CN110969411A - Civil engineering construction project cost management system - Google Patents

Civil engineering construction project cost management system Download PDF

Info

Publication number
CN110969411A
CN110969411A CN201911162892.4A CN201911162892A CN110969411A CN 110969411 A CN110969411 A CN 110969411A CN 201911162892 A CN201911162892 A CN 201911162892A CN 110969411 A CN110969411 A CN 110969411A
Authority
CN
China
Prior art keywords
data
user
management
module
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911162892.4A
Other languages
Chinese (zh)
Inventor
石斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201911162892.4A priority Critical patent/CN110969411A/en
Publication of CN110969411A publication Critical patent/CN110969411A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/21Design, administration or maintenance of databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Databases & Information Systems (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a civil engineering construction project cost management system, which aims to solve the problems that workers are easy to make mistakes and the efficiency is low because the construction cost of the current civil engineering construction project depends on manpower to process data and assign tasks. The civil engineering construction project cost management system comprises a terminal server, a management end and a user end; the management end is connected with the terminal server through a network, and the user end is a handheld device and is connected with the server through a wireless network; the terminal server is internally provided with a data storage module and a data management module, the data management module stores the data in the data storage module according to a set mode and carries out operation and maintenance work by combining the data with the instruction of a worker; the management end is provided with a service supervision module, an information input module, a project management module and a data search module; a user can log in a personal account to enter a user center through a user side, and the content displayed by the user center and the corresponding authority are set by the category of the personal account.

Description

Civil engineering construction project cost management system
Technical Field
The invention relates to a management system, in particular to a civil engineering construction project cost management system.
Background
The civil engineering construction project cost refers to the construction price of civil engineering, the civil engineering cost refers to all expenses spent on carrying out certain engineering construction, the core content is investment estimation, design approximate calculation, correction approximate calculation, construction drawing budget, engineering settlement, completion settlement and the like, the main task of the civil engineering cost is according to drawings, quota and list specification, the data volume of the existing civil engineering construction process is large, the analysis index is large, a large amount of manpower is needed to allocate data processing tasks to each project undertaking department, and on the one hand, project delay is easily caused because the task allocation is not timely; on the other hand, the task assignment error is easily caused by errors in the manpower assignment process, so that the task processing progress is influenced, and the working efficiency of workers is low.
Disclosure of Invention
The invention aims to provide a civil engineering construction project cost management system to solve the problems of high error probability and low efficiency caused by the fact that the construction cost of the existing civil engineering construction project depends on manpower to process data and assign tasks.
In order to achieve the above purpose, the solution of the invention is:
a civil engineering construction project cost management system comprises a terminal server, a management end and a user end; the management end is connected with the terminal server through a network, and the user end is a handheld device and is connected with the server through a wireless network;
the terminal server is internally provided with a data storage module and a data management module, the data management module stores the data in the data storage module according to a set mode and carries out operation and maintenance work by combining the data with the instruction of a worker; the data storage module is used for storing the operation and maintenance information and the input project data;
the management end is provided with a service supervision module, an information input module, a project management module and a data search module; the service supervision module is used for managing the ongoing service by the staff, supervising the flow and completion condition of the service in real time and synchronizing the progress of each service in time; the information input module is used for a manager to input the data generated immediately into the data storage module and input the data according to the storage mode of the data in the data storage module; the project management module is used for reading or modifying the data in the data storage module by a worker according to a set classification mode; the data searching module can read the data in the data storage module so as to enable a worker to search set information through the keywords;
a user can log in a personal account to enter a user center through a user side, and the content displayed by the user center and the corresponding authority are set by the category of the personal account.
Preferably, the storing in the data storage module according to the set mode comprises storing according to single item classification, item occurrence time classification, task classification in the item, item-related file attribute classification and item-related financial information classification.
Preferably, the project management module comprises a financial management unit, a material management unit, a technical material management unit, a contract management unit and a report management unit, wherein the financial management unit is used for storing each expense involved in the project and reasons and time for generating the expense and involved personnel; the material management unit is used for storing and managing materials related to projects; technical data used or designed in the project are stored in the technical data management unit, and the technical data comprise electronic versions of the technical data or data attribute information; the contract management unit is used for recording or compiling contract registration information for the set contract items, wherein the contract registration information comprises contract charging information and contract settlement information; the report management unit is used for managing and maintaining reports related to construction, purchase, manpower and finance in the project.
Preferably, the data stored in the data storage module has a mapping relationship with the same type, similar type, contained or contained data according to the attribute thereof, and when the management terminal reads the set information from different modules, the management terminal can quickly read the data information of the same type, similar type, contained or contained information according to the mapping relationship of the information.
Preferably, when the user center reads the set information, the user side can quickly read the data information of the same type, similar type, contained or contained in the authority range according to the mapping relation of the information, and the information outside the authority range prompts that the information exceeds the authority range.
Preferably, be equipped with the application module in the user center of user side, user's accessible application module carries out goods and materials application, expense examination and approval, plan application, data application, individual vacation, and the application module is sent the application of difference to management end or corresponding user center according to the classification, and staff or corresponding user check and accept the back and examine and approve.
Preferably, the project management module further comprises a project assessment unit, the project assessment unit synchronously records the work content and the completion condition of the related staff in the whole process from the beginning to the end of the project, and the assessment staff examines and checks and records each time one record is completed; and performing working hour quota calculation and yield value calculation on the employees according to the records of the appraisers so as to obtain the performance appraisal result of the whole project and the performance appraisal result of each employee in the project.
Preferably, the management end and the user end can perform information interaction through the terminal server, the management end can send the broadcast information to the user end in a group mode, and the management end and the user end can also independently perform information sending and receiving.
Preferably, the user can search the content displayed by the user center; when a user modifies or inputs data in the user center, the data can be immediately effective within the modification authority range of the user, and the data is effective outside the modification authority range of the user after being approved and approved by management end workers.
Preferably, the management end is a program installed in a computer, and the computer is connected with a printer and a scanner; the user side is an application installed in the smart phone, and the smart phone is connected with the terminal server through the SIM card in a network mode.
The invention has the beneficial effects that:
the civil engineering construction project cost management system stores the data to the terminal server, the working personnel can read and manage the data at the management end and the user end, and the data establishes the mapping relation of the related data according to the attributes of the data, so that when the management end and the user end read the set information, the same type, similar type, contained or contained data information of the information can be quickly read according to the mapping relation; the management end is provided with a service supervision module, an information input module, a project management module and a data search module, and the modules integrate services and processes involved in daily work, so that paperless network office work is realized, and the office process is simplified; the mobile terminal can enable workers to work at any time, so that convenience and efficiency of working are greatly improved, tasks can be dispatched in time through the mobile terminal and the management terminal, meanwhile, receiving personnel can be reminded in time, and the problem that task processing progress is slow due to the fact that tasks are dispatched in error is avoided, so that the system can improve working efficiency and save manpower resources.
Drawings
Fig. 1 is a system diagram of a civil engineering construction project cost management system of the invention.
Detailed Description
The invention is described in further detail below with reference to the following figures and specific examples:
a civil engineering construction project cost management system is shown in figure 1 and comprises a terminal server, a management end and a user end; the management terminal is connected with the terminal server through a network; the user side is a handheld device and is connected with the server through a wireless network;
and a data storage module and a data management module are arranged in the terminal server.
The data management module stores the data in the data storage module according to a set mode and carries out operation and maintenance work by combining the data with the instruction of a worker; the set mode storage comprises the storage according to the classification of single items, the classification according to the time when the items occur, the classification according to the categories of tasks in the items, the classification according to the attributes of files related to the items and the classification according to the financial information related to the items. Therefore, the manager can quickly find out the required information and quickly find out the information related to the information.
The data storage module is used for storing the operation and maintenance information and the input project data; the operation and maintenance information and the associated data information are stored in a binding mode, the data stored in the data storage module are provided with mapping relations according to the attributes, the same type, the similar type and the contained and contained data, and when the management end reads set information in different modules, the management end can quickly read the data information of the same type, the similar type, the contained or contained information according to the mapping relations of the information.
The management end is provided with a service supervision module, an information input module, a project management module and a data search module;
the service supervision module is used for managing the ongoing service by the working personnel, supervising the flow and the completion condition of the service in real time and synchronizing the progress of each service in time. The management personnel can find out the related working personnel from the ongoing business, so that the related working personnel can be reminded, checked and the like in time.
The information input module is used for a manager to input the data generated immediately into the data storage module and input the data according to the storage mode of the data in the data storage module. The manager can also authorize the relevant staff to enter, and audit the entered content, thereby completing the entry of data.
The data searching module can read the data in the data storage module so as to enable a worker to search set information through the keywords. The keywords can be words contained in the data and can also be keywords bound when the data is input.
And the project management module is used for reading or modifying the data in the data storage module by a worker according to a set classification mode. The project management module comprises a financial management unit, a material management unit, a technical data management unit, a contract management unit, a report management unit and a project assessment unit.
The financial management unit is used to store each charge involved in the project and the reason, time, and personnel involved for generating said charge.
The material management unit is used for storing and managing materials involved in the project.
Technical data used or designed in the project are stored in the technical data management unit, and the technical data comprise electronic versions of the technical data or data attribute information.
The contract management unit is used for recording or compiling contract registration information for the set contract items, wherein the contract registration information comprises contract charging information and contract settlement information.
The report management unit is used for managing and maintaining reports related to construction, purchase, manpower and finance in the project.
The project assessment unit synchronously records the work content and completion condition of the related staff in the whole process from the beginning to the end of the project, and the assessment staff examines and records each time one record is completed; and performing working hour quota calculation and yield value calculation on the employees according to the records of the appraisers so as to obtain the performance appraisal result of the whole project and the performance appraisal result of each employee in the project.
A user can log in a personal account to enter a user center through a user side, and the content and the corresponding authority displayed by the user center are set by the category of the personal account; the classification of the personal account is divided according to the attributes of the user, such as the job title or responsible work content of the user. The user may search for the displayed content.
When a user modifies or inputs data in the user center, the data can be immediately effective within the modification authority range of the user, and the data is effective outside the modification authority range of the user after being approved and approved by management end workers.
When the user end reads the set information at the user center, the same type, similar type, contained or contained data information in the authority range can be quickly read according to the mapping relation of the information, and the information outside the authority range prompts that the authority range is exceeded.
An application module is arranged in a user center of a user side, the user can apply materials, examine and approve expenses, plan declaration, data application and personal vacation through the application module, the application module sends different applications to a management end or the corresponding user center according to categories, and workers or corresponding users examine and approve the applications after checking and accepting the applications. And then improve the efficiency of applying for work, make simultaneously to apply for according to can, easily trace back.
The management end and the user end can perform information interaction through the terminal server, the management end can send broadcast information to the user end in a group mode, the management end can also send tasks to the user end according to each function module, and information can be sent and received between the management end and the user end independently.
The management end is a program installed in a computer, and the computer is connected with a printer and a scanner; the user side is an application installed in the smart phone, and the smart phone is connected with the terminal server through the SIM card in a network mode. Therefore, a plurality of managers can manage at different ports, and the workers can work on the mobile phone at any time, so that the convenience and the efficiency of working are greatly improved.
The above description is only an embodiment of the present invention, and is not intended to limit the scope of the present invention, and all equivalent structural changes made by using the contents of the present specification and the drawings, or applied directly or indirectly to other related technical fields, are included in the scope of the present invention.

Claims (10)

1. The utility model provides a civil engineering construction project cost management system which characterized in that: the system comprises a terminal server, a management end and a user end; the management end is connected with the terminal server through a network, and the user end is a handheld device and is connected with the server through a wireless network;
the terminal server is internally provided with a data storage module and a data management module, the data management module stores the data in the data storage module according to a set mode and carries out operation and maintenance work by combining the data with the instruction of a worker; the data storage module is used for storing the operation and maintenance information and the input project data;
the management end is provided with a service supervision module, an information input module, a project management module and a data search module; the service supervision module is used for managing the ongoing service by the staff, supervising the flow and completion condition of the service in real time and synchronizing the progress of each service in time; the information input module is used for a manager to input the data generated immediately into the data storage module and input the data according to the storage mode of the data in the data storage module; the project management module is used for reading or modifying the data in the data storage module by a worker according to a set classification mode; the data searching module can read the data in the data storage module so as to enable a worker to search set information through the keywords;
a user logs in a personal account through a user side to enter a user center, and the content displayed by the user center and the corresponding authority are set by the type of the personal account.
2. The civil engineering construction project cost management system of claim 1, wherein: the storage according to the set mode in the data storage module comprises the storage according to the classification of single items, the classification according to the time when the items occur, the classification according to the categories of tasks in the items, the classification according to the attributes of files related to the items and the classification according to the financial information related to the items.
3. The civil engineering construction project cost management system of claim 2, wherein: the project management module comprises a financial management unit, a material management unit, a technical data management unit, a contract management unit and a report management unit, wherein the financial management unit is used for storing each expense involved in the project, reasons for generating the expense, time and involved personnel; the material management unit is used for storing and managing materials related to projects; technical data used or designed in the project are stored in the technical data management unit, and the technical data comprise electronic versions of the technical data or data attribute information; the contract management unit is used for recording or compiling contract registration information for the set contract items, wherein the contract registration information comprises contract charging information and contract settlement information; the report management unit is used for managing and maintaining reports related to construction, purchase, manpower and finance in the project.
4. The civil engineering construction project cost management system according to any one of claims 1 to 3, wherein: the data stored in the data storage module is provided with mapping relations with the same type, similar type and contained data according to the attributes of the data, and when the management end reads set information in different modules, the management end can quickly read the data information of the same type, similar type, contained or contained information according to the mapping relations of the information.
5. The civil engineering construction project cost management system of claim 4, wherein: when the user end reads the set information at the user center, the same type, similar type, contained or contained data information in the authority range can be quickly read according to the mapping relation of the information, and the information outside the authority range prompts that the authority range is exceeded.
6. The civil engineering construction project cost management system of claim 5, wherein: the system comprises a user center and a user side, wherein an application module is arranged in the user center of the user side, the user can carry out material application, expense examination and approval, plan declaration, data application and personal vacation application through the application module, different applications are dispatched to a management end or the corresponding user center according to categories through the application module, and examination and approval are carried out after checking and receiving of workers or corresponding users.
7. The civil engineering construction project cost management system of claim 6, wherein: the project management module also comprises a project assessment unit, the project assessment unit synchronously records the work content and the completion condition of the related staff in the whole process from the beginning to the end of the project, and the assessment staff examines and records each time one record is completed; and performing working hour quota calculation and yield value calculation on the employees according to the records of the appraisers so as to obtain the performance appraisal result of the whole project and the performance appraisal result of each employee in the project.
8. The civil engineering construction project cost management system of claim 7, wherein: the management end and the user end can carry out information interaction through the terminal server, the management end can send the broadcast information to the user end in a group mode, and the management end and the user end can independently send and receive information.
9. The civil engineering construction project cost management system of claim 8, wherein: the user can search the content displayed by the user center; when a user modifies or inputs data in the user center, the data can be immediately effective within the modification authority range of the user, and the data is effective outside the modification authority range of the user after being approved and approved by management end workers.
10. The civil engineering construction project cost management system of claim 9, wherein: the management end is a program installed in a computer, and the computer is connected with a printer and a scanner; the user side is an application installed in the smart phone, and the smart phone is connected with the terminal server through the SIM card in a network mode.
CN201911162892.4A 2019-11-25 2019-11-25 Civil engineering construction project cost management system Pending CN110969411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911162892.4A CN110969411A (en) 2019-11-25 2019-11-25 Civil engineering construction project cost management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911162892.4A CN110969411A (en) 2019-11-25 2019-11-25 Civil engineering construction project cost management system

Publications (1)

Publication Number Publication Date
CN110969411A true CN110969411A (en) 2020-04-07

Family

ID=70031350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911162892.4A Pending CN110969411A (en) 2019-11-25 2019-11-25 Civil engineering construction project cost management system

Country Status (1)

Country Link
CN (1) CN110969411A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112396407A (en) * 2020-12-25 2021-02-23 张瑞青 Engineering supervision cost consultation comprehensive management system
CN112541737A (en) * 2020-12-14 2021-03-23 成都正信石油天然气工程造价咨询有限公司 Shale gas engineering cost data management system, method, terminal and storage medium
CN113095296A (en) * 2021-05-10 2021-07-09 温州广信工程管理有限公司 Civil engineering material calculation system and method based on Internet of things

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106779325A (en) * 2016-11-29 2017-05-31 河北建筑工程学院 A kind of engineering management monitoring system and method
CN107392568A (en) * 2017-07-04 2017-11-24 成都正信石油天然气工程造价咨询有限公司 A kind of project cost management system
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN110298631A (en) * 2019-06-28 2019-10-01 裴涛 A kind of Construction of Civil Engineering Project Cost management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106779325A (en) * 2016-11-29 2017-05-31 河北建筑工程学院 A kind of engineering management monitoring system and method
CN107392568A (en) * 2017-07-04 2017-11-24 成都正信石油天然气工程造价咨询有限公司 A kind of project cost management system
CN108335080A (en) * 2018-01-25 2018-07-27 广州建衡工程咨询有限公司 A kind of Construction Audit system and implementation method
CN110298631A (en) * 2019-06-28 2019-10-01 裴涛 A kind of Construction of Civil Engineering Project Cost management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112541737A (en) * 2020-12-14 2021-03-23 成都正信石油天然气工程造价咨询有限公司 Shale gas engineering cost data management system, method, terminal and storage medium
CN112541737B (en) * 2020-12-14 2023-04-07 成都正信石油天然气工程造价咨询有限公司 Shale gas engineering cost data management system, method, terminal and storage medium
CN112396407A (en) * 2020-12-25 2021-02-23 张瑞青 Engineering supervision cost consultation comprehensive management system
CN113095296A (en) * 2021-05-10 2021-07-09 温州广信工程管理有限公司 Civil engineering material calculation system and method based on Internet of things

Similar Documents

Publication Publication Date Title
CN111667165A (en) Intelligent mobile application service system based on electric power and application
CN109978504A (en) Processing method, device, equipment and the storage medium of financial data
Siguenza-Guzman et al. Using Time-Driven Activity-Based Costing to support library management decisions: A case study for lending and returning processes
CN110969411A (en) Civil engineering construction project cost management system
CN110046337B (en) Financial data acquisition method and system
CN101452481A (en) Method and system for processing document
CN110555758A (en) Enterprise finance and tax intelligent management system
CN115170090A (en) Project management method and device, electronic equipment and readable storage medium
CN113298446A (en) Financial insurance business process automatic management control system and application
Trinoverly et al. Analyzing the benefit of ERP implementation in developing country: a state owned company case study
CN112102054A (en) Payroll management method and system in parallel enterprise finance and tax SaaS system
CN115860508A (en) Nuclear power storage engineering quantity measuring method and device, computer equipment and medium
CN115099791A (en) Intelligent contract delivery platform based on block chain and operation method thereof
US11475389B1 (en) System and method for audit report generation from structured data
CN113469558A (en) Material management method and system
CN117172498A (en) Project management system for papermaking industry
KR101251600B1 (en) method and apparatus of suportting commercialization for technology
CN112801605A (en) Engineering project cost bid consultation comprehensive management system
CN115330322A (en) Comprehensive digital management system and method
CN111461847B (en) Method for solving customization of SAP (application and data processing) general service
CN107742180A (en) A kind of ships goods goods, materials and equipments cost day reflects method and system
Wulandari et al. Enhancing operational efficiency and financial reporting through Oracle NetSuite ERP implementation: A case study in a logistics company
CN118071504B (en) Transaction information penetration management method, device, equipment and storage medium
CN118429086B (en) Service configuration optimization method and system based on credit card service architecture
Salmon Controlling with SAP: Practical guide

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200407

RJ01 Rejection of invention patent application after publication