CN110748345B - 一种防范煤矿深部双巷布置工作面冲击地压的方法 - Google Patents
一种防范煤矿深部双巷布置工作面冲击地压的方法 Download PDFInfo
- Publication number
- CN110748345B CN110748345B CN201911233045.2A CN201911233045A CN110748345B CN 110748345 B CN110748345 B CN 110748345B CN 201911233045 A CN201911233045 A CN 201911233045A CN 110748345 B CN110748345 B CN 110748345B
- Authority
- CN
- China
- Prior art keywords
- coal
- working face
- roadways
- face
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
Abstract
一种防范煤矿深部双巷布置工作面冲击地压的方法。在双巷布置工作面回采之前沿工作面推进方向对巷间煤柱上部实施水平割缝拉槽,使煤柱缝槽上方煤体整体沉降和煤柱上方岩层挠曲离层,进而使原由煤柱承受的顶板岩层载荷向巷间煤柱两侧转移,之后在靠近工作面的巷道内对工作面回采煤层实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部,然后回采该工作面;在相邻双巷布置工作面回采之前,在靠近相邻工作面的巷道内对相邻工作面回采煤层实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至相邻工作面回采煤层深部;按照上述顺序和工艺循环,依次回采相邻双巷布置工作面。该方法能够有效防范煤矿深部双巷布置工作面冲击地压。
Description
技术领域
本发明涉及煤矿冲击地压防治领域,尤其是一种防范煤矿深部双巷布置工作面冲击地压的方法。
背景技术
随着煤矿开采深度增加和开采范围的增大,冲击地压灾害越来越严重。这种灾害具有极大的隐蔽性和破坏性,通常伴随较大能量的释放,瞬间将煤岩体抛出,极易造成巷道与设备破坏和人员伤亡。实践表明,煤矿井下开采布局不合理极易诱发冲击地压灾害,如深部双巷布置工作面回采过程中外侧巷道易发生冲击地压,而相邻工作面回采过程中内侧巷道超前区域受相邻采空区侧向支承压力和本工作面超前支承压力综合作用易发生冲击地压灾害。
为防范煤矿深部双巷布置工作面冲击地压,现场主要采用开采保护层的方法,即双巷布置工作面回采之前,先回采双巷布置工作面所在煤层的上、下邻近的无冲击危险性煤层,从而对双巷布置工作面所在区域进行卸压。然而,这种防范方法要求必须有可作为保护层开采的邻近煤层,从而导致现场应用受限。在没有可作为保护层开采的邻近煤层的条件下,现有技术难以实现防范煤矿深部双巷布置工作面冲击地压。
发明内容
为克服开采保护层作为冲击地压防范方法要求必须有可作为保护层开采的邻近煤层的不足,本发明提供一种防范煤矿深部双巷布置工作面冲击地压的方法,通过先处理双巷布置工作面的巷间煤柱,使原由煤柱承受的顶板岩层载荷向巷间煤柱两侧转移,之后在靠近工作面的巷道内对工作面回采煤层实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部,然后再回采该工作面,从而有效防范煤矿深部双巷布置工作面冲击地压。
为实现上述目的,本发明采用的技术方案,包括如下步骤:
在双巷工作面回采之前沿工作面推进方向对巷间煤柱实施水平割缝拉槽,将第一个工作面与第二个工作面之间巷间煤柱中上部煤层割掉15~30cm (根据现场条件可选)。
进一步地,使煤柱缝槽上方煤体整体沉降,并使煤柱上方岩层产生挠曲离层,进而使原由煤柱承受的顶板岩层载荷向巷间煤柱两侧的煤层转移。
在靠近第一个工作面的巷道内自煤壁向回采煤层实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部。大直径卸压钻孔孔径 110~150mm(可选),钻孔深度20~25m(可选),钻孔间距1~3m(可选),钻孔距离巷道底板0.5~1.2m。
进一步地,回采第一个工作面,并在第二个回采工作面内侧靠近第二个回采工作面的巷道内自煤壁向第二个回采工作面实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部。
将第二个回采工作面与第三个回采工作面之间巷间煤柱沿工作面推进方向实施水平切割拉槽,使本巷间煤柱上部煤体沉降且上部岩层挠曲离层。
进一步地,在第二个回采工作面外侧靠近第二个回采工作面的巷道内对本回采工作面实施大直径卸压钻孔,再回采第二个回采工作面。
处理下一巷间煤柱,依次循环,直至本煤层开采完毕。
附图说明
图1是本发明巷间煤柱割缝拉槽卸压示意图;
图2是本发明工作面接续布置示意图
图中:1—煤层;2—顶板;3—底板;4—巷间煤柱;5—巷道;6—采空区;7—大直径卸压钻孔;8—工作面推进方向;9—第一个回采工作面;10—第二个回采工作面;11—第三个回采工作面。
具体实施方式
在双巷工作面回采之前沿工作面推进方向(8)对巷间煤柱(4)实施水平割缝拉槽,将第一个回采工作面(9)与第二个回采工作面(10)之间巷间煤柱中上部煤层割掉15~30cm(根据现场条件可选)。
进一步地,使煤柱缝槽上方煤体整体沉降,并使煤柱上方岩层(2)产生挠曲离层,进而使原由煤柱承受的顶板岩层载荷向巷间煤柱两侧转移。
在靠近第一个回采工作面的巷道内自煤壁向回采煤层(1)实施大直径卸压钻孔(7),使煤层应力沿工作面倾斜方向转移至煤层深部。大直径卸压钻孔孔径110~150mm(可选),钻孔深度20~25m(可选),钻孔间距1~3m (可选),钻孔距离巷道底板0.5~1.2m。
进一步地,回采第一个回采工作面,并在第二个回采工作面内侧靠近第二个回采面的巷道内自煤壁向第二个回采工作面实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部。
将第二个回采工作面与第三个回采工作面(11)之间巷间煤柱沿工作面推进方向实施水平切割拉槽,使本巷间煤柱上部煤体沉降且上部岩层挠曲离层。
进一步地,在第二个回采工作面外侧靠近第二个回采工作面的巷道内对本回采工作面实施大直径卸压钻孔,回采第二回采工作面。
处理下一巷间煤柱,依次循环,直至本煤层开采完毕。
Claims (5)
1.一种防范煤矿深部双巷布置工作面冲击地压的方法,其特征在于:包括步骤如下:
步骤(1)在双巷工作面回采之前沿工作面推进方向对巷间煤柱实施水平割缝拉槽,将第一个工作面与第二个工作面之间的巷间煤柱中上部煤层割掉;
步骤(2)使煤柱缝槽上方煤体整体沉降,并使煤柱上方岩层产生挠曲离层,进而使原由巷间煤柱承受的顶板岩层载荷向巷间煤柱两侧的煤层转移;
步骤(3)在靠近第一个工作面的巷道内自煤壁向回采煤层实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部;
步骤(4)回采第一个工作面,并在第二个回采工作面内侧靠近第二个回采面的巷道内自煤壁向第二个回采工作面实施大直径卸压钻孔,使煤层应力沿工作面倾斜方向转移至煤层深部;
步骤(5)将第二个回采工作面与第三个回采工作面之间巷间煤柱沿工作面推进方向实施水平切割拉槽,使本巷间煤柱上部煤体沉降且上部岩层挠曲离层;
步骤(6)在第二个回采工作面外侧靠近第二个回采工作面的巷道内对本回采工作面实施大直径卸压钻孔,再回采第二个回采工作面;
步骤(7)处理下一巷间煤柱,依次循环,直至本煤层开采完毕。
2.根据权利要求1所述的防范煤矿深部双巷布置工作面冲击地压方法,其特征在于:所述步骤(1)中,所述水平割缝拉槽,割掉第一个工作面与第二个工作面巷间煤柱中上部煤层15-30cm。
3.根据权利要求1所述的防范煤矿深部双巷布置工作面冲击地压方法,其特征在于:所述步骤(3)中大直径卸压钻孔孔径110~150mm,钻孔深度20~25m,钻孔间距1~3m,钻孔距离巷道底板0.5~1.2m。
4.根据权利要求1所述的防范煤矿深部双巷布置工作面冲击地压方法,其特征在于:所述步骤(4)中在第一个工作面回采完成后,紧接着在第二个回采工作面内侧对回采煤层实施大直径卸压钻孔。
5.根据权利要求1所述的防范煤矿深部双巷布置工作面冲击地压方法,其特征在于:所述步骤(7)中不断地在不同巷间煤柱进行切割拉槽,使上部煤体沉降,岩层挠曲离层,并在相邻巷道内对回采工作面实施大直径卸压钻孔,依次循环,直至本煤层开采完毕。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911233045.2A CN110748345B (zh) | 2019-12-05 | 2019-12-05 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911233045.2A CN110748345B (zh) | 2019-12-05 | 2019-12-05 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110748345A CN110748345A (zh) | 2020-02-04 |
CN110748345B true CN110748345B (zh) | 2021-04-09 |
Family
ID=69285644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911233045.2A Active CN110748345B (zh) | 2019-12-05 | 2019-12-05 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110748345B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110748345B (zh) * | 2019-12-05 | 2021-04-09 | 华北科技学院 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
CN111946395B (zh) * | 2020-06-17 | 2023-01-20 | 华能庆阳煤电有限责任公司核桃峪煤矿 | 一种防止漏风和导通采空区积水的卸压方法 |
CN111894587A (zh) * | 2020-08-10 | 2020-11-06 | 天地科技股份有限公司 | 提高双巷掘进工作面煤柱回收率与巷道稳定性的方法 |
CN113653490B (zh) * | 2021-10-21 | 2022-01-14 | 煤炭科学研究总院 | 一种近距离煤层群冲击地压地面防治方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101915098A (zh) * | 2010-07-14 | 2010-12-15 | 中国矿业大学 | 水力割缝防治冲击地压的方法 |
CN203570313U (zh) * | 2013-10-19 | 2014-04-30 | 煤炭工业济南设计研究院有限公司 | 一种双巷链式充填回采布置结构 |
CN107575228A (zh) * | 2017-09-15 | 2018-01-12 | 中国矿业大学 | 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法 |
CN108952716A (zh) * | 2018-06-22 | 2018-12-07 | 太原理工大学 | 一种厚煤层长壁工作面多巷布置方法 |
CN110748345A (zh) * | 2019-12-05 | 2020-02-04 | 华北科技学院 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
-
2019
- 2019-12-05 CN CN201911233045.2A patent/CN110748345B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101915098A (zh) * | 2010-07-14 | 2010-12-15 | 中国矿业大学 | 水力割缝防治冲击地压的方法 |
CN203570313U (zh) * | 2013-10-19 | 2014-04-30 | 煤炭工业济南设计研究院有限公司 | 一种双巷链式充填回采布置结构 |
CN107575228A (zh) * | 2017-09-15 | 2018-01-12 | 中国矿业大学 | 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法 |
CN108952716A (zh) * | 2018-06-22 | 2018-12-07 | 太原理工大学 | 一种厚煤层长壁工作面多巷布置方法 |
CN110748345A (zh) * | 2019-12-05 | 2020-02-04 | 华北科技学院 | 一种防范煤矿深部双巷布置工作面冲击地压的方法 |
Non-Patent Citations (3)
Title |
---|
典型深部重大冲击地压事故原因分析及防治对策;李希勇等;《煤炭科学技术》;20030225(第02期);全文 * |
高压水射流割缝卸压技术在大采深高突煤层的研究与应用;李广余等;《煤炭科技》;20150925(第03期);全文 * |
高压水射流割缝防治冲击地压的数值模拟;尹亮亮等;《科学技术与工程》;20100228(第05期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN110748345A (zh) | 2020-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110748345B (zh) | 一种防范煤矿深部双巷布置工作面冲击地压的方法 | |
US20200232323A1 (en) | Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections | |
CN110173264B (zh) | 断顶与常规卸压防治坚硬顶板留巷冲击地压方法 | |
CN103758570A (zh) | 一种水力致裂控制临空巷道强矿压的方法 | |
CN107304676A (zh) | 一种遗留煤柱下冲击地压的防治方法 | |
CN104481578A (zh) | 一种高瓦斯煤层大采高工作面瓦斯治理方法 | |
CN113700483B (zh) | 一种地面钻井卸压的多煤层冲击矿压防治方法 | |
AU2021106168A4 (en) | High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face | |
CN104100271B (zh) | 预掘导硐充填人造帮二次复用巷旁支护成巷方法 | |
CN113756809B (zh) | 一种地面压裂厚硬岩层的载荷迁移冲击矿压防治方法 | |
CN104847401A (zh) | 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法 | |
CN110924945A (zh) | 侧向悬顶冲击地压条件下的安全工作方法 | |
CN103216264A (zh) | 预裂爆破回采巷道基本顶岩层控制围岩变形的方法 | |
CN102797492A (zh) | 切顶巷预裂顶板布置方法 | |
CN111396118A (zh) | 一种煤层群快速石门揭煤消突方法 | |
CN105909284A (zh) | 一种大采高煤壁片帮防治控制方法 | |
CN109798116B (zh) | 实现双翼布置工作面的采区或带区完全无煤柱的方法 | |
CN106089234B (zh) | 一种长距离辅巷多通道快速回撤综采工作面的方法 | |
CN115288681A (zh) | 一种煤矿顶板区域压裂源头防治冲击地压方法 | |
CN105134212B (zh) | 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法 | |
CN114810075B (zh) | 一种急倾斜水平分段放顶煤卸压方法 | |
CN109915144B (zh) | 一种大倾角分叉煤层综放转综采连续推进开采方法 | |
CN113982486A (zh) | 工作面溃水溃泥灾害的防治方法 | |
CN113530545A (zh) | 孤岛工作面覆岩隔离注浆充填开采方法 | |
CN103410514A (zh) | 深部受压矿体卸压回采方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |