CN110924945A - 侧向悬顶冲击地压条件下的安全工作方法 - Google Patents

侧向悬顶冲击地压条件下的安全工作方法 Download PDF

Info

Publication number
CN110924945A
CN110924945A CN201911279739.XA CN201911279739A CN110924945A CN 110924945 A CN110924945 A CN 110924945A CN 201911279739 A CN201911279739 A CN 201911279739A CN 110924945 A CN110924945 A CN 110924945A
Authority
CN
China
Prior art keywords
roadway
lateral
impact
suspended ceiling
carried out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911279739.XA
Other languages
English (en)
Inventor
潘立友
刘宏军
孙久政
欧阳振华
张若祥
毕强
陈理强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201911279739.XA priority Critical patent/CN110924945A/zh
Publication of CN110924945A publication Critical patent/CN110924945A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Abstract

本发明公开了一种侧向悬顶冲击地压条件下的安全工作方法,措施如下:工作面回采过程中,在巷道中布置微震监测仪,加大巷道的安全工作空间,每间距10‑12m打探测孔,当采煤工作面进入大于5m尺寸的侧向悬顶的超前影响范围和震动能量达到100000焦耳时,降低回采速度,从而降低侧向悬顶结构对巷道形成的冲击能量;另外,在整个工作面回采过程中,包括回采、工作面支护、巷道人工卸压、巷道支护等,只能进行其中一项工作,不能两项工作同时进行,避免悬顶受到两个以上的扰动量叠加而引起的冲击危险。

Description

侧向悬顶冲击地压条件下的安全工作方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
冲击地压是最严重的动力灾害之一,且随着采深增大,其破坏性日趋严重,冲击地压问题是急需解决的工程问题。影响冲击地压的因素包括构造、埋深、顶板、煤层硬度、开采因素等,其中坚硬顶板导致的冲击地压占据较大比重,且破坏性也较严重,特别是工作面侧向存在坚硬悬顶结构时,常伴随高能量巷道冲击灾害的发生。主要原因是,沿空巷道掘进时为坚硬悬顶结构带来了较大的静态应力场,在开采期间再附加上本工作面的动态应力,煤层经受整个开采应力场的作用,导致巷道片帮、严重压酥,更加造成了坚硬悬顶结构条件下的侧向高应力,更容易在煤柱区域造成局部性应力集中,导致高级别的冲击能量释放,发生破坏性冲击地压。如何解决工作面侧向坚硬顶板的冲击地压,是煤矿面临的重大技术难题。采取常规的煤层注水、强支护、煤层强卸压、断顶、断底等措施,很难完全控制这种条件下的冲击地压危险。
发明内容
本发明的目的是针对上述问题,提出一种采煤工作面侧向悬顶冲击地压条件下的安全工作方法。
本发明的技术方案是:
一种侧向悬顶冲击地压条件下的安全工作方法,其特征在于采取如下措施:
工作面回采过程中,在巷道中布置微震监测仪,并将巷道进行扩帮挖底,加大巷道的安全工作空间,在增大空间内沿巷道方向每间距 10-12m向煤柱的顶板中打探测孔,探测侧向悬顶的地质结构和确定侧向悬顶的深度尺寸,凡是深度尺寸大于5m的侧向悬顶确定为冲击性悬顶;当采煤工作面进入冲击性悬顶的超前影响范围时,通过微震监测仪随时观测顶板来压的震动能量,当震动能量达到100000焦耳时,立即降低回采速度,拉长冲击能量耗散时间,在回采中始终使震动能量控制在100000焦耳之内,从而降低侧向悬顶结构对巷道形成的冲击能量,直到采过冲击性悬顶区域后再恢复正常回采速度;另外,在整个工作面回采过程中,包括回采、工作面支护、巷道人工卸压、巷道支护等,只能进行其中一项工作, 不能两项工作同时进行,避免悬顶受到两个以上的扰动量叠加而引起的冲击危险。
本发明的积极效果是:
1、通过对侧向悬顶进行结构性量化观测,确定工作面推进速度与冲击地压的时空关系,通过控制回采速度,控制极限能量,拉长冲击能量耗散时间,降低侧向悬顶结构对巷道形成的冲击能量,达到巷道全程安全。。
2、针对侧向悬顶型冲击地压的全程危险性特性,采取一动全静防护技术,避免了工程之间的相互干扰,对巷道内的工作人员起到保护作用。
附图说明
图1是实施例的平面示意图,图2是实施例的立面示意图。
具体实施方式
下面结合附图进一步说明本发明的方法。
如图1所示,一种侧向悬顶冲击地压条件下的安全工作方法,采取如下措施:
工作面回采过程中,在巷道1中布置微震监测仪2,并将巷道1进行扩帮挖底,加大巷道的安全工作空间,在增大空间内沿巷道方向每间距c= 10-12m向煤柱2的顶板中中打探测孔4,探测孔4深度b大于5m以上,探测侧向悬顶3的地质结构和确定侧向悬顶3的深度尺寸,凡是深度尺寸大于a=5m的侧向悬顶确定为冲击性悬顶;当采煤工作面进入冲击性悬顶的超前影响范围时,通过微震监测仪2随时观测顶板来压的震动能量,当震动能量达到100000焦耳时,立即降低回采速度,拉长冲击能量耗散时间,在回采中始终使震动能量控制在100000焦耳之内,从而降低侧向悬顶结构对巷道1形成的冲击能量,直到采过冲击性悬顶区域后再恢复正常回采速度;另外,在整个煤层6工作面回采过程中,包括回采、工作面支护、巷道人工卸压、巷道支护等,只能进行其中一项工作, 不能两项工作同时进行,避免悬顶受到两个以上的扰动量叠加而引起的冲击危险。

Claims (1)

1.一种侧向悬顶冲击地压条件下的安全工作方法,其特征在于采取如下措施:
工作面回采过程中,在巷道中布置微震监测仪,并将巷道进行扩帮挖底,加大巷道的安全工作空间,在增大空间内沿巷道方向每间距 10-12m向煤柱的顶板中打探测孔,探测侧向悬顶的地质结构和确定侧向悬顶的深度尺寸,凡是深度尺寸大于5m的侧向悬顶确定为冲击性悬顶;当采煤工作面进入冲击性悬顶的超前影响范围时,通过微震监测仪随时观测顶板来压的震动能量,当震动能量达到100000焦耳时,立即降低回采速度,拉长冲击能量耗散时间,在回采中始终使震动能量控制在100000焦耳之内,从而降低侧向悬顶结构对巷道形成的冲击能量,直到采过冲击性悬顶区域后再恢复正常回采速度;另外,在整个工作面回采过程中,包括回采、工作面支护、巷道人工卸压、巷道支护等,只能进行其中一项工作, 不能两项工作同时进行,避免悬顶受到两个以上的扰动量叠加而引起的冲击危险。
CN201911279739.XA 2019-12-13 2019-12-13 侧向悬顶冲击地压条件下的安全工作方法 Pending CN110924945A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911279739.XA CN110924945A (zh) 2019-12-13 2019-12-13 侧向悬顶冲击地压条件下的安全工作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911279739.XA CN110924945A (zh) 2019-12-13 2019-12-13 侧向悬顶冲击地压条件下的安全工作方法

Publications (1)

Publication Number Publication Date
CN110924945A true CN110924945A (zh) 2020-03-27

Family

ID=69860348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911279739.XA Pending CN110924945A (zh) 2019-12-13 2019-12-13 侧向悬顶冲击地压条件下的安全工作方法

Country Status (1)

Country Link
CN (1) CN110924945A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483186A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种窗口介入法判断超前破碎顶板煤层冲击危险性的方法
CN112483183A (zh) * 2020-12-18 2021-03-12 山东科技大学 窗口介入法判断工作面侧向坚硬顶板冲击危险性的方法
CN112483184A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种工作面侧向坚硬顶板诱发冲击地压的预测方法
CN112483098A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种采场超前破碎顶板冲击地压防治方法
CN112483089A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种工作面侧向悬顶型冲击地压的一动多静防护方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4266828A (en) * 1978-06-22 1981-05-12 Taiheiyo Engineering Inc. Apparatus on drum shearer for cutting through safety wall in long wall mining
CN102425418A (zh) * 2011-11-14 2012-04-25 山东科技大学 煤矿构造区域人造缺陷体防治冲击地压的方法
CN105781620A (zh) * 2016-04-26 2016-07-20 北京科技大学 基于巷道围岩破裂辅助孔监测的动力灾害预警方法
CN106401588A (zh) * 2016-10-20 2017-02-15 山东科技大学 断层区内工作面开采期间冲击地压防控方法
CN110173264A (zh) * 2019-06-13 2019-08-27 山东科技大学 断顶与常规卸压防治坚硬顶板留巷冲击地压方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4266828A (en) * 1978-06-22 1981-05-12 Taiheiyo Engineering Inc. Apparatus on drum shearer for cutting through safety wall in long wall mining
CN102425418A (zh) * 2011-11-14 2012-04-25 山东科技大学 煤矿构造区域人造缺陷体防治冲击地压的方法
CN105781620A (zh) * 2016-04-26 2016-07-20 北京科技大学 基于巷道围岩破裂辅助孔监测的动力灾害预警方法
CN106401588A (zh) * 2016-10-20 2017-02-15 山东科技大学 断层区内工作面开采期间冲击地压防控方法
CN110173264A (zh) * 2019-06-13 2019-08-27 山东科技大学 断顶与常规卸压防治坚硬顶板留巷冲击地压方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨阳爱亚楠(网名): "采煤工作面预防冲击地压设计安全技术措施", 《百度文库》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483186A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种窗口介入法判断超前破碎顶板煤层冲击危险性的方法
CN112483183A (zh) * 2020-12-18 2021-03-12 山东科技大学 窗口介入法判断工作面侧向坚硬顶板冲击危险性的方法
CN112483184A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种工作面侧向坚硬顶板诱发冲击地压的预测方法
CN112483098A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种采场超前破碎顶板冲击地压防治方法
CN112483089A (zh) * 2020-12-18 2021-03-12 山东科技大学 一种工作面侧向悬顶型冲击地压的一动多静防护方法

Similar Documents

Publication Publication Date Title
CN110924945A (zh) 侧向悬顶冲击地压条件下的安全工作方法
CN104763432B (zh) 一种高应力巷道围岩卸压控制大变形的方法
CN111270987B (zh) 一种煤矿井下远程区域精准防控冲击地压方法
CA3044307A1 (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
CN110173264B (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN102518436B (zh) 煤矿巷道掘进时构造型冲击地压防治方法
CN107304676A (zh) 一种遗留煤柱下冲击地压的防治方法
CN107740707A (zh) 一种深部高承压水下厚煤层开采水害防治方法
CN111335892A (zh) 一种强冲击煤层卸压防治方法
CN110966002B (zh) 一种基于密集钻孔的切顶卸压方法
CN104847401A (zh) 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN103216264A (zh) 预裂爆破回采巷道基本顶岩层控制围岩变形的方法
CN110748345A (zh) 一种防范煤矿深部双巷布置工作面冲击地压的方法
CN111005764A (zh) 两硬条件下冲击地压多参量监测预警体系
CN105909284A (zh) 一种大采高煤壁片帮防治控制方法
CN106677781A (zh) 一种极薄煤层钻采卸压增透方法
CN112031772B (zh) 一种利用高压水射流诱导上覆残留煤柱整体破坏的方法
CN110965964B (zh) 一种特厚煤层瓦斯抽采方法
CN112324499A (zh) 一种阻隔扰动应力波防治冲击地压的方法
CN110080768B (zh) 一种煤矿巷道大范围岩爆防治方法
CN104234685A (zh) 一种特厚煤层回采面防冲卸压钻孔错层布置方法
Pengfei et al. The mechanical criterion of activation and instability of normal fault induced by the movement of key stratum and its disaster-causing mechanism of rockburst in the hanging wall mining
CN215979369U (zh) 一种煤矿冲击地压防治系统
CN112855123B (zh) 一种卸压钻孔深度的确定方法
CN113107583A (zh) 一种厚硬顶板高瓦斯煤层瓦斯抽采系统及抽采方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao

Applicant after: Shandong University of Science and Technology

Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology

Applicant before: Shandong University of Science and Technology

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20200327

RJ01 Rejection of invention patent application after publication