CN211171523U - Guarantee instrument of asphalt concrete compactness under anti-settling well lid - Google Patents

Guarantee instrument of asphalt concrete compactness under anti-settling well lid Download PDF

Info

Publication number
CN211171523U
CN211171523U CN201921965218.5U CN201921965218U CN211171523U CN 211171523 U CN211171523 U CN 211171523U CN 201921965218 U CN201921965218 U CN 201921965218U CN 211171523 U CN211171523 U CN 211171523U
Authority
CN
China
Prior art keywords
well lid
asphalt mixture
compactness
asphalt
separating cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921965218.5U
Other languages
Chinese (zh)
Inventor
宋海涛
刘泰赟
杨守成
郭涛
许庆鹏
王光磊
张兆伟
钱瑶
李明
王大盛
柴继燕
李正虎
许记锋
王刚建
刘晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huitong Construction Group Co Ltd
Original Assignee
Shandong Huitong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huitong Construction Group Co Ltd filed Critical Shandong Huitong Construction Group Co Ltd
Priority to CN201921965218.5U priority Critical patent/CN211171523U/en
Application granted granted Critical
Publication of CN211171523U publication Critical patent/CN211171523U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Machines (AREA)

Abstract

The utility model discloses an instrument of bituminous concrete compactness under assurance anti-settling well lid belongs to road construction appurtenance field. The utility model comprises a manhole cover fabrication hole marking unit and an asphalt mixture metering unit; the asphalt mixture metering unit comprises a positioning rod and a separating cylinder; the separating cylinder is provided with a well lid edge positioning mechanism; the separating cylinder is fixedly connected with the positioning rod; the distance between the separating cylinder and the positioning rod is equal to the distance between the outer edge of the shaft and the well lid process hole. The utility model can quickly find the positions of the well lid and the well lid fabrication hole after the spreading machine spreads in the pavement spreading construction process; the amount of the spare asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism obtained by the asphalt mixture metering unit is exactly equal to the amount of the asphalt mixture required below the well lid when the well lid is lifted to the paving height; the compaction degree of the asphalt concrete around and below the inspection well is ensured, so that the bearing capacity provided by the asphalt mixture is ensured.

Description

Guarantee instrument of asphalt concrete compactness under anti-settling well lid
Technical Field
The utility model relates to a road construction appurtenance field, in particular to guarantee to prevent subsiding instrument of asphalt concrete compactness under well lid.
Background
As shown in fig. 1, a manhole cover 2 on a road surface is used for covering a shaft 3, and two fabrication holes 1 are formed in the manhole cover 2. In the prior art, when a paver is used for paving, a layer of asphalt mixture is directly paved on the whole pavement (including a well cover). In the process of paving the asphalt surface layer of the municipal road, the anti-settling well cover needs to be synchronously lifted along with the asphalt surface layer; the synchronous lifting can reduce the running water beat and shorten the construction period. But can appear the problem in current well lid synchronous lifting work progress:
firstly, the paver paves behind the well lid of traveling, can only look for the well lid with the visual method, can not confirm the position very first time, and this will cause at the in-process of looking for, and the continuous bituminous mixture who looks for the pre-compaction that turns over with the spade, even after the later stage flattening, also can cause the mixture local range in the volume of paving inhomogeneous to it is unqualified to cause the compactness around the well lid.
And secondly, the quantity of the mixture to be filled when the inspection well cover is lowered to the bottom is not measured. Usually, a mixture is manually filled under the well lid by using a shovel, and the well lid is 1-2cm higher than the surrounding pre-pressing surface after the mixture is fully filled, but the height can only be determined by feeling due to different thicknesses of the upper, middle and lower surface layers. The upper surface layer is designed to have the thickness of 4cm, if the well lid is 1-2cm higher than the surrounding asphalt surface, the well lid is higher than the surrounding asphalt surface after the rolling is completed, the flatness is influenced, and if the well lid is strongly vibrated to be leveled, the mixture can be shattered, so that the bearing capacity of the well lid is reduced; the well cover at the middle and lower layers is higher than 1-2cm, because the mixture is turned over, the compaction coefficient is different from that of the mixture pre-pressed at the periphery, and the mixture under the well cover is not enough in compaction degree after the disturbed mixture is filled and rolled. The above reasons can cause the insufficient intensity of the asphalt mixture under the well cover or around the well cover, and the bearing capacity is reduced.
Therefore, how to conveniently find the well lid after the paver paves to the volume of filling the mixture under the accurate measurement well lid is with the compactness of guaranteeing bituminous mixture under the well lid, with promotion efficiency of construction and construction quality, is the problem that awaits solution urgently.
SUMMERY OF THE UTILITY MODEL
In order to compensate the not enough of prior art, the utility model provides a guarantee to prevent subsiding instrument of asphalt concrete compactness under well lid.
The technical scheme of the utility model is that:
a tool for ensuring the compactness of asphalt concrete under an anti-settling well lid comprises a well lid process hole marking unit for marking the position of a well lid process hole before paving and an asphalt mixture metering unit for metering asphalt mixture required under the well lid when the height of the well lid is lifted after paving;
the asphalt mixture metering unit comprises a positioning rod inserted into the well lid process hole and a separating cylinder for separating asphalt mixture paved above the corresponding shaft; the separation cylinder is provided with a well lid edge positioning mechanism; the separating cylinder is fixedly connected with the positioning rod; the distance between the separation cylinder and the positioning rod is equal to the distance between the outer edge of the shaft and the well lid process hole.
When the tool for ensuring the asphalt concrete compactness under the anti-settlement well cover is used, well cover process hole marking units are all placed on the well cover of the section to be paved of the paving working surface before paving operation; the manhole cover technical hole marking unit is inserted into the manhole cover technical hole, and a marker which is easy to find, such as a red rope or red cloth, is tied on the manhole cover technical hole marking unit. After the fabrication holes of the well cover of the section to be paved are all marked, the paving operation is started, after the paver paves and runs through the well cover, the position with the marker is found, the well cover fabrication hole marking unit is pulled out (the next section to be paved is placed in a circulating mode), and two positioning rods of the asphalt mixture metering unit are respectively inserted into the two fabrication holes on the well cover; because the interval between separating section of thick bamboo and the locating lever equals the interval of pit shaft outer edge and well lid fabrication hole, separate section of thick bamboo and just in time separate the bituminous mixture that the pit shaft corresponds inside separating section of thick bamboo. The well lid edge positioning mechanism positions the position of the edge of the well lid, workers uniformly rake asphalt mixtures between the outer side of the separating cylinder and the well lid edge positioning mechanism to the peripheral edge of the well lid for later use, and the mixtures are filled below the well lid; after the asphalt mixture between the outer side of the separation cylinder and the well lid edge positioning mechanism is raked, the asphalt mixture in the separation cylinder is moved away. The well lid exposes this moment, promotes the well lid, then pushes away spare mixture to around the pit shaft of well lid below, the effectual compactness of having guaranteed around the inspection shaft and below asphalt concrete like this to the bearing capacity that makes and is provided by bituminous mixture obtains guaranteeing.
Through the utility model discloses the volume of the reserve asphalt mixture between the partition section of thick bamboo outside and the well lid edge positioning mechanism that the asphalt mixture metering unit in the instrument obtained just in time equals to promote the well lid to the height of paving, the required asphalt mixture's of well lid below volume.
As the preferred scheme, well lid edge positioning mechanism includes a plurality of backup pads, each the outside limit of backup pad is fixed respectively and is provided with the arc location structure that can coincide with the well lid outward flange.
Further, each of the support plates is vertically disposed.
Preferably, the height of each support plate is equal to the height of the partition cylinder. This arrangement further increases the ease of operation and reduces the non-uniformity of the asphalt mixture as it is raked or filled.
Preferably, the height of the separating cylinder is greater than or equal to the virtual paving thickness of the asphalt mixture. Therefore, the asphalt mixture corresponding to the shaft can be completely isolated inside the separation cylinder.
Preferably, the arc-shaped positioning structure is an arc-shaped plate or an arc-shaped steel bar.
As a preferred scheme, the well lid edge positioning mechanism is a positioning ring connected with the separating cylinder through a supporting plate; the diameter of the locating ring is equal to the outer diameter of the well cover. The setting is in order to confirm well lid edge to reduce the disturbance to the pre-compaction bituminous mixture around the well lid in the lift process.
As a preferred scheme, the separating cylinder is fixedly connected with the positioning rod through a connecting plate; the height of the connecting plate is equal to that of the separating cylinder. This arrangement further increases the work convenience.
As the preferred scheme, well lid fabrication hole mark unit is including being used for the elasticity jack catch of card at the well lid fabrication hole, elasticity jack catch top is equipped with the elasticity post, the elasticity post top surface is equipped with the link that is used for fixed marker. The elastic clamping jaws are inserted into the manhole cover fabrication holes in a contracted state and then loosened to rebound, so that the manhole cover fabrication hole positioning units cannot leave the manhole cover fabrication holes; the height of the elastic column is more than or equal to the virtual paving thickness of the asphalt mixture, so that the hanging ring can be ensured to be exposed outside, and the markers hung on the hanging ring can be clearly seen.
As the preferred scheme, the device also comprises a special rake for raking the asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism; the special harrow comprises a handle and an arc-shaped harrow plate which is used for being attached to the outer wall of the separation cylinder; the arc-shaped harrow plate is fixedly connected with the handle. When the special harrow is used, the arc-shaped harrow plate is attached to the outer wall of the separation cylinder and then is pulled outwards with force, so that the construction efficiency can be further improved.
The utility model has the advantages that:
1. the utility model discloses guarantee to prevent subsiding the instrument of the asphalt concrete compactness under the well lid, including the well lid fabrication hole mark unit that is used for marking the well lid fabrication hole position before the operation of paving; therefore, the positions of the well lid and the well lid fabrication hole can be quickly found after the paver paves and runs through the well lid, and the construction efficiency is greatly improved.
2. The amount of the standby asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism, which is obtained by the asphalt mixture metering unit in the tool, is exactly equal to the amount of the asphalt mixture required below the well lid when the well lid is lifted to a paving surface; the compaction degree of the asphalt concrete around and below the inspection well is effectively ensured, so that the bearing capacity provided by the asphalt mixture is ensured.
3. The utility model discloses guarantee to prevent subsiding the instrument simple structure of asphalt concrete compactness under the well lid, design benefit, convenient to use, it is with low costs, with promoting the well lid when road paves, efficiency of construction and efficiency of construction all promote by a wide margin.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a schematic structural view of a well lid and a shaft;
fig. 2 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under an anti-settling well lid in embodiment 1 of the present invention;
fig. 3 is a schematic structural view of the manhole cover process hole marking unit of the present invention;
FIG. 4 is a schematic structural view of a rake of the present invention;
FIG. 5 is a schematic view of the special harrow in FIG. 4;
fig. 6 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under the anti-settling well lid in embodiment 2 of the present invention;
fig. 7 is a schematic structural view of a tool for ensuring the compactness of asphalt concrete under the anti-settling well lid in embodiment 3 of the present invention;
fig. 8 is a schematic view of the coverage condition of the asphalt mixture above the well lid after the asphalt mixture is paved on the road.
Detailed Description
In the description of the present invention, the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "vertical", "horizontal", and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the purpose of describing the present invention, but do not require the present invention to be constructed or operated in a specific orientation, and therefore, cannot be construed as limiting the present invention. The terms "connected" and "connected" in the present invention are to be understood in a broad sense, and may be connected or detachably connected, for example; the terms may be directly connected or indirectly connected through intermediate components, and specific meanings of the terms may be understood as specific conditions by those skilled in the art.
Example 1
As shown in fig. 2, fig. 3, fig. 4 and fig. 5, the tool for ensuring the compactness of asphalt concrete under the anti-settling well lid comprises a well lid process hole marking unit for marking the position of a well lid process hole 1 before paving operation, an asphalt mixture metering unit for metering the asphalt mixture required under the well lid 2 when the well lid is lifted in height after paving operation, and a special rake for collecting the asphalt mixture required under the well lid 2 when the well lid is lifted in height, wherein the asphalt mixture metering unit is used for metering the asphalt mixture.
As shown in fig. 3, the manhole cover process hole marking unit includes an elastic claw 12, an elastic column 11, and a hanging ring 10. The elastic claw 12 is fixedly connected with the elastic column, and the hanging ring 10 is fixedly connected with the upper part of the elastic column 11.
The elastic clamping jaw 12 is used for being clamped in the well lid technical hole 1, the elastic clamping jaw 12 is pinched, the elastic clamping jaw 12 is in a contraction state (when the elastic clamping jaw 12 is in the contraction state, the projection area of the horizontal plane is smaller than the diameter of the well lid technical hole 1), the elastic clamping jaw 12 is inserted into the well lid technical hole 1 at the moment, and after the elastic clamping jaw 12 is inserted, the elastic clamping jaw 12 is loosened to enable the elastic clamping jaw to rebound, so that the clamping is carried out in the well lid technical hole 1.
The height of the elastic column 11 is larger than or equal to the virtual paving thickness of the asphalt mixture, so that the hanging ring can be ensured to be exposed outside, the hanging ring is set to be the elastic column, the hanging ring is suitable for paving pavements with different thicknesses, and in the paving process of the asphalt mixture, the manhole cover process hole marking unit inserted on a manhole cover is not easy to damage.
Before the pavement is paved, a marker which is easy to be found, such as a red rope or red cloth, is arranged on the hanging ring 10. Because the height of the elastic columns 11 is larger than or equal to the virtual paving thickness of the asphalt mixture, the red marker can still be exposed above a new road surface after the road surface is paved.
As shown in fig. 2, the asphalt mixture metering unit comprises a separation cylinder 6, the separation cylinder 6 is hollow, the outer diameter of the separation cylinder 6 is equal to the outer diameter of the shaft 3, and the height of the separation cylinder is greater than or equal to the virtual paving thickness of the asphalt mixture. The left and right sides of separating a section of thick bamboo 6 all is through a connecting plate 8 fixed connection locating lever 9, and the width of connecting plate 8 (promptly, the interval of separating between 6 outer walls of a section of thick bamboo and the locating lever 9) equals the perpendicular distance between pit shaft 3 and the well lid fabrication hole 1, and two well lid fabrication holes 1 on well lid 2 can be inserted respectively to two locating levers 9 like this. As a preferred embodiment, the height of the connecting plate 8 is equal to the height of the separating cylinder 6.
The asphalt mixture metering unit further comprises a well lid edge positioning mechanism for positioning the edge position of the well lid 2. In this embodiment, well lid edge positioning mechanism includes four backup pads 7 that are fixed in and separate a 6 outer walls, and the perpendicular distance between the outer fringe of each backup pad 7 and the 6 outer walls of a section of thick bamboo of separating equals the distance between 3 outer fringe of pit shaft and 2 outer fringes of well lid. In the preferred embodiment, each support plate 7 is vertically disposed, and the height of each support plate 7 is equal to the height of the partition cylinder 6. In addition, arc-shaped reinforcing steel bars 5 are fixed on the outer edges of the supporting plates 7, the radius of each arc-shaped reinforcing steel bar 5 is equal to that of the well lid 2, and the circle center of each arc-shaped reinforcing steel bar 5 is on the same vertical line with that of the well lid 2. This setting can be guaranteed, and the position that arc reinforcing bar 5 corresponds is 2 edges of well lid promptly. In the preferred embodiment, a handrail 4 is fixed to the positioning rod 9 for the convenience of the worker.
As shown in fig. 4, the special harrow comprises a handle 14 and an arc-shaped harrow plate 13 for fitting the outer wall of the separation cylinder 6; the arc-shaped harrow plate 13 is fixedly connected with a handle 14. The special rake is used for raking out the asphalt mixture between the outer side of the separating cylinder 6 and the well lid edge positioning mechanism.
When the asphalt mixture is spread, as shown in fig. 8, after the paving machine paves, a layer of asphalt mixture is also paved on the well cover 2, and the asphalt mixture above the well cover is round and has a certain degree of compaction. In fig. 8, the outer diameter of a is the same as the outer diameter of the well lid, and the radius of B is the same as the outer diameter of the shaft below the well lid; in order to ensure that the compaction degree around the well lid is consistent with the compaction degree under the well lid, the asphalt mixture of the part A only needs to be filled below the lifted well lid, and meanwhile, the mixture at the part B is removed.
In the asphalt mixture metering unit of the utility model, the outer diameter of the separating cylinder 6 is equal to the outer diameter of the shaft 3 below the well lid 2, and the vertical distance between the outer edge of the supporting plate 7 and the outer wall of the separating cylinder 6 is equal to the distance between the outer edge of the shaft 3 and the outer edge of the well lid 2; simultaneously at the outer fixed arc reinforcing bar 5 that sets up of edge of backup pad 7, the radius of each arc reinforcing bar 5 all equals with the radius of well lid 2, and the centre of a circle that each arc reinforcing bar 5 is located all is on same vertical line with the centre of a circle of well lid 2. This setting can be guaranteed, and the position that arc reinforcing bar 5 corresponds is 2 edges of well lid promptly to the location at 2 edges of well lid has been realized.
Use the utility model discloses when guaranteeing to prevent subsiding the instrument of asphalt concrete compactness under the well lid, before the operation that paves, insert well lid fabrication hole 1 with the elasticity jack catch 12 of well lid fabrication hole mark unit, every well lid fabrication hole 1 corresponds a well lid fabrication hole mark unit. Therefore, the well cover of the whole paving working surface can be marked by the marking unit. And hanging a red flag on the hanging ring 10 of each manhole cover fabrication hole marking unit.
After the manhole cover process holes 1 are all marked, starting to adopt a paver to carry out paving operation, and not compacting after the manhole cover process holes are paved; but the well lid 2 and the well lid fabrication hole 1 are found firstly according to the mark of the red flag. The well lid fabrication hole marking unit is pulled out from the well lid fabrication hole 1, then two positioning rods 9 in the asphalt mixture metering unit are simultaneously inserted into the two well lid fabrication holes 1 on the same well lid 2, and the hand-press handrail 4 enables the bottom of the separation cylinder 6 to contact the well lid 2. As shown in fig. 5, raking the asphalt mixture between the outside of the separation cylinder and the arc-shaped steel bars 5 to the periphery of the well lid for later use by using a special rake, and then pulling out the device to remove the residual asphalt mixture; after the well cover is exposed, lifting the well cover, and filling the spare asphalt mixture around a shaft below the well cover; after all the ready-for-use asphalt mixture is moved under the well cover, compaction is performed.
The quantity of the standby asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism, which is obtained by the asphalt mixture metering unit in the tool, is exactly equal to the quantity of the asphalt mixture required below the well lid when the well lid is lifted to a paving surface; the compaction degree of the asphalt concrete around and below the inspection well is effectively ensured, so that the bearing capacity provided by the asphalt mixture is ensured.
Example 2
As shown in fig. 6, the arc-shaped reinforcing steel bars 5 in embodiment 1 are replaced with arc-shaped positioning plates 15; in addition, the height of the connecting plate 8 is smaller than that of the partition cylinder 6, as in embodiment 1.
Example 3
As shown in fig. 7, the arc-shaped reinforcing bars 5 in embodiment 1 are replaced with circular positioning reinforcing bars 16; the diameter of the round positioning steel bar 16 is equal to the outer diameter of the well cover 2. The rest is the same as example 1.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the scope of the embodiments of the present invention, and are intended to be covered by the claims and the specification.

Claims (10)

1. The utility model provides a guarantee to prevent subsiding instrument of bituminous concrete compactness under well lid which characterized in that: the well lid technical hole marking unit is used for marking the position of a well lid technical hole before paving, and the asphalt mixture metering unit is used for metering asphalt mixture required under a well lid when the height of the well lid is lifted after paving;
the asphalt mixture metering unit comprises a positioning rod inserted into the well lid process hole and a separating cylinder for separating asphalt mixture paved above the corresponding shaft; the separation cylinder is provided with a well lid edge positioning mechanism; the separating cylinder is fixedly connected with the positioning rod; the distance between the separation cylinder and the positioning rod is equal to the distance between the outer edge of the shaft and the well lid process hole.
2. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid edge positioning mechanism comprises a plurality of supporting plates, and arc-shaped positioning structures which can be coincided with the outer edge of the well lid are fixedly arranged on the outer side edges of the supporting plates respectively.
3. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: each of the support plates is vertically arranged.
4. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: the height of each supporting plate is equal to that of the separating cylinder.
5. The tool for ensuring the compactness of the asphalt concrete under the anti-settling well lid as recited in claim 1 or 4, wherein: the height of the separation cylinder is more than or equal to the virtual paving thickness of the asphalt mixture.
6. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 2, wherein: the arc positioning structure is an arc plate or an arc reinforcing steel bar.
7. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid edge positioning mechanism is a positioning ring connected with the separating cylinder through a supporting plate; the diameter of the locating ring is equal to the outer diameter of the well cover.
8. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the separating cylinder is fixedly connected with the positioning rod through a connecting plate; the height of the connecting plate is equal to that of the separating cylinder.
9. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the well lid fabrication hole marking unit comprises an elastic clamping claw which is used for being clamped in a well lid fabrication hole, an elastic column is arranged above the elastic clamping claw, and a hanging ring used for fixing a marker is arranged on the top surface of the elastic column.
10. The tool for ensuring the compactness of asphalt concrete under the anti-settling well lid as recited in claim 1, wherein: the special harrow is used for raking the asphalt mixture between the outer side of the separating cylinder and the well lid edge positioning mechanism; the special harrow comprises a handle and an arc-shaped harrow plate which is used for being attached to the outer wall of the separation cylinder; the arc-shaped harrow plate is fixedly connected with the handle.
CN201921965218.5U 2019-11-14 2019-11-14 Guarantee instrument of asphalt concrete compactness under anti-settling well lid Active CN211171523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921965218.5U CN211171523U (en) 2019-11-14 2019-11-14 Guarantee instrument of asphalt concrete compactness under anti-settling well lid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921965218.5U CN211171523U (en) 2019-11-14 2019-11-14 Guarantee instrument of asphalt concrete compactness under anti-settling well lid

Publications (1)

Publication Number Publication Date
CN211171523U true CN211171523U (en) 2020-08-04

Family

ID=71828680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921965218.5U Active CN211171523U (en) 2019-11-14 2019-11-14 Guarantee instrument of asphalt concrete compactness under anti-settling well lid

Country Status (1)

Country Link
CN (1) CN211171523U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735378A (en) * 2019-11-14 2020-01-31 山东汇通建设集团有限公司 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735378A (en) * 2019-11-14 2020-01-31 山东汇通建设集团有限公司 tools for ensuring compaction degree of asphalt concrete under anti-settling well lid

Similar Documents

Publication Publication Date Title
CN211171523U (en) Guarantee instrument of asphalt concrete compactness under anti-settling well lid
CN106592368A (en) Asphalt pavement paving no-cutting construction method
CN110682433A (en) Prefabricated stand column construction scheme
CN106245654B (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN110735378A (en) tools for ensuring compaction degree of asphalt concrete under anti-settling well lid
CN210177327U (en) Tamping device for road construction
CN209443346U (en) Road engineering road stone tamping equipment
CN207906576U (en) A kind of combined type push pipe rear backrest
CN207144641U (en) Assembling type enclosing shield
CN209816862U (en) Construction supporting device of town road drainage structures
CN212175732U (en) Soil material collecting device for soil test
CN209429168U (en) Tunnel sidewalls support shuttering
CN110184952B (en) Modification structure of existing bridge abutment and construction method thereof
CN209874515U (en) Cast in situ concrete grinds flat tectorial membrane device
CN208121502U (en) Based on the reserved displacement cast-in-place curb stone structure of modular indwelling groove mould asphalt concrete pavement
CN214573152U (en) Cement stabilized macadam basic unit construction is with spreading out supplementary device
CN218320056U (en) Multi-functional dust keeper for building engineering
CN208981791U (en) A kind of construction foot prop
CN216185393U (en) A conveyer for shipping bank protection step stone
CN109505220A (en) A kind of town road repairs system and construction method in time
CN208650024U (en) A kind of fishing light complementation photovoltaic plant raises basic platform
CN220954482U (en) Foldable sliding rail type ash leveling device
CN219240227U (en) Automatic leveling and laminating device for sand-free concrete construction
CN220079604U (en) Roadbed edge protection mechanism
CN114541470B (en) Construction method of flexible ecological reinforced retaining wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant