CN110735378A - tools for ensuring compaction degree of asphalt concrete under anti-settling well lid - Google Patents

tools for ensuring compaction degree of asphalt concrete under anti-settling well lid Download PDF

Info

Publication number
CN110735378A
CN110735378A CN201911112694.7A CN201911112694A CN110735378A CN 110735378 A CN110735378 A CN 110735378A CN 201911112694 A CN201911112694 A CN 201911112694A CN 110735378 A CN110735378 A CN 110735378A
Authority
CN
China
Prior art keywords
well lid
ensuring
compactness
well
asphalt concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911112694.7A
Other languages
Chinese (zh)
Inventor
宋海涛
刘泰赟
杨守成
郭涛
许庆鹏
王光磊
张兆伟
钱瑶
李明
王大盛
柴继燕
李正虎
许记锋
王刚建
刘晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huitong Construction Group Co Ltd
Original Assignee
Shandong Huitong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huitong Construction Group Co Ltd filed Critical Shandong Huitong Construction Group Co Ltd
Priority to CN201911112694.7A priority Critical patent/CN110735378A/en
Publication of CN110735378A publication Critical patent/CN110735378A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a tool for ensuring the compactness of asphalt concrete under an anti-settling well lid, which belongs to the field of road construction auxiliary tools and comprises a well lid process hole marking unit and an asphalt mixture metering unit, wherein the asphalt mixture metering unit comprises a positioning rod and a separating cylinder, a well lid edge positioning mechanism is arranged on the separating cylinder, the separating cylinder is fixedly connected with the positioning rod, and the distance between the separating cylinder and the positioning rod is equal to the distance between the outer edge of a shaft and a well lid process hole.

Description

tools for ensuring compaction degree of asphalt concrete under anti-settling well lid
Technical Field
The invention relates to the field of road construction auxiliary tools, in particular to tools for ensuring the compactness of asphalt concrete under an anti-settlement well cover.
Background
As shown in fig. 1, a well lid 2 on a road surface is used for covering a shaft 3, and two process holes 1 are arranged on the well lid 2. during paving operation of a paver in the prior art, layers of asphalt mixture are directly paved (including the well lid) on the whole road surface, in the paving process of an asphalt surface layer of a municipal road, the anti-settling well lid needs to be synchronously lifted along with the paving operation, the flow rhythm can be reduced by synchronous lifting, the construction period can be shortened, and problems can occur in the construction process of synchronous lifting of the existing well lid:
, after the paver paves and goes through the well lid, can only look for the well lid with visual method, can not time confirm the position, this will cause at the in-process of looking for, the continuous pitch mixture of looking for the pre-compaction with the spade of turning over, even after the later stage flattening, also can cause the mixture local range in the volume of paving inhomogeneous to cause the well lid compactness unqualified around.
And secondly, the quantity of the mixture to be filled when the inspection well cover is lowered to the bottom is not measured. Usually, a mixture is manually filled under the well lid by using a shovel, and the well lid is 1-2cm higher than the surrounding pre-pressing surface after the mixture is fully filled, but the height can only be determined by feeling due to different thicknesses of the upper, middle and lower surface layers. The upper surface layer is designed to have the thickness of 4cm, if the well lid is 1-2cm higher than the surrounding asphalt surface, the well lid is higher than the surrounding asphalt surface after the rolling is completed, the flatness is influenced, and if the well lid is strongly vibrated to be leveled, the mixture can be shattered, so that the bearing capacity of the well lid is reduced; the well cover at the middle and lower layers is higher than 1-2cm, because the mixture is turned over, the compaction coefficient is different from that of the mixture pre-pressed at the periphery, and the mixture under the well cover is not enough in compaction degree after the disturbed mixture is filled and rolled. The above reasons can cause the insufficient intensity of the asphalt mixture under the well cover or around the well cover, and the bearing capacity is reduced.
Therefore, how to conveniently find the well lid after the paver paves to the volume of filling the mixture under the accurate measurement well lid is with the compactness of guaranteeing bituminous mixture under the well lid, with promotion efficiency of construction and construction quality, is the problem that awaits solution urgently.
Disclosure of Invention
In order to make up for the defects of the prior art, the invention provides tools for ensuring the compactness of asphalt concrete under the anti-settling well cover.
The technical scheme of the invention is as follows:
tools for ensuring the compaction degree of asphalt concrete under the anti-settling well lid, which comprises a well lid fabrication hole marking unit for marking the position of a well lid fabrication hole before paving and an asphalt mixture metering unit for metering asphalt mixture required under the well lid when the height of the well lid is lifted after paving;
the asphalt mixture metering unit comprises a positioning rod inserted into the well lid process hole and a separating cylinder for separating asphalt mixture paved above the corresponding shaft; the separation cylinder is provided with a well lid edge positioning mechanism; the separating cylinder is fixedly connected with the positioning rod; the distance between the separation cylinder and the positioning rod is equal to the distance between the outer edge of the shaft and the well lid process hole.
When the tool for ensuring the compactness of the asphalt concrete under the anti-settling well lid is used, well lid process hole marking units are placed on well lids of a section to be paved of a paving working surface before paving operation, the well lid process hole marking units are inserted into well lid process holes and are tied with markers which are easy to find such as red ropes or red cloth, paving operation is started after the process holes of the well lids of the section to be paved are marked, after a paver paves and runs through the well lids, the positions with the markers are found, the well lid process hole marking units are pulled out (the section to be paved is placed circularly under ), two positioning rods of an asphalt mixture metering unit are respectively inserted into the two process holes on the well lids, the positions of the edges of the well lids are positioned by a well lid edge positioning mechanism, because the distance between a separating cylinder and the positioning rods is equal to the distance between the outer edge of a well shaft and the process holes of the well lids, the asphalt mixture corresponding to the well lids is just separated into the separating cylinder inside of the separating cylinder, the well lid edge positioning mechanism positions of the edges of the well lids are positioned, workers rake the asphalt mixture outside the well lids and rake the asphalt mixture outside of the well lids to ensure the asphalt mixture and rake the well lids, the asphalt mixture and the well lids, the asphalt mixture under the well lids, the well lids are removed, and the asphalt mixture is lifted by the well lids to ensure the asphalt mixture under well lids.
The amount of the spare asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism obtained by the asphalt mixture metering unit in the tool is just equal to the amount of the asphalt mixture required below the well lid when the well lid is lifted to the paving height.
As the preferred scheme, well lid edge positioning mechanism includes a plurality of backup pads, each the outside limit of backup pad is fixed respectively and is provided with the arc location structure that can coincide with the well lid outward flange.
, each of the support plates is vertically disposed.
The height of each support plate is preferably equal to the height of the divider cylinder, which arrangement increases the ease of operation and reduces the non-uniformity of the asphalt mixture as it is raked or filled.
Preferably, the height of the separating cylinder is greater than or equal to the virtual paving thickness of the asphalt mixture. Therefore, the asphalt mixture corresponding to the shaft can be completely isolated inside the separation cylinder.
Preferably, the arc-shaped positioning structure is an arc-shaped plate or an arc-shaped steel bar.
As a preferred scheme, the well lid edge positioning mechanism is a positioning ring connected with the separating cylinder through a supporting plate; the diameter of the locating ring is equal to the outer diameter of the well cover. The setting is in order to confirm well lid edge to reduce the disturbance to the pre-compaction bituminous mixture around the well lid in the lift process. .
Preferably, the separating cylinder is fixedly connected with the positioning rod through a connecting plate, and the height of the connecting plate is equal to that of the separating cylinder, so that the arrangement step is added to improve the working convenience.
As the preferred scheme, well lid fabrication hole mark unit is including being used for the elasticity jack catch of card at the well lid fabrication hole, elasticity jack catch top is equipped with the elasticity post, the elasticity post top surface is equipped with the link that is used for fixed marker. The elastic clamping jaws are inserted into the manhole cover fabrication holes in a contracted state and then loosened to rebound, so that the manhole cover fabrication hole positioning units cannot leave the manhole cover fabrication holes; the height of the elastic column is more than or equal to the virtual paving thickness of the asphalt mixture, so that the hanging ring can be ensured to be exposed outside, and the markers hung on the hanging ring can be clearly seen.
The special harrow for the asphalt mixture well cover comprises a special harrow for raking the asphalt mixture between the outer side of the separating cylinder and the well cover edge positioning mechanism, the special harrow comprises a handle and an arc-shaped harrow plate for being attached to the outer wall of the separating cylinder, the arc-shaped harrow plate is fixedly connected with the handle, when the special harrow is used, the arc-shaped harrow plate is attached to the outer wall of the separating cylinder and then pulled outwards with force, and the special harrow can improve construction efficiency by steps.
The invention has the beneficial effects that:
1. the invention discloses a tool for ensuring the compactness of asphalt concrete under an anti-settlement well cover, which comprises a well cover process hole marking unit used for marking the position of a well cover process hole before paving operation; therefore, the positions of the well lid and the well lid fabrication hole can be quickly found after the paver paves and runs through the well lid, and the construction efficiency is greatly improved.
2. The amount of the standby asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism obtained by the asphalt mixture metering unit in the tool is just equal to the amount of the asphalt mixture required below the well lid when the well lid is lifted to a paving surface; the compaction degree of the asphalt concrete around and below the inspection well is effectively ensured, so that the bearing capacity provided by the asphalt mixture is ensured.
3. The tool for ensuring the compaction degree of the asphalt concrete under the anti-settlement well cover has the advantages of simple structure, ingenious design, convenience in use and low cost, and can be used for lifting the well cover when being used for paving a road, so that the construction efficiency and the construction efficiency are greatly improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of a well lid and a shaft;
fig. 2 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under a settlement-proof well lid in embodiment 1 of the invention;
FIG. 3 is a schematic view of kinds of structures of the manhole cover process hole marking unit in the invention;
FIG. 4 is a schematic view of structures of the special harrow of the present invention;
FIG. 5 is a schematic view of the special harrow in FIG. 4;
fig. 6 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under a settlement-proof well lid in embodiment 2 of the present invention;
fig. 7 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under a settlement-proof well lid in embodiment 3 of the present invention;
fig. 8 is a schematic view of the coverage condition of the asphalt mixture above the well lid after the asphalt mixture is paved on the road.
Detailed Description
In the description of the present invention, the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "vertical", "horizontal", etc. indicate orientations or positional relationships based on those shown in the drawings, and are only for describing the present invention but do not require that the present invention be constructed or operated in a specific orientation, and thus should not be construed as limiting the present invention.
Example 1
As shown in fig. 2, 3, 4 and 5, tools for ensuring the compaction degree of asphalt concrete under the anti-settling well lid comprise a well lid process hole marking unit for marking the position of a well lid process hole 1 before paving operation, an asphalt mixture metering unit for metering the asphalt mixture required under the well lid 2 when the well lid is lifted in height after paving operation, and a special rake for collecting the asphalt mixture required under the well lid 2 when the well lid is lifted in height metered by the asphalt mixture metering unit.
As shown in fig. 3, the manhole cover process hole marking unit includes an elastic claw 12, an elastic column 11, and a hanging ring 10. The elastic claw 12 is fixedly connected with the elastic column, and the hanging ring 10 is fixedly connected with the upper part of the elastic column 11.
The elastic clamping jaw 12 is used for being clamped in the well lid technical hole 1, the elastic clamping jaw 12 is pinched, the elastic clamping jaw 12 is in a contraction state (when the elastic clamping jaw 12 is in the contraction state, the projection area of the horizontal plane is smaller than the diameter of the well lid technical hole 1), the elastic clamping jaw 12 is inserted into the well lid technical hole 1 at the moment, and after the elastic clamping jaw 12 is inserted, the elastic clamping jaw 12 is loosened to enable the elastic clamping jaw to rebound, so that the clamping is carried out in the well lid technical hole 1.
The height of the elastic column 11 is larger than or equal to the virtual paving thickness of the asphalt mixture, so that the hanging ring can be ensured to be exposed outside, the hanging ring is set to be the elastic column, the hanging ring is suitable for paving pavements with different thicknesses, and in the paving process of the asphalt mixture, the manhole cover process hole marking unit inserted on a manhole cover is not easy to damage.
Before the pavement is paved, a marker which is easy to be found, such as a red rope or red cloth, is arranged on the hanging ring 10. Because the height of the elastic columns 11 is larger than or equal to the virtual paving thickness of the asphalt mixture, the red marker can still be exposed above a new road surface after the road surface is paved.
As shown in fig. 2, the asphalt mixture metering unit includes a separating cylinder 6, the separating cylinder 6 is hollow inside, the outer diameter of the separating cylinder 6 is equal to the outer diameter of the shaft 3, the height of the separating cylinder is greater than or equal to the virtual paving thickness of the asphalt mixture, positioning rods 9 are fixedly connected to the left side and the right side of the separating cylinder 6 through connecting plates 8, the width of each connecting plate 8 (i.e., the distance between the outer wall of the separating cylinder 6 and the positioning rods 9) is equal to the vertical distance between the shaft 3 and the manhole cover process holes 1, so that the two positioning rods 9 can be inserted into the two manhole cover process holes 1 on the manhole cover 2 respectively, and as a preferred embodiment, the height of the.
In addition, arc-shaped reinforcing steel bars 5 are fixed on the outer edges of the supporting plates 7, the radius of each arc-shaped reinforcing steel bar 5 is equal to the radius of the well lid 2, the circle center of each arc-shaped reinforcing steel bar 5 is on the same vertical line of with the circle center of the well lid 2, the arrangement can ensure that the position corresponding to each arc-shaped reinforcing steel bar 5 is the edge of the well lid 2, and a handrail 4 is fixed on a positioning rod 9 in the preferred embodiment, so that the operation of workers is convenient.
As shown in fig. 4, the special harrow comprises a handle 14 and an arc-shaped harrow plate 13 for fitting the outer wall of the separation cylinder 6; the arc-shaped harrow plate 13 is fixedly connected with a handle 14. The special rake is used for raking out the asphalt mixture between the outer side of the separating cylinder 6 and the well lid edge positioning mechanism.
When the asphalt mixture is paved, as shown in fig. 8, after the paver paves, layers of asphalt mixture are paved on the upper surface of the well cover 2 like of the original road surface, the asphalt mixture above the well cover is circular and has a compaction degree of , in fig. 8, the outer diameter of A is the same as that of a well cover, the radius of B is the same as that of a shaft at the lower part of the well cover, and in order to ensure the compaction degree around the well cover and the compaction degree under the well cover , the asphalt mixture at the part A only needs to be filled below the lifted well cover, and the mixture at the part B is removed.
According to the asphalt mixture metering unit, the outer diameter of the separating cylinder 6 is equal to the outer diameter of the shaft 3 below the well cover 2, the vertical distance between the outer edge of the supporting plate 7 and the outer wall of the separating cylinder 6 is equal to the distance between the outer edge of the shaft 3 and the outer edge of the well cover 2, the arc-shaped reinforcing steel bars 5 are fixedly arranged on the outer edge of the supporting plate 7, the radius of each arc-shaped reinforcing steel bar 5 is equal to the radius of the well cover 2, the circle center of each arc-shaped reinforcing steel bar 5 is on the same vertical line with the circle center of the well cover 2, the arrangement can guarantee that the position corresponding to each arc-shaped reinforcing steel bar 5 is the edge of the well.
When the tool for ensuring the compactness of the asphalt concrete under the anti-settling well lid is used, before paving operation, the elastic clamping claws 12 of the well lid process hole marking units are inserted into the well lid process holes 1, each well lid process hole 1 corresponds to well lid process hole marking units, so that the well lid of the whole paving operation surface can be marked by the marking units, and the hanging rings 10 of each well lid process hole marking unit are hung with red flags.
After the well lid technical holes 1 are all marked, paving operation is started by a paver, the well lid is not compacted after being paved, but the well lid 2 and the well lid technical holes 1 are found according to the marks of the red flags, the well lid technical hole marking unit is pulled out from the well lid technical holes 1, then two positioning rods 9 in an asphalt mixture metering unit are simultaneously inserted into the two well lid technical holes 1 on well lids 2, handrails 4 are pressed by hands, the bottom of a separating cylinder 6 is in contact with the well lid 2, as shown in figure 5, an asphalt mixture rake outside the separating cylinder and between arc-shaped reinforcing steel bars 5 is pulled out to the periphery of the well lid for standby, then the device is pulled out, residual asphalt mixture is removed, the well lid is lifted after being exposed, the standby asphalt mixture is filled around a well shaft below the well lid, and all the standby asphalt mixture is compacted after being moved to the position below the well lid.
The amount of the standby asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism, which is obtained by the asphalt mixture metering unit in the tool, is exactly equal to the amount of the asphalt mixture required below the well lid when the well lid is lifted to a paving surface; the compaction degree of the asphalt concrete around and below the inspection well is effectively ensured, so that the bearing capacity provided by the asphalt mixture is ensured.
Example 2
As shown in fig. 6, the arc-shaped reinforcing steel bars 5 in embodiment 1 are replaced with arc-shaped positioning plates 15; in addition, the height of the connecting plate 8 is smaller than that of the partition cylinder 6, as in embodiment 1.
Example 3
As shown in fig. 7, the arc-shaped reinforcing bars 5 in embodiment 1 are replaced with circular positioning reinforcing bars 16; the diameter of the round positioning steel bar 16 is equal to the outer diameter of the well cover 2. The rest is the same as example 1.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; while the invention has been described in detail and with reference to the foregoing embodiments, it will be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention, and they should be construed as being included in the following claims and description.

Claims (10)

  1. tools for ensuring the compactness of asphalt concrete under a settlement-proof well cover, which is characterized by comprising a well cover fabrication hole marking unit for marking the position of a well cover fabrication hole before paving and an asphalt mixture metering unit for metering asphalt mixture needed under the well cover when the height of the well cover is lifted after paving;
    the asphalt mixture metering unit comprises a positioning rod inserted into the well lid process hole and a separating cylinder for separating asphalt mixture paved above the corresponding shaft; the separation cylinder is provided with a well lid edge positioning mechanism; the separating cylinder is fixedly connected with the positioning rod; the distance between the separation cylinder and the positioning rod is equal to the distance between the outer edge of the shaft and the well lid process hole.
  2. 2. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid edge positioning mechanism comprises a plurality of supporting plates, and arc-shaped positioning structures which can be coincided with the outer edge of the well lid are fixedly arranged on the outer side edges of the supporting plates respectively.
  3. 3. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: each of the support plates is vertically arranged.
  4. 4. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: the height of each supporting plate is equal to that of the separating cylinder.
  5. 5. The tool for ensuring the compactness of the asphalt concrete under the anti-settling well lid as recited in claim 1 or 4, wherein: the height of the separation cylinder is more than or equal to the virtual paving thickness of the asphalt mixture.
  6. 6. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: the arc positioning structure is an arc plate or an arc reinforcing steel bar.
  7. 7. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid edge positioning mechanism is a positioning ring connected with the separating cylinder through a supporting plate; the diameter of the locating ring is equal to the outer diameter of the well cover.
  8. 8. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the separating cylinder is fixedly connected with the positioning rod through a connecting plate; the height of the connecting plate is equal to that of the separating cylinder.
  9. 9. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid fabrication hole marking unit comprises an elastic clamping claw which is used for being clamped in a well lid fabrication hole, an elastic column is arranged above the elastic clamping claw, and a hanging ring used for fixing a marker is arranged on the top surface of the elastic column.
  10. 10. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the special harrow is used for raking the asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism; the special harrow comprises a handle and an arc-shaped harrow plate which is used for being attached to the outer wall of the separation cylinder; the arc-shaped harrow plate is fixedly connected with the handle.
CN201911112694.7A 2019-11-14 2019-11-14 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid Pending CN110735378A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911112694.7A CN110735378A (en) 2019-11-14 2019-11-14 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911112694.7A CN110735378A (en) 2019-11-14 2019-11-14 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid

Publications (1)

Publication Number Publication Date
CN110735378A true CN110735378A (en) 2020-01-31

Family

ID=69272907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911112694.7A Pending CN110735378A (en) 2019-11-14 2019-11-14 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid

Country Status (1)

Country Link
CN (1) CN110735378A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506212A (en) * 2022-09-27 2022-12-23 中国有色金属工业第六冶金建设有限公司 Method for paving asphalt around well lid

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010010287A (en) * 1999-07-19 2001-02-05 황광욱 Method for Repairing a Manhole Cover Assembly
JP2006112075A (en) * 2004-10-13 2006-04-27 Shinichi Tsubakimori Manhole and installation method of manhole cover supporting frame
KR20100127062A (en) * 2009-05-25 2010-12-03 (주) 시티이엔지 Construction of manholes method
CN201915317U (en) * 2011-01-05 2011-08-03 袁树连 Road well lid filling device for construction
CN104480966A (en) * 2014-12-15 2015-04-01 青岛城建集团有限公司 Bolting steel cover plate guide-well construction method and bolting steel cover plate device used in method
CN204491349U (en) * 2015-03-27 2015-07-22 中核华泰建设有限公司 Road inspection well periphery pavement repair structure
CN204982946U (en) * 2015-07-30 2016-01-20 济南汇通联合市政工程有限责任公司 Prevent native sediment device that drops
CN105672360A (en) * 2015-04-23 2016-06-15 北京华千新技术有限公司 Changeable-diameter round mold plate
CN205636404U (en) * 2016-04-02 2016-10-12 石飞虎 Make well head and road surface keep smooth -going oval backing plate of reinforced concrete
CN106567410A (en) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 New construction method of municipal road inspection well
CN206971280U (en) * 2017-07-13 2018-02-06 天津市路建源建设市政工程有限公司 A kind of special type checks well construction
CN108374436A (en) * 2018-03-30 2018-08-07 济南城建集团有限公司 It is a kind of to open easily well lid
CN108999052A (en) * 2018-07-13 2018-12-14 湖南鑫长胜材料科技有限公司 A kind of method for maintaining for pavement disease around municipal inspection shaft
CN109267588A (en) * 2018-10-30 2019-01-25 张磊 A kind of reserved mounting device of road construction inspection shaft well head
CN109339109A (en) * 2018-11-21 2019-02-15 杭州江润科技有限公司 Build well room and construction method
CN211171523U (en) * 2019-11-14 2020-08-04 山东汇通建设集团有限公司 Guarantee instrument of asphalt concrete compactness under anti-settling well lid

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010010287A (en) * 1999-07-19 2001-02-05 황광욱 Method for Repairing a Manhole Cover Assembly
JP2006112075A (en) * 2004-10-13 2006-04-27 Shinichi Tsubakimori Manhole and installation method of manhole cover supporting frame
KR20100127062A (en) * 2009-05-25 2010-12-03 (주) 시티이엔지 Construction of manholes method
CN201915317U (en) * 2011-01-05 2011-08-03 袁树连 Road well lid filling device for construction
CN104480966A (en) * 2014-12-15 2015-04-01 青岛城建集团有限公司 Bolting steel cover plate guide-well construction method and bolting steel cover plate device used in method
CN204491349U (en) * 2015-03-27 2015-07-22 中核华泰建设有限公司 Road inspection well periphery pavement repair structure
CN105672360A (en) * 2015-04-23 2016-06-15 北京华千新技术有限公司 Changeable-diameter round mold plate
CN204982946U (en) * 2015-07-30 2016-01-20 济南汇通联合市政工程有限责任公司 Prevent native sediment device that drops
CN205636404U (en) * 2016-04-02 2016-10-12 石飞虎 Make well head and road surface keep smooth -going oval backing plate of reinforced concrete
CN106567410A (en) * 2016-11-07 2017-04-19 温州市兴业市政建设有限公司 New construction method of municipal road inspection well
CN206971280U (en) * 2017-07-13 2018-02-06 天津市路建源建设市政工程有限公司 A kind of special type checks well construction
CN108374436A (en) * 2018-03-30 2018-08-07 济南城建集团有限公司 It is a kind of to open easily well lid
CN108999052A (en) * 2018-07-13 2018-12-14 湖南鑫长胜材料科技有限公司 A kind of method for maintaining for pavement disease around municipal inspection shaft
CN109267588A (en) * 2018-10-30 2019-01-25 张磊 A kind of reserved mounting device of road construction inspection shaft well head
CN109339109A (en) * 2018-11-21 2019-02-15 杭州江润科技有限公司 Build well room and construction method
CN211171523U (en) * 2019-11-14 2020-08-04 山东汇通建设集团有限公司 Guarantee instrument of asphalt concrete compactness under anti-settling well lid

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张钥榉;: "防沉降井盖与预制装配井技术在梅华路中的应用", 城市道桥与防洪, no. 08, 15 August 2016 (2016-08-15) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115506212A (en) * 2022-09-27 2022-12-23 中国有色金属工业第六冶金建设有限公司 Method for paving asphalt around well lid
CN115506212B (en) * 2022-09-27 2023-12-08 中国有色金属工业第六冶金建设有限公司 Paving method of asphalt around well lid

Similar Documents

Publication Publication Date Title
CN110682433A (en) Prefabricated stand column construction scheme
CN110735378A (en) tools for ensuring compaction degree of asphalt concrete under anti-settling well lid
CN211171523U (en) Guarantee instrument of asphalt concrete compactness under anti-settling well lid
CN110984210A (en) Iron frame foundation of power transmission line and construction method
CN111794061A (en) Trial paving device for stone paving and stone paving method
CN217304772U (en) Road compactness test detection device
CN212175732U (en) Soil material collecting device for soil test
CN211179833U (en) Bituminous paving compactness detector
CN210975566U (en) Temporary supporting structure for suspended basket pier top of cast-in-place bridge
CN110499784B (en) Synchronous lifting construction process for manhole cover
CN209816862U (en) Construction supporting device of town road drainage structures
CN208121502U (en) Based on the reserved displacement cast-in-place curb stone structure of modular indwelling groove mould asphalt concrete pavement
CN216185393U (en) A conveyer for shipping bank protection step stone
CN214749525U (en) Vibrating concrete road surface detector
CN213328563U (en) Horizontal adjusting rod assisting paver in accurate paving
CN209891258U (en) Municipal foundation compaction degree detection device
CN214600191U (en) Sand screening installation is used in road and bridge construction
CN212505789U (en) Road prosthetic devices for municipal works
CN215005399U (en) Concrete workability survey device
CN216247323U (en) Concrete drilling core taking machine
CN220079604U (en) Roadbed edge protection mechanism
CN217105013U (en) Road bed compactness detects uses intelligent sampling device
CN218059809U (en) Road surface tamping device
CN116289408A (en) Pavement concrete rapid paving construction device and construction method
CN109505220A (en) A kind of town road repairs system and construction method in time

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination