CN110793672B - Ultra-thick coal seam fully mechanized caving mining device based on bottom plate deformation monitoring system - Google Patents
Ultra-thick coal seam fully mechanized caving mining device based on bottom plate deformation monitoring system Download PDFInfo
- Publication number
- CN110793672B CN110793672B CN201911105561.7A CN201911105561A CN110793672B CN 110793672 B CN110793672 B CN 110793672B CN 201911105561 A CN201911105561 A CN 201911105561A CN 110793672 B CN110793672 B CN 110793672B
- Authority
- CN
- China
- Prior art keywords
- baffle
- model
- mining
- holes
- stress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005065 mining Methods 0.000 title claims abstract description 39
- 238000012544 monitoring process Methods 0.000 title claims abstract description 33
- 239000003245 coal Substances 0.000 title claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000013461 design Methods 0.000 claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000012545 processing Methods 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 claims description 3
- 239000000463 material Substances 0.000 abstract description 7
- 238000000034 method Methods 0.000 abstract description 6
- 238000012360 testing method Methods 0.000 abstract description 5
- 238000010276 construction Methods 0.000 abstract description 2
- 238000005259 measurement Methods 0.000 abstract description 2
- 238000004088 simulation Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000011160 research Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L1/00—Measuring force or stress, in general
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
- G01B21/32—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring the deformation in a solid
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
The invention relates to a device for simulating geological conditions and mining conditions in mining of a coal seam indoors, in particular to a fully mechanized caving mining device for an extra-thick coal seam based on a bottom plate deformation monitoring system. The invention provides a device for monitoring deformation damage and even damage depth of a bottom plate in indoor fully mechanized caving mining of an extra-thick coal seam, which is used for monitoring stress and strain data of different depths of the mining bottom plate in real time and solving the problems of large workload, difficult construction and test and the like in field actual measurement at present. The device comprises a three-part device, wherein the first part is a model frame system device, the second part is designed for arranging stress strain sensors, and the third part is a data acquisition and receiving device. The invention is convenient to simulate indoors, integrates three parts into a whole, and can allocate similar material proportions according to requirements; data can be collected and analyzed in real time according to the mining progress, calculated data are easy to obtain and convenient to process, comparison and analysis are carried out according to stress and strain data, and reliability of test results is verified mutually.
Description
Technical Field
The invention relates to a device for simulating geological conditions and mining conditions in mining of a coal seam indoors, in particular to a fully mechanized caving mining device for an extra-thick coal seam based on a bottom plate deformation monitoring system.
Background
At present, the simulation of the heights of a mining roof caving zone and a water diversion fracture zone by adopting a similar theory is relatively more, the research on the deformation damage aspect of a bottom plate under the mining ore pressure action is relatively less, and a similar simulation device and a monitoring system for the deformation damage and the damage depth aspect of the mining bottom plate under the deep ultra-thick coal seam fully mechanized caving mining condition are lacked. Therefore, a simulation device for deformation damage similar materials of the fully mechanized caving mining bottom plate of the ultra-thick coal seam integrating a monitoring system is needed to be developed, and real-time monitoring of deformation damage and even damage of the bottom plate is carried out through strain and strain data acquisition in the mining process.
Disclosure of Invention
The invention aims to provide a device for monitoring deformation damage and damage depth of a bottom plate in indoor fully mechanized caving mining of an extra-thick coal seam, so as to monitor stress and strain data of different depths of the mining bottom plate in real time and solve the problems of large workload, difficult construction and test and adverse factors of the existing field actual measurement.
The invention is realized by adopting the following technical scheme: a fully mechanized caving mining device for an extra-thick coal seam based on a bottom plate deformation monitoring system comprises a model frame system device and a stress-strain sensor arrangement design;
the model frame system device structure is as follows:
firstly, designing the integral framework structure of the model:
(1) the length, width and height inside the model are 4000 multiplied by 300 multiplied by 1600 mm;
(2) the length, width and height of the baffle plates at the left side and the right side of the model are 50 multiplied by 300 multiplied by 1600mm, and a thick steel plate with the thickness of 50mm is used;
(3) the length and width of the baffle at the bottom of the model are 5000 multiplied by 300mm, and a steel plate with the thickness of 20mm is used;
(4) the length and width of the cover plate at the top of the model are 3800 mm multiplied by 280mm, and the thickness of the cover plate is 10 mm;
secondly, the design of the front and the rear baffle plates
(1) The front baffle and the rear baffle are both in a transverse water tank shape, the back of the front baffle and the rear baffle are fixed on the model from bottom to top in sequence by screws at two ends, and meanwhile, the upper part and the lower part of each two baffles are connected and fixed by three screws with the diameter of 20mm, so that the front baffle and the rear baffle are convenient to mount and dismount;
(2) the front baffle and the rear baffle are processed and manufactured by a thick steel plate with the thickness of 10mm, the length and the height of the front baffle and the rear baffle are 5000 multiplied by 200mm, and the front baffle and the rear baffle extend out of 50mm groove eaves from top to bottom;
(3) three screw holes with the diameter of 20mm are respectively formed in the middle of the groove eaves extending out of 50mm up and down along the length direction at intervals of 1000mm in an up-down symmetrical mode;
(4) two ends of each front baffle and each rear baffle are provided with holes from bottom to top, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm;
finally, the size of the opening of the left and right baffle plates is designed
(1) The bottoms of the left and right side baffles are symmetrically welded on a steel plate at the bottom of the model, and holes are formed in the front and the back of the left and right side baffles according to the heights of the front and back side baffles and the sizes of the holes, so that the left and right side baffles can be fixed by screws;
(2) the left baffle and the right baffle are provided with holes from bottom to top, the two holes are formed in one period, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm; a third hole is formed in the second hole at the interval of 60mm, and the steps are performed similarly in sequence, so that the third hole corresponds to the holes in the two ends of the front baffle and the rear baffle and is fixed conveniently by screws;
(3) the front and the back of each side of the left baffle plate and the right baffle plate are respectively provided with 16 screw holes with the diameter of 30mm, and the total number of the screw holes is 64;
the second part is designed for stress strain sensor arrangement
Firstly, designing a longitudinal section of a model:
(1) the length of the model is 4000mm, and the height of the model is set up according to the geology and the mining condition of a certain working face of the mine which is actually simulated;
(2) respectively reserving 300-sand-doped 500-mm protective coal pillars in mining coal seams at the left end and the right end of the model, and then sequentially arranging four monitoring lines from the hole cutting direction to the mining stopping line direction, namely the length direction of the model, wherein the distance between the first three monitoring lines is 700-sand-doped 900mm, and the distance between the second two monitoring lines is 1500-sand-doped 1700 mm;
(3) 4-6 stress sensors and 8-12 strain sensors are respectively distributed on each monitoring line, the stress sensors are distributed on a typical stratum, and the strain sensors are distributed at intervals of 25-35mm from top to bottom;
secondly, the design of the transverse sensor arrangement
(1) According to the positions of the four monitoring lines, strain sensors and stress sensors are sequentially distributed at a distance of 100mm from the front baffle or the rear baffle in the transverse direction;
(2) the distance between two sensors on the same monitoring section and the same horizontal plane is 100 mm;
and acquiring data acquired by the stress sensor and the strain sensor in real time by using a computer and a data acquisition instrument and processing the data.
The model design comprises a frame structure model and an internal experiment model, the structural parameters corresponding to the two models are obtained through accurate calculation and are very close to the actual situation of fully mechanized caving mining of the ultra-thick coal seam, and the simulation result can effectively guide the on-site roadway floor support, the stope floor management and the like; meanwhile, stress and strain sensors which are embedded in the model in advance are utilized, the stress and strain conditions of different depths of the coal seam floor can be tracked and monitored at any time in the mining process, and therefore the deformation damage and the damage depth characteristics of the different depths of the mined coal seam floor can be accurately and quantitatively judged.
The invention relates to an ultra-thick coal seam mining device which integrates a bottom plate deformation monitoring system by combining the characteristics of convenient simulation indoors and the actual geological and mining conditions of research, and can monitor the stress and the strain of bottom plates at different depths in real time in the mining process. Through similar theory, carry out the ratio of indoor similar material, utilize stress and strain sensor buried underground in advance in the model, can carry out the tracking monitoring coal seam bottom plate different degree of depth stress and the strain condition of mining in-process at any time to accurate quantification judges the different degree of depth deformation damage of coal seam bottom plate of exploitation and destroys the degree of depth characteristic. The device is particularly suitable for inconvenient on-site monitoring of the deep underground ultra-thick coal seam fully mechanized caving mining bottom plate, and then the situation that the mining bottom plate is deformed, damaged or even damaged in depth is simulated indoors according to a similar theory.
The invention is convenient to simulate indoors, integrates three parts into a whole, and can allocate similar material proportions according to requirements; data can be collected and analyzed in real time according to the mining progress, calculated data are easy to obtain and convenient to process, comparison and analysis are carried out according to stress and strain data, and reliability of test results is verified mutually.
Drawings
FIG. 1 is a schematic diagram of an integrated device framework of the present invention.
FIG. 2 is a schematic view of a front and rear side baffle of the present invention.
FIG. 3 is a vertical section model diagram of a similar material test established for geological conditions of a study area according to the invention.
FIG. 4 is a schematic diagram of a cross-sectional sensor layout model of a similar material of the present invention.
Detailed Description
The device comprises a three-part device, wherein the first part is a model frame system device, the second part is designed for arranging stress strain sensors, and the third part is a data acquisition and receiving device.
The first part is the design of model frame system, which combines with the successful case of Xin-mine by the same coal mine group to make concrete description:
firstly, designing the overall framework structure of the model (shown in figure 1):
(1) the length, width and height inside the model are 4000 multiplied by 300 multiplied by 1600 mm;
(2) the length, width and height of the baffle plates at the left side and the right side of the model are 50 multiplied by 300 multiplied by 1600mm, and a thick steel plate with the thickness of 50mm is used;
(3) the length and width of the baffle at the bottom of the model are 5000 multiplied by 300mm, and a steel plate with the thickness of 20mm is used;
(4) the length and width of the cover plate at the top of the model are 3800 mm multiplied by 280mm, and the thickness of the steel plate is 10mm, so that the equivalent load (7.5MPa) can be conveniently applied, and the whole stress of the model is uniform.
Secondly, the structure design of the front and the back baffles (shown in figure 2)
(1) The baffles are in a horizontal water tank shape, the back surfaces of the baffles are fixed on the model from bottom to top in sequence by screws at two ends, and the upper part and the lower part of each two baffles are connected and fixed by three screws with the diameter of 20mm, so that the installation and the disassembly are convenient;
(2) the baffle is made of a steel plate with the thickness of 10mm, the length and the height of the baffle are 5000 multiplied by 200mm, and the baffle extends out 50mm up and down and is used for fixing and connecting screws to prevent similar materials from scattering;
(3) three screw holes with the diameter of 20mm are respectively formed in the middle of the groove eaves extending out of 50mm up and down according to the vertical symmetry of 1000 mm;
(4) and two ends of each baffle plate are provided with holes from bottom to top, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm.
Finally, the size of the opening of the left and right baffle plates is designed
(1) The bottoms of the left and right side baffles are symmetrically welded on a steel plate at the bottom of the model, and holes are formed in the front and the back of the left and right side baffles according to the heights of the front and back side baffles and the sizes of the holes, so that the left and right side baffles can be fixed by screws;
(2) the baffle plates on the two sides are provided with holes from bottom to top, the two holes are formed in one period, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm; a third hole is formed in the second hole at the interval of 60mm, and the steps are performed similarly in sequence, so that the third hole corresponds to the holes in the two ends of the front baffle and the rear baffle and is fixed conveniently by screws;
(3) the front and the back of each side of the two side baffles are respectively provided with 16 screw holes with the diameter of 30mm, and the total number of the screw holes is 64.
The second part is the stress strain sensor layout design, which combines the successful case of the same Xin mine of the same coal mine group to make concrete description:
firstly, designing a longitudinal section of a model:
(1) the model length and height is based on geological conditions of a mining working face of the same Xin mine of the same coal mine group as a background, and the length and height dimension is 4000 multiplied by 1520 mm;
(2) 400mm protective coal pillars (along the length direction of the model, namely the left and right direction in fig. 3) are reserved on the mined coal seams at the two ends of the model respectively, then four monitoring lines are sequentially arranged from the cutting hole to the mining stopping line direction, the distance between the first three monitoring lines is 800mm, and the distance between the second two monitoring lines is 1600 mm;
(3) 5 stress sensors and 10 strain sensors are respectively arranged on each monitoring line, the stress sensors are arranged on typical strata, the distance between the strain sensors from top to bottom is 30mm, and the first layer of the coal seam direct floor is arranged in the middle of the mudstone.
Secondly, the design of the transverse sensor arrangement (as shown in figure 4)
(1) According to the positions of the four monitoring lines, strain sensors and stress sensors are sequentially arranged at a distance of 100mm from a boundary in the transverse direction (namely in the front-back direction);
(2) the distance between the two sensors is 100 mm.
The third part mainly realizes the functions of data acquisition, processing, query and the like by means of a high-performance computer and a data acquisition instrument.
Claims (2)
1. A deep coal seam fully mechanized caving mining device based on a bottom plate deformation monitoring system is characterized by comprising a model frame system device and a stress-strain sensor arrangement design;
the model frame system device structure is as follows:
firstly, designing the integral framework structure of the model:
(1) the length, width and height inside the model are 4000 multiplied by 300 multiplied by 1600 mm;
(2) the length, width and height of the baffle plates at the left side and the right side of the model are 50 multiplied by 300 multiplied by 1600mm, and a thick steel plate with the thickness of 50mm is used;
(3) the length and width of the baffle at the bottom of the model are 5000 multiplied by 300mm, and a steel plate with the thickness of 20mm is used;
(4) the length and width of the cover plate at the top of the model are 3800 mm multiplied by 280mm, and the thickness of the cover plate is 10 mm;
secondly, the design of the front and the rear baffle plates
(1) The front baffle and the rear baffle are both in a transverse water tank shape, the back of the front baffle and the rear baffle are fixed on the model from bottom to top in sequence by screws at two ends, and meanwhile, the upper part and the lower part of each two baffles are connected and fixed by three screws with the diameter of 20mm, so that the front baffle and the rear baffle are convenient to mount and dismount;
(2) the front baffle and the rear baffle are processed and manufactured by a thick steel plate with the thickness of 10mm, the length and the height of the front baffle and the rear baffle are 5000 multiplied by 200mm, and the front baffle and the rear baffle extend out of 50mm groove eaves from top to bottom;
(3) three screw holes with the diameter of 20mm are respectively formed in the middle of the groove eaves extending out of 50mm up and down along the length direction at intervals of 1000mm in an up-down symmetrical mode;
(4) two ends of each front baffle and each rear baffle are provided with holes from bottom to top, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm;
finally, the size of the opening of the left and right baffle plates is designed
(1) The bottoms of the left and right side baffles are symmetrically welded on a steel plate at the bottom of the model, and holes are formed in the front and the back of the left and right side baffles according to the heights of the front and back side baffles and the sizes of the holes, so that the left and right side baffles can be fixed by screws;
(2) the left baffle and the right baffle are provided with holes from bottom to top, the two holes are formed in one period, the center of the first hole is 30mm away from the bottom, the diameter of the hole is 30mm, and the center distance between the two holes is 140 mm; a third hole is formed in the second hole at the interval of 60mm, and the steps are performed similarly in sequence, so that the third hole corresponds to the holes in the two ends of the front baffle and the rear baffle and is fixed conveniently by screws;
(3) the front and the back of each side of the left baffle plate and the right baffle plate are respectively provided with 16 screw holes with the diameter of 30mm, and the total number of the screw holes is 64;
the second part is designed for stress strain sensor arrangement
Firstly, designing a longitudinal section of a model:
(1) the length of the model is 4000mm, and the height of the model is set up according to the geology and the mining condition of a certain working face of the mine which is actually simulated;
(2) respectively reserving 300-sand-doped 500-mm protective coal pillars in mining coal seams at the left end and the right end of the model, and then sequentially arranging four monitoring lines from the hole cutting direction to the mining stopping line direction, namely the length direction of the model, wherein the distance between the first three monitoring lines is 700-sand-doped 900mm, and the distance between the second two monitoring lines is 1500-sand-doped 1700 mm;
(3) 4-6 stress sensors and 8-12 strain sensors are respectively distributed on each monitoring line, the stress sensors are distributed on a typical stratum, and the strain sensors are distributed at intervals of 25-35mm from top to bottom;
secondly, the design of the transverse sensor arrangement
(1) According to the positions of the four monitoring lines, strain sensors and stress sensors are sequentially distributed at a distance of 100mm from the front baffle or the rear baffle in the transverse direction;
(2) the distance between two sensors on the same monitoring section and the same horizontal plane is 100 mm;
acquiring data acquired by the stress sensor and the strain sensor in real time by using a computer and a data acquisition instrument and processing the data;
the equivalent load applied by the top cover plate is 6.5-8.5 MPa.
2. The fully mechanized caving mining device for extra-thick coal seams based on the floor deformation monitoring system according to claim 1, wherein the strain sensor adopts a resistance strain gauge, and the stress sensor adopts an earth pressure cell.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911105561.7A CN110793672B (en) | 2019-11-13 | 2019-11-13 | Ultra-thick coal seam fully mechanized caving mining device based on bottom plate deformation monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911105561.7A CN110793672B (en) | 2019-11-13 | 2019-11-13 | Ultra-thick coal seam fully mechanized caving mining device based on bottom plate deformation monitoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110793672A CN110793672A (en) | 2020-02-14 |
CN110793672B true CN110793672B (en) | 2021-08-03 |
Family
ID=69444296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911105561.7A Active CN110793672B (en) | 2019-11-13 | 2019-11-13 | Ultra-thick coal seam fully mechanized caving mining device based on bottom plate deformation monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110793672B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104132844A (en) * | 2014-08-14 | 2014-11-05 | 贵州大学 | Dynamic disturbance induction coal and gas outburst simulation experiment device and experiment method |
CN104181611A (en) * | 2014-08-28 | 2014-12-03 | 山东科技大学 | Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method |
CN104237024A (en) * | 2014-10-10 | 2014-12-24 | 山东科技大学 | Mine working face floor mining damage simulating experiment method |
CN104730585A (en) * | 2015-03-26 | 2015-06-24 | 山东科技大学 | Method for monitoring destroying depth of mining working face base plate in real time |
CN105021662A (en) * | 2015-08-24 | 2015-11-04 | 山东科技大学 | Real-time dynamic monitoring test device for water regimen of mining working surface and test method |
CN205786608U (en) * | 2016-05-05 | 2016-12-07 | 安徽理工大学 | Pressure-bearing tomography adopts activation and water inrush channel forming process similar test device |
CN104266913B (en) * | 2014-10-10 | 2017-02-08 | 山东科技大学 | Mining failure simulation test device for mine working face floor |
CN108766191A (en) * | 2018-05-17 | 2018-11-06 | 中国矿业大学(北京) | A kind of experimental simulation frame of multilevel unitized production |
CN109917108A (en) * | 2019-04-16 | 2019-06-21 | 辽宁工程技术大学 | A kind of three-dimensional similar material model experiment device and method for simulating seam mining |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005065411A2 (en) * | 2003-12-31 | 2005-07-21 | Saudi Arabian Oil Company | Test apparatus for direct measurement of expansion and shrinkage of oil well cements |
CN101377479B (en) * | 2008-09-25 | 2011-12-28 | 山东科技大学 | Stope mine pressing three-dimensional physical simulation test stand |
CN107328385B (en) * | 2017-08-15 | 2023-04-18 | 山东科技大学 | Goaf top and bottom plate deformation and filling body stress monitoring integrated device and method |
-
2019
- 2019-11-13 CN CN201911105561.7A patent/CN110793672B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104132844A (en) * | 2014-08-14 | 2014-11-05 | 贵州大学 | Dynamic disturbance induction coal and gas outburst simulation experiment device and experiment method |
CN104181611A (en) * | 2014-08-28 | 2014-12-03 | 山东科技大学 | Mine working face top board and bottom board mining breaking fracture development dynamic monitoring method |
CN104237024A (en) * | 2014-10-10 | 2014-12-24 | 山东科技大学 | Mine working face floor mining damage simulating experiment method |
CN104266913B (en) * | 2014-10-10 | 2017-02-08 | 山东科技大学 | Mining failure simulation test device for mine working face floor |
CN104730585A (en) * | 2015-03-26 | 2015-06-24 | 山东科技大学 | Method for monitoring destroying depth of mining working face base plate in real time |
CN105021662A (en) * | 2015-08-24 | 2015-11-04 | 山东科技大学 | Real-time dynamic monitoring test device for water regimen of mining working surface and test method |
CN205786608U (en) * | 2016-05-05 | 2016-12-07 | 安徽理工大学 | Pressure-bearing tomography adopts activation and water inrush channel forming process similar test device |
CN108766191A (en) * | 2018-05-17 | 2018-11-06 | 中国矿业大学(北京) | A kind of experimental simulation frame of multilevel unitized production |
CN109917108A (en) * | 2019-04-16 | 2019-06-21 | 辽宁工程技术大学 | A kind of three-dimensional similar material model experiment device and method for simulating seam mining |
Non-Patent Citations (1)
Title |
---|
特厚煤层上向分层长壁逐巷胶结充填开采覆岩移动控制机理研究;邓雪杰;《中国博士学位论文全文数据库 工程科技Ⅰ辑》;20180115;第88-92页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110793672A (en) | 2020-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105092816B (en) | Three-dimensional multi-coal-seam-mining similar material model experimental system | |
CN104266913B (en) | Mining failure simulation test device for mine working face floor | |
AU2017421071B2 (en) | Three-aspect integrated monitoring method for strata control | |
Ju et al. | Numerical analysis of the dynamic evolution of mining-induced stresses and fractures in multilayered rock strata using continuum-based discrete element methods | |
CN110346216B (en) | Coal rock triaxial loading test device and method under condition of simulated tunneling disturbance | |
Kulatilake et al. | Investigation of stability of a tunnel in a deep coal mine in China | |
Wang et al. | Assessment of excavation damaged zone around roadways under dynamic pressure induced by an active mining process | |
CN109653800B (en) | Composite power disaster monitoring and early warning system and method for deep water-rich overburden thick coal seam mining | |
Guangchao et al. | Ground response of entries driven adjacent to a retreating longwall panel | |
CN109855974A (en) | Cover stress and deformation characteristic test method based on analog simulation pilot system | |
CN104454010A (en) | Integrated monitoring and early warning system and early warning method for dynamic condition of deep well drivage construction | |
Liang et al. | Theoretical models for simulating the failure range and stability of inclined floor strata induced by mining and hydraulic pressure | |
CN202994353U (en) | Tunnel three dimensional stress field stimulation system | |
CN104237024A (en) | Mine working face floor mining damage simulating experiment method | |
CN110792450B (en) | Method for determining advanced support of grouting anchor cable | |
CN105021662B (en) | Adopt workplace regimen real-time dynamic monitoring test unit and test method | |
CN205562534U (en) | Low coverage coal seam group bao shui exploitation simulation modeling experiment device | |
Xu et al. | Mining-induced movement properties and fissure time-space evolution law in overlying strata | |
CN110609335A (en) | Multi-means-based residual mining area complex condition detection method | |
CN107165634A (en) | A kind of the go down the hill width of protection pillar of large mining depth thump high seam master is stayed and set and guard method | |
Waclawik et al. | Rock bolting at the room and pillar method at great depths | |
Mandal et al. | Underpinning-based simultaneous extraction of contiguous sections of a thick coal seam under weak and laminated parting | |
CN103061774A (en) | Shield tunnel construction environment simulation unit | |
CN111579755A (en) | Stope filling body simulation experiment device and method | |
CN104237486A (en) | Mining fracturing simulating test device for sealing drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 037003 xinpingwang mining area, Datong City, Shanxi Province Applicant after: Jinneng holding Coal Group Co.,Ltd. Applicant after: China University of Mining and Technology Address before: 037003 Wangxiao North Street, Xinping, Datong mining area, Shanxi Province Applicant before: Datong Coal Mine Group Co.,Ltd. Applicant before: China University of Mining and Technology |
|
GR01 | Patent grant | ||