CN110552685A - 一种结蜡井利用地面功图计算油井动液面的方法 - Google Patents

一种结蜡井利用地面功图计算油井动液面的方法 Download PDF

Info

Publication number
CN110552685A
CN110552685A CN201910763352.5A CN201910763352A CN110552685A CN 110552685 A CN110552685 A CN 110552685A CN 201910763352 A CN201910763352 A CN 201910763352A CN 110552685 A CN110552685 A CN 110552685A
Authority
CN
China
Prior art keywords
wax precipitation
load
calculating
well
working fluid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910763352.5A
Other languages
English (en)
Other versions
CN110552685B (zh
Inventor
戚兴
巩宏亮
常瑞清
周录方
李春红
孙春龙
张德实
高宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN201910763352.5A priority Critical patent/CN110552685B/zh
Publication of CN110552685A publication Critical patent/CN110552685A/zh
Application granted granted Critical
Publication of CN110552685B publication Critical patent/CN110552685B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations

Abstract

本发明涉及石油开采技术领域,特别涉及到一种结蜡井利用地面功图计算油井动液面的方法。本发明解决了结蜡导致动液面计算不准确的问题。本发明是通过采集洗井后的地面功图确定油井下冲程平均载荷WdL并设为基准值,连续采集结蜡后i个冲程的地面示功图,计算出结蜡后上冲程平均载荷W′u和结蜡后下冲程平均载荷W′d,根据基准值,计算出结蜡摩擦载荷Wf,然后计算出结蜡后的油井液柱载荷W′L,最终计算出油井动液面深度H。本发明方法能够对油井动液面实时监测,并综合考虑结蜡对计算动液面深度的影响,计算准确度高,误差小,能够大幅降低现场测试工作量,提高工作效率。

Description

一种结蜡井利用地面功图计算油井动液面的方法
技术领域:本发明涉及石油开采技术领域,特别涉及到一种结蜡井利用地面功图计算油井动液面的方法。
背景技术:油井的动液面参数直接反应了地层供液情况以及油井井下供排协调关系,是进行采油工艺适应性评价和优化的重要数据。传统动液面测量主要是利用声波法,通过人工操作发声设备发射声波,分析反馈的回波曲线,进而确定节箍波数目以及液面回波的位置,将其代入计算公式得到动液面值。然而声波法是非自动化的,操作过程落后且费时,通常现场每隔两周才进行一次液面测量,不能实时掌握井下动液面的变化。
发明专利一种油井动液面的测量方法及系统通过采集抽油杆载荷和位移进行测量,得到地面功图,进而计算泵功图,利用泵功图上下载荷差,进而求取动液面深度,然而该方法只适用于常规无蜡井,没有考虑结蜡增加的摩擦载荷的影响,进而造成结蜡井动液面计算深度计算不准确。
发明内容:本发明的目的在于克服现有技术的不足,提供计算准确度高,误差小,综合考虑油井结蜡增加的摩擦载荷的影响针的一种结蜡井利用地面功图计算油井动液面的方法。
为了实现上述目的,本发明采用如下技术方案:
一种结蜡井利用地面功图计算油井动液面的方法,包括以下步骤:
步骤1:采集洗井后的油井地面功图,确定固定阀和游动阀的开闭位置,计算出上冲程固定阀打开后到关闭前的上冲程平均载荷WuL和下冲程游动阀打开后至关闭前的下冲程平均载荷WdL,设定下冲程平均载荷WdL为基准值,计算出结蜡前的液柱载荷WL
WL=WuL-WdL (1)
步骤2:同时实测对应的油井环空动液面深度Lf,为了消除振动载荷、惯性载荷以及杆管摩擦载荷等因素对动液面计算的影响,计算出综合影响载荷Wc,公式如下:
Wc=WLlgApLf+(Pc-Pn)Ap (2)
其中,ρl-油井液体密度,kg/m3;g-重力加速度,m/s2;Ap-柱塞截面积,m2;Pc-井口套压,Pa;Pn-井口回压,Pa;
步骤3:连续采集结蜡后i个冲程的地面示功图,计算出结蜡后每个功图的上冲程固定阀打开后到关闭前的上冲程平均载荷W′ui,计算出结蜡后每个功图的下冲程固定阀打开后到关闭前的下冲程平均载荷W′di,得到结蜡后上冲程平均载荷W′u和结蜡后下冲程平均载荷W′d
步骤4:计算结蜡摩擦载荷Wf,结蜡摩擦载荷Wf为基准值WdL与结蜡后下冲程平均载荷W′d之差;
Wf=WdL-W′d (5)
步骤5:根据已知结蜡后上冲程平均载荷W′u、结蜡后下冲程平均载荷W′d和结蜡摩擦载荷Wf,计算出结蜡后油井液柱载荷W′L,计算公式如下:
W′L=W′u-2Wf-W′d (6)
步骤6:根据已知,井口回压Pn和综合影响载荷Wc,计算出结蜡后的油井动液面深度H,计算公式如下:
所述的一种结蜡井利用地面功图计算油井动液面的方法,其特征在于,步骤3中,连续采集结蜡后i个冲程的地面功图,其中i=10~50。
本发明具有以下优点:
1)本发明方法提供了一种结蜡井利用地面功图计算油井动液面的方法,能够利用地面功图直接计算出动液面深度,能够有效替代动液面测试仪器,大幅降低油田成本。
2)本发明方法能够对油井动液面实时监测,并综合考虑结蜡对计算动液面深度的影响,针对结蜡井,本方法计算准确度高,误差小,能够大幅降低现场测试工作量,提高工作效率。
附图说明:图1为本发明原理示意图;图2为XX井刚洗井后采集的地面功图;图3为XX井游动阀和固定阀开关位置示意图;图4为XX井结蜡后采集的油井地面功图。
具体实施方式:下面结合说明书附图对本发明作进一步阐述。
以XX井为例,表1给出了该井的基础生产数据。一种结蜡井利用地面功图计算油井动液面的方法包括以下步骤:
表1 XX井基础生产数据
油井名称 XX
抽油机型号 CYJY10-3-37HB
冲程长度/m 3.0
冲次/min<sup>-1</sup> 4.33
井液密度ρ<sub>l</sub>/kg·m<sup>-3</sup> 0.92
井口套压P<sub>c</sub>/MPa 0.4
井口回压P<sub>n</sub>/MPa 0.6
泵挂深度/m 1058.23
泵径/mm 70
步骤1:采集洗井后的油井地面功图见图2,洗井后的油井地面功图数据表见表2,根据功图曲率变化量最大点确定出固定阀和游动阀的开闭位置,在序号10处为固定阀开启点,序号49处为固定阀关闭点,序号56处为游动阀开启点,序号90为游动阀为关闭点。图3给出了固定阀和游动阀开闭位置,计算出上冲程固定阀打开后到关闭前的上冲程平均载荷WuL=52.11kN,下冲程游动阀打开后至关闭前的下冲程平均载荷WdL=26.38kN,设定下冲程平均载荷WdL=26.38kN为基准值,根据上下冲程平均载荷计算液柱载荷WL=25.73kN;
WL=WuL-WdL=25.73kN
表2洗井后的油井地面功图数据表
步骤2:同时实测对应的油井环空动液面深度Lf=384m,为了消除振动载荷、惯性载荷以及杆管摩擦载荷等因素对动液面计算的影响,计算出综合影响载荷Wc,根据已知油井液体密度ρl=9.2×103kg/m3;重力加速度g=9.8m/s2;柱塞截面积Ap=0.49×10-2m2;井口套压Pc=0.4MPa;井口回压Pn=0.6Mpa,计算公式如下:
Wc=WLlgApLf+(Pc-Pn)Ap=11.644kN
步骤3:连续采集结蜡后10个冲程的地面功图,其中的一个地面功图如图4所示,计算出结蜡后每个功图的上冲程固定阀打开后到关闭前的上冲程平均载荷WuL分别为67.4kN、67.5kN、67.8kN、67.1kN、67.9kN、66.8kN、67.2kN、67.5kN、67.1kN、67.8kN,计算出结蜡后每个功图的下冲程固定阀打开后到关闭前的下冲程平均载荷WdL分别为22.2kN、23.3kN、22.8kN、23.4kN、22.7kN、22.3kN、23.6kN、22.4kN、22.1kN、22.7kN,得到精确的结蜡后上冲程平均载荷W′u和结蜡后下冲程平均载荷W′d,减少个别异常功图对计算油井动液面深度的影响;
步骤4:在上冲程时结蜡对抽油杆的作用力向下,在下冲程时结蜡对抽油杆的作用力向上,假设结蜡对抽油杆的上、下冲程的作用力大小相等方向相反,结蜡摩擦载荷Wf为基准值WdL与结蜡后下冲程平均载荷W′d之差;结蜡摩擦载荷Wf公式如下:
Wf=WdL-W′d=2.98kN
步骤5:根据已知结蜡后上冲程平均载荷W′u=67.41kN、结蜡后下冲程平均载荷W′d=22.75kN和结蜡摩擦载荷Wf=2.98kN,计算出结蜡后油井液柱载荷W′L,计算公式如下:
W′L=W′u-2Wf-W′d=67.41-2×2.98-22.75=38.7kN
步骤6:已知结蜡后的井口套压Pc=0.6MPa和井口回压Pn=1.0Mpa,最终计算出结蜡后的油井动液面深度H,计算公式如下:
利用本发明方法计算得到的油井动液面深度为735.89m,实测油井动液面深度为764m,误差深度为28.11m,误差率为3.68%,完全满足现场对动液面误差小于5%要求。

Claims (2)

1.一种结蜡井利用地面功图计算油井动液面的方法,其特征在于:包括如下步骤:
步骤1:采集洗井后的油井地面功图,确定固定阀和游动阀的开闭位置,计算出上冲程固定阀打开后到关闭前的上冲程平均载荷WuL和下冲程游动阀打开后至关闭前的下冲程平均载荷WdL,设定下冲程平均载荷WdL为基准值,计算出结蜡前的液柱载荷WL
WL=WuL-WdL (1)
步骤2:同时实测对应的油井环空动液面深度Lf,为了消除振动载荷、惯性载荷以及杆管摩擦载荷等因素对动液面计算的影响,计算出综合影响载荷Wc,公式如下:
Wc=WLlgApLf+(Pc-Pn)Ap (2)
其中,ρl-井液密度,kg/m3;g-重力加速度,m/s2;Ap-柱塞截面积,m2;Pc-井口套压,Pa;Pn-井口回压,Pa;
步骤3:连续采集结蜡后i个冲程的地面示功图,计算出结蜡后每个功图的上冲程固定阀打开后到关闭前的上冲程平均载荷W′ui,计算出结蜡后每个功图的下冲程固定阀打开后到关闭前的下冲程平均载荷W′di,得到结蜡后上冲程平均载荷W′u和结蜡后下冲程平均载荷W′d
步骤4:计算结蜡摩擦载荷Wf,结蜡摩擦载荷Wf为基准值WdL与结蜡后下冲程平均载荷W′d之差;
Wf=WdL-W′d (5)
步骤5:根据已知结蜡后上冲程平均载荷W′u、结蜡后下冲程平均载荷W′d和结蜡摩擦载荷Wf,计算出结蜡后油井液柱载荷W′L,计算公式如下:
W′L=W′u-2Wf-W′d (6)
步骤6:根据已知,井口回压Pn和综合影响载荷Wc,计算出结蜡后的油井动液面深度H,计算公式如下:
2.根据权利要求1所述的一种结蜡井利用地面功图计算油井动液面的方法,其特征在于:步骤3中连续采集结蜡后i个冲程的地面功图,其中i=10~50。
CN201910763352.5A 2019-08-19 2019-08-19 一种结蜡井利用地面功图计算油井动液面的方法 Active CN110552685B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910763352.5A CN110552685B (zh) 2019-08-19 2019-08-19 一种结蜡井利用地面功图计算油井动液面的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910763352.5A CN110552685B (zh) 2019-08-19 2019-08-19 一种结蜡井利用地面功图计算油井动液面的方法

Publications (2)

Publication Number Publication Date
CN110552685A true CN110552685A (zh) 2019-12-10
CN110552685B CN110552685B (zh) 2022-08-19

Family

ID=68737695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910763352.5A Active CN110552685B (zh) 2019-08-19 2019-08-19 一种结蜡井利用地面功图计算油井动液面的方法

Country Status (1)

Country Link
CN (1) CN110552685B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196519A (zh) * 2020-09-05 2021-01-08 黑龙江省荣泽石油设备有限公司 一种油井非稳态连续动液面的检测方法
CN112943224A (zh) * 2019-12-11 2021-06-11 中国石油化工股份有限公司 稠油井动液面的计算方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040062657A1 (en) * 2002-09-27 2004-04-01 Beck Thomas L. Rod pump control system including parameter estimator
CN101012741A (zh) * 2007-01-22 2007-08-08 大庆油田有限责任公司 利用改变抽油杆柱弹性模量降能增产的方法以及专用装置
CN102877832A (zh) * 2012-09-14 2013-01-16 中国石油天然气股份有限公司 一种油井动液面的测量方法及系统
CN202832505U (zh) * 2012-09-14 2013-03-27 中国石油天然气股份有限公司 一种油井动液面的测量系统
WO2014040264A1 (zh) * 2012-09-14 2014-03-20 中国石油天然气股份有限公司 一种油井动液面的测量方法及系统
CN105569639A (zh) * 2015-12-31 2016-05-11 山东天工石油装备有限公司 一种基于地面示功图计算油井动液面的方法
CN106761668A (zh) * 2016-11-19 2017-05-31 新疆华隆油田科技股份有限公司 油井故障智能化分析决策系统及方法
CN109958431A (zh) * 2019-04-19 2019-07-02 中国石油天然气股份有限公司 一种基于流入动态曲线计算油井日产液量的方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040062657A1 (en) * 2002-09-27 2004-04-01 Beck Thomas L. Rod pump control system including parameter estimator
CN101012741A (zh) * 2007-01-22 2007-08-08 大庆油田有限责任公司 利用改变抽油杆柱弹性模量降能增产的方法以及专用装置
CN102877832A (zh) * 2012-09-14 2013-01-16 中国石油天然气股份有限公司 一种油井动液面的测量方法及系统
CN202832505U (zh) * 2012-09-14 2013-03-27 中国石油天然气股份有限公司 一种油井动液面的测量系统
WO2014040264A1 (zh) * 2012-09-14 2014-03-20 中国石油天然气股份有限公司 一种油井动液面的测量方法及系统
CN105569639A (zh) * 2015-12-31 2016-05-11 山东天工石油装备有限公司 一种基于地面示功图计算油井动液面的方法
CN106761668A (zh) * 2016-11-19 2017-05-31 新疆华隆油田科技股份有限公司 油井故障智能化分析决策系统及方法
CN109958431A (zh) * 2019-04-19 2019-07-02 中国石油天然气股份有限公司 一种基于流入动态曲线计算油井日产液量的方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
李云祥等: "抽油机井示功图计算动液面的对比算法", 《化学工程与装备》 *
李翔宇等: "基于示功图的抽油井动液面软测量机理建模", 《控制工程》 *
杨胡坤等: "利用电机工作参数预测油井动液面深度的研究", 《北京石油化工学院学报》 *
辛宏等: "低渗透油田示功图实时计算动液面方法", 《石油化工自动化》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943224A (zh) * 2019-12-11 2021-06-11 中国石油化工股份有限公司 稠油井动液面的计算方法
CN112943224B (zh) * 2019-12-11 2023-02-07 中国石油化工股份有限公司 稠油井动液面的计算方法
CN112196519A (zh) * 2020-09-05 2021-01-08 黑龙江省荣泽石油设备有限公司 一种油井非稳态连续动液面的检测方法
CN112196519B (zh) * 2020-09-05 2023-05-09 黑龙江省荣泽石油设备有限公司 一种油井非稳态连续动液面的检测方法

Also Published As

Publication number Publication date
CN110552685B (zh) 2022-08-19

Similar Documents

Publication Publication Date Title
CN104185735B (zh) 关于井下泵卡的流体载荷曲线计算、凹度测试以及迭代阻尼因子
CN107608940B (zh) 一种油井间抽周期确定方法
CA2250726C (en) Pump-off controller
US20160061022A1 (en) Hydrocarbon Well Performance Monitoring System
CN106089184B (zh) 一种井下抽油泵工况的诊断方法和装置
CN103899300A (zh) 一种基于示功图的二流量试井分析的方法及系统
CN108732076B (zh) 一种煤层水力压裂渗透率预测方法
WO2015143626A1 (zh) 一种基于示功图的二流量试井分析的方法及系统
CN110552685A (zh) 一种结蜡井利用地面功图计算油井动液面的方法
CN108518218B (zh) 一种非常规油气藏多段压裂水平井单井动态储量确定方法
CN111287740B (zh) 基于真实应变下的异常高压气藏动态储量计算方法
CN110206536A (zh) 一种基于泵示功图的井口产液量采集方法
CN104405365A (zh) 抽油机功图法产液量计量技术
RU2010116746A (ru) Способ и система для интерпретации испытаний свабированием с использованием нелинейной регрессии
CN103306256B (zh) 一种标准贯入仪及其试验方法
CN106326630A (zh) 用于确定井下泵的产量的方法和装置
CN105569639A (zh) 一种基于地面示功图计算油井动液面的方法
WO2020077469A1 (en) System and method for operating downhole pump
CN105181125B (zh) 钻井用井下水力振荡器模拟测试装置及其测试方法
CN111271049B (zh) 一种有杆泵抽油井充满程度识别方法
CN108335221B (zh) 一种油井抽油泵效提升潜力空间确定方法
CN205225241U (zh) 一种用于气体钻井的岩屑返出量监测装置
CN113468646B (zh) 基于地质力学模型和机器学习检测地热井风险的方法
CN111963161B (zh) 确定隐性不正常油井的方法及装置
CN110821478A (zh) 油井抽油泵漏失检测方法及装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211220

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 233 South Central Avenue

Applicant after: Daqing Oilfield Co.,Ltd.

Applicant after: PETROCHINA Co.,Ltd.

Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 233 South Central Avenue

Applicant before: Daqing Oilfield Co.,Ltd.

GR01 Patent grant
GR01 Patent grant