CN110630273B - 一种全风化花岗岩地层偏压浅埋隧道施工方法 - Google Patents
一种全风化花岗岩地层偏压浅埋隧道施工方法 Download PDFInfo
- Publication number
- CN110630273B CN110630273B CN201910988617.1A CN201910988617A CN110630273B CN 110630273 B CN110630273 B CN 110630273B CN 201910988617 A CN201910988617 A CN 201910988617A CN 110630273 B CN110630273 B CN 110630273B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- grouting
- totally
- construction
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 239000010438 granite Substances 0.000 title claims abstract description 24
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 19
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 17
- 238000012544 monitoring process Methods 0.000 claims abstract description 6
- 238000005259 measurement Methods 0.000 claims abstract description 5
- 239000004568 cement Substances 0.000 claims description 14
- 238000000034 method Methods 0.000 claims description 14
- 239000000463 material Substances 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 10
- 239000000440 bentonite Substances 0.000 claims description 5
- 229910000278 bentonite Inorganic materials 0.000 claims description 5
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 claims description 5
- 239000002002 slurry Substances 0.000 claims description 5
- 239000000203 mixture Substances 0.000 claims description 4
- 239000011398 Portland cement Substances 0.000 claims description 3
- 238000005507 spraying Methods 0.000 claims description 3
- 235000019353 potassium silicate Nutrition 0.000 claims description 2
- 239000011257 shell material Substances 0.000 claims description 2
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims description 2
- 239000011435 rock Substances 0.000 abstract description 22
- 238000009412 basement excavation Methods 0.000 abstract description 9
- 238000013461 design Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 description 7
- 239000007788 liquid Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 239000002352 surface water Substances 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 239000008187 granular material Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000007569 slipcasting Methods 0.000 description 2
- 238000002791 soaking Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 230000000087 stabilizing effect Effects 0.000 description 2
- 238000012876 topography Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Soil Sciences (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Agronomy & Crop Science (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910988617.1A CN110630273B (zh) | 2019-10-17 | 2019-10-17 | 一种全风化花岗岩地层偏压浅埋隧道施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910988617.1A CN110630273B (zh) | 2019-10-17 | 2019-10-17 | 一种全风化花岗岩地层偏压浅埋隧道施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110630273A CN110630273A (zh) | 2019-12-31 |
CN110630273B true CN110630273B (zh) | 2021-09-21 |
Family
ID=68975161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910988617.1A Active CN110630273B (zh) | 2019-10-17 | 2019-10-17 | 一种全风化花岗岩地层偏压浅埋隧道施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110630273B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140238A (zh) * | 2020-01-09 | 2020-05-12 | 中铁二局集团有限公司 | 一种注浆管及地表注浆的隧道加固施工方法 |
CN112127900B (zh) * | 2020-09-07 | 2022-07-05 | 中国水利水电第十四工程局有限公司 | 穿堆积体浅埋偏压隧道明拱暗作半墙半拱防护构造的施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007278022A (ja) * | 2006-04-11 | 2007-10-25 | Sakamoto Shokai:Kk | 風管装置およびトンネル坑内の換気装置 |
CN102425434A (zh) * | 2011-11-17 | 2012-04-25 | 中铁五局(集团)有限公司 | 全风化花岗岩隧道围岩注浆施工方法 |
CN108661669B (zh) * | 2018-04-28 | 2019-11-08 | 中铁六局集团天津铁路建设有限公司 | 一种适用于浅埋偏压段及下穿浅埋富水段的隧道施工方法 |
CN109236328B (zh) * | 2018-10-30 | 2022-02-18 | 广东省交通规划设计研究院集团股份有限公司 | 适用于富水软弱土层的浅埋山岭隧道的加固方法 |
CN110284885A (zh) * | 2019-06-24 | 2019-09-27 | 中铁十二局集团有限公司 | 盾构检修井施工方法 |
-
2019
- 2019-10-17 CN CN201910988617.1A patent/CN110630273B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110630273A (zh) | 2019-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105672348A (zh) | 一种深水区砂卵石地层截除桥梁桩基的施工方法 | |
CN109594564A (zh) | 一种地铁深基坑明挖防坍塌施工方法 | |
CN110735600B (zh) | 一种用于喀斯特地质的机械成孔桩施工工艺 | |
CN104499479A (zh) | 一种穿越砂砾石回填层的挖孔桩施工方法 | |
CN106812150A (zh) | 一种山区陡坡地段公路桥梁桩基施工方法 | |
CN105569051A (zh) | 一种砂卵石漂石地质层基坑支护体系及施工方法 | |
CN110630273B (zh) | 一种全风化花岗岩地层偏压浅埋隧道施工方法 | |
CN108265706A (zh) | 一种在溶洞地质内的工程桩及成桩工艺 | |
CN110284885A (zh) | 盾构检修井施工方法 | |
US4496268A (en) | Method and apparatus for constructing reinforced concrete walls in the earth | |
CN110847929B (zh) | 基于分区爆破的隧道洞口段预加固及开挖施工方法 | |
CN115539048A (zh) | 一种用于浅埋偏压隧道洞口施工方法 | |
CN109944600A (zh) | 盾构接收端加固施工方法 | |
CN110821500B (zh) | 穿越土石分界地层的大断面隧道开挖及支护施工方法 | |
JP7292772B2 (ja) | 採掘跡ゾーンにおける削孔の外部拡張パイプ工法 | |
CN109487777A (zh) | 一种采用压力注浆形成合抱桩加固深厚软土地基的方法 | |
CN102587385A (zh) | 一种换填淤泥质软土的基坑支护方法 | |
CN113431097A (zh) | 一种紧邻深基坑工程浅基础建筑保护结构及施工方法 | |
CN109209448B (zh) | 隧道地表注浆阻水施工方法 | |
CN217053672U (zh) | 一种大直径检查井钻桩法施工系统 | |
CN116291482A (zh) | 一种在地表对深埋长隧道进行超前注浆加固的方法 | |
CN114482107A (zh) | 防渗墙的施工方法 | |
CN110792440B (zh) | 一种穿越黄土冲谷的富水黄土隧道施工方法 | |
CN208039234U (zh) | 一种在溶洞地质内的工程桩 | |
CN113174992A (zh) | 一种海上深水斜桩桩周地层塌陷综合处理加固方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220824 Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Patentee after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. Patentee after: Chengdu new technology Blasting Engineering Co., Ltd. of China Railway Erju Group Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Patentee before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd. |