second adaptor 120 and the base 130. Rock conveyor rail 140 and silt conveyor rail 150 are lowered to the ground by untying first securing cord 141 and second securing cord 151. The construction waste to be treated enters from the input end of the crusher 200, and the crushed construction waste enters the first adaptor 110. The crushed construction waste is mainly divided into stones and silt, the stones are separated by the sieving net 112 and move from the stone outlet 111 to the stone conveying rail 140, and the stones move along the stone conveying rail 140 under the vibration of the first vibrator 160 to be stacked. The silt will pass through the screening net 112, fall to the second rotating member, and move from the silt outlet 121 to the silt conveying rail 150, and under the vibration of the second vibrator 170, the silt moves along the silt conveying rail 150 to be stacked. This machine is retrieved to rubbish for engineering building has realized the centralized processing to building rubbish to the completion is to the classification of stone and silt, and area is little, easy operation, and convenient to use has promoted work efficiency.
The crusher 200 is used for crushing the construction waste. In this embodiment, the crusher 200 is a reaction crusher. In another embodiment, the crusher 200 is a heavy hammer crusher. In yet another embodiment, the crusher 200 is a jaw crusher. Since the crusher 200 is a mature product in the market, the structure and the working principle thereof can be referred to the prior art, and will not be described herein again. The construction waste processed by the crusher 200 can be divided into two types of stones with small sizes and fine silt, and the stones and the silt are screened and transported in the conveying mechanism 100. To facilitate the user's throwing of construction waste into the crusher 200, in one embodiment a feed hopper 210 is provided at the input end of the crusher 200. The feeding hopper 210 has a conical funnel-shaped structure, so that a user can operate an excavator to throw the construction waste into the feeding hopper 210, and the construction waste in the feeding hopper 210 falls into the crusher 200 to be crushed. Thus, the fault tolerance rate of user operation is improved by the arrangement of the feed hopper 210, and the convenience degree of putting is improved.
The conveyor 100 is used to screen and transport rocks and silt. The first transition piece 110 carries the output end of the crusher 200 and stones and silt will fall onto the screening mesh 112 in the first transition piece 110. Small-sized stones cannot pass through the sieving mesh 112 and will move from the stone outlet 111 towards the stone transport rail 140. And fine silt will pass through screening net 112 and enter second adaptor 120, and second adaptor 120 is used for accepting silt, and silt will move from silt export 121 to silt conveying rail 150. The base 130 is used to support the crusher 200, the first adaptor 110 and the second adaptor 120.
To facilitate movement of the stone towards the stone outlet 111, in one embodiment the screening mesh 112 is at a predetermined angle to the horizontal, the predetermined angle being towards the stone outlet 111. That is, the sieving net 112 is disposed obliquely, and the oblique direction of the sieving net 112 is toward the stone outlet 111. In this way, the movement of the stone towards the stone outlet 111 is facilitated. So, promoted the screening efficiency to stone and silt, reduced the screening time, promoted work efficiency.
The first adaptor 110, the second adaptor 120 and the base 130 are rotatably connected to each other, so that the first adaptor 110 and the second adaptor 120 can rotate. That is, the orientation of stone outlet 111 and silt outlet 121 can be rotationally adjusted to change the swing position of stone conveyor rail 140 and silt conveyor rail 150.
In order to facilitate the rotation connection relationship between the first adaptor 110 and the second adaptor 120, in one embodiment, the first adaptor 110 and the second adaptor 120 are both cylindrical structures, the first adaptor 110 is provided with a first annular sliding block 113, the second adaptor 120 is provided with a first annular sliding groove 122, and the first annular sliding block 113 is inserted into the first annular sliding groove 122 and is rotatably connected with the second adaptor 120. In this way, the first annular sliding block 113 slides and rotates on the first annular sliding groove 122, so as to realize the rotating connection between the first adaptor 110 and the second adaptor 120. Further, in one embodiment, the second adaptor 120 is further provided with a second annular sliding block 123, the base 130 is provided with a second annular sliding groove 131, and the second annular sliding block 123 is inserted into the second annular sliding groove 131 and is rotatably connected with the base 130. Thus, the second annular slider 123 slides and rotates on the second annular sliding groove 131, so as to realize the rotational connection between the second adaptor 120 and the base 130. Therefore, the smoothness of the rotational connection among the first adaptor 110, the second adaptor 120 and the base 130 is improved.
The stone transport rails 140 are used to transport stones. When the first rotating member 110 is rotated to a direction desired by the user, the first fixing rope 141 is unwound, and the stone transport rail 140 is lowered to the ground. Because first adaptor 110 is swing joint's relation with stone transport rail 140, that is to say, the adjustable change of the contained angle of stone transport rail 140 and horizontal plane, stone transport rail 140 is the tilt state after being transferred to do benefit to the transportation of stone. In order to facilitate the articulation of the first articulation 110 to the block transport rail 140, in one embodiment, the transport mechanism 100 further comprises a first hinge 180, the block transport rail 140 being articulated to the first articulation 110 by means of the first hinge 180. In this way, the angle of the stone transport rail 140 to the first transfer element 110 is changed.
The first vibrator 160 is used to generate a vibration effect to improve the efficiency of transporting the stone in the stone transporting rail 140. The stone transport rail 140 is shaken by the vibration of the first vibrator 160, thereby accelerating the movement of stones on the stone transport rail 140. In one embodiment, the first vibrator 160 is located at an end of the stone transport rail 140 distal from the first transfer block. In this way, installation of the first vibrator 160 is facilitated and a shaking effect on the stone transport rail 140 is improved. In this way, the efficiency of conveying the stones in the stone conveying rail 140 is further improved.
The second vibrator 170 is used to generate a vibration effect to improve the efficiency of transporting silt in the silt transporting rail 150. Under the vibration of the second vibrator 170, the silt transporting rail 150 is shaken, so that the movement of silt on the silt transporting rail 150 is accelerated. In one embodiment, a second vibrator 170 is located at an end of the silt conveyor rail 150 remote from the second diverter block. This facilitates the installation of the second vibrator 170 and enhances the shaking effect on the silt conveyor rail 150. So, further promoted the transport efficiency to silt in silt conveying rail 150.
The flat car 300 is used for realizing the mobile transportation function of the garbage recycling machine for engineering construction. The wheel set 310 is used for providing traction power, and if the wheel set 310 is further provided with a motor, the motor is respectively and rotatably connected with each movable wheel and is used for driving each movable wheel to rotate, so as to provide traction power for the base, and the base 320 is used for supporting the conveying mechanism 100 and the crusher 200. The wheel set 310 is connected with the base 320, and the base 320 is transported under the driving of the wheel set 310, so that the moving function of the engineering construction waste recycling machine is realized. In this embodiment, the flatbed may also be referred to as a flatbed. The flatbed includes wheelset and base, and the wheelset includes four removal wheels, and four removal wheels rotate with the base respectively and are connected, and wherein, one side of base sets up two and removes the wheel, and the opposite side of base sets up two and removes the wheel, and the base sets up on the base. To increase the stability of the base 130, in one embodiment, the base 130 is welded to the base 320, i.e., the base is welded to the base. Thus, the base 130 is not easily detached from the base 320, and the base 130 and the base 320 are stably connected. Therefore, the connection stability of the base 130 and the base 320 is improved, and the working stability of the engineering construction waste recycling machine is improved.
It will be appreciated that when the building waste is large, it is difficult to access the input end of the crusher, i.e. when the building waste is large, it is difficult to drop through the hopper into the crusher for crushing treatment, and this requires human intervention to remove the large pieces from the hopper so as not to interfere with subsequent waste transport. In order to facilitate the removal of stones from the feeding hopper, in one embodiment, the construction waste recycling machine further comprises a carrying frame, and the carrying frame is arranged on the moving vehicle. Further, the carrier is attached to a trailer. Further, the carrier is mounted on the base. Specifically, the carrying frame comprises a supporting pipe, a base and a connecting rod, wherein the base is fixedly arranged at the bottom of the supporting pipe and is provided with a fixing bolt capable of limiting, and therefore the carrying frame is fixed at a specified place by utilizing the fixing bolt arranged inside the base in a rotating mode, for example, the carrying frame is arranged on the base. The supporting tube is arranged on the periphery of the sliding rod in a sliding manner, the positioning bolts are arranged on two sides of the supporting tube in a sliding manner, the height of the sliding rod fixedly arranged at the bottom of the connecting platform through a bolt can be adjusted according to actual conditions, the fixed tube is arranged on the periphery of the telescopic rod after adjustment in a sliding manner, the limiting bolt is arranged on one side of the fixed tube in a sliding manner, the sleeve is fixedly arranged at the top of the fixed tube through the connecting platform according to actual conditions, the telescopic rod is arranged in the sleeve in a sliding manner, the height of the telescopic rod is adjusted, so that the connecting platform is fixedly arranged at two ends of the cross rod through the bolt, the height of the cross rod is adjusted on two sides of the connecting rod through the hook, the connecting rod is placed between the cross rods through the hook, and larger or heavier objects and equipment which are required to be used, the solar energy storage battery pack is fixedly arranged on one side of the sleeve, solar radiation energy is directly or indirectly converted into electric energy through photoelectric effect or photochemical effect by absorbing sunlight, the box body is fixedly arranged on one side of the connecting platform by utilizing a lead, the storage battery pack is fixedly arranged in the box body and is an electrochemical device for storing chemical energy and emitting the electric energy when necessary, an indicator lamp is fixedly arranged on one side of the box body, and the storage battery pack can be lightened after being provided with the electric energy by utilizing the lead, therefore, the device is more striking at night, the pedestrians are reminded to keep a certain distance from the device, and the safety of the device is improved.
Furthermore, through holes are formed in the surfaces of the two sides of the sliding rod at equal intervals, and the through holes coincide with the positioning bolts, so that the overall height of the device can be adjusted according to the overall height of a constructed building, and the overall practicability of the device is improved. Furthermore, the surface of the box body is fixedly provided with the ventilation window, so that the air inside can be better circulated, the equipment can be effectively prevented from being damaged due to overheating, the service life of the equipment is prolonged, the inside of the ventilation window is provided with the filter screen, dust and microorganisms in an air medium are removed by a physical retention method, and the air with low dust content is purified and then sent into the inside of the device, so that the process requirement and the air cleanliness are ensured. Further, equidistant fixed mounting in surface on one side of the telescopic link has a limiting hole, and the coincidence of limiting hole and limiting bolt can adjust the height of a part of structure of the device according to the actual use condition of the device, thereby being more convenient for a user to use the device. Furthermore, a reinforcing plate is fixedly installed between the periphery of the supporting tube and the base, the stability, the firmness and the pressure resistance between the supporting tube and the base are improved by utilizing the triangular stability principle, the surface of the reinforcing plate is coated with an anti-oxidation layer, and the surface of the equipment can be effectively prevented from being oxidized by oxygen contained in the air after coating, so that the service life of the equipment is prolonged. Further, the inside surface of box is provided with the waterproof layer, can utilize the sponge to prevent effectively that water stain entering equipment's inside, makes equipment can carry out work under the environment of difference, increases its sealing performance, and the inboard of waterproof layer is provided with the insulating layer, can utilize insulating rubber to prevent effectively that the phenomenon of electric leakage from appearing in the use of device to improve the security of device.
In the above embodiment, the garbage recycling machine for engineering construction uses the inner rotary of the base to install the fixing bolt through the carrying frame, to fix the device at the designated place, uses the two sides of the supporting tube to install the positioning bolt in a sliding way, can adjust the height of the sliding rod fixed at the bottom of the connecting platform through the bolt according to the actual situation, uses the surface of one side of the fixing tube to install the limiting bolt in a sliding way, can adjust the height of the telescopic rod according to the actual situation, thereby realizing the adjustment of the height of the cross rod, uses the hook to place the connecting rod between the cross rods, thereby realizing the restriction of the position between the devices, simultaneously, also storing the articles and equipment with larger volume or heavier needed in the construction process, avoiding the influence on the user when being placed on the scaffold, improving the safety of the device, when facing higher buildings, there is the sleeve pipe through bolt fixed mounting at the top of connecting the platform, can add according to actual conditions at the top of device and hold, the solar energy electroplax is through absorbing the sunlight, directly or indirectly convert photoelectric effect or photochemical effect with solar radiation energy into the electric energy, and utilize the wire to store power transmission to storage battery's inside, the pilot lamp can light after storage battery utilizes the wire to provide electric power, thereby improve the striking nature of device at night, remind the pedestrian and device to keep certain distance, the security of device is improved.
Further, in the actual garbage removing process, the worker can collect the garbage in advance by using garbage collecting tools such as sacks, garbage bins or garbage cans, and then transfer the garbage through the garbage collecting tools, for example, pour the garbage into the input end of the crusher for treatment. In order to facilitate lifting of the garbage collection tool and better pour garbage in the garbage collection tool into an input end of the crusher, in one embodiment, the garbage recycling machine for engineering construction further comprises a clamping and hoisting mechanism, the clamping and hoisting mechanism comprises a bearing beam, a hoisting column, a support frame, an annular pendant, a bearing ring, a steel wire rope and a clamp, the hoisting column is arranged in the middle of the bearing beam, the bearing beam is mounted on a sleeve through the hoisting column, and the clamping and hoisting mechanism can move up and down by utilizing the telescopic action of a telescopic rod; the clamping and hoisting mechanism can be moved in a left-right limiting manner by utilizing the limiting fixing bolt arranged on the base, so that the left-right position of the clamping and hoisting mechanism is adjusted, and the garbage collection tool is hoisted at a proper position. Further, the both ends of spandrel girder are connected with the support frame, and the upper end of support frame is connected with annular pendant, is fixed connection between spandrel girder, ground jack post, support frame and the annular pendant, like this, increases holistic stability through fixed connection, reduces to rock at the hoist and mount in-process, improves the security of using. Furthermore, bearing rings are installed at two ends of the lower portion of the bearing beam, and steel wire ropes are arranged in the bearing rings. In this embodiment, the bearing ring is provided with two, and two equal fixed mounting in below at spandrel girder both ends of bearing ring. And steel wire ropes are arranged in the bearing rings, and the other ends of the steel wire ropes are connected with clamps. The clamp comprises a first clamping arm, a second clamping arm, a rotating shaft, a fixing hole, a first fixing device and a second fixing device, wherein one end of the first clamping arm and one end of the second clamping arm are provided with the fixing hole, the connecting part between the first clamping arm and the second clamping arm is provided with the rotating shaft, a steel wire rope is arranged in the fixing hole, the inner walls of the first clamping arm and the second clamping arm are provided with the first fixing device, the first fixing device consists of an arc friction rubber pad, a transverse rubber sheet and a convex point, the arc friction rubber pad is provided with the transverse rubber sheet, the transverse rubber sheet is provided with the convex point, the side edges of the first clamping arm and the second clamping arm are connected with the second fixing device, the second fixing device comprises a fixing cover, a tension ring and a fixing rope, the outer side of the fixing cover is connected with the tension ring, the fixing rope is arranged in the tension ring, the steel wire rope is fixedly connected in the fixing hole on the first clamping arm, horizontal form film and bump all set up to be no less than three, and horizontal form film evenly distributed rubs on the cushion in the arc, and bump evenly distributed is on horizontal form film, and anchor clamps are provided with two, all install in both sides wire rope below, through bearing ring and wire rope and spandrel girder swing joint. This machine is retrieved to rubbish for engineering construction, through increasing centre gripping hoisting machine structure, loosen the insertion garbage collection instrument through first centre gripping arm and second arm lock when using, the taut regulation of wire rope in the fixed orifices on the rethread second arm lock, arc friction cushion increases the friction, improve fastening degree, horizontal form film fills space in the garbage collection instrument, increase the contact surface, be difficult for sliding, improve whole anchor clamps performance, and the output terminal surface of garbage collection instrument passes through fixed cover parcel, avoid the output terminal surface of garbage collection instrument to be loosened and make rubbish empty and go out, it is fixed by the internal fixation rope of elasticity circle, the garbage collection instrument can not fall out when guaranteeing the slope of wire rope, improve personnel's safety, avoid appearing pounding the accident, dual fixed use is convenient more firm, and convenient the dismantlement.
The hoisting column is arranged in the middle of the bearing beam, the support frames are connected to two ends of the bearing beam, the annular hanging piece is connected to the upper end of each support frame, the bearing beam, the hoisting column, the support frames and the annular hanging piece are fixedly connected, overall stability is improved through the fixed connection, shaking is reduced in the hoisting process, and using safety is improved; the steel wire rope is fixedly connected in the fixing hole on the first clamping arm, the fixing hole on the second clamping arm is movably connected with the steel wire rope, at least three transverse rubber sheets and at least three convex points are arranged, the transverse rubber sheets are uniformly distributed on the arc friction rubber mat, the convex points are uniformly distributed on the transverse rubber sheets, two clamps are arranged and are respectively arranged below the steel wire ropes on two sides, and the transverse rubber sheets and the convex points are movably connected with the bearing beam through the bearing ring and the steel wire rope, when in use, the clamping garbage collection tool is loosened through the first clamping arm and the second clamping arm, the steel wire rope in the fixing hole on the second clamping arm is tensioned, the arc friction rubber mat increases friction, improves the fastening degree, transversely fills the gap in the garbage collection tool, increases the contact surface, is not easy to slide, improves the service performance of the whole clamp, the end surface of the garbage collection tool is, the rubbish of garbage collection instrument can not fall out when guaranteeing wire rope slope, improves personnel's safety, avoids appearing pounding the injury accident, and dual fixed use is convenient firm more, and convenient the dismantlement.
In order to facilitate night operation of construction personnel, in one embodiment, the engineering construction waste recycling machine further comprises an illumination lamp, the illumination lamp is arranged on the crusher and comprises a lamp holder, a buffer device, an electrode communicating block, a light emitting diode, a lampshade, a fixing device and a lampshade fixing part, and the lamp holder is detachably arranged on the shell of the crusher. The mounting groove has been seted up at the middle part on lamp stand top, and the dashpot has all been seted up at both ends about the mounting groove bottom, and the inside of dashpot all is provided with this buffer. The buffering device comprises a buffering spring fixedly installed at the bottom of the buffering groove, the top end of the buffering spring is fixedly provided with the electrode communicating block, and the buffering device can effectively protect the stitch of the light-emitting diode from being damaged when the light-emitting diode is installed.
The inside movable mounting of mounting groove has this emitting diode, and the equal fixed mounting in the left and right sides of emitting diode bottom has the circular channel, and the ring channel has been seted up on the top of lamp stand, and fixed joint has this lamp shade in the circular channel, and first draw-in groove has all been seted up to the bottom of the lamp shade left and right sides, and the second draw-in groove has all been seted up to the left and right sides of emitting diode bottom, and the both sides that the lamp stand top is close to the middle part all are provided. Fixing device includes the activity groove of seting up near middle part position on the lamp stand top, the inside in activity groove is provided with the poker rod, one side fixed mounting that the poker rod bottom is close to the lamp stand middle part has the fixture block, the middle part activity cover of fixture block is equipped with reset spring, the one end alternate in the inside of second draw-in groove that the poker rod was kept away from to the fixture block, fixing device can make emitting diode after the lamp stand is advanced in the installation, make it relatively fixed with the lamp stand to when needs are changed emitting diode, conveniently dismantle and install it.
Furthermore, the lamp shade fixing part is arranged on two sides of the top end of the lamp holder far away from the middle part, the lamp shade fixing part comprises a fixing groove arranged on the top end of the lamp holder far away from the middle part, a supporting rod is fixedly arranged at the bottom of the fixing groove, a connecting rod is arranged at the top end of the supporting rod, gears are fixedly arranged at two ends of the connecting rod, a pressing rod is vertically and alternately arranged in the fixing groove, a tooth socket is arranged on one side, close to the gear, of the pressing rod, the tooth socket on one side, located on the pressing rod, is meshed with one of the gears, a compression spring is movably sleeved on the outer side of the pressing rod, a fixing rod is transversely and alternately arranged in the fixing groove, a tooth socket is arranged on one side, close to the gear, of the fixing rod, is, and when the light emitting diode is replaced, the lamp holder is convenient to detach, the working pressure of workers is reduced, and the working efficiency is improved.
Thus, when the light-emitting diode is installed, the light-emitting diode installation conduction block butt joint electrode communicating block is installed on the lamp holder, one end of the clamping block, far away from the poking rod, is clamped in the second clamping grooves positioned on two sides of the bottom of the light-emitting diode after installation, so that the light-emitting diode is stably installed, when the lampshade is installed, the bottom end of the lampshade is pressed down in alignment with the annular groove, because the first clamping groove on the lampshade is not butted with the upper fixed rod, when the lampshade is installed, the fixed rod retracts into the fixed groove due to the action of force of the bottom of the lampshade on the bottom of the lampshade, then the lampshade is rotated to clamp the first clamping groove on the bottom of the lampshade on the fixed rod, so that the lampshade is fixed relative to the lamp holder, the lampshade can play a role in protecting the light-emitting diode, and under the initial state of the fixed rod, the pressing rod can, after a first clamping groove on the lamp shade is in butt joint with the fixed rod, the pressing rod returns to the original position under the action of the compression spring, when the light-emitting diode is disassembled, the lamp shade is firstly disassembled, the pressing rods positioned on two sides of the top end of the lamp holder are pressed at the same time, the fixed rod slides towards the inside of the fixed groove under the action of the gear transmission of the pressing rods, so that the lamp shade is separated from the lamp holder, when the light-emitting diode is disassembled, the poke rod is pulled towards the middle direction far away from the top end of the lamp holder at the same time, the inner part of the fixture block item movable groove connected with the poke rod slides, then the light-emitting diode needing to be replaced is taken out, and.
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.
Claims (4)
1. The utility model provides a garbage recycling machine for engineering construction which characterized in that includes: conveying mechanism, crusher and flatbed; the conveying mechanism and the crusher are respectively arranged on the flat car;
the conveying mechanism comprises a first adapter, a second adapter, a base, a stone conveying rail, a sediment conveying rail, a first vibrator and a second vibrator;
the first adapter is rotationally connected with the second adapter, and the second adapter is rotationally connected with the base;
the output end of the crusher is communicated with the input end of the first adaptor, and the first adaptor is communicated with the second adaptor; a stone outlet is formed in the side surface of the first adaptor, a sediment outlet is formed in the side surface of the second adaptor, the stone outlet is communicated with the sediment outlet, and a screening channel is formed between the stone outlet and the sediment outlet; a screening net is arranged in the first rotating piece and is positioned in the screening channel between the stone block outlet and the sediment outlet;
the stone conveying rail is movably connected with the first adaptor at the stone outlet, and the sediment conveying rail is movably connected with the second adaptor at the sediment outlet; the stone conveying rail is provided with a first fixed rope, and the tail end of the first fixed rope is connected with the crusher; the silt conveying rail is provided with a second fixed rope, and the tail end of the second fixed rope is connected with the crusher; the first straight vibrator is connected with the stone conveying rail, and the second straight vibrator is connected with the sediment conveying rail;
the flat car comprises a wheel set and a base, wherein the wheel set comprises four moving wheels, the four moving wheels are respectively and rotatably connected with the base, two moving wheels are arranged on one side of the base, and two moving wheels are arranged on the other side of the base; the base is arranged on the base;
the first adapter piece and the second adapter piece are both of cylindrical structures, the first adapter piece is provided with a first annular sliding block, the second adapter piece is provided with a first annular sliding groove, and the first annular sliding block is inserted into the first annular sliding groove and is rotatably connected with the second adapter piece.
2. The engineering and construction waste recycling machine according to claim 1, wherein the second adaptor is further provided with a second annular slider, the base is provided with a second annular chute, and the second annular slider is inserted into the second annular chute and is rotatably connected with the base.
3. The recycling machine for garbage from engineering and construction according to claim 2, wherein the second vibrator is located at an end of the stone transporting rail away from the second transfer block.
4. The recycling machine for garbage for engineering and construction as claimed in claim 2, wherein the conveying mechanism further comprises a first hinge, and the stone conveying rail is movably connected with the first adaptor through the first hinge.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911352289.2A CN110976053A (en) | 2019-12-25 | 2019-12-25 | Garbage recycling machine for engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911352289.2A CN110976053A (en) | 2019-12-25 | 2019-12-25 | Garbage recycling machine for engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110976053A true CN110976053A (en) | 2020-04-10 |
Family
ID=70076468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911352289.2A Withdrawn CN110976053A (en) | 2019-12-25 | 2019-12-25 | Garbage recycling machine for engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110976053A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10137624A (en) * | 1996-11-07 | 1998-05-26 | Komatsu Ltd | Biaxial shearing type crusher mounted mobile crusher |
EP2058095A2 (en) * | 2007-11-09 | 2009-05-13 | KOMPTECH GmbH | Chipping machine |
CN102239008A (en) * | 2008-12-03 | 2011-11-09 | 桑德威克采矿和建筑材料处理有限责任两合公司 | Mobile crusher |
CN206567067U (en) * | 2017-01-23 | 2017-10-20 | 柳工美卓建筑设备(常州)有限公司 | A kind of crawler belt movement jaw crushing screening station |
CN110102369A (en) * | 2019-05-10 | 2019-08-09 | 陕西理工大学 | A kind of civil engineering work disposal unit of environmental protection |
CN209406529U (en) * | 2018-11-17 | 2019-09-20 | 深圳市绿建环保工程有限公司 | A kind of building waste recycles the screening plant of movable crusher |
-
2019
- 2019-12-25 CN CN201911352289.2A patent/CN110976053A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10137624A (en) * | 1996-11-07 | 1998-05-26 | Komatsu Ltd | Biaxial shearing type crusher mounted mobile crusher |
EP2058095A2 (en) * | 2007-11-09 | 2009-05-13 | KOMPTECH GmbH | Chipping machine |
CN102239008A (en) * | 2008-12-03 | 2011-11-09 | 桑德威克采矿和建筑材料处理有限责任两合公司 | Mobile crusher |
CN206567067U (en) * | 2017-01-23 | 2017-10-20 | 柳工美卓建筑设备(常州)有限公司 | A kind of crawler belt movement jaw crushing screening station |
CN209406529U (en) * | 2018-11-17 | 2019-09-20 | 深圳市绿建环保工程有限公司 | A kind of building waste recycles the screening plant of movable crusher |
CN110102369A (en) * | 2019-05-10 | 2019-08-09 | 陕西理工大学 | A kind of civil engineering work disposal unit of environmental protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111318340A (en) | Building decoration refuse treatment equipment | |
KR100988351B1 (en) | Constructive waste sorting system upper screen waste crisis means | |
CN111013796B (en) | Road construction rubbish rapid transport vechicle | |
CN208494874U (en) | Drum type sand screening machine | |
CN110976053A (en) | Garbage recycling machine for engineering construction | |
CN110976059A (en) | Construction waste treatment equipment | |
CN110976052A (en) | Movable construction waste treatment device | |
CN211865234U (en) | Movable waste metal crushing equipment | |
CN113117797A (en) | Waste treatment device for civil engineering construction | |
CN215694727U (en) | Civil engineering construction waste treatment equipment of environmental protection | |
CN111889176B (en) | Building rubbish soil material recovery unit | |
CN213612508U (en) | Waste rock sorting equipment | |
CN213494202U (en) | Be used for civil engineering to sieve husky equipment | |
CN213159819U (en) | Dust remover sack throws material device | |
CN112007849A (en) | Classification device for fine screening of construction sand | |
CN210474609U (en) | Tunnel hole sediment separator | |
CN210230653U (en) | Movable combined vibrating screen | |
CN218637896U (en) | Sand screening device convenient for sand classification | |
CN210474597U (en) | Classification device for fine screening of construction sand | |
CN218877009U (en) | Long anchor rope conveying mechanism that security performance is high | |
JP2002177936A (en) | Waste classifier and waste classification process | |
CN109772511A (en) | Equipment for handling waste steel recycling | |
CN213791793U (en) | Building rubbish soil material recovery unit | |
CN113996536B (en) | Building engineering waste recovery device | |
CN221816672U (en) | Linear type vibration screening machine for concrete recycling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20200410 |