CN110808564A - Concrete cable trench construction technology - Google Patents
Concrete cable trench construction technology Download PDFInfo
- Publication number
- CN110808564A CN110808564A CN201911089168.3A CN201911089168A CN110808564A CN 110808564 A CN110808564 A CN 110808564A CN 201911089168 A CN201911089168 A CN 201911089168A CN 110808564 A CN110808564 A CN 110808564A
- Authority
- CN
- China
- Prior art keywords
- cable trench
- wall
- concrete
- seepage
- split bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/02—Installations of electric cables or lines in or on the ground or water laid directly in or on the ground, river-bed or sea-bottom; Coverings therefor, e.g. tile
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本发明涉及一种混凝土电缆沟施工工艺,包括以下步骤:步骤S1:挖设电缆沟基槽,电缆沟基槽的两侧挖设排水沟;步骤S2:浇筑混凝土垫层;步骤S3:绑扎墙筋;步骤S4:在混凝土垫层的两侧安装两组边墙钢模板,边墙钢模板包括内模板和外模板,内模板和外模板之间设有防水板,防水板的两侧壁分别与内模板和外模板之间预留有浇筑混凝土的填充空间;步骤S5:混凝土搅拌及浇筑,形成电缆沟墙体;步骤S6:边墙钢模板拆除;步骤S7:混凝土养护及保护;步骤S8:土方回填;由于土方回填后,容易出现渗水现象,利用防水板对电缆沟墙体外部的水起到防渗作用,可有效的避免电缆沟内部积水,提高了电缆工作过程的稳定性。
The present invention relates to a concrete cable trench construction process, comprising the following steps: step S1: excavating a cable trench foundation trench, excavating drainage trenches on both sides of the cable trench foundation trench; step S2: pouring a concrete cushion; step S3: binding a wall Step S4: install two sets of side wall steel formwork on both sides of the concrete cushion, the side wall steel formwork includes an inner formwork and an outer formwork, a waterproof board is arranged between the inner and outer formwork, and the two side walls of the waterproof board are respectively A filling space for pouring concrete is reserved between the inner formwork and the outer formwork; step S5: concrete mixing and pouring to form a cable trench wall; step S6: removal of side wall steel formwork; step S7: concrete curing and protection; step S8 : Backfilling with earthwork; since the phenomenon of water seepage is easy to occur after earthwork is backfilled, the waterproof board is used to prevent seepage of the water outside the wall of the cable trench, which can effectively avoid the accumulation of water inside the cable trench and improve the stability of the cable working process.
Description
技术领域technical field
本发明涉及电缆沟的技术领域,尤其是涉及一种混凝土电缆沟施工工艺。The invention relates to the technical field of cable trenches, in particular to a construction technology for concrete cable trenches.
背景技术Background technique
电缆沟是用以敷设和更换电力或电讯电缆设施的地下管道,也是被敷设电缆设施的围护结构,是发电厂、变电站、市政工程和大型厂矿中不可或缺的基础设施;在变电站工程施工中,站内混凝土电缆沟工作量大,其施工质量将直接影响变电站工程的整体形象。Cable trenches are underground pipes for laying and replacing power or telecommunication cable facilities, and also the enclosure structure of the laid cable facilities. They are an indispensable infrastructure in power plants, substations, municipal engineering and large factories and mines; The concrete cable trench in the station has a large workload, and its construction quality will directly affect the overall image of the substation project.
现有的授权公布号CN102758451A的中国发明专利公开了一种混凝土电缆沟施工工艺,包括以下步骤:测量定位,开挖沟槽土方;垫层混凝土浇筑及养护;钢筋绑扎;底板混凝土浇筑及养护;以及边墙钢模板拼装及预埋件安装;其中,边墙钢模板上开设有对拉螺栓孔,边墙的内外钢模板之间采用对拉螺栓固定以确定边墙两侧钢模板间的间距;通过采用钢模板拼装成型边墙,钢模板拼接紧密、不易变形,电缆沟混凝土施工一次成型,拆模后沟壁平整光洁、接缝平整无漏浆,电缆沟沟壁混凝土表面质量可以达到清水混凝土质量水平,不需要进行二次粉刷。The existing Chinese invention patent with the authorized publication number CN102758451A discloses a concrete cable trench construction technology, which includes the following steps: measuring and positioning, excavating trench earthwork; cushion concrete pouring and curing; steel bar binding; floor concrete pouring and curing; As well as the assembly of side wall steel formwork and the installation of pre-embedded parts; among them, the side wall steel formwork is provided with tie bolt holes, and the inner and outer steel formwork of the side wall is fixed with tie bolts to determine the distance between the steel formwork on both sides of the side wall. ;By using steel formwork to assemble and form the side wall, the steel formwork is tightly spliced and not easy to be deformed. The cable trench concrete is formed at one time. After the mold is removed, the trench wall is smooth and clean, the joints are smooth and no leakage, and the concrete surface quality of the cable trench wall can reach clean water. Concrete quality level, no secondary painting required.
但是上述技术方案中存在以下使用缺陷:由于电缆沟为混凝土浇筑,成型的电缆沟防水性不好、易渗水,导致电缆沟内部存在积水,积水过多时,使得内部电缆易被水浸没,造成电缆使用不安全。However, there are the following defects in the above technical solution: because the cable trench is made of concrete, the formed cable trench has poor waterproofness and is easy to seep water, which leads to the accumulation of water inside the cable trench. Make the cable unsafe to use.
发明内容SUMMARY OF THE INVENTION
针对现有技术存在的不足,本发明的目的是提供一种混凝土电缆沟施工工艺,其优点是:具有良好的抗渗效果,避免电缆沟内部积水,提高了电缆工作过程的稳定性。Aiming at the deficiencies of the prior art, the purpose of the present invention is to provide a concrete cable trench construction technology, which has the advantages of good anti-seepage effect, avoids water accumulation in the cable trench, and improves the stability of the cable working process.
本发明的上述发明目的是通过以下技术方案得以实现的:The above-mentioned purpose of the present invention is achieved through the following technical solutions:
一种混凝土电缆沟施工工艺,包括以下步骤:A concrete cable trench construction technology, comprising the following steps:
步骤S1:根据设计要求,挖设电缆沟基槽,电缆沟基槽的两侧挖设排水沟,开挖后,基底及时排水,不得受水浸泡以及超挖,若超挖,采用碎石填至基底标高;Step S1: According to the design requirements, excavate the cable trench foundation groove, and dig drainage trenches on both sides of the cable trench foundation trench. After excavation, the substrate should be drained in time, and should not be soaked in water or over-excavated. If it is over-excavated, it should be filled with gravel. to the base level;
步骤S2:夯实基底原土,电缆沟基槽、碎石经验收合格,放垫层中线、边线以及标高,抽干积水后浇筑混凝土垫层;Step S2: tamp the original soil of the base, the cable trench foundation groove and the crushed stone are accepted and qualified, put the cushion center line, side line and elevation, and pour the concrete cushion after draining the accumulated water;
步骤S3:在混凝土垫层上放线,逐点绑扎墙筋;Step S3: Lay out lines on the concrete cushion, and tie the wall reinforcement point by point;
步骤S4:在混凝土垫层的两侧安装两组边墙钢模板,边墙钢模板包括内模板和外模板,内模板和外模板之间设有防水板,防水板的两侧壁分别与内模板和外模板之间预留有浇筑混凝土的填充空间;Step S4: Install two sets of side wall steel formwork on both sides of the concrete cushion, the side wall steel formwork includes an inner formwork and an outer formwork, a waterproof board is arranged between the inner and outer formwork, and the two side walls of the waterproof board are respectively connected to the inner and outer formwork. A filling space for pouring concrete is reserved between the formwork and the outer formwork;
步骤S5:混凝土搅拌及浇筑,形成电缆沟墙体;Step S5: concrete mixing and pouring to form a cable trench wall;
步骤 S6:边墙钢模板拆除;Step S6: Remove the side wall steel formwork;
步骤 S7:混凝土养护及保护,电缆沟墙体的墙壁抹灰完成后,覆盖浇水养护不少于7d;Step S7: Concrete curing and protection, after the wall of the cable trench wall is plastered, cover and water for no less than 7 days;
步骤 S8:根据设计要求,土方回填并压实。Step S8: According to the design requirements, earthwork is backfilled and compacted.
通过采用上述技术方案,由于混凝土浇筑形成的电缆沟墙体具有一定的渗水性,土方回填之后,在遇到雨季时,泥土里容易出现渗水现象,利用防水板可防止渗出的水通过电缆沟墙体渗透至电缆沟墙体的内部,防水板是以高分子聚合物为基本原料制成的一种防渗材料,具有强度高、抗腐蚀、耐老化、防渗性能好的特点,进而起到阻隔的作用,可有效的避免电缆沟墙体内部产生积水,提高了电缆工作过程的稳定性,延长了电缆的使用寿命。By adopting the above technical solution, since the wall of the cable trench formed by concrete pouring has a certain water permeability, after the earthwork is backfilled, in the rainy season, the soil is prone to seepage. The wall penetrates into the inside of the cable trench wall. The waterproof board is an anti-seepage material made of high molecular polymer as the basic raw material. It has the characteristics of high strength, anti-corrosion, anti-aging and good anti-seepage performance. It can effectively avoid the accumulation of water inside the wall of the cable trench, improve the stability of the working process of the cable, and prolong the service life of the cable.
本发明进一步设置为:所述步骤S4中的防水板、内模板和外模板之间通过防渗对拉螺栓连接,所述防渗对拉螺栓的两端螺纹连接有锁紧螺母,所述电缆沟墙体内形成有与防渗对拉螺栓相配合的通孔,所述防渗对拉螺栓上设有用于封堵通孔两端的密封封堵件。The present invention is further provided as follows: in the step S4, the waterproof plate, the inner formwork and the outer formwork are connected by anti-seepage tie bolts, the two ends of the anti-seepage tie bolts are threadedly connected with locking nuts, and the cable A through hole is formed in the ditch wall to be matched with the anti-seepage pull bolt, and the anti-seepage pull bolt is provided with a sealing plug for blocking both ends of the through hole.
通过采用上述技术方案,防渗对拉螺栓的设置,确保了内模板、外模板与防水板之间的间距稳定,实现了在电缆沟墙体浇筑完成后,使得防水板稳定嵌设在电缆沟墙体内部,加强了电缆沟墙体的坚固性;电缆沟墙体成型后,拧开锁紧螺母,将模板拆除;由于土方回填后,泥土中的水易从电缆沟墙体的外部,从通孔的一端渗入通孔的另一端,然后渗透至电缆沟墙体的内部,利用密封封堵件,对通孔的两端封堵、密封,可有效的避免泥土中的水渗入电缆沟墙体内部,使得电缆能够稳定工作。By adopting the above technical solution, the setting of the anti-seepage tie bolts ensures the stable spacing between the inner formwork, the outer formwork and the waterproof board, and realizes that after the cable trench wall is poured, the waterproof board can be stably embedded in the cable trench Inside the wall, the firmness of the cable trench wall is strengthened; after the cable trench wall is formed, unscrew the lock nut and remove the formwork; after the earth is backfilled, the water in the soil is easy to pass from the outside of the cable trench wall, from the outside of the cable trench wall. One end of the through hole penetrates into the other end of the through hole, and then penetrates into the inside of the wall of the cable trench. Using sealing plugs to seal and seal both ends of the through hole, it can effectively prevent the water in the soil from seeping into the cable trench wall. Inside the body, so that the cable can work stably.
本发明进一步设置为:所述防渗对拉螺栓内设有空腔,所述密封封堵件包括分别与防渗对拉螺栓的两端螺纹连接的柔性石墨密封环、两两相对滑移设置在空腔内且呈弧形的第一抵板和第二抵板,所述柔性石墨密封环的一端延伸至通孔内,所述柔性石墨密封环的内环壁分别设有与第一抵板、第二抵板相配合的抵紧槽,所述空腔内设有驱动第一抵板、第二抵板插入抵紧槽内的驱动组件,所述防渗对拉螺栓的外壁设有供第一抵板、第二抵板穿过的开口。The present invention is further provided as follows: the anti-seepage double-pull bolt is provided with a cavity, and the sealing and plugging member comprises flexible graphite sealing rings threadedly connected with both ends of the anti-seepage double-pull bolt, and two relatively sliding In the cavity and the arc-shaped first abutting plate and a second abutting plate, one end of the flexible graphite sealing ring extends into the through hole, and the inner ring wall of the flexible graphite sealing ring is respectively provided with the first abutting plate. A pressing groove in which the plate and the second abutting plate are matched, the cavity is provided with a driving component that drives the first abutting plate and the second abutting plate to be inserted into the pressing groove, and the outer wall of the anti-seepage pull bolt is provided with An opening for the first abutting plate and the second abutting plate to pass through.
通过采用上述技术方案,首先旋转柔性石墨密封环,使得柔性石墨密封环的一端插入通孔内,堵住通孔,由于柔性石墨密封环具有耐高温、耐腐蚀、耐磨损的特性,实现了密封效果;其次旋转锁紧螺母并向柔性石墨密封环方向靠近,可将柔性石墨密封环的一端稳定固定在通孔内;然后利用驱动组件驱动第一抵板和第二抵板穿过开口并插入槽内,可将柔性石墨密封环的外环壁抵紧在通孔的两端内壁,填补了对拉螺栓与通孔内壁之间的缝隙,提高了柔性石墨密封环位于通孔内的稳定性,进一步加强了密封效果,可有效的避免电缆沟墙体内部产生积水,提高了电缆工作的稳定性。By adopting the above technical solution, the flexible graphite sealing ring is first rotated so that one end of the flexible graphite sealing ring is inserted into the through hole and the through hole is blocked. Since the flexible graphite sealing ring has the characteristics of high temperature resistance, corrosion resistance and wear resistance, the Sealing effect; secondly, rotate the locking nut and approach the flexible graphite sealing ring, so that one end of the flexible graphite sealing ring can be stably fixed in the through hole; Inserted into the groove, the outer ring wall of the flexible graphite sealing ring can be pressed against the inner walls of both ends of the through hole, filling the gap between the pull bolt and the inner wall of the through hole, and improving the stability of the flexible graphite sealing ring in the through hole It further strengthens the sealing effect, can effectively avoid the accumulation of water inside the wall of the cable trench, and improve the stability of the cable work.
本发明进一步设置为:所述驱动组件包括与防渗对拉螺栓的轴向同向的驱动杆、与驱动杆一端相连的抵块、设置在抵块底部侧壁上的限位块、与防渗对拉螺栓的径向同向的第一支杆和第二支杆、分别与第一支杆和第二支杆的一端相连的滑块以及分别转动连接在防渗对拉螺栓两端壁上的旋转螺母,所述第一支杆、第二支杆在开口内滑移,所述驱动杆远离抵块的一端延伸出防渗对拉螺栓的端壁外并与旋转螺母螺纹连接,所述第一支杆和第二支杆远离滑块的一端分别与第一抵板和第二抵板相连,所述滑块沿防渗对拉螺栓的径向滑移,所述空腔内沿其轴向设有供限位块滑移的限位槽,所述滑块与抵块相接触的侧壁均设为倾斜面。The present invention is further provided as follows: the drive assembly includes a drive rod in the same direction as the anti-seepage anti-tension bolt, an abutment block connected with one end of the drive rod, a limit block arranged on the side wall of the bottom of the abutment block, and an anti-seepage block. The first support rod and the second support rod in the same radial direction of the seepage pull bolt, the sliders respectively connected with one end of the first support rod and the second support rod, and the two ends of the anti seepage pull bolt are rotatably connected to the walls respectively. The first support rod and the second support rod slide in the opening, and the end of the driving rod far away from the block extends out of the end wall of the anti-seepage pull bolt and is threadedly connected with the rotating nut, so The ends of the first support rod and the second support rod away from the slider are respectively connected with the first abutting plate and the second abutting plate, the slider slides along the radial direction of the anti-seepage pull bolt, and the inner edge of the cavity is The axial direction is provided with a limit groove for the limit block to slide, and the side walls of the slider and the abutment block are all set as inclined surfaces.
通过采用上述技术方案,转动旋转螺母,由于限位槽对限位块的滑移起到限位作用,且旋转螺母与驱动杆螺纹连接,进而带动抵块向滑块方向滑移;由于滑块的侧壁设为倾斜面,当抵块在滑移过程中,由于开口的限位,使得两个相对的滑块相互远离,进而第一支杆、第二支杆均穿过开口,可将第一抵板和第二抵板插入抵紧槽内,从而可将柔性石墨密封环的外环壁抵紧在通孔内壁,实现了对通孔两端的密封。By adopting the above technical solution, when the rotating nut is rotated, the limit groove plays a limiting role on the sliding of the limiting block, and the rotating nut is threadedly connected with the driving rod, thereby driving the abutting block to slide in the direction of the slider; The side wall of the sliding block is set as an inclined surface. When the abutting block is sliding, due to the limit of the opening, the two opposite sliders are kept away from each other, and the first and second support rods pass through the opening, which can The first abutting plate and the second abutting plate are inserted into the abutting groove, so that the outer ring wall of the flexible graphite sealing ring can be pressed against the inner wall of the through hole, and the two ends of the through hole can be sealed.
本发明进一步设置为:所述柔性石墨密封环的内环、外环截面均为梯形,所述第一支杆的长度尺寸小于第二支杆的长度尺寸。In the present invention, the inner ring and the outer ring of the flexible graphite sealing ring are both trapezoidal in cross section, and the length dimension of the first support rod is smaller than the length dimension of the second support rod.
通过采用上述技术方案,柔性石墨密封环的外环截面为梯形,实现了在旋转柔性石墨密封环时,可将柔性石墨密封环的一端快速的插入通孔内;性石墨密封环的内环截面为梯形,且第一支杆的长度尺寸小于第二支杆的长度尺寸,可将第一抵板和第二抵板插入抵紧槽内,提高了柔性石墨密封环的外环壁贴合在通孔内部的紧密性,密封效果好。By adopting the above technical solution, the outer ring section of the flexible graphite sealing ring is trapezoidal, so that when the flexible graphite sealing ring is rotated, one end of the flexible graphite sealing ring can be quickly inserted into the through hole; the inner ring section of the flexible graphite sealing ring is It is trapezoidal, and the length dimension of the first support rod is smaller than the length dimension of the second support rod. The first abutting plate and the second abutting plate can be inserted into the abutting groove, which improves the adhesion of the outer ring wall of the flexible graphite sealing ring. The tightness inside the through hole has a good sealing effect.
本发明进一步设置为:所述第一支杆、第二支杆上均套设有弹簧,所述弹簧的一端固定在空腔内壁,所述弹簧的另一端固定在滑块的侧壁。The present invention further provides that: the first support rod and the second support rod are sleeved with a spring, one end of the spring is fixed on the inner wall of the cavity, and the other end of the spring is fixed on the side wall of the slider.
通过采用上述技术方案,弹簧的设置,对滑块的移动起到限位作用,当浇筑电缆沟墙体时,利用弹簧的弹力,可将第一抵板和第二抵板远离通孔内壁,避免第一抵板和第二抵板与混凝土粘接;且在浇筑混凝土前,可将防渗对拉螺栓的两端套设防护模套,避免混凝土浆料通过开口渗入空腔内部,影响滑块的滑移。By adopting the above technical solution, the setting of the spring can limit the movement of the slider. When pouring the wall of the cable trench, the elastic force of the spring can be used to keep the first abutting plate and the second abutting plate away from the inner wall of the through hole. Prevent the first and second abutting plates from being bonded to the concrete; and before pouring concrete, protective mold sleeves can be set at both ends of the anti-seepage tie bolts to prevent the concrete slurry from infiltrating into the cavity through the opening and affecting the slippage. slippage of the block.
本发明进一步设置为:所述柔性石墨密封环的外环壁固定有密封环板,所述密封环板的侧壁设有遇水膨胀止水条贴合在电缆沟墙体的侧壁上。The present invention is further provided as follows: the outer ring wall of the flexible graphite sealing ring is fixed with a sealing ring plate, and the side wall of the sealing ring plate is provided with a water-swellable water stop strip which is attached to the side wall of the cable trench wall.
通过采用上述技术方案,由于土方回填后,泥土对电缆沟墙体的两侧受压,可将密封环板、遇水膨胀止水条紧贴在电缆沟墙体的侧壁上;当泥土中渗水时,遇水膨胀止水条发生膨胀,将密封环板与电缆沟墙体之间的缝隙封堵,进一步加强了密封效果。By adopting the above technical solution, since the soil is under pressure on both sides of the wall of the cable trench after the earth is backfilled, the sealing ring plate and the water-swelling water-stop strip can be closely attached to the side wall of the cable trench wall; When water seeps, the water-swelling water-stop strip expands and seals the gap between the sealing ring plate and the wall of the cable trench, further enhancing the sealing effect.
本发明进一步设置为:所述步骤S2还包括步骤S21:在混凝土垫层的中部铺设有鹅卵石人行道,在鹅卵石人行道的两侧均设有排水坡面,排水坡面的较高一端朝向鹅卵石人行道,排水坡面的较低一端朝向排水沟并设有排水孔,排水孔上连接有排水管并延伸至排水沟内。The present invention is further configured as follows: the step S2 further includes a step S21: a cobblestone sidewalk is laid in the middle of the concrete cushion, a drainage slope is provided on both sides of the cobblestone sidewalk, and the higher end of the drainage slope faces the cobblestone sidewalk, The lower end of the drainage slope faces the drainage ditch and is provided with a drainage hole, and the drainage hole is connected with a drainage pipe and extends into the drainage ditch.
通过采用上述技术方案,当电缆沟墙体的内部产生积水时,排水坡面的设置,对积水起到导流的作用,进而积水通过地心引力的作用,向排水孔方向流动,最终积水通过排水管及时排入排水沟内,有效的避免积水堆积在电缆沟墙体内部,影响了电缆工作过程的稳定性。By adopting the above technical solution, when water accumulates inside the wall of the cable trench, the setting of the drainage slope can divert the accumulated water, and then the accumulated water flows toward the drainage hole through the action of gravity. Finally, the accumulated water is drained into the drainage ditch in time through the drain pipe, which effectively avoids the accumulation of accumulated water in the wall of the cable trench, which affects the stability of the cable working process.
本发明进一步设置为:所述电缆沟墙体的内墙壁、外墙壁均涂刷有水泥基渗透结晶型防水涂料。The present invention is further provided that: the inner wall and the outer wall of the cable trench wall are painted with cement-based permeable crystalline waterproof paint.
通过采用上述技术方案,水泥基渗透结晶型防水涂料具有自愈合性能、无毒、环保、防腐、耐酸碱、渗透能力强等特点,能通过化学反应渗透到混凝土内部产生结晶,并封堵住混凝土的毛细孔,进而当出现渗水情况时,从源头对电缆沟墙体起到防水的作用,进一步加强了抗渗效果,提高了电缆工作过程的稳定性。By adopting the above technical solutions, the cement-based permeable crystalline waterproof coating has the characteristics of self-healing performance, non-toxicity, environmental protection, anti-corrosion, acid and alkali resistance, strong penetration ability, etc. It can penetrate into the concrete through chemical reaction to generate crystals and block The capillary pores of the concrete are trapped, and when there is water seepage, the wall of the cable trench can be waterproofed from the source, which further strengthens the anti-seepage effect and improves the stability of the cable working process.
本发明进一步设置为:所述内模板、外模板分别与防水板侧壁之间的间距为8-10cm。The present invention further provides that: the distance between the inner template, the outer template and the side wall of the waterproof board is 8-10 cm.
通过采用上述技术方案,防水板两侧分别与内模板、外模板之间的距离为8-10cm,进而电缆沟墙体的墙壁尺寸为16-20cm,坚固性强。By adopting the above technical solution, the distance between the two sides of the waterproof board and the inner and outer formwork is 8-10cm, and the wall size of the cable trench wall is 16-20cm, which is strong.
综上所述,本发明的有益技术效果为:To sum up, the beneficial technical effects of the present invention are:
1.防水板具有良好的防渗效果,可防止渗出的水通过电缆沟墙体渗透至电缆沟墙体的内部,起到阻隔的作用,可有效的避免电缆沟墙体内部产生积水,提高了电缆工作过程的稳定性,延长了电缆的使用寿命;1. The waterproof board has a good anti-seepage effect, which can prevent the seepage water from penetrating into the inside of the cable trench through the cable trench wall, which plays a role of barrier and can effectively avoid water accumulation inside the cable trench wall. Improve the stability of the working process of the cable and prolong the service life of the cable;
2.利用防渗对拉螺栓,确保了内模板、外模板与防水板之间的间距稳定,在电缆沟墙体浇筑完成后,使得防水板稳定嵌设在电缆沟墙体内部,加强了电缆沟墙体的坚固性;电缆沟墙体成型后,拧开锁紧螺母,将模板拆除;由于土方回填后,为避免泥土中的水渗透至电缆沟墙体的内部,利用密封封堵件,对通孔的两端进行密封,有效的防止电缆沟墙体内部出现积水现象,使得电缆能够稳定工作;2. The use of anti-seepage pull bolts ensures a stable distance between the inner formwork, the outer formwork and the waterproof board. After the cable trench wall is poured, the waterproof board is stably embedded in the cable trench wall, strengthening the cable The firmness of the ditch wall; after the cable ditch wall is formed, unscrew the lock nut and remove the formwork; after the earthwork is backfilled, in order to prevent the water in the soil from penetrating into the cable ditch wall, the sealing plug is used to prevent Seal both ends of the through hole to effectively prevent water accumulation inside the wall of the cable trench, so that the cable can work stably;
3.当电缆沟墙体的内部产生积水时,排水坡面的设置,对积水起到导流的作用,进而积水通过地心引力的作用,向排水孔方向流动,最终积水通过排水管及时排入排水沟内,有效的避免积水堆积在电缆沟墙体内部,影响了电缆工作过程的稳定性。3. When water accumulates inside the wall of the cable trench, the setting of the drainage slope will divert the accumulated water, and then the accumulated water will flow in the direction of the drainage hole through the action of gravity, and finally the accumulated water will pass through. The drainage pipe is drained into the drainage ditch in time to effectively avoid accumulation of water in the wall of the cable ditch, which affects the stability of the cable working process.
附图说明Description of drawings
图1是本实施例的整体剖视结构示意图。FIG. 1 is a schematic diagram of the overall cross-sectional structure of this embodiment.
图2是用于体现图1中A部分的放大结构示意图。FIG. 2 is an enlarged schematic diagram for embodying part A in FIG. 1 .
图3用于体现图2中B部分的放大结构示意图。FIG. 3 is an enlarged structural schematic diagram for showing part B in FIG. 2 .
附图标记:1、电缆沟基槽;2、排水沟;3、混凝土垫层;4、边墙钢模板;41、内模板;42、外模板;5、防水板;6、填充空间;7、电缆沟墙体;8、防渗对拉螺栓;9、锁紧螺母;10、通孔;11、密封封堵件;111、柔性石墨密封环;112、第一抵板;113、第二抵板;114、抵紧槽;115、开口;12、空腔;13、驱动组件;131、驱动杆;132、抵块;133、限位块;134、第一支杆;135、第二支杆;136、滑块;137、旋转螺母;14、定位凸缘;15、限位槽;16、倾斜面;17、弹簧;18、密封环板;19、遇水膨胀止水条;20、鹅卵石人行道;21、排水坡面;22、排水孔;23、排水管;24、梯形块。Reference signs: 1. Cable trench foundation groove; 2. Drainage trench; 3. Concrete cushion; 4. Side wall steel formwork; 41. Inner formwork; 42. Outer formwork; 5. Waterproof board; 6. Filling space; , cable trench wall; 8, anti-seepage pull bolt; 9, lock nut; 10, through hole; 11, sealing plug; 111, flexible graphite sealing ring; 112, first abutting plate; 113, second Abutting plate; 114, abutting groove; 115, opening; 12, cavity; 13, driving assembly; 131, driving rod; 132, abutting block; 133, limit block; 134, first support rod; 135, second Support rod; 136, slider; 137, rotating nut; 14, positioning flange; 15, limit groove; 16, inclined surface; 17, spring; 18, sealing ring plate; 19, water expansion water stop strip; 20 , cobblestone sidewalk; 21, drainage slope; 22, drainage hole; 23, drainage pipe; 24, trapezoidal block.
具体实施方式Detailed ways
以下结合附图对本发明作进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings.
实施例:Example:
参照图1,为本发明公开的一种混凝土电缆沟施工工艺,包括以下操作步骤:Referring to Fig. 1, it is a concrete cable trench construction technique disclosed by the present invention, comprising the following operation steps:
步骤S1:根据设计要求,挖设电缆沟基槽1,电缆沟基槽1的两侧挖设排水沟2;若电缆沟底为松土或淤泥土质,采用水泥土搅拌桩加固地基;开挖后,基底及时排水,不得受水浸泡以及超挖,若超挖,采用碎石填至基底标高;Step S1: According to the design requirements, excavate the cable trench foundation groove 1, and excavate the
步骤S2:夯实基底原土,电缆沟基槽1、碎石经验收合格,放垫层中线、边线以及标高,抽干积水后浇筑混凝土垫层3,在捣制混凝土的过程中以及垫层混凝土终凝前不得中断排水;Step S2: tamp the original soil of the base, the cable trench foundation groove 1, the crushed stone have been accepted as qualified, put the cushion center line, the side line and the elevation, and pour the concrete cushion 3 after draining the accumulated water, in the process of tamping the concrete and the cushion Drainage shall not be interrupted before the final setting of concrete;
步骤S3:在混凝土垫层3上放线,逐点绑扎墙筋;Step S3: Lay out lines on the concrete cushion 3, and tie the wall reinforcement point by point;
步骤S4:在混凝土垫层3的两侧安装两组边墙钢模板4,边墙钢模板4包括内模板41和外模板42,内模板41和外模板42之间设有防水板5,防水板5的两侧壁分别与内模板41和外模板42之间预留有浇筑混凝土的填充空间6,电缆沟边墙的厚度尺寸为内模板41和外模板42之间距离尺寸;Step S4: Install two sets of side wall steel formwork 4 on both sides of the concrete cushion 3, the side wall steel formwork 4 includes an
步骤S5:混凝土搅拌,将混凝土浇筑至填充空间6内,形成电缆沟墙体7;Step S5: mixing the concrete, pouring the concrete into the filling space 6 to form the cable trench wall 7;
步骤S6:边墙钢模板4拆除;Step S6: the side wall steel formwork 4 is removed;
步骤S7:混凝土养护及保护,电缆沟墙体7的墙壁抹灰完成后,覆盖浇水养护不少于7d;Step S7: Concrete curing and protection, after the wall plastering of the cable trench wall body 7 is completed, cover the watering and curing for not less than 7d;
步骤S8:根据设计要求,土方回填并压实;Step S8: According to the design requirements, earthwork is backfilled and compacted;
由于混凝土浇筑形成的电缆沟墙体7具有一定的渗水性,土方回填之后,当遇到雨季时,泥土里容易出现渗水现象,利用防水板5可防止渗出的水通过电缆沟墙体7渗透至电缆沟墙体7的内部,防水板5是以高分子聚合物为基本原料制成的一种防渗材料,具有强度高、抗腐蚀、耐老化、防渗性能好的特点,进而起到阻隔的作用,可避免电缆沟墙体7内部产生积水,影响电缆的正常工作。Because the cable trench wall 7 formed by concrete pouring has a certain water permeability, after the earthwork is backfilled, in the rainy season, water seepage is easy to occur in the soil. The use of the
参照图1,电缆沟墙体7的内墙壁和外墙壁均涂刷有水泥基渗透结晶型防水涂料;水泥基渗透结晶型防水涂料具有自愈合性能、无毒、环保、防腐、耐酸碱等特点,同时具有渗透功能,能通过化学反应渗透到混凝土内部产生结晶,并封堵住混凝土的毛细孔,进而当回填的土中渗出水时,从源头对电缆沟墙体7起到防水的作用,进一步加强了抗渗效果,提高了电缆工作过程的稳定性。Referring to Figure 1, the inner and outer walls of the cable trench wall 7 are painted with cement-based permeable crystalline waterproof coating; It can penetrate into the concrete through chemical reaction to generate crystallization and block the capillary pores of the concrete, and then when the backfill soil seeps out water, it can waterproof the cable trench wall 7 from the source. It further strengthens the impermeability effect and improves the stability of the cable working process.
参照图1,步骤S2还包括步骤S21,在混凝土垫层3的中部铺设有鹅卵石人行道20,鹅卵石人行道20的长度方向与电缆沟墙体7的长度方向同向,在鹅卵石人行道20的两侧均设有排水坡面21,排水坡面21的坡度为3°至6°,排水坡面21的较高一端朝向鹅卵石人行道20相连,排水坡面21的较低一端朝向排水沟2并设有排水孔22,排水沟2沿电缆沟墙体7的长度方向等间距排列,排水孔22上连接有排水管23并延伸至排水沟2内;当电缆沟墙体7的内部产生积水时,排水坡面21的设置,对积水起到导流的作用,进而积水通过地心引力的作用,向排水孔22方向流动,最终积水通过排水管23及时排入排水沟2内,可避免积水堆积在电缆沟墙体7内部,影响了电缆工作过程的稳定性。1, step S2 also includes step S21, a
参照图1和图2,步骤S4中的防水板5、内模板41和外模板42之间通过防渗对拉螺栓8连接,防渗对拉螺栓8的两端螺纹连接有锁紧螺母9,内模板41、外模板42分别与防水板5侧壁之间的间距为8-10cm,进而电缆沟墙体7的墙壁厚度尺寸为16-20cm,坚固性强;电缆沟墙体7内形成有与防渗对拉螺栓8相配合的通孔10,防渗对拉螺栓8上设有用于封堵通孔10两端的密封封堵件11;防渗对拉螺栓8的设置,确保了内模板41、外模板42与防水板5之间的间距稳定,实现了在电缆沟墙体7浇筑完成后,使得防水板5稳定嵌设在电缆沟墙体7内部,加强了电缆沟墙体7的坚固性;电缆沟墙体7成型后,拧开锁紧螺母9,将模板拆除;由于土方回填后,泥土中的水易从电缆沟墙体7的外部,从通孔10的一端渗入通孔10的另一端,然后渗透至电缆沟墙体7的内部,利用密封封堵件11,可避免泥土中的水渗入电缆沟墙体7内部,使得电缆能够稳定工作。1 and 2, the
参照图2,密封封堵件11包括分别与防渗对拉螺栓8的两端螺纹连接的柔性石墨密封环111、呈弧形设置的第一抵板112和第二抵板113,柔性石墨密封环111的一端延伸至通孔10内,防渗对拉螺栓8内设有空腔12,防渗对拉螺栓8为空心对拉螺栓,第一抵板112和第二抵板113分别两两相对滑移设置在空腔12内,两个相对的第一抵板112和两个相对的第二抵板113沿防渗对拉螺栓8的径向相对滑移,柔性石墨密封环111的内环壁分别设有与第一抵板112和抵板相配合的抵紧槽114,空腔12内设有驱动第一抵板112、第二抵板113插入抵紧槽114内的驱动组件13,防渗对拉螺栓8的外壁分别设有供第一抵板112和第二抵板113穿过的开口115,锁紧螺母9抵紧在柔性石墨密封环111背向通孔10的端壁上;Referring to FIG. 2 , the sealing
柔性石墨密封环111具有耐高温、耐腐蚀、耐磨损的特性,且密封效果好;进而在封堵时,首先旋转柔性石墨密封环111,使得柔性石墨密封环111的一端插入通孔10内,堵住通孔10,实现了密封效果;其次旋转锁紧螺母9并向柔性石墨密封环111方向靠近,可将柔性石墨密封环111的一端稳定固定在通孔10内;然后利用驱动组件13驱动第一抵板112和第二抵板113穿过开口115并插入槽内,可将柔性石墨密封环111的外环壁抵紧在通孔10的两端内壁,填补了对拉螺栓与通孔10内壁之间的缝隙,提高了柔性石墨密封环111位于通孔10内的稳定性,进一步加强了密封效果;该密封方式,通过将柔性石墨密封环111的一端插入通孔10内,并将其插入通孔10内的外环壁抵紧在通孔10的内壁上,密封效果好,可避免水渗透至电缆沟墙体7内部。The flexible
参照图2和图3,柔性石墨密封环111的外环壁固定有密封环板18,密封环板18的侧壁设有遇水膨胀止水条19贴合在电缆沟墙体7的侧壁上;土方回填后,泥土对电缆沟墙体7的两侧受压,可将密封环板18、遇水膨胀止水条19紧贴在电缆沟墙体7的侧壁上;当泥土中渗水时,遇水膨胀止水条发生膨胀,将密封环板18与电缆沟墙体7之间的缝隙封堵,进一步加强了密封效果。Referring to FIGS. 2 and 3 , the outer ring wall of the flexible
参照图2和图3,驱动组件13包括位于空腔12内的驱动杆131、与驱动杆131的一端相连的抵块132、设置在抵块132底部侧壁上的限位块133、第一支杆134、第二支杆135、分别与第一支杆134和第二支杆135的一端相连的滑块136、分别转动连接在防渗对拉螺栓8的两个端壁转动连接的旋转螺母137,第一支杆134和第二支杆135均在开口115内滑移,开口11的尺寸与第一支杆134、第二支杆135的尺寸配合,驱动杆131远离抵块132的一端延伸出防渗对拉螺栓8的端壁外并与旋转螺母137螺纹连接,驱动杆131远离抵块132的一端外壁设为螺纹,驱动杆131靠近旋转螺母137的一端设有定位凸缘14,第一支杆134和第二支杆135远离滑块136的一端分别与第一抵板112和第二抵板113相连,滑块136沿空腔12的径向滑移,空腔12内沿其径向可设有供滑块136滑移的滑槽(图中未示出),以对滑块136的滑移起到限位作用,空腔12内沿其轴向设有供限位块133滑移的限位槽15,抵块132朝向滑块136的一端设有梯形块24,梯形块24的长底边与抵块132相连,滑块136朝向抵块132的侧壁设有与梯形块24的腰壁相配合的倾斜面16;2 and 3 , the
调节时,转动旋转螺母137,由于限位槽15对限位块133的滑移起到限位作用,且旋转螺母137与驱动杆131螺纹连接,带动限位块133在限位槽15内滑移,进而抵块132向滑块136方向靠近;定位凸缘14的设置,避免驱动杆131完全转动至空腔12内,起到限位作用;由于滑块136的侧壁设为倾斜面16,当抵块132在滑移过程中,使得滑块136稳定的在滑槽内滑移,进而两个相对的滑块136相互远离,进而第一支杆134和第二支杆135均穿过开口115,使得第一抵板112和第二抵板113插入抵紧槽114内,从而可将柔性石墨密封环111的外环壁抵紧在通孔10内壁,实现了对通孔10两端的密封;该驱动方式,方便操作,省时省力,封堵效率高。During adjustment, the
参照图2和图3,柔性石墨密封环111的内环、外环截面均为梯形,实现了在旋转柔性石墨密封环111时,可将柔性石墨密封环111的一端快速的插入通孔10内;由于柔性石墨密封环111的内环截面为梯形,第一支杆134的长度尺寸小于第二支杆135的长度尺寸,可将第一抵板112和第二抵板113插入抵紧槽114内,提高了柔性石墨密封环111的外环壁贴合在通孔10内部的紧密性,密封效果好。Referring to FIGS. 2 and 3 , the cross-sections of the inner ring and the outer ring of the flexible
参照图3,第一支杆134、第二支杆135上均套设有弹簧17,弹簧17的一端固定在空腔12内壁,弹簧17的另一端固定在滑块136的侧壁;弹簧17的设置,对滑块136起到限位作用,当浇筑电缆沟墙体7时,利用弹簧17的弹力,可将第一抵板112和第二抵板113远离通孔10的内壁,避免第一抵板112和第二抵板113与混凝土粘接;同时在浇筑混凝土前,可将防渗对拉螺栓8的两端套设防护模套,避免混凝土浆料通过开口115渗入空腔12内部,影响滑块136的滑移。3, the
工作过程:钢板拆除后,首先转动柔性石墨密封环111,使得柔性石墨密封环111一端插入通孔10内;其次旋转锁紧螺母9,使得柔性石墨密封环111紧堵住通孔10,进而可将遇水膨胀止水条19紧贴合在电缆沟墙体7的外壁,实现了密封效果;然后转动旋转螺母137,带动抵块132向滑块136方向滑移,此时两个相对的第一支杆134和两个相对的第二支杆135相互远离,同时弹簧17压缩,进而可将第一抵板112和第二抵板113均插入抵紧槽114内,从而可将柔性石墨密封环111的内环壁抵紧在通孔10的内壁上,进一步加强了密封效果;Working process: after the steel plate is removed, firstly rotate the flexible
土方回填后,当出现渗水情况时,首先遇水膨胀止水条19发生膨胀,填补电缆沟墙体7与密封环板18之间的缝隙,实现了初次防水效果;由于柔性石墨密封环111的一端紧堵住通过,其另一端的外环壁紧抵在通孔10的内壁,实现了二次防水、抗渗效果,有效的避免了水渗透至电缆沟墙体7内部;当电缆沟墙体7的上部出现渗水现象时,利用排水坡面21,可将电缆沟墙体7内部的积水及时排入排水沟2内,进而可防止电缆沟墙体7内部积水,影响电缆的正常工作。After earthwork is backfilled, when there is water seepage, the water-swelling water-
本具体实施方式的实施例均为本发明的较佳实施例,并非依此限制本发明的保护范围,故:凡依本发明的结构、形状、原理所做的等效变化,均应涵盖于本发明的保护范围之内。The embodiments of this specific embodiment are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore: all equivalent changes made according to the structure, shape and principle of the present invention should be covered in within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911089168.3A CN110808564B (en) | 2019-11-08 | 2019-11-08 | Concrete cable trench construction process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201911089168.3A CN110808564B (en) | 2019-11-08 | 2019-11-08 | Concrete cable trench construction process |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110808564A true CN110808564A (en) | 2020-02-18 |
| CN110808564B CN110808564B (en) | 2021-02-09 |
Family
ID=69502172
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201911089168.3A Active CN110808564B (en) | 2019-11-08 | 2019-11-08 | Concrete cable trench construction process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110808564B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111864667A (en) * | 2020-08-12 | 2020-10-30 | 陈柯柯 | Double-layer drainage type bridge |
| CN114156785A (en) * | 2021-11-30 | 2022-03-08 | 南京苏秦电力设备安装有限公司 | Power cable laying process |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6159399A (en) * | 1992-05-13 | 2000-12-12 | Rascor Spezialbau Gmbh | Procedure for the erection of concrete walls using braced boardings and device to carry out the same |
| CN202391123U (en) * | 2011-12-21 | 2012-08-22 | 中国十七冶集团有限公司 | Sealing split bolt for templates capable of being reused |
| CN102758451A (en) * | 2012-06-01 | 2012-10-31 | 湖北省输变电工程公司 | Concrete cable channel construction process |
| CN106640154A (en) * | 2017-01-13 | 2017-05-10 | 中交四公局第工程有限公司 | Treatment method and structure for water seepage of tunnel lining circular construction joint crack |
| CN206422499U (en) * | 2017-01-03 | 2017-08-18 | 山西省交通科学研究院 | Cold-proof outlet tunnel cable duct structure |
| CN208202558U (en) * | 2018-03-29 | 2018-12-07 | 青岛博海建设集团有限公司 | A kind of top plate reserved holes of pipes mold mechanism convenient for disassembly and assembly |
| CN110311343A (en) * | 2019-07-30 | 2019-10-08 | 四川国统混凝土制品有限公司 | A prefabricated steel cylinder concrete circular power pipe gallery with pipe seat |
-
2019
- 2019-11-08 CN CN201911089168.3A patent/CN110808564B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6159399A (en) * | 1992-05-13 | 2000-12-12 | Rascor Spezialbau Gmbh | Procedure for the erection of concrete walls using braced boardings and device to carry out the same |
| CN202391123U (en) * | 2011-12-21 | 2012-08-22 | 中国十七冶集团有限公司 | Sealing split bolt for templates capable of being reused |
| CN102758451A (en) * | 2012-06-01 | 2012-10-31 | 湖北省输变电工程公司 | Concrete cable channel construction process |
| CN206422499U (en) * | 2017-01-03 | 2017-08-18 | 山西省交通科学研究院 | Cold-proof outlet tunnel cable duct structure |
| CN106640154A (en) * | 2017-01-13 | 2017-05-10 | 中交四公局第工程有限公司 | Treatment method and structure for water seepage of tunnel lining circular construction joint crack |
| CN208202558U (en) * | 2018-03-29 | 2018-12-07 | 青岛博海建设集团有限公司 | A kind of top plate reserved holes of pipes mold mechanism convenient for disassembly and assembly |
| CN110311343A (en) * | 2019-07-30 | 2019-10-08 | 四川国统混凝土制品有限公司 | A prefabricated steel cylinder concrete circular power pipe gallery with pipe seat |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111864667A (en) * | 2020-08-12 | 2020-10-30 | 陈柯柯 | Double-layer drainage type bridge |
| CN114156785A (en) * | 2021-11-30 | 2022-03-08 | 南京苏秦电力设备安装有限公司 | Power cable laying process |
| CN114156785B (en) * | 2021-11-30 | 2022-08-23 | 南京苏秦电力设备安装有限公司 | Power cable laying process |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110808564B (en) | 2021-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110306616B (en) | Construction method of sewage pipeline | |
| CN110725341B (en) | Basement outer wall embedded sleeve and pipeline gap leakage treatment method | |
| CN106640154A (en) | Treatment method and structure for water seepage of tunnel lining circular construction joint crack | |
| CN110080801B (en) | Repair structure of damaged tunnel segment and construction method thereof | |
| CN109488371B (en) | Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method | |
| CN113668612A (en) | Modular combined prefabricated electric working well and its construction method | |
| CN109339118A (en) | A kind of basement bottom board leakage-resistant device and construction method | |
| CN111779028A (en) | A kind of finished product prefabricated electric power shallow trench and its construction method | |
| CN110808564A (en) | Concrete cable trench construction technology | |
| CN114809137A (en) | Basement bottom plate leakage maintenance directional drainage structure and construction method thereof | |
| CN113235652A (en) | Leakage plugging method for deformation joint of comprehensive pipe gallery | |
| CN112900583A (en) | Spatial intersection construction method for rainwater and sewage pipe positions at same elevation | |
| CN112038980A (en) | Direct-buried cable laying method | |
| CN107100206A (en) | A kind of prevention and controls of basement leakage | |
| CN113700111A (en) | Construction method of rainwater permeation, drainage and reuse integrated system | |
| CN116240969B (en) | Engineering temporary drainage ditch circulating construction method | |
| KR100456610B1 (en) | Structure method for drainageway of weak stratum and the conduct pipe thereof | |
| CN111335445B (en) | Construction method of concrete catch basin by using steel pipe as inner mold | |
| CN215630142U (en) | Modular combined prefabricated electric working well | |
| CN215367071U (en) | Flood prevention wall subsiding crack infiltration blocks up structure | |
| CN216428347U (en) | Underground construction covering and digging method concrete side wall top waterproof structure | |
| CN210507548U (en) | Sump pit expansion joint waterproof construction | |
| CN115012451A (en) | Underground structure induced joint | |
| CN108678002A (en) | A kind of precast assembly Pipe rack | |
| CN108374673A (en) | Discharge structure and its construction method outside a kind of sections of jurisdiction TBM |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250514 Address after: 230000 Xingyuan Community Service Center, High tech Zone, Hefei City, Anhui Province. Intersection of Hongfeng Road and Science Avenue, 5th Floor, Block A, Research Building, Zhongrui Building, Zone A, 8721 Patentee after: Hefei Yuqiang Information Technology Co.,Ltd. Country or region after: China Address before: 210046 Jiangsu Province Nanjing City Qixia District Qixia Street Xinhe Village Youyi Road 158 No. 158 Youyi Road, Xinhe Village, Qixia Street, Qixia District, Nanjing City, Jiangsu Province Patentee before: NANJING JULIAN TRANSMISSION INSTALLATION CO.,LTD. Country or region before: China |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20250820 Address after: 056000 Hebei Province, Handan City, Fengfeng Mining District, Lingshui Town, Taixing East Road No. 146, Guotai Business Building, Unit 1, 15th Floor Patentee after: Hebei Tianyao Electric Power Engineering Co.,Ltd. Country or region after: China Address before: 230000 Xingyuan Community Service Center, High tech Zone, Hefei City, Anhui Province. Intersection of Hongfeng Road and Science Avenue, 5th Floor, Block A, Research Building, Zhongrui Building, Zone A, 8721 Patentee before: Hefei Yuqiang Information Technology Co.,Ltd. Country or region before: China |