CN110529159A - A kind of temporary support device and its implementation method - Google Patents
A kind of temporary support device and its implementation method Download PDFInfo
- Publication number
- CN110529159A CN110529159A CN201910790390.XA CN201910790390A CN110529159A CN 110529159 A CN110529159 A CN 110529159A CN 201910790390 A CN201910790390 A CN 201910790390A CN 110529159 A CN110529159 A CN 110529159A
- Authority
- CN
- China
- Prior art keywords
- hole
- steelframe
- support device
- temporary support
- protection mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 92
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 12
- 238000009434 installation Methods 0.000 claims description 25
- 238000003780 insertion Methods 0.000 claims description 6
- 230000037431 insertion Effects 0.000 claims description 6
- 210000003205 muscle Anatomy 0.000 claims description 5
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 238000004078 waterproofing Methods 0.000 claims description 5
- 238000003672 processing method Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 22
- 230000009471 action Effects 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 229910000831 Steel Inorganic materials 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 239000011435 rock Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000009412 basement excavation Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000001143 conditioned effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D19/00—Provisional protective covers for working space
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
- E21F16/02—Drainage of tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention discloses a kind of temporary support device, including several groups protection mechanism, it is detachably connected between every group of protection mechanism, protection mechanism includes fixed frame, fixing axle and rotary sleeve, and adjustable plate is connected on rotary sleeve, and adjustable plate is flexibly connected with steelframe, dowel is removably connected between adjacent steelframe, what steelframe and dowel were formed is spatially detachably equipped with adjustable rooting mechanism, and adjustable rooting mechanism includes reinforcing portion and lifting parts, and steelframe bottom is removably connected with waterproof case;Temporary support device disclosed by the invention can not only carry out flexible modulation and disassembly is convenient, construction time and cost are saved, and construction efficiency can be improved, improves structure service life, waterproof action is also acted as, while can guarantee stability and safety in work progress.
Description
Technical field
The present invention relates to technical field of tunnel construction, more particularly to a kind of temporary support device and its implementation method.
Background technique
Gib refers in underground job, and rock is fallen in order to prevent, takes measures to prop up top plate, makes to construct
With the temporary support pattern of the one kind continued.
With the continuous development of Tunnel Engineering, longspan tunnel is more and more, and large cross-section tunnel is disposably excavated and be will cause
The problems such as working face exposure time is too long, and load releasing is very fast and cause country rock unstable, increase the risk of tunnel construction, therefore
The thought that tunnel piecemeal excavates is gradually prevailing.Under the poor geological conditions of country rock, more and more Large span tunnel constructions are used
Piecemeal excavation+gib construction method.During gib is as tunnel excavation, the provisional knot of safety is improved
Structure, to closing country rock, the requirement of protection Surrounding Rock Strength etc. is lower, as long as can guarantee the intensity of gib, rigidity and entirety
Property, it will be able to play gib function;Existing gib mode is generallyd use by steel arch-shelf+longitudinally connected muscle+steel mesh
The skeleton of composition sprays concrete composition.This temporary support structures have very high intensity, rigidity, can satisfy safety completely
The needs of production.But such structure installing and dismounting is difficult, needs when removing artificial or pounds concrete by external force
Just broken can dismantle one by one steel arch-shelf, longitudinally connected muscle and steel mesh, just makes troubles to remove, asked to solve this
Topic has part to directly adopt steel arch-shelf in the prior art, the gib that longitudinally connected muscle and reinforcing rib structure are assembled at present
Structure, in this way can be to avoid spraying concrete, but such structure is equally relatively simple, since Tunnel Engineering is used in construction
Different forms of construction work, the temporary support structures used corresponding in this way would also vary from, and interim in currently available technology
The equal structure of supporting construction is single to be adjusted, and the temporary support structures of every kind of form of construction work are required to particular production, in this way
Just the expenditure for increasing manpower, since, using the connection of large-scale steel arch-shelf, each personnel are carrying out in currently available technology
It is taken time and effort very much when disassembly installation, the construction speed of Tunnel Engineering can be not only reduced, due to repeatedly carrying out gib knot
The component that the installing and dismounting of structure will lead between temporary support structures is seriously worn, and then influences its stability and safety
Property, reduce its service life;In addition, there are also some Tunnel Engineering easily to occur water burst phenomenon, but at present interim in construction
The setting for not carrying out proof mechanism of water in supporting construction does not also carry out waterproof construction in construction, therefore, is badly in need of one kind at present not
Flexible modulation can only be carried out and disassembly is convenient, construction time and cost is saved, and construction efficiency can be improved, improve whole knot
Structure service life, also acts as waterproof action, may finally guarantee the gib dress of the stability and safety in work progress
It sets.
Summary of the invention
The object of the present invention is to provide a kind of temporary support device and its implementation methods, exist to solve the above-mentioned prior art
The problem of, it can not only carry out flexible modulation and disassembly is convenient, save construction time and cost, and construction efficiency can be improved,
Structure service life is improved, waterproof action is also acted as, may finally guarantee stability and safety in work progress.
To achieve the above object, the present invention provides following schemes: the present invention provides a kind of temporary support device, if including
Group protection mechanism is done, is detachably connected between every group of protection mechanism, the protection mechanism includes fixed frame, removable on the fixed frame
It unloads and is connected with fixing axle, rotary sleeve is connected in the fixing axle, several adjustings are connected on the rotary sleeve
Plate is connected with steelframe on the adjustable plate, is removably connected with dowel between the adjacent steelframe, the steelframe with connect
What muscle was formed is spatially detachably equipped with adjustable rooting mechanism, and the adjustable rooting mechanism includes reinforcing portion, the reinforcing portion
On be fixedly installed with lifting parts, the steelframe bottom is removably connected with waterproof case.
Preferably, several first through hole are offered on the steelframe, and it is second logical that several are offered on the adjustable plate
Fastener is removably connected in hole, the first through hole and the second through-hole.
Preferably, raised line is fixed on the adjustable plate, the steelframe is fixed with fastener, the fastener and raised line phase
It fastens.
Preferably, several first transverse slats are removably connected on the fixed frame, first transverse slat passes through with steelframe
First support plate is slidably connected, and sliding slot is offered on first transverse slat, slidably connects sliding panel on the sliding slot, and described
One end of one support plate is hinged on steelframe, and the other end of first support plate is fixedly connected with sliding block, the sliding block and cunning
Slot is slidably connected, and the reinforcing portion is securing plate, and the lifting parts are link, is fixedly installed with link in the securing plate.
Preferably, fifth hole is offered on the sliding panel, offers engaging slot on first transverse slat, described first
Third through-hole is offered on transverse slat, the engaging slot has fixture block by third through-hole and fifth hole fastening.
Preferably, it is symmetrically installed with the second transverse slat with first transverse slat, offers the second groove on second transverse slat,
The first groove is offered in the securing plate, insertion is connected with the second support plate in first groove and the second groove.
Preferably, it is fixed with engaging frame below first transverse slat and the second transverse slat, is fixed with strip in the securing plate,
The strip is fastened in engaging frame.
Preferably, fourth hole is symmetrically offered on the side wall of the engaging frame, the 6th through-hole is offered on the strip,
The hole heart of 6th through-hole and fourth hole is on same straight line, and insertion is connected in the fourth hole and the 6th through-hole
The both ends of fixed strip, the fixed strip offer screw thread.
Preferably, the waterproof case is splash guard, is connected with deflector below the splash guard.
To achieve the above object, the present invention also provides following schemes: a kind of gib as claimed in claims 1-9
The implementation method of device, implementation comprise the following steps:
(1) Assembling outside the hole makes: ready steelframe, fixed frame, fixing axle and other component are set up outside hole
Assembling, forms preliminary protection mechanism;
(2) it adjusts outside hole: according to the processing method in tunnel, preliminary protection mechanism assembled in step (1) being carried out just
Step rotation adjusts and height adjustment, forms preliminary temporary support device;
(3) installation and adjustment in hole: the temporary support device tentatively regulated in step (2) is placed in moving trolley,
Moving trolley is pushed in Tunnel, until being moved to the designated position of temporary support device installation, steelframe height is adjusted
It is fixed to touching tunnel inner wall, then by steelframe, finally the support frame on moving trolley bottom plate is put down, is anchored at tunnel
On ground;
(4) hole inner waterproofing is arranged: the splash guard in step (3) on mounted temporary support device is turned to suitable position
It postpones, the deflector on splash guard is put down, find the installation site of deflector, then using auxiliary tool on tunnel ground
Resettlement groove is excavated out, and excavates drainage trough in the outflow end of resettlement groove, drainage trough leads to outside tunnel, is finally placed on deflector
In resettlement groove.
The invention discloses following technical effects: temporary support device disclosed by the invention is made of multiple groups protection mechanism,
It is detachably connected between multiple groups protection mechanism, wherein protection mechanism includes fixed frame, fixing axle is removably connected on fixed frame,
It is connected with rotary sleeve in fixing axle, several adjustable plates are connected on rotary sleeve, adjustable plate is flexibly connected with steelframe,
Dowel is removably connected between adjacent steelframe, what steelframe and dowel were formed is spatially detachably equipped with adjustable rooting machine
Structure, adjustable rooting mechanism include reinforcing portion, are fixedly installed with lifting parts in reinforcing portion, when protection mechanism needs to carry out height adjustment
When, directly steelframe is adjusted upward or downward along adjustable plate, until steelframe is when being adjusted to suitable position, then by steelframe and
Adjustable plate is fixedly connected, and when needing to carry out angular adjustment, cable wire is directly wound in lifting parts, then using auxiliary
Assistant engineer has cable wire pull-up, can carry out angular adjustment to protection mechanism in this way, while being removably connected with waterproof in bottom
Part, flexible modulation can be not only carried out by above technical scheme and disassembly is convenient, save construction time and cost, and can mention
High construction efficiency improves structure service life, also acts as waterproof action, may finally guarantee stability and peace in work progress
Quan Xing.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of temporary support device in the present invention;
Fig. 2 is the partial enlarged view of A in Fig. 1;
Fig. 3 is the right view of temporary support device in the present invention;
Fig. 4 is the partial enlarged view of B in Fig. 3;
In Fig. 5 in the present invention fixture block snap-in structure schematic diagram;
In Fig. 6 in the present invention fixed strip fit structure schematic diagram;
Structural schematic diagram after the temporary support device of embodiment 1 is adjusted in Fig. 7;
Structural schematic diagram after the temporary support device of embodiment 2 is adjusted in Fig. 8;
Structural schematic diagram after the temporary support device of embodiment 3 is adjusted in Fig. 9;
Wherein, 1- steelframe;2- fixing axle;3- rotary sleeve;4- dowel;5- fixed frame;6- adjustable plate;7- raised line;8-
One through-hole;The second through-hole of 9-;10- fastener;11- fastener;12- sliding slot;The first support plate of 13-;14- sliding block;15- first is horizontal
Plate;16- sliding panel;17- fixture block;18- securing plate;19- link;20- splash guard;21- deflector;22- moving trolley;The bottom 23-
Plate;24- support frame;25- engages frame;26- strip;27- third through-hole;28- fixed strip;29- nut;The second support plate of 30-;
31- fourth hole;The first groove of 32-;The second groove of 33-;34- engaging slot;The second transverse slat of 35-;36- fifth hole;37- the 6th
Through-hole.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real
Applying mode, the present invention is described in further detail.
Embodiment 1
As shown in figs. 1-7, the present invention provides a kind of temporary support device, including several groups protection mechanism, every group of protection machine
It is detachably connected between structure, otic placode (not shown) is installed on two steelframes 1 of every group of protection mechanism closely, when needs are adopted
When being spliced with multiple groups protection mechanism, directly otic placode is connected by screw bolts, not only installing and dismounting is easy in this way, also drops
Low use cost;Wherein protection mechanism includes fixed frame 5, is removably connected with fixing axle 2 on fixed frame 5, in fixing axle 2
It is connected with rotary sleeve 3, several adjustable plates 6 are connected on rotary sleeve 3, sliding rail is offered on rotary sleeve 3 (in figure
Do not show), adjustable plate 6 is slidably connected in rotary sleeve 3 by sliding rail, steelframe 1 is connected on adjustable plate 6, it is adjacent
Dowel 4 is removably connected between steelframe 1, dowel 4 can be directly used bolt connecting mode and be fixedly mounted between steelframe 1,
What steelframe 1 and dowel 4 were formed is spatially detachably equipped with adjustable rooting mechanism, and adjustable rooting mechanism includes reinforcing portion, is added
Gu being fixedly installed with lifting parts in portion, 1 bottom of steelframe is removably connected with waterproof case.
Scheme is advanced optimized, in order to enable the height adjustment between steelframe 1 and adjustable plate 6 is convenient, and then guarantees that steelframe 1 exists
Stability when height adjustment is carried out, it is convenient not only to guarantee that temporary support device is adjusted, and guarantees its safety when adjusting.
Several first through hole 8 are offered on steelframe 1, several the second through-holes 9, first through hole 8 and are offered on adjustable plate 6
It is removably connected with fastener 11 in two through-holes 9, wherein fastener 11 can use bolt and nut, when steelframe 1 needs to carry out height
When degree is adjusted, the fastener 11 of preliminary secured adjusted plate 6 and steelframe 1 is laid down first, then manually adjusts the height of steelframe 1,
Until being adjusted to suitable position, fastener 11 is finally passed through into first through hole 8 and the second through-hole 9, by steelframe 1 and adjustable plate 6
Fixation not only can carry out convenient and fast height adjustment, it can also be ensured that steady between steelframe 1 and adjustable plate 6 after adjusting
It is qualitative.
Furtherly, in order to facilitate the height adjustment between steelframe 1 and adjustable plate 6, guarantee that it does not shake when adjusting
It is dynamic, not only make the height adjustment between steelframe 1 and adjustable plate 6 more convenient and quick, more ensure that the safety in adjustment process
Property and stability, while ensure that adjust after temporary support device stability and safety.It is fixed on adjustable plate 6 convex
Item 7 is fixed with fastener 10 on steelframe 1, and fastener 10 and raised line 7 are interlocked, when steelframe 1 upward or downward adjust after,
It is fastened on the raised line 7 on adjustable plate 6 in the fastener 10 on steelframe 1, not only can guarantee fastener 11
Smoothly installation can also prevent the steelframe 1 when adjusting from the phenomenon that sliding or loosening occur, and then influence temporary support device
Stability and safety.
Scheme is advanced optimized, in order to guarantee that the protection mechanism of temporary support device can be rotated in any environment
It adjusts, and then guarantees that temporary support device can be suitble to the tunnelling under any mode to work, while also guaranteeing gib
The stability and safety of device when in use.Several the first transverse slats 15, the first transverse slat are removably connected on fixed frame 5
15 can be bolted and be fixed on fixed frame 5, and the first transverse slat 15 is slidably connected with steelframe 1 by the first support plate 13,
Sliding slot 12 is offered on the first transverse slat 15, sliding panel 16 is slidably connected on sliding slot 12, and one end of the first support plate 13 is hinged
On steelframe 1, the other end of the first support plate 13 is fixedly connected with sliding block 14, and sliding block 14 is slidably connected with sliding slot 12, reinforcing portion
For securing plate 18, lifting parts are link 19, are fixedly installed with link 19 in securing plate 18, when needing protection mechanism being adjusted to spy
When determining structure, it is wound with cable wire on link 19, can be pulled, be pulled up using auxiliary tool or direct manpower
It can realize the adjusting of protection mechanism, in this way in order to which protection mechanism sliding phenomenon does not occur and to adjust when guaranteeing that manpower pulls
Section is laborious, and the other side is by Manual-pushing sliding panel 16, so that sliding panel 16 will push in this way along 12 slid inward of sliding slot
Sliding block 14 slides, and when sliding block 14 is slided, the first support plate 13 being attached thereto will push steelframe 1 to move up, this
Sample is under the pulling force of cable wire and the dual thrust of sliding shoe, and protection mechanism will be more time saving and energy saving when being adjusted, in turn
The cost of tunnelling work is reduced, simultaneously because the installation of the first support plate 13 can guarantee the stabilization after protection mechanism adjusting
Property, the phenomenon that preventing it from falling, and then ensure that the safety in utilization and stability of temporary support device.
Furtherly, in order to guarantee the stability after the protection mechanism of temporary support device is adjusted, guarantee that tunnel is dug
Dig the safety and convenience of work.Fifth hole 36 is offered on sliding panel 16, offers engaging slot on the first transverse slat 15
34, third through-hole 27 is offered on the first transverse slat 15, engaging slot 34 has fixture block by third through-hole 27 and the fastening of fifth hole 36
17.When protection mechanism is adjusted to suitable position, when, by sliding panel 16 and transverse slat by the fixation of fixture block 17, not only make in this way
It is convenient to adjust, it is ensured that adjusts the stability of rear protecting mechanism.
It further says, in order to guarantee the stability after the protection mechanism of temporary support device is adjusted, prevents its adjusting
Afterwards occur loosen and be that tunnelling work belt carrys out security risk.The second transverse slat 35 is symmetrically installed with the first transverse slat 15, second
The second groove 33 is offered on transverse slat 35, and the first groove 32, the first groove 32 and the second groove 33 are offered in securing plate 18
Interior insertion is connected with the second support plate 30, when protection mechanism is adjusted to suitable position, prevents it to the direction of securing plate 18
Second support plate 30, is directly inserted into the first groove 32 and the second groove 33, in the first support plate 13 and second by inclination
Under being used cooperatively of fagging 35, the protection mechanism being conditioned is not in double swerve, stronger, and then more be ensure that anti-
Protect the stability and safety when mechanism uses, the final stability and safety guaranteed when temporary support device uses.
Scheme is advanced optimized, in order to enable the steelframe 1 between protection mechanism is rotating flexibility ratio when adjusting, and then can be with
Quickly and easily it is adjusted to the temporary support device needed.Engaging frame 25 is fixed with below first transverse slat 15 and the second transverse slat 35,
Be fixed with strip 26 in securing plate 18, strip 26 is fastened in engaging frame 25, when need will be perpendicular to the protection mechanism on ground into
When 90 ° of adjustings of row, directly protection mechanism is manually lifted, is fastened on the strip 26 in fixed plate in engaging frame 25 i.e.
It can.
Furtherly, in order to guarantee to engage the protection mechanism that engages in frame 25 will not by its own weight and fall,
Engage and symmetrically offer fourth hole 31 on the side wall of frame 25, offers the 6th through-hole 37 on strip 26, the 6th through-hole 37 and the
The hole heart of four through-holes 31 is on same straight line, and insertion is connected with fixed strip 28 in fourth hole 31 and the 6th through-hole 37, fixed
The both ends of item 28 offer screw thread, and when being fastened on strip 26 in engaging frame 25, fixed strip 28 is inserted into 31 He of fourth hole
In 6th through-hole 37, the both ends of fixed strip 28 are attached using nut 29.
Scheme is advanced optimized, water burst phenomenon occurs in tunnel after temporary support device installation in order to prevent, and leads to tunnel
Excacation can not normally be carried out in road, splash guard 20 is set by waterproof case, deflector 21 is connected with below splash guard 20, when
When there is water burst phenomenon, it can not only prevent it from flowing in tunnel, can also be led to outside tunnel by deflector 21, in this way
The safety for not only guaranteeing tunnelling, more ensure that working environment when tunnelling.
As shown in figs. 1-7, the present invention provides a kind of implementation method using the above temporary support device, when using CRD method
When construction, implementation is comprised the following steps:
(1) Assembling outside the hole makes: ready steelframe 1, fixed frame 5, fixing axle 2 and other component are carried out frame outside hole
If fixing axle 2, is mounted on fixed frame 5 first, then rotary sleeve 3 is socketed in fixing axle 2, is then successively installed by assembling
Adjustable plate 6, and steelframe 1 is connected on adjustable plate 6 by fastener 11, several steelframes 1 are connected by the way that dowel 4 is fixed
It connects, forms preliminary protection mechanism, due to being constructed using CRD method, repeat above step and four groups of protection machines are installed in fixing axle 2
Structure;
(2) it is adjusted outside hole:, need to will be in four groups of preliminary protection mechanisms assembled in step (1) due to being constructed using CRD method
Three groups of preliminary protection mechanisms carry out 180 ° and 90 ° rotations respectively and adjust, when carrying out 180 ° of rotations and adjusting, needs will be vertical
Protection mechanism in ground rotates 180 °, so that horizontality is in the protection mechanism perpendicular to ground, first by first group
Protection mechanism rotates 90 ° by manpower, and then cable wire is socketed in link 19, by auxiliary tool by the certain angle of its pull-up
Degree, is followed by fixed with the first transverse slat 15 and the second transverse slat 35 on the fixed frame 5 of 1 two sides of the steelframe of pull-up respectively, and by the
One support plate 13 is hinged on pull-up steelframe 1, and the other end is then slidably connected in the sliding slot 12 of the first transverse slat 15, and then in cunning
Sliding panel 16 is placed in sliding in slot 12, can be pulled simultaneously by manpower in the side of installation securing plate 18 at this time, and
The other side, which then passes through, pushes sliding panel 16 to make the first support plate 13 that protection mechanism be pushed to move up, until first group of protection machine
When structure is adjusted to designated position, the second transverse slat 35 is installed again on the fixed frame 5 of 18 side of securing plate, and in the second transverse slat
The second support plate 30 is placed between 35 and steelframe 1;And second group of preliminary protection mechanism and the preliminary protection mechanism of third group are successively adjusted
Whole 90 °, second group of preliminary protection mechanism is rotated clockwise 90 °, the strip 26 in securing plate 18 is fastened on the first transverse slat 15
On engaging frame 25 on, then the preliminary protection mechanism of third group is rotated by 90 ° counterclockwise, by the strip 26 in securing plate 18
It is fastened on the engaging frame 25 on the second transverse slat 35, while the fastener 11 of steelframe 1 and adjustable plate 6 being dismantled to steelframe 1
Height be adjusted, i.e., the height of preliminary protection mechanism is adjusted, steelframe 1 and adjustable plate 6 is then passed through into fastening again
Part 11 pre-tightens, and finally splash guard 20 and deflector 21 are sequentially arranged at below preliminary protection mechanism, form preliminary gib
Device;
(3) temporary support device tentatively regulated in step (2) installation and adjustment in hole: is placed on moving trolley 22
On, moving trolley 22 is pushed in Tunnel, until being moved to the designated position of preliminary temporary support device installation, will be protected
The height of mechanism adjusts to touching tunnel inner wall, then the steelframe 1 on protection mechanism is fixed again, finally will movement it is small
Support frame 24 on 22 bottom plate 23 of vehicle is put down, and is anchored on tunnel ground, is completed installation of the temporary support device in hole and is fixed
It adjusts, if the width needs of temporary support device are adjusted, direct-assembling multiple groups protection mechanism connects the otic placode on steelframe 1
It connects, can be installed in hole;
(4) hole inner waterproofing is arranged: the splash guard 20 in step (3) on mounted temporary support device is turned to properly
Behind position, the deflector 21 on splash guard 20 is put down, the installation site of deflector 21 is found, then using auxiliary tool in tunnel
Resettlement groove is excavated out on road ground, and excavates drainage trough in the outflow end of resettlement groove, and drainage trough leads to outside tunnel, finally by water conservancy diversion
Plate 21 is placed in resettlement groove.
Embodiment 2
As shown in Fig. 1-6 and 8, the present invention also provides a kind of implementation methods using the above temporary support device, work as use
When CD method is constructed, implementation is comprised the following steps:
(1) Assembling outside the hole makes: ready steelframe 1, fixed frame 5, fixing axle 2 and other component are carried out frame outside hole
If fixing axle 2, is mounted on fixed frame 5 first, then rotary sleeve 3 is socketed in fixing axle 2, is then successively installed by assembling
Adjustable plate 6, and steelframe 1 is connected on adjustable plate 6 by fastener 11, several steelframes 1 are connected by the way that dowel 4 is fixed
It connects, forms preliminary protection mechanism, due to being constructed using CD method, repetition above step is installed two groups in fixing axle 2 and tentatively protected
Mechanism;
(2) it is adjusted outside hole:, need to will be in two groups of preliminary protection mechanisms assembled in step (1) due to being constructed using CD method
One group of preliminary protection mechanism carry out 180 ° and 90 ° rotations respectively and adjust, when carrying out 180 ° of rotations and adjusting, needs will be vertical
Protection mechanism in ground rotates 180 °, so that being in horizontality with the protection mechanism perpendicular to ground, will need to adjust first
Then cable wire is socketed in link 19 by the preliminary protection mechanism of section by 90 ° of manpower rotation, by auxiliary tool by its pull-up
It is certain to reduce, the first transverse slat 15 and the second transverse slat are followed by respectively fixed on the fixed frame 5 of 1 two sides of the steelframe of pull-up respectively
35, and the first support plate 13 is hinged on pull-up steelframe 1, the other end is then slidably connected in the sliding slot 12 of the first transverse slat 15,
And then in sliding slot 12 sliding place sliding panel 16, at this time can simultaneously by manpower installation securing plate 18 side into
Row pulls, and the other side then passes through promotion sliding panel 16 and makes the first support plate 13 that protection mechanism be pushed to move up, until the
When one group of protection mechanism is adjusted to designated position, the second transverse slat 35 is installed again on the fixed frame 5 of 18 side of securing plate, and
The second support plate 30 is placed between the second transverse slat 35 and steelframe 1;Simultaneously by the disassembly pair of the fastener 11 of steelframe 1 and adjustable plate 6
The height of steelframe 1 is adjusted, i.e., the height of preliminary protection mechanism is adjusted, and then again passes through steelframe 1 and adjustable plate 6
Fastener 11 pre-tightens, and finally splash guard 20 and deflector 21 are sequentially arranged at below preliminary protection mechanism, is formed preliminary interim
Suspension device;
(3) temporary support device tentatively regulated in step (2) installation and adjustment in hole: is placed on moving trolley 22
On, moving trolley 22 is pushed in Tunnel, until being moved to the designated position of preliminary temporary support device installation, will be protected
The height of mechanism adjusts to touching tunnel inner wall, then the steelframe 1 on protection mechanism is fixed again, finally will movement it is small
Support frame 24 on 22 bottom plate 23 of vehicle is put down, and is anchored on tunnel ground, is completed installation of the temporary support device in hole and is fixed
It adjusts;
(4) hole inner waterproofing is arranged: the splash guard 20 in step (3) on mounted temporary support device is turned to properly
Behind position, the deflector 21 on splash guard 20 is put down, the installation site of deflector 21 is found, then using auxiliary tool in tunnel
Resettlement groove is excavated out on road ground, and excavates drainage trough in the outflow end of resettlement groove, and drainage trough leads to outside tunnel, finally by water conservancy diversion
Plate 21 is placed in resettlement groove.
Embodiment 3
As shown in Fig. 1-6 and 9, the present invention also provides a kind of implementation methods using the above temporary support device, work as use
When two side-wall pilot tunnel is constructed, implementation is comprised the following steps:
(1) Assembling outside the hole makes: ready steelframe 1, fixed frame 5, fixing axle 2 and other component are carried out frame outside hole
If fixing axle 2, is mounted on fixed frame 5 first, then rotary sleeve 3 is socketed in fixing axle 2, is then successively installed by assembling
Adjustable plate 6, and steelframe 1 is connected on adjustable plate 6 by fastener 11, several steelframes 1 are connected by the way that dowel 4 is fixed
It connects, forms preliminary protection mechanism, due to being constructed using two side-wall pilot tunnel, repeat above step and install four groups in fixing axle 2
Preliminary protection mechanism;
(2) it is adjusted outside hole:, need to be tentatively anti-by assembled four groups in step (1) due to being constructed using two side-wall pilot tunnel
Two groups of preliminary protection mechanisms in shield mechanism carry out 180 ° of rotations respectively and adjust, and need to hang down when carrying out 180 ° of rotations and adjusting
Directly the protection mechanism in ground rotates 180 °, so that horizontality is in the protection mechanism perpendicular to ground, first by first
Then cable wire is socketed in link 19 by the preliminary protection mechanism of group by 90 ° of manpower rotation, by auxiliary tool by its pull-up one
It is fixed to reduce, the first transverse slat 15 and the second transverse slat 35 are followed by fixed on the fixed frame 5 of 1 two sides of the steelframe of pull-up respectively, and
First support plate 13 is hinged on pull-up steelframe 1, the other end is then slidably connected in the sliding slot 12 of the first transverse slat 15, and then
Sliding panel 16 is placed in sliding in sliding slot 12, can be drawn simultaneously by manpower in the side of installation securing plate 18 at this time
It is dynamic, and the other side then passes through promotion sliding panel 16 and makes the first support plate 13 that protection mechanism be pushed to move up, until first group
When protection mechanism is adjusted to designated position, the second transverse slat 35 is installed again on the fixed frame 5 of 18 side of securing plate, and
The second support plate 30 is placed between two transverse slats 35 and steelframe 1;The fastener 11 of steelframe 1 and adjustable plate 6 is dismantled to steelframe 1 simultaneously
Height be adjusted, i.e., the height of preliminary protection mechanism is adjusted, steelframe 1 and adjustable plate 6 is then passed through into fastening again
Part 11 pre-tightens, and finally splash guard 20 and deflector 21 are sequentially arranged at below preliminary protection mechanism, forms one tentatively temporarily
Suspension device, the rotation for then carrying out above step to the preliminary protection mechanism that another set needs to adjust again are adjusted, are formed
Another preliminary temporary support device;
(3) two temporary support devices tentatively regulated in step (2) installation and adjustment in hole: are individually positioned in movement
On trolley 22, moving trolley 22 is pushed in Tunnel, until it is moved to the designated position of preliminary temporary support device installation,
The height of two groups of protection mechanisms is adjusted to tunnel inner wall is touched respectively, the steelframe 1 on protection mechanism is fixed again,
Finally the support frame 24 on 22 bottom plate 23 of moving trolley is put down, is anchored on tunnel ground, completes temporary support device in hole
Interior installation secured adjusted;
(4) hole inner waterproofing is arranged: the splash guard 20 in step (3) on mounted temporary support device is turned to properly
Behind position, the deflector 21 on splash guard 20 is put down, the installation site of deflector 21 is found, then using auxiliary tool in tunnel
Resettlement groove is excavated out on road ground, and excavates drainage trough in the outflow end of resettlement groove, and drainage trough leads to outside tunnel, finally by water conservancy diversion
Plate 21 is placed in resettlement groove.
In the description of the present invention, it is to be understood that, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown is merely for convenience of the description present invention, rather than the device or element of indication or suggestion meaning must
There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Embodiment described above is only that preferred embodiment of the invention is described, and is not carried out to the scope of the present invention
It limits, without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention
Various changes and improvements, should all fall into claims of the present invention determine protection scope in.
Claims (10)
1. a kind of temporary support device, it is characterised in that: including several groups protection mechanism, detachably connect between every group of protection mechanism
It connects, the protection mechanism includes fixed frame (5), is removably connected with fixing axle (2), the fixing axle on the fixed frame (5)
(2) it is connected on rotary sleeve (3), several adjustable plates (6), the adjustable plate is connected on the rotary sleeve (3)
(6) it is connected on steelframe (1), is removably connected with dowel (4) between the adjacent steelframe (1), the steelframe (1) and company
Connect muscle (4) formation is spatially detachably equipped with adjustable rooting mechanism, and the adjustable rooting mechanism includes reinforcing portion, described to add
Gu being fixedly installed with lifting parts in portion, steelframe (1) bottom is removably connected with waterproof case.
2. temporary support device according to claim 1, it is characterised in that: offered on the steelframe (1) several
One through-hole (8) offers several the second through-holes (9), the first through hole (8) and the second through-hole (9) on the adjustable plate (6)
Inside it is removably connected with fastener (11).
3. temporary support device according to claim 2, it is characterised in that: be fixed with raised line on the adjustable plate (6)
(7), the steelframe (1) is fixed with fastener (10), and the fastener (10) and raised line (7) are interlocked.
4. temporary support device according to claim 1, it is characterised in that: be removably connected on the fixed frame (5)
Several first transverse slats (15), first transverse slat (15) and steelframe (1) are slidably connected by the first support plate (13), and described the
It offers sliding slot (12), is slidably connected sliding panel (16) on the sliding slot (12), first support plate on one transverse slat (15)
(13) one end is hinged on steelframe (1), and the other end of first support plate (13) is fixedly connected with sliding block (14), the cunning
Block (14) is slidably connected with sliding slot (12), and the reinforcing portion is securing plate (18), and the lifting parts are link (19), the reinforcing
Link (19) are fixedly installed on plate (18).
5. temporary support device according to claim 4, it is characterised in that: it is logical to offer the 5th on the sliding panel (16)
Hole (36) offers engaging slot (34) on first transverse slat (15), offers third through-hole on first transverse slat (15)
(27), the engaging slot (34) has fixture block (17) by third through-hole (27) and fifth hole (36) fastening.
6. temporary support device according to claim 4, it is characterised in that: be symmetrically installed with first transverse slat (15)
Second transverse slat (35) offers the second groove (33) on second transverse slat (35), offers first on the securing plate (18)
Groove (32), first groove (32) and the second groove (33) interior insertion are connected with the second support plate (30).
7. temporary support device according to claim 6, it is characterised in that: first transverse slat (15) and the second transverse slat
(35) lower section is fixed with engaging frame (25), is fixed with strip (26) on the securing plate (18), the strip (26) is fastened on card
It closes in frame (25).
8. temporary support device according to claim 7, it is characterised in that: symmetrically opened on the side wall of engaging frame (25)
Equipped with fourth hole (31), the 6th through-hole (37), the 6th through-hole (37) and fourth hole are offered on the strip (26)
(31) the hole heart is on same straight line, and insertion is connected with fixed strip in the fourth hole (31) and the 6th through-hole (37)
(28), the both ends of the fixed strip (28) offer screw thread.
9. temporary support device according to claim 1, it is characterised in that: the waterproof case is splash guard (20), described
Deflector (21) are connected with below splash guard (20).
10. a kind of implementation method of temporary support device as claimed in claims 1-9, it is characterised in that: it is implemented comprising such as
Lower step:
(1) Assembling outside the hole makes: ready steelframe (1), fixed frame (5), fixing axle (2) and other component are carried out outside hole
Assembling is set up, preliminary protection mechanism is formed;
(2) it adjusts outside hole: according to the processing method in tunnel, preliminary protection mechanism assembled in step (1) tentatively being revolved
Modulation section and height adjustment form preliminary temporary support device;
(3) installation and adjustment in hole: the temporary support device tentatively regulated in step (2) is placed on moving trolley (22),
Moving trolley (22) is pushed in Tunnel, until the designated position of temporary support device installation is moved to, by steelframe (1) height
Degree adjusts to touching tunnel inner wall, then steelframe (1) is fixed, finally by the support on moving trolley (22) bottom plate (23)
Frame (24) is put down, and is anchored on tunnel ground;
(4) hole inner waterproofing is arranged: the splash guard (20) in step (3) on mounted temporary support device is turned to suitable position
It postpones, the deflector (21) on splash guard (20) is put down, the installation site of deflector (21) is found, then use auxiliary tool
Resettlement groove is excavated out on tunnel ground, and excavates drainage trough in the outflow end of resettlement groove, and drainage trough leads to outside tunnel, finally will
Deflector (21) is placed in resettlement groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910790390.XA CN110529159B (en) | 2019-08-26 | 2019-08-26 | Temporary supporting device applied to tunnel excavation and implementation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910790390.XA CN110529159B (en) | 2019-08-26 | 2019-08-26 | Temporary supporting device applied to tunnel excavation and implementation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110529159A true CN110529159A (en) | 2019-12-03 |
CN110529159B CN110529159B (en) | 2021-01-05 |
Family
ID=68664219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910790390.XA Active CN110529159B (en) | 2019-08-26 | 2019-08-26 | Temporary supporting device applied to tunnel excavation and implementation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110529159B (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1606707A1 (en) * | 1988-04-18 | 1990-11-15 | Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт | Entry-driving support |
JP2000204898A (en) * | 1999-01-13 | 2000-07-25 | Maeda Corp | Protector installation method |
US20130051931A1 (en) * | 2011-08-26 | 2013-02-28 | Erik Denver | Impact resistant cambered lagging element |
CN105697013A (en) * | 2016-03-31 | 2016-06-22 | 中国矿业大学(北京) | Contractible temporary support for tunneling tunnel |
CN105927254A (en) * | 2016-06-30 | 2016-09-07 | 北京城建七建设工程有限公司 | Emergency device for collapse of mined tunnel vault and application method |
CN206667271U (en) * | 2017-03-29 | 2017-11-24 | 国网新疆电力公司巴州供电公司 | The shallow anti-collapse Rapid Combination support of earth's surface tunneling |
CN207111142U (en) * | 2017-06-22 | 2018-03-16 | 天地科技股份有限公司 | Temporary supporting device for laneway tunneling |
CN207194929U (en) * | 2017-07-31 | 2018-04-06 | 何丽娟 | The protector that catchments of mine |
CN108561165A (en) * | 2018-06-15 | 2018-09-21 | 贵州大学 | A kind of tunnel supporting apparatus convenient for deployment and dismounting |
CN208106465U (en) * | 2018-04-10 | 2018-11-16 | 王永辉 | A kind of easy-to-dismount coal mine temporary support device |
CN208267878U (en) * | 2018-04-11 | 2018-12-21 | 王占锋 | One kind being used for coal mine digging tunnel face guard |
-
2019
- 2019-08-26 CN CN201910790390.XA patent/CN110529159B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1606707A1 (en) * | 1988-04-18 | 1990-11-15 | Подмосковный Научно-Исследовательский И Проектно-Конструкторский Угольный Институт | Entry-driving support |
JP2000204898A (en) * | 1999-01-13 | 2000-07-25 | Maeda Corp | Protector installation method |
US20130051931A1 (en) * | 2011-08-26 | 2013-02-28 | Erik Denver | Impact resistant cambered lagging element |
CN105697013A (en) * | 2016-03-31 | 2016-06-22 | 中国矿业大学(北京) | Contractible temporary support for tunneling tunnel |
CN105927254A (en) * | 2016-06-30 | 2016-09-07 | 北京城建七建设工程有限公司 | Emergency device for collapse of mined tunnel vault and application method |
CN206667271U (en) * | 2017-03-29 | 2017-11-24 | 国网新疆电力公司巴州供电公司 | The shallow anti-collapse Rapid Combination support of earth's surface tunneling |
CN207111142U (en) * | 2017-06-22 | 2018-03-16 | 天地科技股份有限公司 | Temporary supporting device for laneway tunneling |
CN207194929U (en) * | 2017-07-31 | 2018-04-06 | 何丽娟 | The protector that catchments of mine |
CN208106465U (en) * | 2018-04-10 | 2018-11-16 | 王永辉 | A kind of easy-to-dismount coal mine temporary support device |
CN208267878U (en) * | 2018-04-11 | 2018-12-21 | 王占锋 | One kind being used for coal mine digging tunnel face guard |
CN108561165A (en) * | 2018-06-15 | 2018-09-21 | 贵州大学 | A kind of tunnel supporting apparatus convenient for deployment and dismounting |
Also Published As
Publication number | Publication date |
---|---|
CN110529159B (en) | 2021-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020101310A4 (en) | Temporary Support Device and Implementation Method | |
CN102155219B (en) | Comprehensive dredging machine | |
CN104879061A (en) | Multifunctional self-propelled portal wagon drill | |
CN103422663B (en) | Attached lift scaffold | |
CN108952763A (en) | A kind of equipment and its engineering method for vcehicular tunnel, railway tunnel supporting construction | |
CN109736844B (en) | Rapid construction method for tunnel primary support | |
CN106703835A (en) | Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction | |
CN207686728U (en) | Constructing tunnel equipment | |
CN110529159A (en) | A kind of temporary support device and its implementation method | |
CN208735148U (en) | A kind of driving face in coal mine rotating laser bracket | |
CN208749125U (en) | Assembled architecture edge protection mechanism | |
CN111828073A (en) | Novel roadway support device | |
CN206900371U (en) | Rail traffic platform door pillar combines and the platform door system using column combination | |
CN114892677A (en) | Multi-arch foundation pit supporting device and method for strip-shaped deep foundation pit | |
CN206346755U (en) | A kind of grid steel frame for tunnel just branch construction exempts to weld quick assembling supporting construction | |
CN212337302U (en) | Multifunctional mobile platform for subway underground excavation tunnel | |
CN211818258U (en) | Temporary support frame for beam string | |
CN211081696U (en) | Anchor rod trolley | |
CN204000867U (en) | Sill anchor assembling support | |
CN216277939U (en) | Roadway deformation supporting device | |
CN215979418U (en) | Supporting and connecting structure for road, bridge and tunnel | |
CN219447160U (en) | Road machinery cab skeleton texture | |
CN110939471A (en) | Net supporting machine for roadway support and using method thereof | |
CN221032446U (en) | Long-stroke rack applied to pipe shed construction | |
CN220909602U (en) | Reinforced protective cover of drill jumbo |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |