CN102797492A - 切顶巷预裂顶板布置方法 - Google Patents

切顶巷预裂顶板布置方法 Download PDF

Info

Publication number
CN102797492A
CN102797492A CN2012103164589A CN201210316458A CN102797492A CN 102797492 A CN102797492 A CN 102797492A CN 2012103164589 A CN2012103164589 A CN 2012103164589A CN 201210316458 A CN201210316458 A CN 201210316458A CN 102797492 A CN102797492 A CN 102797492A
Authority
CN
China
Prior art keywords
roof
lane
cutting
roadway
top board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103164589A
Other languages
English (en)
Other versions
CN102797492B (zh
Inventor
窦林名
何江
巩思园
毛卫民
王毅
张军伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210316458.9A priority Critical patent/CN102797492B/zh
Publication of CN102797492A publication Critical patent/CN102797492A/zh
Application granted granted Critical
Publication of CN102797492B publication Critical patent/CN102797492B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种切顶巷预裂顶板布置方法,尤其适用于具有厚层坚硬顶板的工作面进行顶板预裂,避免顶板在工作面后方形成大面积悬顶而使煤体产生高应力集中诱发冲击矿压灾害。在需要预裂顶板的位置掘进巷道,联通工作面沿采空区一侧的顺槽与瓦斯高抽巷,此掘进的巷道称为切顶巷。切顶巷在厚层坚硬顶板中形成一个巷道大小的孔洞,将顶板强度弱化,当工作面推进至切顶巷区域时,顶板沿切顶巷预裂弱化区产生断裂,从而避免厚层坚硬顶板在工作面后方形成大面积悬顶,避免悬顶导致的工作面前方煤体形成高应力集中诱发冲击矿压,同时该方法预裂顶板无需爆破,避免因爆破产生的火花诱发矿井瓦斯爆炸灾害。该方法简单、安全、实用、切顶效果好。

Description

切顶巷预裂顶板布置方法
技术领域
本发明涉及切顶巷预裂顶板布置方法,尤其适用于具有冲击矿压危险的高瓦斯长壁采煤工作面冲击矿压防治。
背景技术
冲击矿压是高应力作用下,煤岩体积聚的大量弹性变形能在瞬间猛烈释放造成的矿井爆炸性动力灾害,常导致巷道、机电设备瞬间遭到破坏,严重时将造成人员伤亡等,给矿井安全高效生产造成了极大影响。坚硬厚层顶板形成的采空区大面积悬顶是工作面煤体形成高应力集中的主要因素,尤其在工作面邻近采空区一侧,由于受到邻面侧向应力以及本工作面后方悬顶造成的超前应力影响,更易发生冲击矿压灾害。预裂坚硬厚层顶板是避免工作面后方形成大面积悬顶的主要方法。目前预裂顶板的方法主要采用顶板深孔爆破的方法,由于存在“哑炮”、拒爆等现象,深孔爆破存在安全隐患,另一方面,若矿井存在高瓦斯,爆破容易诱发瓦斯爆炸,导致灾害。由于煤矿厚层坚硬顶板导致的冲击矿压灾害日趋严重,以及现有预裂厚层坚硬顶板技术方法效果不佳,易诱发瓦斯灾害等,有效预裂顶板技术是本领域内急待解决的问题。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种方法简单、安全可靠、效果好的切顶巷预裂顶板的巷道布置方法。
技术方案:本发明的切顶巷预裂顶板布置方法:
a、在邻面采空区一侧的工作面上方施工位于坚硬厚层顶板中或其上方的瓦斯高抽巷,瓦斯高抽巷距上顺槽的平面距离为15~25m;
b、在需要预裂弱化顶板的位置施工连接上顺槽与瓦斯高抽巷的切顶巷,切顶巷长度为15~40m;
当工作面回采推进时,采空区上方悬顶将逐渐增大;
当工作面推进至切顶巷区域时,坚硬厚层顶板将沿切顶巷弱化区开始破断,从而减小来压步距,避免坚硬厚层顶板在工作面后方采空区形成大面积悬顶。
所述的切顶巷施工为半圆拱形、或方形巷道。
有益效果:利用工作面上顺槽和瓦斯高抽巷,在其间掘出间距为15~40m的切顶巷,切顶巷在厚层坚硬顶板中可形成巷道大小的孔洞,破坏了厚层坚硬顶板的完整性,达到预裂的效果。当工作面推进至切顶巷区域时,厚层坚硬顶板由于受切顶巷弱化作用,首先从切顶巷边角应力集中位置开始形成裂纹扩展,并最终导致厚层坚硬顶板沿切顶巷区域破断,避免厚层坚硬顶板在工作面后方形成大面积悬顶导致工作面煤体应力集中产生冲击矿压灾害。该方法提前在上顺槽与瓦斯高抽巷之间掘进巷道弱化厚层坚硬顶板,可避免回采过程中因爆破弱化顶板导致的瓦斯爆炸灾害。该巷道布置方法适用于具有冲击矿压危险的煤层在采用长壁工作面开采时,沿采空区一侧预裂顶板,尤其适用于具有厚层坚硬顶板的工作面进行顶板预裂,可避免顶板在工作面后方形成大面积悬顶而使煤体产生高应力集中诱发冲击矿压灾害。其方法简单、安全、实用、效果好,具有广泛的实用性。
附图说明
图1是本发明的平面布置示意图。
图2是图1的A-A的剖面示意图。
图3是本发明的近水平煤层开采剖面布置示意图。
图中:1-工作面,2-上顺槽,3-下顺槽,4-瓦斯高抽巷,5-切顶巷,6-工作面后部采空区,7-区段煤柱,8—邻面采空区,9—厚层坚硬顶板。
具体实施方式
下面结合附图对本发明的实施作进一步的描述: 
图1图2所示,本发明的切顶巷预裂顶板布置方法,当采煤工作面上区段回采形成采空区8后,掘进本工作面1的上顺槽2、下顺槽3,当工作面1形成之后,在邻面采空区8一侧工作面1上方施工位于坚硬厚层顶板9中或其上方的瓦斯高抽巷4,瓦斯高抽巷4距上顺槽2的平面距离为15~25m;在需要预裂弱化顶板的区域施工连接上顺槽2与瓦斯高抽巷4的切顶巷5,切顶巷5长度为15~40m;所述的切顶巷5可施工为半圆拱形、也可施工为方形巷道。当工作面1回采推进时,采空区6上方悬顶逐渐增大;当工作面1推进至切顶巷5区域时,坚硬厚层顶板9将沿切顶巷5弱化区开始破断,从而减小来压步距,避免坚硬厚层顶板9在工作面后方采空区6形成大面积悬顶,实现冲击矿压防治的目的。
图3所示,当煤层倾角较小或近水平时,切顶巷5可倾斜布置。

Claims (2)

1.一种切顶巷预裂顶板布置方法,其特征在于:
a、在邻面采空区(8)一侧的工作面(1)上方施工位于坚硬厚层顶板(9)中或其上方的瓦斯高抽巷(4),瓦斯高抽巷(4)距上顺槽(2)的平面距离为15~25m;
b、在需要预裂弱化顶板的位置施工连接上顺槽(2)与瓦斯高抽巷(4)的切顶巷(5),切顶巷(5)长度为15~40m;
当工作面(1)回采推进时,采空区(6)上方悬顶将逐渐增大;
当工作面(1)推进至切顶巷(5)区域时,坚硬厚层顶板(9)将沿切顶巷(5)弱化区开始破断,从而减小来压步距,避免坚硬厚层顶板(9)在工作面后方采空区(6)形成大面积悬顶。
2.根据权利要求1所述的切顶巷预裂顶板布置方法,其特征在于:所述的切顶巷(5)施工为半圆拱形、或方形巷道。
CN201210316458.9A 2012-08-31 2012-08-31 切顶巷预裂顶板布置方法 Expired - Fee Related CN102797492B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210316458.9A CN102797492B (zh) 2012-08-31 2012-08-31 切顶巷预裂顶板布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210316458.9A CN102797492B (zh) 2012-08-31 2012-08-31 切顶巷预裂顶板布置方法

Publications (2)

Publication Number Publication Date
CN102797492A true CN102797492A (zh) 2012-11-28
CN102797492B CN102797492B (zh) 2014-10-29

Family

ID=47196770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210316458.9A Expired - Fee Related CN102797492B (zh) 2012-08-31 2012-08-31 切顶巷预裂顶板布置方法

Country Status (1)

Country Link
CN (1) CN102797492B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252651A (zh) * 2018-01-12 2018-07-06 新疆龟兹矿业有限公司 综采工作面多点分散平行式炮眼预裂顶板的方法
CN109915141A (zh) * 2019-04-13 2019-06-21 山东科技大学 不等宽护巷煤柱采场巷道冲击地压的防治方法
CN110067558A (zh) * 2019-04-16 2019-07-30 中国矿业大学 一种急倾斜特厚煤层回采巷道联合卸压防治冲击矿压方法
CN110685691A (zh) * 2019-11-16 2020-01-14 山东科技大学 一种坚硬顶板强制放顶方法
CN111946343A (zh) * 2020-07-29 2020-11-17 山西晋城无烟煤矿业集团有限责任公司 一种地面垂直孔复合喷射压裂解决坚硬顶板难垮落的方法
CN113062762A (zh) * 2021-03-26 2021-07-02 太原理工大学 一种提高高抽巷瓦斯抽采效率的方法
CN113356863A (zh) * 2021-07-26 2021-09-07 中国矿业大学 一种采煤工作面坚硬顶板分区高低位组合预裂爆破的方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA975388A (en) * 1972-02-29 1975-09-30 Errol M. Gardiner Trona mining method
SU954568A1 (ru) * 1976-05-19 1982-08-30 Институт горного дела Способ выемки целиков
GB2283771A (en) * 1993-11-12 1995-05-17 Jennmar Corp Longwall mining roof control system
RU2312990C1 (ru) * 2006-03-28 2007-12-20 Государственное образовательное учреждение высшего профессионального образования "Кузбасский государственный технический университет" (ГУ КузГТУ) Способ предупреждения горных ударов на пологих удароопасных пластах
CN101705821A (zh) * 2009-10-29 2010-05-12 太原理工大学 一种用于煤矿开采中坚硬顶板控制放顶的方法
CN101749018A (zh) * 2010-01-31 2010-06-23 山西晋城无烟煤矿业集团有限责任公司 煤柱直接回收采煤法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA975388A (en) * 1972-02-29 1975-09-30 Errol M. Gardiner Trona mining method
SU954568A1 (ru) * 1976-05-19 1982-08-30 Институт горного дела Способ выемки целиков
GB2283771A (en) * 1993-11-12 1995-05-17 Jennmar Corp Longwall mining roof control system
RU2312990C1 (ru) * 2006-03-28 2007-12-20 Государственное образовательное учреждение высшего профессионального образования "Кузбасский государственный технический университет" (ГУ КузГТУ) Способ предупреждения горных ударов на пологих удароопасных пластах
CN101705821A (zh) * 2009-10-29 2010-05-12 太原理工大学 一种用于煤矿开采中坚硬顶板控制放顶的方法
CN101749018A (zh) * 2010-01-31 2010-06-23 山西晋城无烟煤矿业集团有限责任公司 煤柱直接回收采煤法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘益文等: "《南方煤矿瓦斯抽采与利用实用技术》", 31 October 2009, 中国矿业大学出版社 *
庞贵振等: "鸡西矿区瓦斯地质特征及瓦斯防治技术研究", 《基于瓦斯地质的煤矿瓦斯防治技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252651A (zh) * 2018-01-12 2018-07-06 新疆龟兹矿业有限公司 综采工作面多点分散平行式炮眼预裂顶板的方法
CN108252651B (zh) * 2018-01-12 2020-01-10 新疆龟兹矿业有限公司 综采工作面多点分散平行式炮眼预裂顶板的方法
CN109915141A (zh) * 2019-04-13 2019-06-21 山东科技大学 不等宽护巷煤柱采场巷道冲击地压的防治方法
CN110067558A (zh) * 2019-04-16 2019-07-30 中国矿业大学 一种急倾斜特厚煤层回采巷道联合卸压防治冲击矿压方法
CN110685691A (zh) * 2019-11-16 2020-01-14 山东科技大学 一种坚硬顶板强制放顶方法
CN110685691B (zh) * 2019-11-16 2020-12-01 山东科技大学 一种坚硬顶板强制放顶方法
CN111946343A (zh) * 2020-07-29 2020-11-17 山西晋城无烟煤矿业集团有限责任公司 一种地面垂直孔复合喷射压裂解决坚硬顶板难垮落的方法
CN113062762A (zh) * 2021-03-26 2021-07-02 太原理工大学 一种提高高抽巷瓦斯抽采效率的方法
CN113356863A (zh) * 2021-07-26 2021-09-07 中国矿业大学 一种采煤工作面坚硬顶板分区高低位组合预裂爆破的方法

Also Published As

Publication number Publication date
CN102797492B (zh) 2014-10-29

Similar Documents

Publication Publication Date Title
CN102797492B (zh) 切顶巷预裂顶板布置方法
CN102678120B (zh) 冲击地压卸压解危方法
CN105735993B (zh) 一种基于二氧化碳爆破的防治坚硬顶板型冲击地压的方法
WO2018201706A1 (zh) 底板顺层长钻孔分段压裂高效抽放煤巷条带瓦斯及区域消突方法
CN104100266B (zh) 防治沿空巷道冲击地压的方法
WO2021103533A1 (zh) 一种作业可控的切顶卸压沿空留巷方法
CN103758570A (zh) 一种水力致裂控制临空巷道强矿压的方法
CN104481578B (zh) 一种高瓦斯煤层大采高工作面瓦斯治理方法
CN104329113B (zh) 一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法
CN103306714B (zh) 近距离煤层群底抽巷钻孔一孔三用的瓦斯治理方法
CN102644476A (zh) 保护层机巷高位钻场穿层钻孔抽采被保护层瓦斯的方法
CN107120137B (zh) 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法
CN106894816A (zh) 基于三角板结构模型的远场关键层切顶卸压护巷方法
CN102383828A (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN102678117A (zh) 基于聚能爆破的定向水力致裂方法
CN102587960A (zh) 一种高瓦斯煤层回采工作面巷道的布置方法
CN104847406B (zh) 一种致裂相邻采煤工作面遗留充填墙体的方法
CN101608552A (zh) 煤层底板含水层加固并在加固过程中保护隔水层的方法
CN108397227A (zh) 一种倾向递进消突巷道布置方法
CN102518436A (zh) 煤矿巷道掘进时构造型冲击地压防治方法
CN104632219A (zh) 厚煤层大采高沿空留巷方法
CN102943690A (zh) 采煤工作面顶板离层水的防治方法
CN105804753A (zh) 一种基于二氧化碳爆破的弱化坚硬煤层放顶煤的方法
CN104847401A (zh) 一种区域性防治煤与瓦斯突出煤层采煤工作面突出的方法
CN102777180A (zh) 一种煤矿主动式区域性防治冲击地压的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141029

Termination date: 20170831

CF01 Termination of patent right due to non-payment of annual fee