CN110760919A - High-bearing lifting hanger for electroplating - Google Patents
High-bearing lifting hanger for electroplating Download PDFInfo
- Publication number
- CN110760919A CN110760919A CN201911172915.XA CN201911172915A CN110760919A CN 110760919 A CN110760919 A CN 110760919A CN 201911172915 A CN201911172915 A CN 201911172915A CN 110760919 A CN110760919 A CN 110760919A
- Authority
- CN
- China
- Prior art keywords
- lifting
- hanger
- gear
- portal frame
- electroplating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D17/00—Constructional parts, or assemblies thereof, of cells for electrolytic coating
- C25D17/06—Suspending or supporting devices for articles to be coated
- C25D17/08—Supporting racks, i.e. not for suspending
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Electroplating Methods And Accessories (AREA)
Abstract
The invention discloses a high-bearing lifting hanger for electroplating, which comprises a horizontal moving portal frame, wherein a plurality of hangers are hung at the lower part of the horizontal moving portal frame, the tail end of the horizontal moving portal frame is connected with a drying chamber, and lifting devices for adjusting the vertical heights of the hangers are arranged on the double inner side walls of the horizontal moving portal frame, compared with the prior art, the high-bearing lifting hanger for electroplating has the following technical effects: 1. the electroplating lifting hanger bracket system is highly automatic, saves manpower resources and physical expenditure, and accelerates the efficiency of electroplating work; 2, the invention enables the paint-plated product to automatically enter a drying chamber after the completion of electroplating to obtain sufficient hot air for drying; 3 the hanger structure adopted by the invention has the characteristics of high bearing capacity and high stability.
Description
Technical Field
The application relates to a high-bearing lifting hanger for electroplating.
Background
Generally, the electroplating process mainly goes through an electrolysis process, wherein after a voltage is inputted between an anode and a cathode, metal ions in the electroplating solution are attracted to the cathode and are reduced to be plated on a plated object connected with the cathode, and meanwhile, the metal connected with the anode is re-dissolved to provide more metal ions in the electroplating solution, so that the electrolysis process is continued until a sufficient plating layer is deposited on the plated object.
The traditional hanger needs to undergo steel wire cutting, bending and copper pipe punching, one copper wire and one nut are placed at a specified position and then screwed down by a screw, and the last hanger is shaped separately, so that the labor cost in each step is large; traditional electroplating hanger, the structure is complicated, is difficult for standardized, mass production to the shape is irregular, is not convenient for densely hang and establishes and wait to electroplate the work piece, is not convenient for automizedly hang and puts and wait to electroplate the work piece, and production efficiency is low. The existing electroplating hanging tool is operated in the whole manual process, time and physical power are consumed for carrying the hanging part and the hanging tool, and the hanging part are transferred to a drying device from an electroplating box body manually.
Disclosure of Invention
In order to solve the technical problem that the electroplating hanger consumes time and labor, the application discloses a high-bearing lifting hanger for electroplating, which comprises a horizontal movement portal frame, wherein a plurality of hangers are hung on the lower part of the horizontal movement portal frame, the tail end of the horizontal movement portal frame is connected with a drying chamber, and a lifting device for adjusting the vertical height of the hangers is arranged on the double inner side walls of the horizontal movement portal frame.
The invention can be further optimized into that the horizontal movement portal frame comprises two guide beams which are arranged in parallel and fixed on the upper part of a factory building, the upper surface of each guide beam is provided with an upper guide rail, a travelling crane can be movably arranged on each guide beam through a pulley embedded in each guide rail, two sides of each guide beam are fixedly connected with stand columns, racks are arranged on the inner sides of the stand columns, and the lower part of the horizontal movement portal frame moves on a base fixed on the ground through a pulley II.
The invention can be further optimized to provide power for the traveling crane with a servo motor, a reduction gear set is arranged between the servo motor and the pulleys of the traveling crane, the reduction gear set comprises a power input gear fixedly connected with the servo motor, a coaxial gear and a rotating gear fixed on a rotating shaft of the pulleys, the coaxial gear is a gear set formed by coaxially fixing a gear with a large diameter and a gear with a small diameter, the gear with the large diameter is meshed with the power input gear, and the gear with the small diameter is meshed with the rotating gear.
The invention can be further optimized in that the lifting device comprises a lifting motor and a lifting gear fixed on a motor shaft of the lifting motor, and the lifting device drives a cross beam arranged in the middle of the lifting device to move up and down.
The invention can be further optimized in that the lifting device can be replaced by a lifting steel cable fixedly connected on a motor shaft of the lifting motor, and the other end of the lifting steel cable is fixed on a pulley on the bottom surface of the guide beam.
The hanging tool can be further optimized to comprise a main rod in the middle and hanging rods vertically arranged on two sides of the main rod, two C-shaped retaining rings are arranged at the hanging position of the hanging tool, and the retaining ring close to the right is buckled on the cross beam.
The invention can be further optimized to be that a plurality of fastening grooves for preventing the hanging tool from sliding or falling are uniformly fixed on the cross beam.
The invention can be further optimized in that the hanging tool can be replaced by a rectangular frame and a plurality of transverse rods which are transversely arranged in parallel in the rectangular frame.
The invention can be further optimized in that the drying chamber is provided with a lifting support, the structure of the lifting support is the same as that of the horizontal movement portal frame, and a lifting rod of the lifting support can clamp a left retaining ring of the hanger to enable the hanger to be separated from the cross beam.
The invention can be further optimized to be provided with a laser anti-collision device on the lifting support.
Compared with the prior art, the application can obtain the following technical effects: 1. the electroplating lifting hanger bracket system is highly automatic, saves manpower resources and physical expenditure, and accelerates the efficiency of electroplating work; 2, the invention enables the paint-plated product to automatically enter a drying chamber after the completion of electroplating to obtain sufficient hot air for drying; 3 the hanger structure adopted by the invention has the characteristics of high bearing capacity and high stability.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a schematic diagram of the general structure of the present invention;
FIG. 2 is a schematic structural view of a joint of a horizontal moving gantry and a drying chamber of the present invention;
FIG. 3 is a schematic illustration of the reduction gear set configuration of the present invention;
FIG. 4 is a schematic view of the construction of the lift of the present invention;
FIG. 5 is a schematic view of another embodiment of the lift of the present invention;
FIG. 6 is a schematic view of a hanger of the present invention;
fig. 7 is another schematic structural view of the hanger of the present invention.
Detailed Description
Embodiments of the present application will be described in detail with reference to the drawings and examples, so that how to implement technical means to solve technical problems and achieve technical effects of the present application can be fully understood and implemented.
As shown in fig. 1 to 7, the high-load-bearing lifting hanger for electroplating according to the embodiment of the present application includes a horizontal movement gantry 1, a plurality of hangers 2 are hung on a lower portion of the horizontal movement gantry 1, a drying chamber 3 is connected to a tail end of the horizontal movement gantry 1, and a lifting device 4 for adjusting vertical heights of the hangers 2 is arranged on two inner side walls of the horizontal movement gantry 1.
Embodiment 1, a horizontal movement gantry 1 comprises two guide beams 5 which are arranged in parallel and fixed on the upper part of a factory building, the upper surface of the guide beam 5 is provided with an upper guide rail 6, a traveling crane 8 can be movably arranged on the guide beam 5 through a pulley 7 embedded in the guide rail 6, two sides of the guide beam 5 are fixedly connected with an upright post 15, the inner side of the upright post is provided with a rack 16, the lower part of the horizontal movement gantry 1 moves on a base 22 fixed on the ground through a pulley two 21, the traveling crane 8 is provided with power provided by a servo motor 9, a reduction gear set is arranged between the servo motor 9 and the pulley 7 of the traveling crane 8, the reduction gear set comprises a power input gear 10 fixedly connected with the servo motor 9, a coaxial gear 11 and a rotating gear 12 fixed on a rotating shaft of the pulley 7, the coaxial gear 11 is a gear formed by coaxially fixing a gear with a large diameter and a gear with a, the gear that the diameter is little meshes with running gear 12, and horizontal migration portal frame 1 can carry out the ration through the control of driving 8 and remove about, drives the hanger and carries out the displacement, has reduced the labour of workman's transport hanger, and the cooperation of horizontal migration portal frame 1 and base 22, and it is higher to enable the holistic removal precision of portal frame.
Embodiment 2, elevating gear 4 includes elevator motor 17 and is fixed in elevator gear 18 on the elevator motor 17 motor shaft, and elevating gear 4 drives the crossbeam 14 that sets up in the middle of the elevating gear up-and-down motion, and the lift characteristics of this embodiment are that the bearing is strong, and accuracy control is accurate.
Embodiment 4, the hanger 2 includes the middle mobile jib 25 and sets up the peg 26 in the both sides of mobile jib 25 perpendicularly, and the department of hanging of hanger 2 is the buckle 23 of two C types, and the buckle 23 near the right is detained on crossbeam 14, and even being fixed with a plurality of catching groove 24 that is used for preventing the hanger slip or drop on crossbeam 14, and this embodiment is applicable to annular piece that is plated, and it is fast to go up the unloading.
Embodiment 5, the hanger 2 can be replaced by a rectangular frame 27 and several transverse rods 28 arranged in parallel transversely in the rectangular frame 27, and this embodiment is suitable for flexible plated parts.
In embodiment 6, the drying chamber 3 is provided with the lifting bracket 29, the structure of the lifting bracket 29 is the same as that of the horizontal movement portal frame 1, the lifting rod 30 of the lifting bracket 29 can clamp the left retaining ring 23 of the hanger 2 to release the hanger from the cross beam 14, and the lifting bracket 29 is provided with the laser anti-collision device 31, so that the hanger after being electroplated can be seamlessly transferred into the drying chamber, and the paint-coated product can automatically enter the drying chamber after being electroplated to be sufficiently dried by hot air.
Compared with the prior art, the application can obtain the following technical effects: 1. the electroplating lifting hanger bracket system is highly automatic, saves manpower resources and physical expenditure, and accelerates the efficiency of electroplating work; 2, the invention enables the paint-plated product to automatically enter a drying chamber after the completion of electroplating to obtain sufficient hot air for drying; 3 the hanger structure adopted by the invention has the characteristics of high bearing capacity and high stability.
The foregoing description shows and describes several preferred embodiments of the invention, but as aforementioned, it is to be understood that the invention is not limited to the forms disclosed herein, but is not to be construed as excluding other embodiments and is capable of use in various other combinations, modifications, and environments and is capable of changes within the scope of the inventive concept as expressed herein, commensurate with the above teachings, or the skill or knowledge of the relevant art. And that modifications and variations may be effected by those skilled in the art without departing from the spirit and scope of the invention as defined by the appended claims.
Claims (10)
1. The utility model provides a high bearing lift hanger for electroplate, includes horizontal migration portal frame (1), the lower part of horizontal migration portal frame (1) has hung a plurality of hangers (2), the tail end of horizontal migration portal frame (1) even has drying chamber (3), its characterized in that, be equipped with on the two inside walls of horizontal migration portal frame (1) and be used for adjusting elevating gear (4) of hanger (2) vertical height.
2. A high load bearing lifting hanger for electroplating according to claim 1 wherein: horizontal migration portal frame (1) includes two parallel arrangement, is fixed in nose girder (5) on factory building upper portion, the upper surface of nose girder (5) is opened has upper guide rail (6), nose girder (5) go up through inlay in pulley (7) in guide rail (6) can mobile be provided with driving (8), the both sides fixedly connected with stand (15) of nose girder (5), the inboard of stand is equipped with rack (16), the lower part of horizontal migration portal frame (1) is passed through two (21) pulleys and is removed on base (22) that are fixed in ground.
3. A high load bearing lifting hanger for electroplating according to claim 2 wherein: driving (8) have servo motor (9) to provide power, servo motor (9) with be speed reduction gear group between pulley (7) of driving (8), speed reduction gear group include with servo motor (9) fixed connection's power input gear (10), coaxial gear (11) with be fixed in pulley (7) are changeed epaxial running gear (12), coaxial gear (11) are the gear train that the gear that a diameter is big and the gear coaxial fixation that a diameter is little formed, the gear that its diameter is big with power input gear (10) meshing, the gear that the diameter is little with running gear (12) meshing.
4. A high load bearing lifting hanger for electroplating according to claim 3 wherein: the lifting device (4) comprises a lifting motor (17) and a lifting gear (18) fixed on a motor shaft of the lifting motor (17), and the lifting device (4) drives a cross beam (14) arranged in the middle of the lifting device to move up and down.
5. A high load bearing lifting hanger for electroplating according to claim 4 wherein: the lifting device (4) can be replaced by a lifting steel cable (19) fixedly connected to a motor shaft of the lifting motor (4), and the other end of the lifting steel cable (19) is fixed to a pulley (20) on the bottom surface of the guide beam (5).
6. A high load bearing lifting hanger for electroplating according to claim 4 wherein: the hanger (2) comprises a middle main rod (25) and hanging rods (26) vertically arranged on two sides of the main rod (25), the hanging position of the hanger (2) is provided with two C-shaped retaining rings (23), and the retaining rings (23) close to the right are buckled on the cross beam (14).
7. A high load bearing lifting hanger for electroplating according to claim 6 wherein: a plurality of catching grooves (24) for preventing the hanging tool from sliding or falling are uniformly fixed on the cross beam (14).
8. A high load bearing lifting hanger for electroplating according to claim 6 wherein: the hanger (2) can be replaced by a rectangular frame (27) and a plurality of transverse rods (28) which are transversely arranged in parallel in the rectangular frame (27).
9. A high load bearing lifting hanger for electroplating according to claim 6 wherein: the drying chamber (3) is provided with a lifting support (29), the structure of the lifting support (29) is the same as that of the horizontal movement portal frame (1), and a lifting rod (30) of the lifting support (29) can clamp a left retaining ring (23) of the hanger (2) to enable the hanger to be separated from the cross beam (14).
10. A high load bearing lifting hanger for electroplating according to claim 9 wherein: the lifting bracket (29) is provided with a laser anti-collision device (31).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911172915.XA CN110760919A (en) | 2019-11-26 | 2019-11-26 | High-bearing lifting hanger for electroplating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911172915.XA CN110760919A (en) | 2019-11-26 | 2019-11-26 | High-bearing lifting hanger for electroplating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110760919A true CN110760919A (en) | 2020-02-07 |
Family
ID=69339231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911172915.XA Pending CN110760919A (en) | 2019-11-26 | 2019-11-26 | High-bearing lifting hanger for electroplating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110760919A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519233A (en) * | 2020-04-22 | 2020-08-11 | 太仓市施美电镀有限公司 | Nickel plating production line and electroplating process thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000169970A (en) * | 1998-12-07 | 2000-06-20 | Yoshinobu Abe | Plating method in inert atmosphere |
CN202492602U (en) * | 2012-02-20 | 2012-10-17 | 蓟县下仓乡前苏庄电镀厂 | Equipment for metal surface treatment |
CN204918820U (en) * | 2015-07-22 | 2015-12-30 | 四川西金联合电气股份有限公司 | Portal frame for electroplating |
CN205784300U (en) * | 2016-06-12 | 2016-12-07 | 南通创源电化学科技有限公司 | A kind of drying system for Electropolating hangers |
CN206624935U (en) * | 2017-03-24 | 2017-11-10 | 莆田市涵江区依吨多层电路有限公司 | A kind of board substrate electroplanting device |
CN107738989A (en) * | 2017-09-29 | 2018-02-27 | 松阳县恒亮不锈钢制品有限公司 | A kind of portal jib crane mechanism of stainless steel electroplating assembly line |
CN208201163U (en) * | 2018-04-25 | 2018-12-07 | 深圳捷飞高电路有限公司 | A kind of automation plating line |
CN208869699U (en) * | 2018-09-09 | 2019-05-17 | 浙江晨影工艺品有限公司 | A kind of iron art products electroplating surface equipment |
-
2019
- 2019-11-26 CN CN201911172915.XA patent/CN110760919A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000169970A (en) * | 1998-12-07 | 2000-06-20 | Yoshinobu Abe | Plating method in inert atmosphere |
CN202492602U (en) * | 2012-02-20 | 2012-10-17 | 蓟县下仓乡前苏庄电镀厂 | Equipment for metal surface treatment |
CN204918820U (en) * | 2015-07-22 | 2015-12-30 | 四川西金联合电气股份有限公司 | Portal frame for electroplating |
CN205784300U (en) * | 2016-06-12 | 2016-12-07 | 南通创源电化学科技有限公司 | A kind of drying system for Electropolating hangers |
CN206624935U (en) * | 2017-03-24 | 2017-11-10 | 莆田市涵江区依吨多层电路有限公司 | A kind of board substrate electroplanting device |
CN107738989A (en) * | 2017-09-29 | 2018-02-27 | 松阳县恒亮不锈钢制品有限公司 | A kind of portal jib crane mechanism of stainless steel electroplating assembly line |
CN208201163U (en) * | 2018-04-25 | 2018-12-07 | 深圳捷飞高电路有限公司 | A kind of automation plating line |
CN208869699U (en) * | 2018-09-09 | 2019-05-17 | 浙江晨影工艺品有限公司 | A kind of iron art products electroplating surface equipment |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519233A (en) * | 2020-04-22 | 2020-08-11 | 太仓市施美电镀有限公司 | Nickel plating production line and electroplating process thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204265878U (en) | Continuous entirety conveyance plating conveying production line | |
CN211140622U (en) | Automatic electroplating production line | |
CN111573232A (en) | Aerated concrete plate circulating system and preparation process | |
CN211594267U (en) | PC coincide floor stacking machine | |
CN110760919A (en) | High-bearing lifting hanger for electroplating | |
CN204893935U (en) | Automatic handling manipulator of aircraft cabin cover | |
CN202017337U (en) | Efficient elevator mechanism adhered to electric lifting scaffold | |
CN202785287U (en) | Automatic mechanical clamp | |
CN203144540U (en) | Electrolytic manganese production line and negative plate crane | |
CN108910719A (en) | A kind of lightweight wall plate plate crane | |
CN110055559B (en) | Polar plate slot-out inserting plate device and method | |
CN107747399B (en) | Hanging basket walking system and working method thereof | |
CN113718295B (en) | Intelligent inlet and outlet tank system of electrolytic manganese cathode plate and application method | |
CN112343223A (en) | Curtain wall mounting device | |
CN209081994U (en) | Zinc-plated pre-processing device | |
CN212293807U (en) | Material taking device of annular electroplating production line | |
CN205709571U (en) | Large-scale manipulator maintenance replacing system | |
CN212669819U (en) | A stores pylon for electroplating pretreatment equipment | |
CN208534063U (en) | A kind of hanger device | |
CN102717430A (en) | Demolding device for concrete pipe pile | |
CN201793795U (en) | Device for conveying galvanized sheet by hanging beam | |
CN203112954U (en) | Galvanized workpiece conveying mechanism | |
CN202201644U (en) | Installation equipment for insulator supporting column of serial compensation platform | |
CN102080251B (en) | Plating/phosphating automation line structure and implementation method thereof | |
CN220927536U (en) | Walking hanging basket for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200207 |
|
RJ01 | Rejection of invention patent application after publication |