CN208650024U - A kind of fishing light complementation photovoltaic plant raises basic platform - Google Patents
A kind of fishing light complementation photovoltaic plant raises basic platform Download PDFInfo
- Publication number
- CN208650024U CN208650024U CN201821052083.9U CN201821052083U CN208650024U CN 208650024 U CN208650024 U CN 208650024U CN 201821052083 U CN201821052083 U CN 201821052083U CN 208650024 U CN208650024 U CN 208650024U
- Authority
- CN
- China
- Prior art keywords
- platform
- several
- photovoltaic plant
- storehouse
- fishing light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 239000011150 reinforced concrete Substances 0.000 claims description 7
- 230000003068 static effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 13
- 239000004567 concrete Substances 0.000 abstract description 7
- 238000012876 topography Methods 0.000 abstract description 6
- 230000003014 reinforcing effect Effects 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000004904 shortening Methods 0.000 abstract 1
- 238000010248 power generation Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 241000251468 Actinopterygii Species 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Photovoltaic Devices (AREA)
Abstract
What the utility model disclosed a kind of fishing light complementation photovoltaic plant raises basic platform, comprising: several detached columns being installed in pool, the levelling bench waterborne being arranged on the detached column and the ladder being arranged between the platform and ground;Several built-in fittings are provided on the platform, the built-in fitting includes several long parts and several short piece, and several long parts join end to end to form frame, several are arranged in the frame, hollow out forms prefabricated storehouse in the vertical direction in frame, and several short piece are as locating piece.The advantages of the utility model, which has, to be avoided the uneven place of topography is even flat and excavates, backfills a large amount of earthwork, saves a large amount of concrete, reinforcing bar and artificial, while avoiding the bigger pollution of environment, also the shortening construction period, raising working efficiency.
Description
Technical field
The utility model belongs to fishing light complementation technical field of photovoltaic power generation, and in particular to a kind of fishing light complementation photovoltaic plant
Raise basic platform.
Background technique
In recent years, as the installed capacity of photovoltaic plant is increasing, on fish pond, beach and other places, construction has played a large amount of photovoltaics
Power station.The power station of this some types generallys use piling formula at present, realizes power generation waterborne, the fishing light complement mode breeded fish under water
Photovoltaic power generation.Power station after the construction stage is to drain water, carry out precast concrete piling, then install photovoltaic power generation equipment,
Electrical equipment;Fish pond, which discharges water, after completion carries out fishery cultivating.
Photovoltaic industry is a special new energy industry, and construction speed is fast, the construction period is short, and reason is also mostly by simultaneously
Net timing node influences, however power station needs to carry out in the construction period order, design, buying, the infrastructure, equipment of equipment
Installation, debugging, almost occur robbing work state in each photovoltaic plant;At this moment, if Equipment Foundations are set according to whole plate basis
Meter is then backfilled and is compacted firstly the need of by the low position of topography, and the position of high-land needs earth excavation.Ground needs to dry
Certain degree carries out formwork again, reinforcing bar binding, pours.On the one hand it because the embankment of topography problem needs a large amount of earthwork, and returns
Filling out area is fish pond, and rain drop erosion is likely to occur the problems such as collapsing after backfill, is drained, is dried;On the other hand, whole plate base
Plinth needs a large amount of concrete, reinforcing bar, artificial, and the environment polluted is even more serious.If can be using the detached column platform side raised
The efficiency that case then more can be reduced the construction period, improve work.
Summary of the invention
In view of the above-mentioned problems, the utility model a kind of fishing light complementation photovoltaic plant is provided raise basic platform.
Fishing light complementation photovoltaic plant described in the utility model raises basic platform, comprising: is installed in several in pool
Detached column, the levelling bench waterborne being arranged on the detached column and the ladder being arranged between the platform and ground;
It is provided with several built-in fittings on the platform, the built-in fitting includes several long parts and several short piece, several described
Long part joins end to end to form frame, several are arranged in the frame, and hollow out forms prefabricated storehouse in the vertical direction in frame, several
The short piece is as locating piece.
Preferably, the detached column is reinforced concrete structure, including cylinder and chassis, described cylinder one end are installed in institute
It states on chassis, the floor space on the chassis is greater than the cross-sectional area of the cylinder.
Preferably, the platform is reinforced concrete structure, and the built-in fitting is arranged on the platform, the built-in fitting
Top expose the platform.
Preferably, the long part of the built-in fitting is long channel steel, and the short piece includes short channel-section steel and steel plate.
Preferably, the prefabricated storehouse is rectangle.
Preferably, the prefabricated storehouse includes 1 storehouse, 1 secondary storehouse, 1 static reactive generator storehouse and 1 ground connection
Transformer storehouse.
Preferably, detachable fence is set around the platform.
The utility model has the advantages that the utility model is through setting detached column and on detached column, casting platform replaces previous pour
Whole plate basic platform avoids the uneven place of topography is even flat and excavates, backfills a large amount of earthwork, also saves a large amount of mixed
Solidifying soil, reinforcing bar and artificial, while the bigger pollution of environment is avoided, the construction period is also shortened, is improved work efficiency;Pass through
By detached column using the cross-sectional area of reinforced concrete structure and cylinder less than undersurface of bottom disc product, and make the setting of detached column more
Add securely;Expose the built-in fitting of platform by being arranged on concrete platform, and vertical direction is formed by the long part of built-in fitting
The prefabricated storehouse of multiple rectangles of hollow out, and more easily arranging apparatus, the short piece by the way that built-in fitting is arranged are caused the device to as locating piece
It is accurately positioned and installs;By the way that detachable fence is arranged around platform, facilitate the installation and removal of equipment, the maintenance in later period with
O&M and the safety for ensureing construction personnel.
Detailed description of the invention
Fig. 1 is the side view for raising basic platform of the utility model;
Fig. 2 is the structural schematic diagram of the detached column for raising basic platform of the utility model;It (a) is top view;(b) it is
(a) 1-1 sectional view;
Fig. 3 is the plan view for raising basic platform of the utility model;
In figure, 1, detached column;2, platform;3, ladder;4, detachable fence;5, a storehouse;6, secondary storehouse;7, static reacance
Generator storehouse;8, grounding transformer storehouse;9, locating piece.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model
It is not limited to the embodiment.
Embodiment 1: a kind of fishing light complementation photovoltaic plant raises basic platform 2, comprising: be installed in pool it is several solely
Column 1, the levelling bench waterborne 2 being arranged on the detached column 1 and the ladder 3 being arranged between the platform 2 and ground.
The detached column 1 is reinforced concrete structure, including cylinder and chassis, described cylinder one end and the chassis phase
Even, the floor space on the chassis is greater than the cross-sectional area of the cylinder.The height of the cylinder is set according to topography height,
Then height of column is small for high-land, and topography is big to then height of column, as long as keeping 2 holding of platform being arranged thereon horizontal.It is described
Chassis is arranged in pool below ground, and depth is so that cylinder is securely advisable.
The platform 2 is reinforced concrete structure, be provided on the platform 2 pre-buried several long channel steels, short channel-section steel and
The platform 2 is exposed on steel plate, top.4 long channel steels join end to end to form a rectangular frame, in vertical direction in frame
Hollow out forms prefabricated storehouse.The prefabricated storehouse includes: 5,1,1 storehouse, 6,1, secondary storehouse static reactive generator storehouse 7 and 1
Grounding transformer storehouse 8 is placed corresponding equipment respectively and is installed.The short channel-section steel and steel plate are as locating piece 9 to corresponding
Equipment carries out location and installation.
Be additionally provided with detachable fence 4 around the platform 2, facilitate the installation and removal of equipment, the maintenance in later period with
O&M and guarantee construction personnel's safety.
In concrete operations, first pool water is drained, directly individually excavates setting detached column 1 in the fixed place in pool,
Reinforcing bar binding and formwork are carried out in the pillar of detached column 1 again, and casting concrete platform 2, concrete platform 2 is pre- on fixed position
Steel plate and channel steel are buried, long channel steel joins end to end to form rectangular frame, and hollow out forms prefabricated storehouse, short slot in the vertical direction in frame
Steel and steel plate are as locating piece 9.After waiting the concrete curing phase, photovoltaic power generation equipment is mounted on prefabricated storehouse by welding
In.Cable testing bridge, cable stationary barrier, ground connection, upper people's ladder 3, detachable fence 4 etc. can be welded on corresponding pre-buried
On locating piece 9, O&M channel is reserved on platform simultaneously, so far completes construction.
This is raised basic platform 2 and is applied in fishing light complementation photovoltaic plant, in the premise for guaranteeing that photovoltaic plant is effectively run
Under, comprehensively consider backlog time, purchase cost, construction period and the simple and easy to do operability of later period O&M maintenance, has mentioned
A kind of steel bracket basic platform saved cost and accelerate the construction speed in power station again is supplied, it is ensured that the duration considers simultaneously
The O&M of equipment and maintenance, and power station dismantle after 25 years after can still be utilized.O&M efficiency is improved, power station is improved
Economic benefit contributes to reduce environmental pollution.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not
It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define
Under the premise of, it can various changes can be made in the form and details to it.
Claims (7)
1. a kind of fishing light complementation photovoltaic plant raises basic platform characterized by comprising be installed in several only in pool
Column, the levelling bench waterborne being arranged on the detached column and the ladder being arranged between the platform and ground;
Several built-in fittings are provided on the platform, the built-in fitting includes several long parts and several short piece, several long parts
It joins end to end to form frame, several are arranged in the frame, and hollow out forms prefabricated storehouse in the vertical direction in frame, several described
Short piece is as locating piece.
2. fishing light complementation photovoltaic plant according to claim 1 raises basic platform, which is characterized in that the detached column
For reinforced concrete structure, including cylinder and chassis, described cylinder one end is installed on the chassis, the floor space on the chassis
Greater than the cross-sectional area of the cylinder.
3. fishing light complementation photovoltaic plant according to claim 1 raises basic platform, which is characterized in that the platform is
Reinforced concrete structure, on the platform, the platform is exposed on the top of the built-in fitting for the built-in fitting setting.
4. fishing light complementation photovoltaic plant according to claim 1 raises basic platform, which is characterized in that the built-in fitting
Long part be long channel steel, the short piece includes short channel-section steel and steel plate.
5. fishing light complementation photovoltaic plant according to claim 1 raises basic platform, which is characterized in that the prefabricated storehouse
For rectangle.
6. fishing light complementation photovoltaic plant according to claim 5 raises basic platform, which is characterized in that the prefabricated storehouse
Including 1 storehouse, 1 secondary storehouse, 1 static reactive generator storehouse and 1 grounding transformer storehouse.
7. fishing light complementation photovoltaic plant according to claim 1 raises basic platform, which is characterized in that the platform week
Enclose setting detachable fence.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821052083.9U CN208650024U (en) | 2018-07-04 | 2018-07-04 | A kind of fishing light complementation photovoltaic plant raises basic platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821052083.9U CN208650024U (en) | 2018-07-04 | 2018-07-04 | A kind of fishing light complementation photovoltaic plant raises basic platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208650024U true CN208650024U (en) | 2019-03-26 |
Family
ID=65783296
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821052083.9U Expired - Fee Related CN208650024U (en) | 2018-07-04 | 2018-07-04 | A kind of fishing light complementation photovoltaic plant raises basic platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208650024U (en) |
-
2018
- 2018-07-04 CN CN201821052083.9U patent/CN208650024U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205776347U (en) | Novel cover for subway station digs against making structural system | |
CN108442390A (en) | A kind of roadbed side slope combination protection mechanization efficient construction method | |
CN107558477B (en) | Supporting structure combining foundation pit and side slope and construction method | |
CN205024712U (en) | Combined tower crane foundation | |
CN105586985B (en) | A kind of construction method of subway building enclosure and a kind of subway building enclosure | |
CN108951649B (en) | Foundation pit supporting structure | |
CN110777802A (en) | Deep foundation pit high-low span supporting structure and construction method thereof | |
CN209779548U (en) | gravity type flood control wall capable of being quickly installed and detached | |
CN104131570B (en) | Steel case enclosure device and its construction method for foundation pit construction | |
CN208650024U (en) | A kind of fishing light complementation photovoltaic plant raises basic platform | |
CN209837881U (en) | Face and build and enclose fender modularization device | |
CN205975653U (en) | Independent bearing platform structure of soil child mould construction | |
CN212175798U (en) | Whole strutting arrangement of deep basal pit | |
CN210737555U (en) | Underground pipeline in-situ protection mechanism for foundation pit supporting system | |
CN211172073U (en) | Semi-covered subway station gantry crane foundation and muck pit retaining wall combined construction structure | |
CN109742715B (en) | Arrangement structure of electric power pipe trench after transition and modification and electric power pipe trench transition and modification method | |
CN103572762B (en) | The bracket of the oblique inner support lower end of foundation pit supporting construction and fabrication tool and construction method | |
CN207436068U (en) | A kind of new prefabricated two walls unification foundation pit system | |
CN215330061U (en) | Cable trench in-situ suspension protection device | |
CN106120690A (en) | A kind of inverter box flattens platform and preparation method thereof | |
CN217556976U (en) | Water conservancy construction cofferdam device | |
CN205934891U (en) | Dc -to -ac converter case flattens platform | |
CN109898403A (en) | The underwater canal case steel suspension bridge of urban rives construction method nested with double steel sheet-pile cofferdam | |
CN110965586B (en) | Construction method of multi-layer basement structure of municipal road | |
CN211524190U (en) | Foundation pit packway ladder cage fixing base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190326 |