CN107304676A - 一种遗留煤柱下冲击地压的防治方法 - Google Patents

一种遗留煤柱下冲击地压的防治方法 Download PDF

Info

Publication number
CN107304676A
CN107304676A CN201610247069.3A CN201610247069A CN107304676A CN 107304676 A CN107304676 A CN 107304676A CN 201610247069 A CN201610247069 A CN 201610247069A CN 107304676 A CN107304676 A CN 107304676A
Authority
CN
China
Prior art keywords
drilling
coal column
coal
water
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610247069.3A
Other languages
English (en)
Inventor
潘俊锋
朱海洲
孙锦华
秦子晗
刘新
刘一新
孙刘伟
连鸿全
夏永学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Long Coal Hegang Mining Co Ltd
Tiandi Science and Technology Co Ltd
Original Assignee
Heilongjiang Long Coal Hegang Mining Co Ltd
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Long Coal Hegang Mining Co Ltd, Tiandi Science and Technology Co Ltd filed Critical Heilongjiang Long Coal Hegang Mining Co Ltd
Priority to CN201610247069.3A priority Critical patent/CN107304676A/zh
Publication of CN107304676A publication Critical patent/CN107304676A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明公开了一种遗留煤柱下冲击地压的防治方法,通过在煤柱下方巷道施工钻孔,采用高压注水的方式,对上方煤柱进行弱化处理,降低煤柱内的集中高应力。首先掌握遗留煤柱与下方工作面的位置关系,确定卸压区域;然后在该区域施工注水钻孔,钻孔参数要根据地质条件和位置关系进行确定;在钻孔施工过程中,必须掌握进入上方煤层时的钻孔深度;钻孔完成后,利用乳化液泵站、高压注水管路和水力膨胀封孔器进行注水,封孔位置要位于上方煤层之中;当达到注水时间或者注水压力出现突然下降时,停止注水。该方法能够实现对采空区内遗留煤柱的直接卸压处理,与钻孔卸压和煤层爆破等传统方法相比,具有工程量低,安全系数高、防治效果好等优点。

Description

一种遗留煤柱下冲击地压的防治方法
技术领域
本发明涉及在遗留煤柱下进行采掘作业时,进行冲击地压防治的一种方法。这种冲击地压的防治方法,主要适用在近距离煤层群开采条件下,当上方煤层回采过程中存在遗留煤柱时,对下方煤层带来高应力集中现象,使其冲击危险性增加,针对这种情况进行的冲击地压防治方法。
背景技术
对于赋存有多煤层的矿区,煤层群联合开采是一种经济高效的开采手段。对于冲击地压矿井而言,选择合理的煤层作为保护层进行开采,可以有效的降低被保护层的煤体应力,达到预先卸压的效果。但在保护层开采过程中,受地质构造或煤层赋存条件影响,部分区域不可避免要留设一部分煤柱,比如断层保护煤柱、大巷煤柱等。此类煤柱由于周围区域采空从而造成煤柱体成为高应力集中区,当煤柱尺寸较大时(宽度>20m),高应力向下传递,从而造成煤柱下方被保护层的高应力集中现象,当下方煤层在该区域进行采掘作业时,极易发生冲击地压灾害。
目前,针对上方煤层遗留煤柱区域造成的高应力现象,主要采用在下方煤层采掘过程中对煤体进行卸压的方法。目前煤体卸压方法主要有大孔径钻孔和煤层爆破等手段。采用上述手段后,能够缓解采场围岩内的应力集中程度,达到卸压的目的。但由于上方遗留煤柱仍然存在,使得采场围岩的高应力来源并没有消失,随着时间的增加,围岩内在应力还会重新升高,需要二次卸压甚至多轮卸压,从而使得冲击地压的防治工作大大增加。而要从根本上解决问题,就必须对上方煤层的遗留煤柱进行处理,但由于煤柱位于采空区内,若采用大孔径钻孔,钻孔数量多、深度大,且钻孔需要通过煤层间的岩石,工程量太大;若采用爆破卸压方法的,由于采空区内积聚大量瓦斯,爆破过程中一旦出现穿孔现象,极易引起瓦斯爆炸,造成更为严重的事故。因此,目前针对遗留煤柱区域的冲击地压防治,仍然是以本煤层的多轮卸压为主,无法从根本上解决煤柱本身产生的高应力问题。
煤层注水在煤矿开采过程中较为常见,其主要目的是为了防治防灭火的需要,有研究表明,煤层在浸水之后,其承载强度降低,冲击属性下降。另外随着页岩气开采的发展,高压水致裂技术也日趋成熟,目前在煤矿上已开始应用水力压裂处理坚硬顶板,但工艺较为复杂。因此,采用高压注水的方法去处理采空区的遗留煤柱是冲击地压防治的一种新方法,既能降低工程量,又可以避免次生灾害。
发明内容
本发明的目的是提供一种遗留煤柱下冲击地压防治方法,使用该方法能够从根本上对高应力来源进行消除,既能够减少卸压工程量,又具备较高的安全性,具有良好的防治效果。
为了实现上述目的,本发明采用以下技术方案:
(1)选择一个受上方遗留煤柱影响且具有冲击危险的回采工作面;
(2)根据采掘情况和地质条件,将采空区内遗留煤柱的位置、尺寸标注在采掘工程平面图上,并分析与当前回采工作面的位置关系;
(3)根据上方煤柱与顺槽巷道的位置关系,进行钻孔设计,设计要求终孔位置位于煤柱的中心区域,高度位于上方煤层的中间,孔间距为20m,沿巷道走向布置;
(4)现场进行钻孔施工前要确定好钻机的角度,施工过程中要注意观察,并记录钻头进入上方煤层时的钻孔深度;
(5)钻孔到位后,安装高压注水管,并利用高压封孔器进行封孔,封孔位置根据上方煤层位置,要求深入煤层1m左右;
(6)开始注水,初始注水压力在15MPa,待孔内注满水之后,注水压力增加至25MPa,进行水力压裂;
(7)当注水时间超过2个小时,或者注水压力降至5MPa以下时,停止注水,将注水管路拆卸,并进行下一个孔的注水工作。
本发明的有益效果:在采空区遗留煤柱内进行高压注水,能够使煤柱内的弱面进一步发育,从而起到弱化煤体的作用,使得降低了煤柱内高应力向底板的传递作用,进而减少或消除煤柱下方回采工作面的冲击危险。该方法钻孔间距在20m左右,能够大大降低钻孔工程量,而采用高压注水不会引燃采空区内的瓦斯,具有工程量小,安全系数高、卸压效果好的特点。
附图
图1本发明高压注水钻孔示意图。
在上述附图中,其中,1-遗留煤柱,2-封孔器,3-压裂缝隙,4-注水管路,5-注水泵站,6-工作面巷道。
具体实施方式
一种遗留煤柱下冲击地压的防治方法,如图1所示。其步骤如下:
选择一个受上方遗留煤柱影响的回采工作面,煤柱宽度在20m以上,垂直距离不超过50m。对煤柱尺寸和当前工作面的布置进行分析,确定两者之间的位置关系,并绘制平面图和剖面图。
根据所绘制的平、剖面图,进行钻孔施工设计,施工位置为工作面顺槽巷道,钻孔终孔位置应位于煤柱中心区域,高度在煤柱所在煤层中间为宜,如附图1所示。
安装钻机进行施工,根据施工工程量和现场条件选择合适的钻机进行作业,施工前应采用测绘工具确定钻机摆放的角度,钻孔直径为75mm,钻孔走向间距为20m。
施工过程中,要做好记录,对煤层上方的岩层厚度进行记录,对进行入上方煤层时的钻孔深度进行记录,在钻孔到位后,拆除钻杆并将钻机移至下一个钻孔位置进行施工。
在已施工完的钻孔安装高压注水管路,注水泵利用工作面的乳化液泵站,注水管选择25mm*8.5mm-50MPa/2m的无缝钢管,封孔器选择水力膨胀式封孔器,封孔位置位于进入煤层1m的位置。
管路安装完毕后,先对封孔器内注入高压水,待封孔器膨胀后达到封孔目的之后,再将泵站管路接到注水管路上进行注水。
注水开始时,泵站压力先调至15MPa,待孔内区域充满水之后,再将泵站压力增加至25MPa,进行高压注水。注水时间控制在2小时,或者水压下降至5MPa以下。
注水完成后,拆卸完注水管路后,并对注水孔进行封孔,封孔材料选择水泥砂浆,封孔长度不低于3m。
以上为本发明的较佳实施案例以及设计图式,上述较佳实施案例以及设计图式仅是举例说明,并非用于限制本发明的权利范围,凡以均等的技术手段、或为本申请专利范围所涵盖的权利范围而实施者,均不脱离本发明的保护范围。

Claims (8)

1.一种遗留煤柱下冲击地压防治方法,其特征在于:步骤如下:
选择一个受上方遗留煤柱影响的回采工作面;
根据采掘情况和地质条件,确定采空区内的遗留煤柱与当前回采工作面的相对位置关系,进行钻孔设计;
现场进行钻孔施工时,施工前要确定好钻机的位置和角度,施工过程中要注意观察,并记录钻头进入上方煤层时的钻孔深度;
钻孔到位后,安装高压注水管,并利用高压封孔器进行封孔,封孔位置根据上方煤层位置确定;
开始注水,初始注水压力在15MPa,待孔内注满水之后,注水压力增加至25MPa,进行水力压裂;
当注水时间超过2个小时,或者注水压力降至5MPa以下时,停止注水,将注水管路拆卸,并进行下一个孔的注水工作。
2.如权利要求1所述的方法,其特征在于:适用于煤层群开采中,受上方煤层遗留煤柱影响且具备冲击危险性的回采工作面。
3.如权利要求1所述的方法,其特征在于:掌握上方煤层遗留煤柱的尺寸和位置后,并将其与下方工作面的相对位置关系进行描绘,用平面图和剖面图进行说明。
4.如权利要求1所述的方法,其特征在于:根据煤柱与工作面的位置关系进行注水钻孔的设计,确定钻机施工的位置、方位角和倾角,钻孔深度以深入上方煤柱中间为宜,钻孔间距按照20m进行布置。
5.如权利要求1所述的方法,其特征在于:在遗留煤柱下方的巷道进行施工时,要先行按照设计摆放好钻机,在钻进过程中,要对煤岩层变化情况进行观察,当钻头进行上方煤层时要掌握此时的钻孔深度,当钻头深入上方煤层中间位置时停止钻进。
6.如权利要求1所述的方法,其特征在于:钻孔形成之后,安装注水管路,注水泵利用工作面的乳化液泵站,注水管选择25mm*8.5mm-50MPa/2m的无缝钢管,封孔器选择水力膨胀式封孔器,封孔位置深入上方煤层深度至少1m。
7.如权利要求1所述的方法,其特征在于:封孔完成之后,开始注水,泵站压力先调至15MPa,待孔内充满水之后,再将泵站压力增加至25MPa,进行高压注水。
8.如权利要求1所述的方法,其特征在于:开始高压注水后,时间控制在2小时,或者水压下降至5MPa以下时,停止注水。
CN201610247069.3A 2016-04-22 2016-04-22 一种遗留煤柱下冲击地压的防治方法 Pending CN107304676A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610247069.3A CN107304676A (zh) 2016-04-22 2016-04-22 一种遗留煤柱下冲击地压的防治方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610247069.3A CN107304676A (zh) 2016-04-22 2016-04-22 一种遗留煤柱下冲击地压的防治方法

Publications (1)

Publication Number Publication Date
CN107304676A true CN107304676A (zh) 2017-10-31

Family

ID=60152757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610247069.3A Pending CN107304676A (zh) 2016-04-22 2016-04-22 一种遗留煤柱下冲击地压的防治方法

Country Status (1)

Country Link
CN (1) CN107304676A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109113745A (zh) * 2018-09-17 2019-01-01 朱海洲 一种利用综掘机进行大倾角大断面下山施工切眼的方法
CN109296395A (zh) * 2018-11-01 2019-02-01 天地科技股份有限公司 综采工作面端头悬顶瓦斯超限控制方法
CN109519221A (zh) * 2018-10-29 2019-03-26 河南大有能源股份有限公司耿村煤矿 一种冲击地压危险区域煤层底板断裂注水方法
CN110080771A (zh) * 2019-05-21 2019-08-02 北京科技大学 一种深井高应力大巷煤柱释能改性防治冲击地压的方法
CN110230493A (zh) * 2019-05-27 2019-09-13 太原理工大学 一种遗留煤柱的切角破坏方法
WO2019227852A1 (zh) * 2018-05-31 2019-12-05 中国矿业大学 上覆采空区遗留矿柱应力集中的压裂解除方法
CN110714764A (zh) * 2019-12-10 2020-01-21 山西工程技术学院 一种近距离上覆残留煤柱卸压方法
CN111927453A (zh) * 2020-07-22 2020-11-13 中国矿业大学(北京) 一种上邻近层煤炭资源回收并减弱其应力集中的方法
CN111946395A (zh) * 2020-06-17 2020-11-17 华能庆阳煤电有限责任公司核桃峪煤矿 一种防止漏风和导通采空区积水的卸压方法
CN112554888A (zh) * 2020-11-19 2021-03-26 山东科技大学 一种边界煤柱下巷道的卸压-补强协同维护方法
CN113266356A (zh) * 2021-06-17 2021-08-17 天地科技股份有限公司 近距离煤层开采上部煤柱支承压力水力弱化方法
CN114320292A (zh) * 2022-01-07 2022-04-12 辽宁工程技术大学 一种基于溶液改性作用的煤层冲击地压防治方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654049A (zh) * 2012-05-28 2012-09-05 中国矿业大学 多孔线性控制水力致裂方法
CN103397883A (zh) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 多煤层开采矿井冲击地压综合防治方法
CN103758570A (zh) * 2014-01-14 2014-04-30 中国矿业大学 一种水力致裂控制临空巷道强矿压的方法
CN103939077A (zh) * 2014-05-04 2014-07-23 山东科技大学 一种高应力低孔隙率煤层射孔压裂增透方法
CN104594898A (zh) * 2014-11-10 2015-05-06 山东科技大学 一种坚硬顶板注水卸压处理方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102654049A (zh) * 2012-05-28 2012-09-05 中国矿业大学 多孔线性控制水力致裂方法
CN103397883A (zh) * 2013-08-21 2013-11-20 大同煤矿集团有限责任公司 多煤层开采矿井冲击地压综合防治方法
CN103758570A (zh) * 2014-01-14 2014-04-30 中国矿业大学 一种水力致裂控制临空巷道强矿压的方法
CN103939077A (zh) * 2014-05-04 2014-07-23 山东科技大学 一种高应力低孔隙率煤层射孔压裂增透方法
CN104594898A (zh) * 2014-11-10 2015-05-06 山东科技大学 一种坚硬顶板注水卸压处理方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨伟利: "《遗留煤柱诱发冲击地压机理及其防治技术研究》", 《采矿与安全工程学报》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019227852A1 (zh) * 2018-05-31 2019-12-05 中国矿业大学 上覆采空区遗留矿柱应力集中的压裂解除方法
US11299954B2 (en) 2018-05-31 2022-04-12 China University Of Mining And Technology Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf
CN109113745A (zh) * 2018-09-17 2019-01-01 朱海洲 一种利用综掘机进行大倾角大断面下山施工切眼的方法
CN109113745B (zh) * 2018-09-17 2023-09-15 朱海洲 一种利用综掘机进行大倾角大断面下山施工切眼的方法
CN109519221A (zh) * 2018-10-29 2019-03-26 河南大有能源股份有限公司耿村煤矿 一种冲击地压危险区域煤层底板断裂注水方法
CN109519221B (zh) * 2018-10-29 2020-06-05 河南大有能源股份有限公司耿村煤矿 一种冲击地压危险区域煤层底板断裂注水方法
CN109296395A (zh) * 2018-11-01 2019-02-01 天地科技股份有限公司 综采工作面端头悬顶瓦斯超限控制方法
CN110080771A (zh) * 2019-05-21 2019-08-02 北京科技大学 一种深井高应力大巷煤柱释能改性防治冲击地压的方法
CN110230493B (zh) * 2019-05-27 2020-08-07 太原理工大学 一种遗留煤柱的切角破坏方法
CN110230493A (zh) * 2019-05-27 2019-09-13 太原理工大学 一种遗留煤柱的切角破坏方法
CN110714764B (zh) * 2019-12-10 2020-10-13 山西工程技术学院 一种近距离上覆残留煤柱卸压方法
CN110714764A (zh) * 2019-12-10 2020-01-21 山西工程技术学院 一种近距离上覆残留煤柱卸压方法
CN111946395A (zh) * 2020-06-17 2020-11-17 华能庆阳煤电有限责任公司核桃峪煤矿 一种防止漏风和导通采空区积水的卸压方法
CN111927453A (zh) * 2020-07-22 2020-11-13 中国矿业大学(北京) 一种上邻近层煤炭资源回收并减弱其应力集中的方法
CN112554888A (zh) * 2020-11-19 2021-03-26 山东科技大学 一种边界煤柱下巷道的卸压-补强协同维护方法
CN112554888B (zh) * 2020-11-19 2022-08-02 山东科技大学 一种边界煤柱下巷道的卸压-补强协同维护方法
CN113266356A (zh) * 2021-06-17 2021-08-17 天地科技股份有限公司 近距离煤层开采上部煤柱支承压力水力弱化方法
CN114320292A (zh) * 2022-01-07 2022-04-12 辽宁工程技术大学 一种基于溶液改性作用的煤层冲击地压防治方法
CN114320292B (zh) * 2022-01-07 2024-03-08 辽宁工程技术大学 一种基于溶液改性作用的煤层冲击地压防治方法

Similar Documents

Publication Publication Date Title
CN107304676A (zh) 一种遗留煤柱下冲击地压的防治方法
Huang et al. Cavability control by hydraulic fracturing for top coal caving in hard thick coal seams
CN102678120B (zh) 冲击地压卸压解危方法
WO2019227852A1 (zh) 上覆采空区遗留矿柱应力集中的压裂解除方法
WO2018201706A1 (zh) 底板顺层长钻孔分段压裂高效抽放煤巷条带瓦斯及区域消突方法
CN102619552B (zh) 导向槽定向水力压穿增透及消突方法
CN102518436B (zh) 煤矿巷道掘进时构造型冲击地压防治方法
AU2012272545B2 (en) Mining method for gassy and low permeability coal seams
CN107120137B (zh) 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法
CN1664310A (zh) 煤矿孤岛煤柱冲击地压控制方法
CN112593936B (zh) 一种深部矿井多灾害区域超前综合防治方法
CN107816365B (zh) 一种煤层钻爆抽注一体化防突方法
CN115749713B (zh) 岩层变频脉冲缝网压裂方法与装备
CN107387082A (zh) 一种弱化煤层坚硬顶板的方法
CN113404535A (zh) 一种煤矿井上下水力压裂防治冲击地压的方法
AU2021105130A4 (en) Method for treating hard roof through hydraulic fracturing
CN111520184A (zh) 一种煤矿冲击地压和有害气体综合防治系统及方法
CN111335892A (zh) 一种强冲击煤层卸压防治方法
CN110067592A (zh) 基于坚硬顶板地面压裂的顶板瓦斯协同控制方法
CN102383728A (zh) 煤矿冲击地压缺陷分割控制方法
CN103411493A (zh) 一种穿采空区深孔预裂爆破钻孔装药方法
CN104847401A (zh) 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN106285674A (zh) 冲击性软煤层巷道迎头释放地压能量的方法
CN104763423B (zh) 利用反井方式凿岩采出粉矿的开采工艺
CN110675273B (zh) 一种采煤工作面溃水溃砂灾害的判断方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171031

WD01 Invention patent application deemed withdrawn after publication