CN110892122A - 一种将天花装饰线系统安装于主体结构上的施工方法 - Google Patents

一种将天花装饰线系统安装于主体结构上的施工方法 Download PDF

Info

Publication number
CN110892122A
CN110892122A CN201880000514.3A CN201880000514A CN110892122A CN 110892122 A CN110892122 A CN 110892122A CN 201880000514 A CN201880000514 A CN 201880000514A CN 110892122 A CN110892122 A CN 110892122A
Authority
CN
China
Prior art keywords
wire
slot
piece
wiring
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201880000514.3A
Other languages
English (en)
Inventor
杨泓斌
李缙
陈祥祥
梁艺光
郑泽杭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zengcheng Bi Gui Garden Property Development Co Ltd
Zengcheng Country Garden Property Development Co Ltd
Original Assignee
Zengcheng Bi Gui Garden Property Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zengcheng Bi Gui Garden Property Development Co Ltd filed Critical Zengcheng Bi Gui Garden Property Development Co Ltd
Publication of CN110892122A publication Critical patent/CN110892122A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L97/00Compositions of lignin-containing materials
    • C08L97/02Lignocellulosic material, e.g. wood, straw or bagasse
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • E04F13/074Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for accommodating service installations or utility lines, e.g. heating conduits, electrical lines, lighting devices or service outlets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

本发明适用于建筑施工技术领域,提供了一种将天花装饰线系统安装于主体结构上的施工方法,包括以下步骤:制备布线件以及天花装饰件,制备或购买线缆。将线缆从线槽的槽口压入布线件的线槽内,或从线槽的端口穿入线槽内;将天花装饰件盖罩于布线件上,并使两者形成卡扣连接,将布线件的侧面及顶面对应固定在主体结构的侧面板及顶面板上。本发明的施工方法能将线缆以及布线件、线槽盖板、天花装饰件集合成一个系统,然后再安装于主体结构上,实现了线路与主体结构分离。克服了传统预埋线路维修时需开凿楼层板、墙板的弊端,减少对结构主体的破坏,大大增加了房屋安全可靠性。

Description

PCT国内申请,说明书已公开。

Claims (10)

  1. PCT国内申请,权利要求书已公开。
CN201880000514.3A 2018-05-16 2018-05-16 一种将天花装饰线系统安装于主体结构上的施工方法 Pending CN110892122A (zh)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2018/086938 WO2019218171A1 (zh) 2018-05-16 2018-05-16 一种将天花装饰线系统安装于主体结构上的施工方法

Publications (1)

Publication Number Publication Date
CN110892122A true CN110892122A (zh) 2020-03-17

Family

ID=68539216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201880000514.3A Pending CN110892122A (zh) 2018-05-16 2018-05-16 一种将天花装饰线系统安装于主体结构上的施工方法

Country Status (2)

Country Link
CN (1) CN110892122A (zh)
WO (1) WO2019218171A1 (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090173023A1 (en) * 2006-04-28 2009-07-09 Kaplan Steven E Cable and overlay moldings
CN201420368Y (zh) * 2009-05-11 2010-03-10 宋明群 一种新型顶角线
CN103073906A (zh) * 2013-02-05 2013-05-01 山西峰岩新型建材股份有限公司 一种聚乙烯木塑及其制备方法
CN106013732A (zh) * 2016-06-30 2016-10-12 张健 一种安装导线管道底板墙角线

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204850372U (zh) * 2015-07-14 2015-12-09 王琨 防污室内多功能装饰线盒
CN105804372A (zh) * 2016-03-28 2016-07-27 文登蓝岛建筑工程有限公司 一种顶角布线装饰条
CN206220437U (zh) * 2016-06-30 2017-06-06 张健 一种安装导线管道底板墙角线
CN105926902A (zh) * 2016-06-30 2016-09-07 张健 一种安装导线管道支架墙角线

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090173023A1 (en) * 2006-04-28 2009-07-09 Kaplan Steven E Cable and overlay moldings
CN201420368Y (zh) * 2009-05-11 2010-03-10 宋明群 一种新型顶角线
CN103073906A (zh) * 2013-02-05 2013-05-01 山西峰岩新型建材股份有限公司 一种聚乙烯木塑及其制备方法
CN106013732A (zh) * 2016-06-30 2016-10-12 张健 一种安装导线管道底板墙角线

Also Published As

Publication number Publication date
WO2019218171A1 (zh) 2019-11-21

Similar Documents

Publication Publication Date Title
CN110892122A (zh) 一种将天花装饰线系统安装于主体结构上的施工方法
CN112204209A (zh) 一种将天花装饰线系统安装于主体结构上的施工方法
CN110730853A (zh) 一种管线与主体结构分离的住宅的施工方法
CN110892123A (zh) 一种将踢脚线系统安装于墙板上的施工方法
WO2019218193A1 (zh) 一种嵌置于墙板凹槽的布线件
CN219773367U (zh) 一种集成可滑动设备带的装配式墙体
CN112166222A (zh) 一种天花吊顶系统的施工方法
CN112166236A (zh) 一种将门套线系统安装于墙板上的施工方法
CN112292493A (zh) 一种楼层板系统的施工方法
CN112204211A (zh) 一种水管、弱电电线均与主体结构分离的住宅
CN112218992A (zh) 集成有弱电与强电电线的踢脚线系统及具有该系统的墙板
WO2019218204A1 (zh) 集成有强电电线的门套线系统及具有该系统的墙板
WO2019218194A1 (zh) 一种集成有强电电线的墙板系统
CN112166226A (zh) 一种集成有强电与弱电电线的墙板系统
CN112166227A (zh) 一种墙板以及可安装管线的墙板系统
CN112204219A (zh) 集成有弱电电线的门套线系统及具有该系统的墙板
CN110730848A (zh) 一种天花吊顶系统的施工方法
WO2019218173A1 (zh) 一种墙板系统的施工方法
CN111201358A (zh) 一种水管、弱电电线均与主体结构分离的住宅
WO2019218190A1 (zh) 集成弱电电线的天花装饰线系统及具有该系统的主体结构
CN112154241A (zh) 一种天花吊顶系统的施工方法
WO2019218203A1 (zh) 一种可安装线缆的门套线
CN112204207A (zh) 一种安装有弱电电线的装饰墙系统
CN110730850A (zh) 一种墙板系统
CN110731038A (zh) 一种水管、强电电线与主体结构分离的住宅的施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200317