CN110707538A - 一种风力发电机组控制柜的布线接线线束化装置及其方法 - Google Patents
一种风力发电机组控制柜的布线接线线束化装置及其方法 Download PDFInfo
- Publication number
- CN110707538A CN110707538A CN201911119836.2A CN201911119836A CN110707538A CN 110707538 A CN110707538 A CN 110707538A CN 201911119836 A CN201911119836 A CN 201911119836A CN 110707538 A CN110707538 A CN 110707538A
- Authority
- CN
- China
- Prior art keywords
- wiring
- cable
- control cabinet
- wind generating
- generating set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/20—Bus-bar or other wiring layouts, e.g. in cubicles, in switchyards
- H02B1/202—Cable lay-outs
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
本发明提供一种风力发电机组控制柜的布线接线线束化装置及其方法,涉及风力发电机组技术领域。本发明通过改变风力发电机组控制柜的生产工艺及流程,将风力发电机组控制柜的布线及接线进行线束化。这样的生产工艺及流程不仅提高了操作工人的生产效率,而且将风力发电机组控制柜的生产更加规范化,实现了工艺的一致性,提高了风力发电机组运行的稳定性,并且降低了风力发电机组控制柜的接线错误率。
Description
技术领域
本发明涉及风力发电机组技术领域,具体为一种风力发电机组控制柜的布线接线线束化 装置及其方法。
背景技术
随着风力发电事业的发展,风力发电机组控制柜的生产工艺及流程直接关系到风力发电 机组控制柜的生产效率及布线合理性、运行稳定性等。
目前,风力发电机组控制柜的生产是车间工人做一根线,接一根线,一边做线一边接线。 这样,不仅工人生产效率低而且在接线过程中,由于每个操作工人之间布线有差异,就会造 成柜子之间工艺的不统一;甚至有的操作工人会把动力线与信号线布在一起,这样就会出现 严重的信号干扰现象,影响风力风力发电机组运行稳定性;除此之外,这样的生产流程,接 线错误率很高。
因此,寻找一种合适的风力发电机组控制柜线束的生产工艺及流程是目前急需解决的问 题。
发明内容
本发明的目的在于提供一种风力发电机组控制柜线束的生产方法,提高了风力发电机组 运行的稳定性,提高了装置的实用性解决了现有技术的问题。
为实现上述目的,本发明提供如下技术方案:一种风力发电机组控制柜的布线接线线束 化装置,其特征在于:包括底板,设在底板上的分线卡,贴在底板上的部件编号贴纸,以及 用于改变线缆走线方向的立柱,所述分线卡竖向间隔设置,所述部件编号贴纸设在分线卡的 一侧,所述立柱竖直设在底板上,所述分线卡呈角铁状,其水平部分安装在底板上,竖直部 分呈梳子状,水平设在底板下侧的线缆其接线端绕过立柱卡在分线卡竖直部分的相应的槽内。
一种风力发电机组控制柜线束的生产方法,其特征在于包括以下步骤:
A.根据控制柜内电气元件的布置,按1:1比例绘出的CAD布置图;
B.根据控制柜电气原理图,将每一根线缆所要连接的起点和终点以及每一根线缆的线 径、颜色、使用线鼻子的类型、长度以表格形式的列出,制成线缆接线总表;
C.在步骤A中所述的CAD布置图内测量出每根线缆的长度,并填写在步骤B中所述的线 缆接线总表内;
D.根据电压等级、布线方式将步骤B中所述的线缆接线总表的内容分成多个线缆接线分 表,每个线缆接线分表内的所有线缆组成一个线束;
E.根据步骤D中所述的线缆接线分表制作出相应的线束制作模板;
F.根据每个线缆接线分表的内容,将相应的线缆在相应的线束制作模板上布线,并根据 线缆的分支及布线情况用扎带捆绑,做成相应的线束;
G.将步骤F中所述的线束从线束制作模板取下放置在控制柜内,并将线束中的每根线缆 根据步骤D中所述的线缆接线分表进行接线;
所述线束制作模板上设有包括卡线线槽、布线槽、电气元件布局图、电气元件端子号和 布线路径;
所述线束制作模板与实际的控制柜布线面板成1:1的比例。
与现有技术相比,本发明的有益效果如下:
本发明通过改变风力发电机组控制柜的生产工艺及流程,将风力发电机组控制柜的布线 及接线进行线束化。这样的生产工艺及流程不仅提高了操作工人的生产效率,而且将风力发 电机组控制柜的生产更加规范化,实现了工艺的一致性,提高了风力发电机组运行的稳定性, 并且降低了风力发电机组控制柜的接线错误率。
附图说明
图1为线束化装置的主视图;
图2为图1的俯视图;
图3为CAD布置图的示例图;
图4为线缆接线总表的示例图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描 述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明 中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例, 都属于本发明保护的范围。
本发明提供了一种风力发电机组控制柜的布线接线线束化装置,其特征在于:包括底板 1,设在底板1上的分线卡3,贴在底板1上的部件编号贴纸5,以及用于改变线缆4走线方 向的立柱2,所述分线卡3竖向间隔设置,所述部件编号贴纸5设在分线卡3的一侧,所述 立柱2竖直设在底板1上,所述分线卡3呈角铁状,其水平部分安装在底板1上,竖直部分呈梳子状,水平设在底板1下侧的线缆4其接线端绕过立柱2卡在分线卡3竖直部分的相应的槽内。
一种风力发电机组控制柜线束的生产方法,其特征在于包括以下步骤:
A.根据控制柜内电气元件的布置,按1:1比例绘出CAD布置图;
B.根据控制柜电气原理图,将每一根线缆所要连接的起点和终点以及每一根线缆的线 径、颜色、使用线鼻子的类型、长度以表格形式的列出,制成线缆接线总表;
C.在步骤A中所述的CAD布置图内测量出每根线缆的长度,并填写在步骤B中所述的线 缆接线总表内;
D.根据电压等级、布线方式将步骤B中所述的线缆接线总表的内容分成多个线缆接线分 表,每个线缆接线分表内的所有线缆组成一个线束;
E.根据步骤D中所述的线缆接线分表制作出相应的线束制作模板;
F.根据每个线缆接线分表的内容,将相应的线缆在相应的线束制作模板上布线,并根据 线缆的分支及布线情况用扎带捆绑,做成相应的线束;
G.将步骤F中所述的线束从线束制作模板取下放置在控制柜内,并将线束中的每根线缆 根据步骤D中所述的线缆接线分表进行接线;
所述线束制作模板上设有包括卡线线槽、布线槽、电气元件布局图、电气元件端子号和 布线路径;
所述线束制作模板与实际的控制柜布线面板成1:1的比例。
本发明中通过利用CAD布置图测量线缆长度精度比较高,这样就在接线过程中避免了出 现线缆过长或过短的情况;按照线束制作模板中规定的布线路径去布线,这样风力发电机组 控制柜的生产更加规范化,实现了工艺的一致性。并且动力线与信号线分开布线,避免了信 号干扰的现象,提高了风力发电机组运行的稳定性;这样的生产工艺及流程不仅大大提高了 操作工人的生产效率,并且降低了风力发电机组控制柜的接线错误率。
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者 操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这 种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他 性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且 还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的 要素。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在 不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型, 本发明的范围由所附权利要求及其等同物限定。
Claims (2)
1.一种风力发电机组控制柜的布线接线线束化装置及其方法,其特征在于:包括底板(1),设在底板(1)上的分线卡(3),贴在底板(1)上的部件编号贴纸(5),以及用于改变线缆(4)走线方向的立柱(2),所述分线卡(3)竖向间隔设置,所述部件编号贴纸(5)设在分线卡(3)的一侧,所述立柱(2)竖直设在底板(1)上,所述分线卡(3)呈角铁状,其水平部分安装在底板(1)上,竖直部分呈梳子状,水平设在底板(1)下侧的线缆(4)其接线端绕过立柱(2)卡在分线卡(3)竖直部分的相应的槽内。
2.一种风力发电机组控制柜线束的生产方法,其特征在于包括以下步骤:
A.根据控制柜内电气元件的布置,按1:1比例绘出的CAD布置图;
B.根据控制柜电气原理图,将每一根线缆所要连接的起点和终点以及每一根线缆的线径、颜色、使用线鼻子的类型、长度以表格形式的列出,制成线缆接线总表;
C.在步骤A中所述的CAD布置图内测量出每根线缆的长度,并填写在步骤B中所述的线缆接线总表内;
D.根据电压等级、布线方式将步骤B中所述的线缆接线总表的内容分成多个线缆接线分表,每个线缆接线分表内的所有线缆组成一个线束;
E.根据步骤D中所述的线缆接线分表制作出相应的线束制作模板;
F.根据每个线缆接线分表的内容,将相应的线缆在相应的线束制作模板上布线,并根据线缆的分支及布线情况用扎带捆绑,做成相应的线束;
G.将步骤F中所述的线束从线束制作模板取下放置在控制柜内,并将线束中的每根线缆根据步骤D中所述的线缆接线分表进行接线;
所述线束制作模板上设有包括卡线线槽、布线槽、电气元件布局图、电气元件端子号和布线路径;
所述线束制作模板与实际的控制柜布线面板成1:1的比例。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911119836.2A CN110707538B (zh) | 2019-11-15 | 2019-11-15 | 一种风力发电机组控制柜的布线接线线束化装置及其方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911119836.2A CN110707538B (zh) | 2019-11-15 | 2019-11-15 | 一种风力发电机组控制柜的布线接线线束化装置及其方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110707538A true CN110707538A (zh) | 2020-01-17 |
CN110707538B CN110707538B (zh) | 2021-05-11 |
Family
ID=69206274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911119836.2A Active CN110707538B (zh) | 2019-11-15 | 2019-11-15 | 一种风力发电机组控制柜的布线接线线束化装置及其方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110707538B (zh) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3949457A (en) * | 1975-03-20 | 1976-04-13 | Fortsch William A | Means and method for branching wire bundles |
DE20108245U1 (de) * | 2001-05-16 | 2001-07-26 | Schiederwerk MBZ Telekommunikation GmbH & Co., 90451 Nürnberg | Telekommunikation-Endverzweiger mit Prüfabschlüssen |
CN2572727Y (zh) * | 2002-08-22 | 2003-09-10 | 联想(北京)有限公司 | 服务器机柜顶部的束线架 |
CN201323413Y (zh) * | 2008-12-05 | 2009-10-07 | 南车洛阳机车有限公司 | 机车线路磁力组合下线装置 |
CN101714174A (zh) * | 2009-09-14 | 2010-05-26 | 株洲南车时代电气股份有限公司 | 一种电气产品布线方法 |
CN102122806A (zh) * | 2010-12-24 | 2011-07-13 | 南京南车浦镇城轨车辆有限责任公司 | 地铁车辆数字化模板布线方法 |
CN202050195U (zh) * | 2011-05-06 | 2011-11-23 | 宁夏电力公司吴忠供电局 | 组合式电线排线模板 |
CN102542104A (zh) * | 2011-12-23 | 2012-07-04 | 芜湖国睿兆伏电子股份有限公司 | 一种调制器电源机柜的电气装联方法 |
CN202395320U (zh) * | 2011-12-12 | 2012-08-22 | 上海人民电力设备股份有限公司 | 电气高压开关柜二次接线分线模 |
CN104507251A (zh) * | 2014-11-25 | 2015-04-08 | 中国航空工业集团公司洛阳电光设备研究所 | 一种线束模板及其制作方法 |
CN205017756U (zh) * | 2015-09-28 | 2016-02-03 | 国电联合动力技术有限公司 | 一种风力发电机组控制柜 |
CN206210718U (zh) * | 2016-11-28 | 2017-05-31 | 陕西龙翔电器有限公司 | 用于高压断路器布线的布线工装 |
CN108011317A (zh) * | 2017-06-09 | 2018-05-08 | 杭州中车车辆有限公司 | 一种地铁车辆电气柜线束制作方法 |
CN208241208U (zh) * | 2018-06-05 | 2018-12-14 | 昆山爱光电子有限公司 | 一种用于线束加工的一体式排线治具 |
CN109583060A (zh) * | 2018-11-16 | 2019-04-05 | 中国电建集团华东勘测设计研究院有限公司 | 一种电气三维系统照明设计方法 |
CN208970859U (zh) * | 2018-11-28 | 2019-06-11 | 安徽兄弟电子有限公司 | 一种线束加工用内部理线架 |
CN209150495U (zh) * | 2019-01-02 | 2019-07-23 | 杭州临安森源电缆有限公司 | 一种控制柜强电和信号线混合布线装置 |
CN209561089U (zh) * | 2019-05-09 | 2019-10-29 | 江苏迈乔科技有限公司 | 一种线束成型板 |
-
2019
- 2019-11-15 CN CN201911119836.2A patent/CN110707538B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3949457A (en) * | 1975-03-20 | 1976-04-13 | Fortsch William A | Means and method for branching wire bundles |
DE20108245U1 (de) * | 2001-05-16 | 2001-07-26 | Schiederwerk MBZ Telekommunikation GmbH & Co., 90451 Nürnberg | Telekommunikation-Endverzweiger mit Prüfabschlüssen |
CN2572727Y (zh) * | 2002-08-22 | 2003-09-10 | 联想(北京)有限公司 | 服务器机柜顶部的束线架 |
CN201323413Y (zh) * | 2008-12-05 | 2009-10-07 | 南车洛阳机车有限公司 | 机车线路磁力组合下线装置 |
CN101714174A (zh) * | 2009-09-14 | 2010-05-26 | 株洲南车时代电气股份有限公司 | 一种电气产品布线方法 |
CN102122806A (zh) * | 2010-12-24 | 2011-07-13 | 南京南车浦镇城轨车辆有限责任公司 | 地铁车辆数字化模板布线方法 |
CN202050195U (zh) * | 2011-05-06 | 2011-11-23 | 宁夏电力公司吴忠供电局 | 组合式电线排线模板 |
CN202395320U (zh) * | 2011-12-12 | 2012-08-22 | 上海人民电力设备股份有限公司 | 电气高压开关柜二次接线分线模 |
CN102542104A (zh) * | 2011-12-23 | 2012-07-04 | 芜湖国睿兆伏电子股份有限公司 | 一种调制器电源机柜的电气装联方法 |
CN104507251A (zh) * | 2014-11-25 | 2015-04-08 | 中国航空工业集团公司洛阳电光设备研究所 | 一种线束模板及其制作方法 |
CN205017756U (zh) * | 2015-09-28 | 2016-02-03 | 国电联合动力技术有限公司 | 一种风力发电机组控制柜 |
CN206210718U (zh) * | 2016-11-28 | 2017-05-31 | 陕西龙翔电器有限公司 | 用于高压断路器布线的布线工装 |
CN108011317A (zh) * | 2017-06-09 | 2018-05-08 | 杭州中车车辆有限公司 | 一种地铁车辆电气柜线束制作方法 |
CN208241208U (zh) * | 2018-06-05 | 2018-12-14 | 昆山爱光电子有限公司 | 一种用于线束加工的一体式排线治具 |
CN109583060A (zh) * | 2018-11-16 | 2019-04-05 | 中国电建集团华东勘测设计研究院有限公司 | 一种电气三维系统照明设计方法 |
CN208970859U (zh) * | 2018-11-28 | 2019-06-11 | 安徽兄弟电子有限公司 | 一种线束加工用内部理线架 |
CN209150495U (zh) * | 2019-01-02 | 2019-07-23 | 杭州临安森源电缆有限公司 | 一种控制柜强电和信号线混合布线装置 |
CN209561089U (zh) * | 2019-05-09 | 2019-10-29 | 江苏迈乔科技有限公司 | 一种线束成型板 |
Also Published As
Publication number | Publication date |
---|---|
CN110707538B (zh) | 2021-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102361274A (zh) | 电气线束树状制作方法 | |
CN204068100U (zh) | 一种理线器 | |
CN110707538B (zh) | 一种风力发电机组控制柜的布线接线线束化装置及其方法 | |
CN102916324B (zh) | 一种用于二次连接的导线制作装置 | |
CN106250634B (zh) | 一种配电柜智能二次下线工艺 | |
CN104267225A (zh) | 一种电能表标准接线装置及其使用方法 | |
CN207038883U (zh) | 一种现场层io设备快速更换接口转换装置 | |
CN206074729U (zh) | 一种控制柜电缆束成型及自动检测装置 | |
CN209658758U (zh) | 一种弱电安装用施工装置 | |
CN204896972U (zh) | 一种电缆成束下线装置 | |
CN202872164U (zh) | 用于二次连接的导线制作装置 | |
CN203967449U (zh) | 一种便捷式接线转换装置及其连接结构 | |
CN206116987U (zh) | 一种电气柜抽屉单元限位导向装置 | |
CN203148998U (zh) | 防错接电能表 | |
CN202025577U (zh) | 任务系统多功能线束装配板 | |
CN215936607U (zh) | 一种桌板可滑动的桌架 | |
CN204967213U (zh) | 一种用于低压分线箱的分线板装置 | |
CN204538480U (zh) | 一种带有线路板的低压计量箱 | |
CN220893377U (zh) | 一种集成式测绘设备箱体 | |
CN204011780U (zh) | 一种适用于多种不同导线截面的接线端子排 | |
CN209527024U (zh) | 新型拆分式导轨 | |
CN203251555U (zh) | 电气控制柜的端子固定装置 | |
CN205986024U (zh) | 安装导轨可移动的暗装式配电箱 | |
CN215600213U (zh) | 新型三相共体电压互感器二次测量和保护绕组接线结构 | |
CN203708068U (zh) | 一种步进电机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 071051 No.88, Fengfeng street, high tech Development Zone, Baoding City, Hebei Province Patentee after: Guoneng United Power Technology (Baoding) Co.,Ltd. Address before: 071051 No.88, Fengfeng street, high tech Development Zone, Baoding City, Hebei Province Patentee before: GUODIAN UNITED POWER TECHNOLOGY (BAODING) Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |