CN110659871B - Information management method and related device - Google Patents

Information management method and related device Download PDF

Info

Publication number
CN110659871B
CN110659871B CN201910767434.7A CN201910767434A CN110659871B CN 110659871 B CN110659871 B CN 110659871B CN 201910767434 A CN201910767434 A CN 201910767434A CN 110659871 B CN110659871 B CN 110659871B
Authority
CN
China
Prior art keywords
post
working
target
business
relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910767434.7A
Other languages
Chinese (zh)
Other versions
CN110659871A (en
Inventor
刘新
黄庆财
曾苏妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Launch Technology Co Ltd
Original Assignee
Shenzhen Launch Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Launch Technology Co Ltd filed Critical Shenzhen Launch Technology Co Ltd
Priority to CN201910767434.7A priority Critical patent/CN110659871B/en
Publication of CN110659871A publication Critical patent/CN110659871A/en
Application granted granted Critical
Publication of CN110659871B publication Critical patent/CN110659871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9024Graphs; Linked lists
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Abstract

The application provides an information management method and a related device. The method comprises the following steps: establishing a post relation diagram based on the function identification of the first post and the function identification of the second post; adding the working style label of the first employee corresponding to the first post into the post relation diagram to obtain a post working diagram; and sending the post work diagram to a target employee. By implementing the application, the new staff can be effectively helped to quickly familiarize with the working content and the business style of the colleague after entering the staff, so as to achieve the purposes of quickly developing business and integrating into a new working team.

Description

Information management method and related device
Technical Field
The present application relates to the field of computer technologies, and in particular, to an information management method and a related device.
Background
When a new employee of a company just enters the company, the new employee is often unfamiliar with a new working environment, a new interpersonal relationship and new working contents, and the new employee often needs to spend a certain time to grasp the rhythm and the center of gravity of the work of the new employee and the colleague, so that the new employee is not beneficial to quickly and effectively developing the business and being integrated into a new working team.
Disclosure of Invention
The application provides an information management method and a related device, which can effectively help new staff to quickly familiarize with the working content and the business style of a colleague after entering the staff, so as to achieve the purposes of quickly developing business and integrating the business into a new working team.
In a first aspect, the present application proposes an information management method, the method comprising:
establishing a post relation diagram based on a first post function identifier and a second post function identifier, wherein the first post function identifier comprises a first post function content identifier and a first post business requirement identifier, the second post function identifier comprises a second post function content identifier and a second post business requirement identifier, and the post relation diagram comprises a first post business relation and a second post business relation;
adding the working style label of the first employee corresponding to the first post to the post relation diagram to obtain a post working diagram;
and sending the post work graph to a target employee, wherein the target post of the target employee is in the post work graph.
In one possible implementation manner, before the job identifier based on the first job and the job identifier of the second job establish the job relationship diagram, the method further includes:
analyzing the working content of the first post to obtain a function identifier of the first post;
and analyzing the working content of the second post to obtain the function identification of the second post.
In one possible implementation manner, after the building of the post relation diagram based on the first post function identifier and the second post function identifier, the method further includes:
and analyzing the working condition of the first staff corresponding to the first post to obtain the working style label of the first staff.
In one possible implementation, after the sending the post work graph to the target employee, the method further includes:
analyzing a target post of a target employee to obtain a business relation of the target post in the post work diagram, wherein the business relation is a first business relation of the target post and the first post or a second business relation of the target post and the second post;
analyzing and obtaining the priority of the first business relation and the second business relation;
and sending prompt information to the target staff based on the priority, wherein the prompt information is used for prompting the working gravity center of the target staff at the target post.
In a second aspect, the present application proposes an information management apparatus comprising:
the building unit is used for building a post relation diagram based on the function identification of a first post and the function identification of a second post, wherein the function identification of the first post comprises the function content identification of the first post and the service requirement identification of the first post, the function identification of the second post comprises the function content identification of the second post and the service requirement identification of the second post, and the post relation diagram comprises the service relation of the first post and the second post;
the adding unit is used for adding the working style label of the first employee corresponding to the first post to the post relation diagram to obtain a post working diagram;
the first sending unit is used for sending the post work diagram to a target staff, and the target post of the target staff is in the post work diagram.
In one possible implementation, the apparatus further includes:
the first analysis unit is used for analyzing the working content of the first post to obtain the function identification of the first post;
and the second analysis unit is used for analyzing the working content of the second post to obtain the function identification of the second post.
In one possible implementation, the apparatus further includes:
and the third analysis unit is used for analyzing the working condition of the first staff corresponding to the first post to obtain the working style label of the first staff.
In one possible implementation, the apparatus further includes:
a fourth analysis unit, configured to analyze a target post of a target employee, and obtain a business relationship of the target post in the post work chart, where the business relationship is a first business relationship between the target post and the first post or a second business relationship between the target post and the second post;
a fifth analysis unit, configured to analyze and obtain priority of the first service relationship and the second service relationship;
and the second sending unit is used for sending prompt information to the target staff based on the priority, wherein the prompt information is used for prompting the working gravity center of the target staff at the target post.
In a third aspect, the present application proposes a server comprising: a transceiver, a processor, and a memory; the transceiver, the processor and the memory are interconnected by a bus; wherein the memory is for storing a computer program comprising program instructions, the processor being configured to invoke the program instructions to perform the method as set forth in the first aspect.
In a fourth aspect, the present application proposes a computer readable storage medium storing a computer program comprising program instructions which, when executed by a processor, cause the processor to perform the method proposed in the respective aspect.
In a fifth aspect, embodiments of the present application provide a computer program product comprising program instructions which, when run on a computer, cause the computer to perform the method as set forth in the preceding aspects.
By implementing the application, the new staff can be effectively helped to quickly familiarize with the working content and the business style of the colleague after entering the staff, so as to achieve the purposes of quickly developing business and integrating into a new working team.
Drawings
In order to more clearly describe the embodiments of the present application or the technical solutions in the background art, the following description will describe the drawings that are required to be used in the embodiments of the present application or the background art.
FIG. 1 is a flow chart of an information management method according to the present application;
FIG. 2 is a flow chart of another information management method according to the present application;
FIG. 3 is a flowchart of a specific application scenario of an information management method according to the present application;
fig. 4 is a schematic structural diagram of an information management device according to the present application;
fig. 5 is a schematic structural diagram of a server according to the present application.
Detailed Description
The terms first, second and the like in the description and in the claims and in the above-described figures are used for distinguishing between different objects and not necessarily for describing a sequential or chronological order. Furthermore, the terms "comprise" and "have," as well as any variations thereof, are intended to cover a non-exclusive inclusion. For example, a process, method, system, article, or apparatus that comprises a list of steps or elements is not limited to only those listed or inherent to such process, method, or apparatus, but may optionally include other steps or elements not listed or inherent to such process, method, or apparatus.
At present, new staff of a company are often unfamiliar with a new working environment, new interpersonal relationship and new working contents when the company just enters the company, and the new staff often needs to spend a certain time to grasp the rhythm and the center of gravity of the work of the new staff and the colleagues, so that the new staff is not beneficial to quickly and effectively developing the business and being integrated into a new working team.
Fig. 1 is a flowchart of an information management method according to the present application, where the method includes the following steps:
101. and establishing a position relation diagram based on the position identification of the first position and the position identification of the second position.
Specifically, the function identifier of the first position may be a function content identifier of the first position and a service requirement identifier of the first position, the function identifier of the second position may be a function content identifier of the second position and a service requirement identifier of the second position, and the position relation graph may be a service relation between the first position and the second position. The responsibility content identifier of the first position may be the actual working content of the position, and the service requirement identifier of the first position may be the object and service that the position needs to cooperate. The post relation diagram may be a cooperation relation or a business relation between the first post and the second post, for example, the first post is responsible for writing a project application, and the second post is responsible for auditing the project application, so that the business relation between the first post and the second post is "writing-auditing".
102. And adding the working style label of the first employee corresponding to the first post into the post relation diagram to obtain a post working diagram.
Specifically, the work style label of the first employee corresponding to the first post and the work style label of the second employee corresponding to the second post are added into the post relation diagram to obtain a post work diagram, and the post work diagram is used for assisting the employee in familiarizing with the work flow. The work style label can be the work style of the employee according to the usual workplace mode and the workplace habit summary of the employee. For example, the work style label may be "chronic" or "efficient". And the working style labels are added into the post relation diagram, so that other staff can directly and clearly obtain the working style of the business cooperation object.
103. And sending the post work diagram to a target employee.
Specifically, the job map is sent to a target employee, whose target job is in the job map. This step is performed to help the target employee quickly become familiar with the business partner and the work style of the partner for the target post.
By implementing the embodiment of the application, new staff can be effectively helped to quickly familiarize with the working content and the business style of the colleague after entering the staff, so that the purposes of quickly developing business and integrating into a new working team are achieved.
Fig. 2 is a flowchart of another information management method according to the present application, where the method includes the following steps:
201. and analyzing the working content of the first post to obtain the function identification of the first post.
Specifically, the preset post working content can be a written project application, an audit project application and a project application legal consultant, the working content of the first post is read, and the working content of the first post is matched with the preset post working content to obtain the function identification of the first post. The job identifier of the first job may be a job content identifier of the first job and a business requirement identifier of the first job.
202. And analyzing the working content of the second post to obtain the function identification of the second post.
Specifically, the preset post working content can be a written project application, an audit project application and an application law consultant, the working content of the second post is read, and the working content of the second post is matched with the preset post working content to obtain the function identification of the second post. The job identifier of the second station may be a job content identifier of the second station and a business requirement identifier of the second station.
203. And establishing a position relation diagram based on the position identification of the first position and the position identification of the second position.
Specifically, the function identifier of the first position may be a function content identifier of the first position and a service requirement identifier of the first position, the function identifier of the second position may be a function content identifier of the second position and a service requirement identifier of the second position, and the position relation graph may be a service relation between the first position and the second position. The post relation diagram may be a cooperation relation and a business relation between the first post and the second post, for example, the first post is responsible for writing a project application, and the second post is responsible for auditing the project application, so that the business relation between the first post and the second post is writing-auditing.
204. And analyzing the working condition of the first staff corresponding to the first post to obtain the working style label of the first staff.
Specifically, the working condition of the first employee corresponding to the first post or the working public praise in the colleague is obtained, the working characteristics, which can be working efficiency, working attitude and time awareness, are extracted, and the working style label of the first employee is generated based on the working characteristics.
And acquiring the working condition of a second employee corresponding to the second post or the working public praise in the colleague, extracting the working characteristics, wherein the working characteristics can be working efficiency, working attitude and time awareness, and generating the working style label of the second employee based on the working characteristics.
205. And adding the working style label of the first employee corresponding to the first post into the post relation diagram to obtain a post working diagram.
Specifically, the work style label of the first employee corresponding to the first post and the work style label of the second employee corresponding to the second post are added into the post relation diagram to obtain a post work diagram, and the post work diagram is used for assisting the employee in familiarizing with the work flow. The work style label can be the work style of the employee according to the usual workplace mode and the workplace habit summary of the employee. For example, the work style label may be "chronic" or "efficient". And the working style labels are added into the post relation diagram, so that other staff can directly and clearly obtain the working style of the business cooperation object.
206. And sending the post work diagram to a target employee.
Specifically, the job map is sent to a target employee, whose target job is in the job map. This step is performed to help the target employee quickly become familiar with the business partner and the work style of the partner for the target post.
207. And analyzing the target positions of the target staff to obtain the business relation of the target positions in the position work diagram.
Specifically, a target post of a target employee is analyzed, working content of the target post is determined, and a business relation of the target post in the post working diagram is determined according to the working content, wherein the business relation is a first business relation between the target post and the first post or a second business relation between the target post and the second post.
208. And analyzing and obtaining the priority of the first business relation and the second business relation.
Specifically, an evaluation criterion is preset, and the evaluation criterion may be an emergency degree of a service and an importance level of a service object. For example, a high priority of a high business emergency or a high priority of a high importance level of a business object. And sorting the first business relation and the second business relation according to the evaluation standard, and establishing priority.
209. And sending prompt information to the target staff based on the priority.
Specifically, a prompt message is sent to the target staff based on the priority, and the prompt message is used for prompting the work center of gravity of the target staff at the target post. When the priority is changed, the server sends prompt information again, so as to assist the work of the target staff.
By implementing the embodiment of the application, new staff can be effectively helped to quickly familiarize with the working content and the business style of the colleague after entering the staff, so that the purposes of quickly developing business and integrating into a new working team are achieved.
Fig. 3 is a flowchart of a specific application scenario of another information management method according to the present application, where the method includes the following steps:
301. and analyzing the working content of the first post to obtain the function identification of the first post.
For example, the working content of the first post is analyzed, and the working content of the first post is written project application, so that the function identifier of the first post is "project application writing".
302. And analyzing the working content of the second post to obtain the function identification of the second post.
For example, the working content of the second post is analyzed, and the working content of the second post is an audit project application, so that the function identifier of the second post is "project application audit".
303. And establishing a position relation diagram based on the position identification of the first position and the position identification of the second position.
For example, the first post's role is identified as "project application writing" and the second post's role is identified as "project application auditing". The job identifier of the first station may be a job content identifier of the first station and a service requirement identifier of the first station, the job content identifier of the first station may be "responsible for writing a project application," and the service requirement identifier of the first station may be "requiring a second station to audit the project application. The job identifier of the second station may be a job content identifier of the second station and a service requirement identifier of the second station, the job content identifier of the second station may be "responsible for checking project application" and the service requirement identifier of the second station may be "need to guide and check the first station to write project application". The post relation diagram may be a business relation between the first post and the second post, and the business relation may be "write-audit".
304. And analyzing the working condition of the first staff corresponding to the first post to obtain the working style label of the first staff.
For example, the office situation of the first employee corresponding to the first post is analyzed, where the office situation of the employee may be: the first staff member needs to provide a piece of information, and the first staff member confirms that the first staff member can provide the information immediately when the first staff member replies to the mail to indicate that the requirement is received by sending the mail and the related information is received by the first staff member in the afternoon after the next day, so that the handling style of the first staff member can be recorded as a 'chronic son', and the working style of the first staff member is labeled as a 'chronic son'.
305. And adding the working style label of the first employee corresponding to the first post into the post relation diagram to obtain a post working diagram.
For example, a work style tag "chronic child" of the first employee corresponding to the first post is added to the post relationship diagram to obtain a post work diagram.
306. And sending the post work diagram to a target employee.
For example, the post work graph is sent to a target employee whose target post "flowman" is in the post work graph.
307. And analyzing the target positions of the target staff to obtain the business relation of the target positions in the position work diagram.
For example, a target post of a target employee, such as "flow personnel", is analyzed, and the working content of the target post is "responsible for official submission of the project application, so that the target post needs to submit the official version of the project application to the official after the first post and the second post complete the official writing of the project application. The business relation between the target post and the first post is a first business relation, and the business relation between the target post and the second post is a second business relation.
308. And analyzing and obtaining the priority of the first business relation and the second business relation.
For example, because the first station is responsible for writing the project application, the second station is responsible for auditing the project application, the second station has a higher authority for finalizing the project application than the first station. The preset evaluation standard is 'project application manuscript right', so the priority of the second business relation is in front of the first business relation.
309. And sending prompt information to the target staff based on the priority.
For example, because the second post has greater authority for finalization of the project application than the first post, and the target post needs to submit the finalized project application to the official, the priority of the second business relationship is in front of the first business relationship, and the server sends prompt information to the target employee, where the prompt information is used to prompt the target employee to preferentially hear the opinion of the second post when confirming whether finalization of the project application is completed and submitted.
The information management method in the embodiment of the application can be realized by a common server or a distributed decentralization server of a block chain platform, and specific application is selected according to the requirements of an implementer. For example, the distributed decentralization server of the blockchain platform analyzes the working content of the first post to obtain the function identifier of the first post; and analyzing the working content of the second post to obtain the function identification of the second post. The distributed decentralization server of the blockchain platform establishes a post relation diagram based on the function identification of the first post and the function identification of the second post, and analyzes the working condition of the first employee corresponding to the first post to obtain the working style label of the first employee. The distributed decentralization server of the blockchain platform adds the working style label of the first staff corresponding to the first post to the post relation diagram to obtain a post working diagram, and sends the post working diagram to target block link point equipment, wherein the target block link point equipment corresponds to the target staff. The distributed decentralization server of the blockchain platform analyzes target posts of target staff to obtain business relations of the target posts in the post work diagram, and analyzes and obtains priorities of the first business relation and the second business relation. And the distributed decentralization server of the block chain platform sends prompt information to the target block chain link point equipment based on the priority.
By implementing the embodiment of the application, new staff can be effectively helped to quickly familiarize with the working content and the business style of the colleague after entering the staff, so that the purposes of quickly developing business and integrating into a new working team are achieved.
Fig. 4 is a schematic structural diagram of an information management apparatus according to the present application, where the apparatus includes:
a building unit 401, configured to build a post relation graph based on a first post function identifier and a second post function identifier, where the first post function identifier includes a first post function content identifier and a first post business requirement identifier, the second post function identifier includes a second post function content identifier and a second post business requirement identifier, and the post relation graph includes a first post business relation and a second post business relation;
an adding unit 402, configured to add a work style tag of a first employee corresponding to the first post to the post relation diagram, to obtain a post work diagram;
a first sending unit 403, configured to send the post work chart to a target employee, where the target post of the target employee is in the post work chart.
As shown in fig. 4, the apparatus further includes:
a first analysis unit 404, configured to analyze the working content of the first post to obtain a function identifier of the first post;
and the second analysis unit 405 is configured to analyze the working content of the second post, and obtain a function identifier of the second post.
Further, the device further comprises:
and a third analysis unit 406, configured to analyze the business situation of the first employee corresponding to the first post, and obtain a working style label of the first employee.
Further, the device further comprises:
a fourth analysis unit 407, configured to analyze a target post of a target employee to obtain a business relationship of the target post in the post work diagram, where the business relationship is a first business relationship between the target post and the first post or a second business relationship between the target post and the second post;
a fifth analyzing unit 408, configured to analyze and obtain priorities of the first service relationship and the second service relationship;
and a second sending unit 409, configured to send, based on the priority, a prompt message to the target employee, where the prompt message is used to prompt the target employee of the working center of gravity of the target post.
It will be appreciated that the specific implementation of the information management apparatus shown in fig. 4 may also refer to the methods shown in fig. 1, 2 and 3, and will not be described in detail here.
In the embodiment of the present application, the establishing unit 401 establishes a post relation diagram based on a first post function identifier and a second post function identifier, where the first post function identifier includes the first post function content identifier and the first post business requirement identifier, the second post function identifier includes the second post function content identifier and the second post business requirement identifier, and the post relation diagram includes the first post business relation and the second post business relation; the adding unit 402 adds the work style label of the first employee corresponding to the first post to the post relation diagram to obtain a post work diagram; the first transmitting unit 403 transmits the aforementioned job chart to the target staff member, the target job of the aforementioned target staff member being in the aforementioned job chart. Therefore, the embodiment of the application can effectively help new staff to quickly familiarize with the working content and the business style of the colleague after entering the staff, so as to achieve the purposes of quickly developing business and integrating into a new working team.
Referring to fig. 5, fig. 5 is a schematic structural diagram of a server according to an embodiment of the present application, where the apparatus includes: at least one processor 501, such as a central processing unit (central processing unit, CPU), at least one memory 502, at least one transceiver 503, and at least one bus 504. Wherein the bus 504 may be a set of parallel data lines for interconnecting the processor 501, the memory 502 and the transceiver 503; the memory 502 may be a high-speed random access memory (random access memory, RAM) or a nonvolatile memory (non-volatile memory), such as at least one Read Only Memory (ROM).
Specifically, the processor 501 establishes a post relation diagram based on a first post function identifier and a second post function identifier, where the first post function identifier includes a first post function content identifier and a first post business requirement identifier, the second post function identifier includes a second post function content identifier and a second post business requirement identifier, and the post relation diagram includes a first post business relation and a second post business relation; the processor 501 adds the work style label of the first employee corresponding to the first post to the post relation diagram to obtain a post work diagram; the transceiver 503 transmits the job map to the target employee, the target job of the target employee being in the job map.
Further, the processor 501 analyzes the working content of the first post to obtain a function identifier of the first post; the processor 501 analyzes the working content of the second post to obtain a function identifier of the second post.
Further, the processor 501 analyzes the business situation of the first employee corresponding to the first post to obtain the working style label of the first employee.
Further, the processor 501 analyzes a target post of a target employee to obtain a business relationship of the target post in the post work diagram, where the business relationship is a first business relationship between the target post and the first post or a second business relationship between the target post and the second post; the processor 501 analyzes and obtains the priority of the first service relationship and the second service relationship; the transceiver 503 transmits a prompt message to the target employee based on the priority, the prompt message being used to prompt the target employee to the center of gravity of the target post.
Specifically, the memory 502 may store program instructions, and the processor 501 may be configured to invoke the program instructions to perform the methods shown in fig. 1, 2, and 3.
Those of ordinary skill in the art will appreciate that all or part of the steps of the various methods of the above embodiments may be implemented by a program that instructs associated hardware, the program may be stored in a computer readable storage medium including Read Only Memory (ROM), random access memory (random access memory, RAM), programmable read only memory (programmable read only memory, PROM), erasable programmable read only memory (erasable programmable read only memory, EPROM), one-time programmable read only memory (OTPROM), electrically Erasable Programmable Read Only Memory (EEPROM), compact disc read only memory (compact disc read-only memory, CD-ROM) or other optical disc memory, magnetic disk memory, tape memory, or any other medium capable of being used to carry or store data that is readable by a computer.
The foregoing has described in detail a method and apparatus for information management according to embodiments of the present application, and specific examples have been applied to illustrate the principles and embodiments of the present application, and the above description of the embodiments is only for aiding in understanding of the method and core idea of the present application; also, it is within the scope of the present application to be modified by those of ordinary skill in the art in light of the present teachings. In view of the foregoing, this description should not be construed as limiting the application.

Claims (6)

1. An information management method, wherein the method is applied to a distributed decentralization server of a blockchain platform, and comprises the following steps:
establishing a post relation diagram based on a first post function identifier and a second post function identifier, wherein the first post function identifier comprises a first post function content identifier and a first post business requirement identifier, the second post function identifier comprises a second post function content identifier and a second post business requirement identifier, and the post relation diagram comprises a first post business relation and a second post business relation;
analyzing the working condition or the working public praise of a first employee corresponding to the first post, extracting the working characteristics of the first employee, and obtaining the working style label of the first employee based on the working characteristics, wherein the working characteristics are working efficiency, working attitude and time awareness;
adding the working style label of the first employee corresponding to the first post to the post relation diagram to obtain a post working diagram;
the post work diagram is sent to a target employee, and the target post of the target employee is in the post work diagram;
analyzing a target post of a target employee to obtain a business relation of the target post in the post work diagram, wherein the business relation is a first business relation of the target post and the first post or a second business relation of the target post and the second post;
analyzing and obtaining the priority of the first business relation and the second business relation, wherein the priority is determined by a preset evaluation standard, and the evaluation standard is the emergency degree of business and the importance level of a business object; sending prompt information to the target staff based on the priority, wherein the prompt information is used for prompting the working gravity center of the target post of the target staff;
and if the priority is changed, sending the prompt information to the target staff based on the changed priority.
2. The method of claim 1, wherein prior to establishing the post relationship graph based on the first post's function identification and the second post's function identification, the method further comprises:
analyzing the working content of the first post to obtain a function identifier of the first post;
and analyzing the working content of the second post to obtain the function identification of the second post.
3. An information management apparatus, the apparatus being a distributed de-centralized server of a blockchain platform, comprising:
the building unit is used for building a post relation diagram based on the function identification of a first post and the function identification of a second post, wherein the function identification of the first post comprises the function content identification of the first post and the service requirement identification of the first post, the function identification of the second post comprises the function content identification of the second post and the service requirement identification of the second post, and the post relation diagram comprises the service relation of the first post and the second post;
the third analysis unit is used for analyzing the working condition or the working public praise of the first staff corresponding to the first post, extracting the working characteristics of the first staff, and obtaining the working style label of the first staff based on the working characteristics, wherein the working characteristics are working efficiency, working attitude and time awareness;
the adding unit is used for adding the working style label of the first employee corresponding to the first post to the post relation diagram to obtain a post working diagram;
the first sending unit is used for sending the post work diagram to a target staff, wherein the target post of the target staff is in the post work diagram;
a fourth analysis unit, configured to analyze a target post of a target employee, and obtain a business relationship of the target post in the post work chart, where the business relationship is a first business relationship between the target post and the first post or a second business relationship between the target post and the second post;
a fifth analysis unit, configured to analyze and obtain a priority of the first service relationship and the second service relationship, where the priority is determined by a preset evaluation criterion, and the evaluation criterion is an emergency degree of a service and an importance level of a service object;
the second sending unit is used for sending prompt information to the target staff based on the priority, wherein the prompt information is used for prompting the working gravity center of the target post of the target staff;
and the second sending unit is further configured to send the prompt message to the target employee based on the changed priority if the priority is changed.
4. A device according to claim 3, characterized in that the device further comprises:
the first analysis unit is used for analyzing the working content of the first post to obtain the function identification of the first post;
and the second analysis unit is used for analyzing the working content of the second post to obtain the function identification of the second post.
5. A distributed decentralization server of a blockchain platform, comprising a processor, a memory, and a transceiver; the processor, the memory and the transceiver are connected with each other through a bus; wherein the memory is for storing a computer program comprising program instructions, the processor being configured to invoke the program instructions to perform the method of claim 1 or 2.
6. A computer readable storage medium, characterized in that the computer readable storage medium stores a computer program comprising program instructions which, when executed by a processor, cause the processor to perform the method of claim 1 or 2.
CN201910767434.7A 2019-08-16 2019-08-16 Information management method and related device Active CN110659871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910767434.7A CN110659871B (en) 2019-08-16 2019-08-16 Information management method and related device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910767434.7A CN110659871B (en) 2019-08-16 2019-08-16 Information management method and related device

Publications (2)

Publication Number Publication Date
CN110659871A CN110659871A (en) 2020-01-07
CN110659871B true CN110659871B (en) 2023-08-18

Family

ID=69037605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910767434.7A Active CN110659871B (en) 2019-08-16 2019-08-16 Information management method and related device

Country Status (1)

Country Link
CN (1) CN110659871B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009199396A (en) * 2008-02-22 2009-09-03 Fun Team Co Ltd Business ability diagnostic system
CN102509184A (en) * 2011-10-24 2012-06-20 山东城通科技有限公司 Enterprise operation and management personnel comprehensive quality and post competence assessment system
CN106156935A (en) * 2015-04-22 2016-11-23 董武斌 A kind of enrollment based on Post Model, train, practise, device of obtaining employment
CN106682813A (en) * 2016-11-25 2017-05-17 深圳市元征科技股份有限公司 User working state determining method and terminal
CN107146034A (en) * 2017-05-18 2017-09-08 国网上海市电力公司 A kind of post competency assessment method
CN107563659A (en) * 2017-09-13 2018-01-09 包永祥 A kind of civil servant employed personnel's querying method and system
CN107609798A (en) * 2017-10-17 2018-01-19 上海鸥未信息科技有限公司 Post competency model system application process
CN107833011A (en) * 2017-10-16 2018-03-23 北京互动百科网络技术股份有限公司 A kind of post joins automatic Verification method and device
CN108364160A (en) * 2017-01-26 2018-08-03 樊少霞 A kind of intelligence personnel work processing method and processing device
CN108416567A (en) * 2018-02-01 2018-08-17 谢春旺 One kind being based on full-range multi-functional synergetic office work method and device
CN109636158A (en) * 2018-12-01 2019-04-16 河南中欧企业咨询有限公司 A kind of post competency assessment system based on block chain
CN109947949A (en) * 2019-03-12 2019-06-28 国家电网有限公司 Knowledge information intelligent management, device and server

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090327051A1 (en) * 2003-10-02 2009-12-31 Diane Nerby Online employee assessment and management performance system and method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009199396A (en) * 2008-02-22 2009-09-03 Fun Team Co Ltd Business ability diagnostic system
CN102509184A (en) * 2011-10-24 2012-06-20 山东城通科技有限公司 Enterprise operation and management personnel comprehensive quality and post competence assessment system
CN106156935A (en) * 2015-04-22 2016-11-23 董武斌 A kind of enrollment based on Post Model, train, practise, device of obtaining employment
CN106682813A (en) * 2016-11-25 2017-05-17 深圳市元征科技股份有限公司 User working state determining method and terminal
CN108364160A (en) * 2017-01-26 2018-08-03 樊少霞 A kind of intelligence personnel work processing method and processing device
CN107146034A (en) * 2017-05-18 2017-09-08 国网上海市电力公司 A kind of post competency assessment method
CN107563659A (en) * 2017-09-13 2018-01-09 包永祥 A kind of civil servant employed personnel's querying method and system
CN107833011A (en) * 2017-10-16 2018-03-23 北京互动百科网络技术股份有限公司 A kind of post joins automatic Verification method and device
CN107609798A (en) * 2017-10-17 2018-01-19 上海鸥未信息科技有限公司 Post competency model system application process
CN108416567A (en) * 2018-02-01 2018-08-17 谢春旺 One kind being based on full-range multi-functional synergetic office work method and device
CN109636158A (en) * 2018-12-01 2019-04-16 河南中欧企业咨询有限公司 A kind of post competency assessment system based on block chain
CN109947949A (en) * 2019-03-12 2019-06-28 国家电网有限公司 Knowledge information intelligent management, device and server

Also Published As

Publication number Publication date
CN110659871A (en) 2020-01-07

Similar Documents

Publication Publication Date Title
US10318116B2 (en) Dynamic presentations management
CN110569298A (en) data docking and visualization method and system
CN109658059B (en) File verification method and device, electronic equipment and computer readable medium
CN112016286A (en) File generation method and device and electronic equipment
CN112836018A (en) Method and device for processing emergency plan
CN110647523A (en) Data quality analysis method and device, storage medium and electronic equipment
CN110659871B (en) Information management method and related device
CN116187915A (en) Warehouse management method, device, equipment and storage medium
CN111640030B (en) Processing device, equipment and storage medium for insurance claim failure data
CN114282078A (en) Project data processing method and device, electronic equipment and storage medium
CN113064564A (en) Logistics surface single printing method, device, equipment and storage medium
CN112669105A (en) Method, device and medium for detecting subletting
CN112131611A (en) Data correctness verification method, device, equipment, system and storage medium
US20230047250A1 (en) Document splitting tool
CN112307106A (en) Data preprocessing method and device
CN112465149A (en) Same-city part identification method and device, electronic equipment and storage medium
US20230052950A1 (en) Pre-coded automatic docketing
CN110830358A (en) Information interaction method and device, storage medium and processor
CN115204814A (en) Order approval method and device, storage medium and computer equipment
Klaubert et al. Real time construction progress control using NFC
KR102589989B1 (en) System for managing simple approval requests using email and the operating method thereof
US20220391922A1 (en) Automated docketing checker
US20210042815A1 (en) Order issuing and receiving matching system, order issuing and receiving matching method, and non-transitory computer readable media
CN111177501B (en) Label processing method, device and system
CN114037419A (en) Method and system for managing materials with valid period, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant