CN109519221B - 一种冲击地压危险区域煤层底板断裂注水方法 - Google Patents
一种冲击地压危险区域煤层底板断裂注水方法 Download PDFInfo
- Publication number
- CN109519221B CN109519221B CN201811265284.1A CN201811265284A CN109519221B CN 109519221 B CN109519221 B CN 109519221B CN 201811265284 A CN201811265284 A CN 201811265284A CN 109519221 B CN109519221 B CN 109519221B
- Authority
- CN
- China
- Prior art keywords
- coal
- water injection
- water
- hole
- roadway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及冲击地压危险区域煤层底板断裂注水方法,有效解决对留有底煤的巷道底板进行爆破断裂、对经爆破断裂的巷道底板插管注水,防止事故灾害,保证煤矿生产安全的问题,方法是,确定采掘工作面巷道底煤留设厚度,采取底板卸压,实施底板爆破断裂和底板插管注水;根据掘进工作面弱冲击危险区段综掘时滞后迎头距离、含煤矸互层的巷道底煤厚度对确定的爆破断裂的底板钻孔,巷道底板上沿巷道走向,相间开交替打卸压爆破孔和注水孔;在钻孔中插管注水;含水量与煤的冲击倾向性的关系,通过测量仪根据煤层冲击倾向性强度弱化的情况,确定含水率增量。本发明方法新颖独特,易操作使用,工作效率高,使用效果好,防止事故发生,保证煤矿安全生产。
Description
技术领域
本发明涉及煤矿安全生产,特别是一种冲击地压危险区域煤层底板断裂注水方法。
背景技术
目前为止,我国发生冲击地压的矿井超过140处,遍布17个产煤省市和自治区,是威胁煤矿安全生产的主要灾害之一,其中,煤巷以底板型冲击形式出现的占多数。冲击地压危险区域煤层底板断裂注水是防止灾害的重要技术手段,但由于种种原因,现有技术对留有底煤的巷道进行底板断裂、插管注水软化、防治冲击地压的效果并不尽人意,因此对冲击地压危险区域煤层底板断裂注水方法上的改进和创新势在必行。
发明内容
针对上述情况,为克服现有技术之缺陷,本发明之目的就是提供一种冲击地压危险区域煤层底板断裂注水方法,可有效解决对留有底煤的巷道底板进行爆破断裂、对经爆破断裂的巷道底板(有底煤)插管注水,防止事故灾害,保证煤矿生产安全的问题。
本发明解决的技术方案是,一种冲击地压危险区域煤层底板断裂注水方法,包括以下步骤:
(1)、确定采掘工作面巷道底煤留设厚度,采取底板卸压,实施底板爆破断裂和底板插管注水;
(2)、根据掘进工作面弱冲击危险区段综掘时滞后迎头距离、含煤矸互层的巷道底煤厚度对确定的爆破断裂的底板钻孔,巷道底板上沿巷道走向,相间开交替打卸压爆破孔和注水孔,相邻卸压爆破孔和注水孔的间距为1m;
(3)、插管注水:在钻孔中插管注水;
(4)、检测含水率增量:含水量与煤的冲击倾向性的关系,根据煤种而异,通过测量仪根据煤层冲击倾向性强度弱化的情况,确定含水率增量。
本发明方法新颖独特,易操作使用,工作效率高,使用效果好,可有效用于冲击地压危险区域煤层底板断裂注水,有效解决了对留有底煤的巷道底板进行爆破断裂、对经爆破断裂的巷道底板(有底煤)插管注水,防止事故发生,保证煤矿安全生产,经济和社会效益巨大。
附图说明
图1为本发明的巷道底板(煤)插管注水示意图。
具体实施方式
以下结合具体情况对本发明的具体实施方式作详细说明。
本发明在具体实施中,一种冲击地压危险区域煤层底板断裂注水方法,包括以下步骤:
(1)、确定采掘工作面巷道底煤留设厚度:
当采掘工作面巷道底煤留设厚度超过1m(即厚底煤段)或由顶板岩层进入煤层的穿层巷道底板与煤层间夹持的岩层厚度小于3m时,采取底板卸压,实施底板爆破断裂和底板插管注水;
(2)、钻孔:
对确定的爆破断裂的底板钻孔,方法是:巷道底板上沿巷道走向,相间开交替打卸压爆破孔和注水孔,相邻卸压爆破孔和注水孔的间距为1m;
①掘进工作面弱冲击危险区段综掘时滞后迎头距离不大于40m,炮掘时滞后迎头距离不大于15m的弱冲击危险区段断底布孔注水;中等及强冲击危险区滞后迎头不大于7m的中等及强冲击危险区段断底布孔注水;回采工作面超前实施不小于300m的回采工作面断底布孔注水;
②当含煤矸互层的巷道底煤厚度1.0<d≤4.0m时,在巷道两帮脚实施断底,钻孔方位垂直巷帮,倾角向下45°,孔径75mm,孔间距1m,采用“隔一爆一”,为保证断裂效果,爆破孔每孔装药量为2kg,没有进行爆破的孔插管注水,孔深接触底板岩层为止;
③当含煤矸互层的巷道底煤厚度>4m时,除巷帮底角实施断底外,每隔20m,沿巷道横断面施工3~4个底板爆破孔,孔径75mm,间距1~1.5m,钻孔倾角45°~90°,孔深6<h≤10m,第一个断底孔布置在距巷帮1.0m的位置,横断面爆破孔掘进工作面距迎头最大距离不超过30m,回采工作面超前300m;
(3)、插管注水:
①插管:当孔深大于2.5m时,插管长度为2.5m;当孔深不大于2.5m时,插管插至孔底;
②注水:将插管后的注水钻孔连接上清水管进行静压注水,首次注水时间为埋入胶管后24小时内,注水量以胶管内水不再下渗为止,以后每3天注水一次(若孔内渗水较快,应缩短注水周期,保证孔内始终有水,达到充分湿润煤体的目的);对于施工过程中孔内出水的钻孔则不再注水,但要插管; 注水周期根据各矿实际注水情况自行界定。
(4)、检测含水率增量:含水量与煤的冲击倾向性的关系,根据煤种而异,通过测量仪根据煤层冲击倾向性强度弱化的情况,确定含水率增量;没有测定时,注水直到胶管内水不再下渗为止,或煤层(体)原始含水率低于5%时,增量不低于3%;煤层(体)原始含水率高于6%时,增量不得低于2%。
为了保证使用效果和使用方便,所述的插管注水由图1所示,其注水设备是,在巷道底煤2的巷道底板1上打孔,在孔中插入注水胶管4,注水胶管4经固定法兰3固定在巷道底板上,注水胶管的上口部有胶管防护盖5,使用时,打开胶管防护盖,注水胶管的进水口与注水管道相连通。
本发明方法新颖独特,易操作使用,成本低,生产效率高,使用安全,实地应用和试验,效果非常好,在实验中,据统计计算:按每千米为统计基数,煤矿岩巷掘进成本3.75万元/m(1000m巷道掘进成本为3750万元),煤巷掘进成本3.1万元/m(1000m巷道掘进成本为3100万元),同时煤巷更利于巷道修护和回采作业,且修护及回采成本相对较低。因此,包括冲击地压矿井在内的采煤工作面多采取煤巷掘进,因煤层赋存结构不可避免的会在部分巷段留有底煤,容易形成底板型冲击。而冲击地压危险区域煤层底板断裂注水技术技术每千米实施成本为:〔1000(巷帮纵向爆破孔)+50×4(巷中横向爆破孔)〕×2kg(每孔装药量)×〔16元/kg(炸药单价)+2.3元/发(雷管单价)〕×1.15(人工、放炮线等投入浮动系数)=50508元;就冲击地压防治而言,相对于岩巷布置巷道,布置煤巷并采取该技术进行冲击地压防治每千米巷道能节约投入:3750-3100-5.05=644.95万元。推而广之,经济效益是非常巨大的,而且通过本发明的实施,有效避免冲击地压灾害发生,保证煤矿安全生产,提高煤矿生产效率30%以上,有巨大的经济效益和社会效益。
Claims (2)
1.一种冲击地压危险区域煤层底板断裂注水方法,其特征在于,包括以下步骤:
(1)、确定采掘工作面巷道底煤留设厚度:
当采掘工作面巷道底煤留设厚度超过1m或由顶板岩层进入煤层的穿层巷道底板与煤层间夹持的岩层厚度小于3m时,采取底板卸压,实施底板爆破断裂和底板插管注水;
(2)、钻孔:
对确定的爆破断裂的底板钻孔,方法是:巷道底板上沿巷道走向,相间开交替打卸压爆破孔和注水孔,相邻卸压爆破孔和注水孔的间距为1m;
①掘进工作面弱冲击危险区段综掘时滞后迎头距离不大于40m,炮掘时滞后迎头距离不大于15m的弱冲击危险区段断底布孔注水;中等及强冲击危险区滞后迎头不大于7m的中等及强冲击危险区段断底布孔注水;回采工作面超前实施不小于300m的回采工作面断底布孔注水;
②当含煤矸互层的巷道底煤厚度1.0<d≤4.0m时,在巷道两帮脚实施断底,钻孔方位垂直巷帮,倾角向下45°,孔径75mm,孔间距1m,采用“隔一爆一”,为保证断裂效果,爆破孔每孔装药量为2kg,没有进行爆破的孔插管注水,孔深接触底板岩层为止;
③当含煤矸互层的巷道底煤厚度>4m时,除巷帮底角实施断底外,每隔20m,沿巷道横断面施工3~4个底板爆破孔,孔径75mm,间距1~1.5m,钻孔倾角45°~90°,孔深6<h≤10m,第一个断底孔布置在距巷帮1.0m的位置,横断面爆破孔掘进工作面距迎头最大距离不超过30m,回采工作面超前300m;
(3)、插管注水:
①插管:当孔深大于2.5m时,插管长度为2.5m;当孔深不大于2.5m时,插管插至孔底;
②注水:将插管后的注水钻孔连接上清水管进行静压注水,首次注水时间为埋入胶管后24小时内,注水量以胶管内水不再下渗为止,以后每3天注水一次,若孔内渗水较快,应缩短注水周期,保证孔内始终有水,达到充分湿润煤体的目的;对于施工过程中孔内出水的钻孔则不再注水,但要插管; 注水周期根据各矿实际注水情况自行界定;
(4)、检测含水率增量:含水量与煤的冲击倾向性的关系,根据煤种而异,通过测量仪根据煤层冲击倾向性强度弱化的情况,确定含水率增量;没有测定时,注水直到胶管内水不再下渗为止,或煤层原始含水率低于5%时,增量不低于3%;煤层原始含水率高于6%时,增量不得低于2%。
2.根据权利要求1所述的冲击地压危险区域煤层底板断裂注水方法,其特征在于,所述的插管注水是采用注水设备,注水设备是,在巷道底煤(2)的巷道底板(1)上打孔,在孔中插入注水胶管(4),注水胶管(4)经固定法兰(3)固定在巷道底板上,注水胶管的上口部有胶管防护盖(5),使用时,打开胶管防护盖,注水胶管的进水口与注水管道相连通。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265284.1A CN109519221B (zh) | 2018-10-29 | 2018-10-29 | 一种冲击地压危险区域煤层底板断裂注水方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811265284.1A CN109519221B (zh) | 2018-10-29 | 2018-10-29 | 一种冲击地压危险区域煤层底板断裂注水方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109519221A CN109519221A (zh) | 2019-03-26 |
CN109519221B true CN109519221B (zh) | 2020-06-05 |
Family
ID=65772625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811265284.1A Expired - Fee Related CN109519221B (zh) | 2018-10-29 | 2018-10-29 | 一种冲击地压危险区域煤层底板断裂注水方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109519221B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113187480A (zh) * | 2021-05-13 | 2021-07-30 | 河南大有能源股份有限公司耿村煤矿 | 一种煤矿冲击地压的综合防护方法 |
CN115012936B (zh) * | 2022-07-13 | 2023-03-21 | 安徽理工大学 | 一种煤矿tbm掘巷穿煤期间的卸压解危方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678120A (zh) * | 2012-05-18 | 2012-09-19 | 河南大有能源股份有限公司 | 冲击地压卸压解危方法 |
CN103161493A (zh) * | 2013-04-10 | 2013-06-19 | 中国矿业大学 | 气液固三相耦合爆破弱化冲击地压及增透方法 |
CN103397883A (zh) * | 2013-08-21 | 2013-11-20 | 大同煤矿集团有限责任公司 | 多煤层开采矿井冲击地压综合防治方法 |
CN103939099A (zh) * | 2014-04-11 | 2014-07-23 | 中国矿业大学 | 一种强冲击危险煤层群冲击地压的防治方法 |
CN104989405A (zh) * | 2015-06-12 | 2015-10-21 | 北京科技大学 | 大倾角煤层开采冲击地压定向防治方法 |
CN105804750A (zh) * | 2016-03-14 | 2016-07-27 | 神华集团有限责任公司 | 一种近直立特厚煤层冲击地压的防治方法 |
CN106948817A (zh) * | 2017-05-12 | 2017-07-14 | 山东新河矿业有限公司 | 断底煤钻孔结合爆破卸压的冲击地压防治方法 |
CN107304676A (zh) * | 2016-04-22 | 2017-10-31 | 黑龙江龙煤鹤岗矿业有限责任公司 | 一种遗留煤柱下冲击地压的防治方法 |
-
2018
- 2018-10-29 CN CN201811265284.1A patent/CN109519221B/zh not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102678120A (zh) * | 2012-05-18 | 2012-09-19 | 河南大有能源股份有限公司 | 冲击地压卸压解危方法 |
CN103161493A (zh) * | 2013-04-10 | 2013-06-19 | 中国矿业大学 | 气液固三相耦合爆破弱化冲击地压及增透方法 |
CN103397883A (zh) * | 2013-08-21 | 2013-11-20 | 大同煤矿集团有限责任公司 | 多煤层开采矿井冲击地压综合防治方法 |
CN103939099A (zh) * | 2014-04-11 | 2014-07-23 | 中国矿业大学 | 一种强冲击危险煤层群冲击地压的防治方法 |
CN104989405A (zh) * | 2015-06-12 | 2015-10-21 | 北京科技大学 | 大倾角煤层开采冲击地压定向防治方法 |
CN105804750A (zh) * | 2016-03-14 | 2016-07-27 | 神华集团有限责任公司 | 一种近直立特厚煤层冲击地压的防治方法 |
CN107304676A (zh) * | 2016-04-22 | 2017-10-31 | 黑龙江龙煤鹤岗矿业有限责任公司 | 一种遗留煤柱下冲击地压的防治方法 |
CN106948817A (zh) * | 2017-05-12 | 2017-07-14 | 山东新河矿业有限公司 | 断底煤钻孔结合爆破卸压的冲击地压防治方法 |
Also Published As
Publication number | Publication date |
---|---|
CN109519221A (zh) | 2019-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661643B (zh) | 一种采煤工作面末采回撤通道切顶卸压护巷方法 | |
CN106194244B (zh) | 低透气煤层液相co2相变致裂增透网格式瓦斯抽采方法 | |
CN1664310A (zh) | 煤矿孤岛煤柱冲击地压控制方法 | |
CN111927456B (zh) | 一种动载深部采区煤柱失稳卸-固-让多级防治方法 | |
CN106195616A (zh) | 一种液体二氧化碳灌装系统 | |
CN109139092B (zh) | 一种治理深埋煤层冲击与瓦斯灾害的一孔多用施工方法 | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN107816365B (zh) | 一种煤层钻爆抽注一体化防突方法 | |
CN111411962A (zh) | 一种煤矿冲击地压治理方法 | |
CN110645039A (zh) | 一种厚硬顶板冲击地压与瓦斯复合灾害综合防治方法 | |
CN105507938A (zh) | 钻孔内水力冲孔与预裂爆破联合增透抽采系统的施工方法 | |
CN107120137B (zh) | 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法 | |
Huang et al. | Field investigation into directional hydraulic fracturing for hard roof in Tashan Coal Mine | |
CN109519221B (zh) | 一种冲击地压危险区域煤层底板断裂注水方法 | |
CN110656936A (zh) | 基于静力膨胀剂的矿山顶板定向切顶卸压方法 | |
CN103277129A (zh) | 一种防止采煤工作面上隅角瓦斯超限技术 | |
CN106437825A (zh) | 一种高瓦斯矿井综放工作面高位钻孔的瓦斯抽采方法 | |
CN108930536A (zh) | 一种沿空留巷超前工作面高压注水致裂坚硬顶板的方法 | |
CN115749855A (zh) | 一种基于超前预注浆回收断层煤柱资源的方法 | |
CN114165232A (zh) | 一种煤矿井下末采顶板水力压裂切顶卸压的方法 | |
CN111022050B (zh) | 一种注浆改造复合顶板的全闭合爆破卸压及自留巷方法 | |
CN112780276A (zh) | 一种注浆改造复合顶板的全闭合爆破卸压结构及自留巷方法 | |
CN110985123A (zh) | 一种高压水力预裂解危冲击矿压顺槽巷道钻孔布置方法 | |
CN106285777B (zh) | 大水矿山矿房超前放水的方法 | |
CN114483055A (zh) | 特大跨度超浅埋高铁隧道穿越水塘洞段施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200605 Termination date: 20201029 |
|
CF01 | Termination of patent right due to non-payment of annual fee |