CN110528795A - The light-duty frame board installation system of roofing - Google Patents

The light-duty frame board installation system of roofing Download PDF

Info

Publication number
CN110528795A
CN110528795A CN201910828991.5A CN201910828991A CN110528795A CN 110528795 A CN110528795 A CN 110528795A CN 201910828991 A CN201910828991 A CN 201910828991A CN 110528795 A CN110528795 A CN 110528795A
Authority
CN
China
Prior art keywords
pulley
channel steel
fixedly connected
light
square tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910828991.5A
Other languages
Chinese (zh)
Inventor
常洪涛
薛虎林
丁金波
汪明凯
武月中
陈颖
牛彦林
刘震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electrical Construction Group Henan Engineering Co Ltd
Center International Group Co Ltd
Original Assignee
China Electrical Construction Group Henan Engineering Co Ltd
Center International Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electrical Construction Group Henan Engineering Co Ltd, Center International Group Co Ltd filed Critical China Electrical Construction Group Henan Engineering Co Ltd
Priority to CN201910828991.5A priority Critical patent/CN110528795A/en
Publication of CN110528795A publication Critical patent/CN110528795A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C5/00Base supporting structures with legs
    • B66C5/02Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • E04D15/04Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material

Abstract

The invention discloses a kind of light-duty frame board installation systems of roofing, including supporting square tube, supporting square tube is two groups and every group of quantity is two, two supporting square tube upper surfaces are fixedly connected with several fixed frames, several described fixed frame upper surfaces, which are fixedly connected to, reinforces supporting rib column, the reinforcement supporting rib column top is fixedly connected with the first channel steel, mounting rack is slidably connected above the supporting square tube, the mounting rack bottom four corners are fixedly connected to column, and the column bottom is mounted on first pulley;Mounting rack can be walked about by the first pulley of column bottom on two the first channel steels, to realize the conveying for the steel skeleton light-duty rack cement composite board being hung below mounting rack, staff's high altitude operation is set to have more the sense of security when steel skeleton light-duty rack cement composite board is installed in this way, to improve the safety of high altitude operation.

Description

The light-duty frame board installation system of roofing
Technical field
The invention belongs to frame board mounting technique fields, and in particular to the light-duty frame board installation system of roofing.
Background technique
Steel skeleton light-duty rack cement composite board has the comprehensive performances such as preferable environmental protection, energy conservation, fire resisting, lightweight, high-strength, Not only traditional good durability of concrete product had been maintained, but also has had the characteristics that lightweight, high-strength, heat preservation, heat-proof quality are good, in certain journey Traditional concrete plate is compensated on degree from great, lightweight profiled sheet is durable, deficiency existing for waterproof etc., and therefore, steel skeleton is light Type rack cement composite board is widely used as roofing materials.
Prior art installation steel skeleton light-duty rack cement composite board be using comprehensive lifting, using ground lifting machine or Steel skeleton light-duty rack cement composite board is directly hoisted to roofing installation site from ground stacking place by hoisting machinery, and machinery is only In Ground Operation, a large amount of manpower conjunction with mechanical operations are needed, by place, road constraint, and installation effectiveness is low.
Summary of the invention
To solve the problems mentioned above in the background art.The present invention provides the light-duty frame board installation system of roofing, tools The characteristics of being improved installation effectiveness.
To achieve the above object, the invention provides the following technical scheme: the light-duty frame board installation system of roofing, including support Square tube, the supporting square tube is two groups and every group of quantity is two, and two supporting square tube upper surfaces are fixedly connected with several A fixed frame, several described fixed frame upper surfaces, which are fixedly connected to, reinforces supporting rib column, the reinforcement supporting rib column top It is fixedly connected with the first channel steel, mounting rack is slidably connected above the supporting square tube, the mounting rack bottom four corners are fixed It is connected with column, the column bottom is mounted on first pulley, and there are two symmetrical second for tool below the mounting rack Channel steel, second channel steel offer the second sliding cavity, have auxiliary pushing component above two second channel steels, described Auxiliary pushing component includes rack and second pulley, and the rack bottom four corners are fixedly connected to the second pulley, The second pulley is slidably connected to inside second sliding cavity, and supporting square tube inner wall quadrangle is fixedly connected to down Chain.
Preferably, first channel steel offers the first sliding cavity, and it is sliding that the first pulley is slidably connected to described first Move intracavitary portion.
Preferably, column outer wall two sides are fixedly connected to limited block, and the limited block is located at the first pulley Two sides.
Preferably, the jack bottom is equipped with hook.
Preferably, the two sidewalls of first channel steel rear and front end offer limiting slot, place in the limiting slot There is limit plate.
Preferably, second channel steel and the first channel steel inner wall are coated with Teflon coating.
Compared with prior art, the beneficial effects of the present invention are:
1, mounting rack can be walked about by the first pulley of column bottom on two the first channel steels, be hung on installation to realize Make work when the conveying of the steel skeleton light-duty rack cement composite board below frame, in this way installation steel skeleton light-duty rack cement composite board Make personal height operation and have more the sense of security, improves the safety of high altitude operation.
2, it is moved in the top of supporting square tube along the first groove steel rail direction due to mounting rack, it can be with mounting rack reference Coordinate system, such staff are easy to determine the precise mounting position of next steel skeleton light-duty rack cement composite board, It is accurately finished the installation of steel skeleton light-duty rack cement composite board, is avoided because of the correction of later period caused by installation site mistake expense The laborious phenomenon of thing, so that working efficiency can be improved.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is supporting square tube in the present invention, fixed frame, reinforces the structural schematic diagram after supporting rib column and the installation of the first channel steel;
Fig. 3 is the structural schematic diagram of mounting rack in the present invention;
Fig. 4 is the structural schematic diagram of auxiliary pushing component in the present invention.
Fig. 5 is the top view of the first channel steel and the second channel steel in the present invention
In figure: 1, supporting square tube;11, fixed frame;12, reinforce supporting rib column;13, the first channel steel;131, the first sliding cavity;132, Limiting slot;133, limit plate;2, mounting rack;21, column;211, limited block;22, first pulley;3, the second channel steel;31, second Sliding cavity;4, auxiliary pushing component;41, rack;42, second pulley;5, jack;51, it links up with.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention, in the present invention, for ease of description, the relative positional relationship of each component Description be be described according to the Butut mode of Figure of description, such as: front, rear, top, and bottom, left and right positional relationship Foundation illustrates Butut direction to determine.
Please refer to Fig. 1-5, the present invention is the following technical schemes are provided: the light-duty frame board installation system of roofing, including support side Pipe 1, supporting square tube 1 is two groups and every group of quantity is two, and two 1 upper surfaces of supporting square tube are fixedly connected with several fixed frames 11, several 11 upper surfaces of fixed frame, which are fixedly connected to, reinforces supporting rib column 12, reinforces being fixedly connected at the top of supporting rib column 12 There is the first channel steel 13, mounting rack 2 is slidably connected above supporting square tube 1,2 bottom four corners of mounting rack are fixedly connected to column 21,21 bottom of column is mounted on first pulley 22, and there are two the second symmetrical channel steel 3, the second slots for tool below mounting rack 2 Steel 3 offers the second sliding cavity 31, has auxiliary pushing component 4 above two the second channel steels 3, auxiliary pushing component 4 includes Rack 41 and second pulley 42,41 bottom four corners of rack are fixedly connected to second pulley 42, and the sliding of second pulley 42 connects It is connected to inside the second sliding cavity 31,1 inner wall quadrangle of supporting square tube is fixedly connected to jack 5.
In the present embodiment, first two groups of supporting square tubes 1 are picked up, two groups of supporting square tubes 1 are individually positioned in and are needed to skeleton The two sides of the room face keel of plate installation, then lift mounting rack 2, by the first pulley 22 of 21 bottom of column, mounting rack 2 are put It being placed in the first sliding cavity 131, mounting rack 2 is by the support lifting of column 21, after the completion of placement, then two the second channel steels 3 are right Claim to be layed in face of the room for needing to carry out mounting framework plate and hold, it is sliding that rack 41 is then pushed to second by second pulley 42 Move in chamber 31, then the frame board installed removed to the upper end of rack 41, fixed frame 11(quantity is three at this time) upper end Reinforcement supporting rib column 12 frame board is supported, then by the second pulley 42 of 41 bottom of rack, will be located at and place The frame board of 41 upper end of frame is pushed to the direction of mounting rack 2, after being pushed to the lower section of mounting rack 2, is equipped with by four jacks 5 Hook 51 hooks the frame board for fixing 41 upper end of rack, and there are four lifting lugs for frame board welding, hook lifting lug by hook 51 Fix frame board, worker's hand after the completion of fixing is matched by the first sliding cavity 131 and first pulley 22, by mounting rack 2 It is pushed forward by the continuation of the first channel steel 13, after being pushed to above the room facial bone frame installed, is by jack 5( Manual chain hoist) decentralization chain make hook 51 drive frame boards decline, jack 5 transfer chain be the prior art details are not described herein, After the skeleton that frame board touches installation room face, hook 51 is dismantled from skeleton shell lug, completes the peace to frame board Dress, so that staff's high altitude operation be made to have more the sense of security, improves the safety of high altitude operation, and can pass through mounting rack 2 Reference coordinate system, such staff are easy to determine the accurate installation position of next steel skeleton light-duty rack cement composite board It sets, is accurately finished the installation of steel skeleton light-duty rack cement composite board, avoid because of later period school caused by installation site mistake Just bothersome laborious phenomenon.
Specifically, the first channel steel 13 offers the first sliding cavity 131, first pulley 22 is slidably connected to the first sliding cavity Inside 131;First pulley 22 is set to drive 2 forward slip of mounting rack to the room face installed by the first sliding cavity 131 Above skeleton, slidable adjustment can be carried out according to multiple installation sites, there is no the prior arts to be sling frame board by lifting machine When being installed, if site environment is narrow, mechanical hoisting can not install accurate defect in place.
Specifically, 21 outer wall two sides of column are fixedly connected to limited block 211, limited block 211 is located at 22 liang of first pulley Side;Limited block 211 is located inside the first sliding cavity 131, and after jack 5 slings frame board, first pulley 22 is in the first sliding cavity In 131 when sliding, the shaking that will not be generated because of frame board gravity deviates 22 sliding trace of first pulley, generates frictional force and increases Greatly, laborious when causing to push.
Specifically, 5 bottom of jack is equipped with hook 51;Frame board is sling by hook 51, hook 51 is made by jack 5 It drives frame board to decline to the position in installation room face, touches installation room slowly until frame board is located to wait a moment above installation room face Face dismantles hook 51 after contact from frame board, and hook 51 is risen to the installation for being used for next piece of frame board by jack 5.
Specifically, the two sidewalls of 13 rear and front end of the first channel steel offer limiting slot 132, placed in limiting slot 132 There is limit plate 133;After first pulley 22 is put among the first channel steel 13, it will be inserted into limit plate 133 in limiting slot 132, make When first pulley 22 is slided in the first sliding cavity 131, it will not directly deviate from from the first channel steel 13 because the thrust of manpower is excessive.
Specifically, the second channel steel 3 and 13 inner wall of the first channel steel are coated with Teflon coating;Teflon coefficient of friction it is low and Anticorrosive and oxidation can be reduced in this way because encountering the rainy day when construction, and the second channel steel 3 and the first channel steel 13 are by rain drop erosion A possibility that rust, the resistance that first pulley 22 and second pulley 42 push in the second channel steel 3 and the first channel steel 13 increases.
The working principle of the invention and process for using: after the present invention installs, two groups of supporting square tubes 1 being picked up, and point It is not placed on the two sides for needing the room face keel installed to frame board, then lifts mounting rack 2, passes through the first of 21 bottom of column Mounting rack 2 is placed in the first sliding cavity 131 by pulley 22, after the completion of placement, by two 3 symmetrical layings of the second channel steel in need The roofing front end of mounting framework plate is carried out, then rack 41 is pushed in the second sliding cavity 31 by second pulley 42, The frame board installed is removed to the upper end of rack 41 again, then passes through the second pulley 42 of 41 bottom of rack, by position Frame board in 41 upper end of rack is pushed to the direction of mounting rack 2 by the second sliding cavity 31, is pushed under mounting rack 2 Fang Hou, the hook 51 being equipped with by four jacks 5 hook the frame board for fixing 41 upper end of rack, worker after the completion of fixing It with hand, is matched by the first sliding cavity 131 and first pulley 22, mounting rack 2 is pushed forward by the continuation of the first channel steel 13, After being pushed to above the room facial bone frame installed, hook 51 is set to drive frame board decline on the decentralization chain of jack 5, After the skeleton that frame board touches installation room face, hook 51 is dismantled and risen from skeleton shell lug, completes to skeleton Then the installation of plate again retracts mounting rack 2 according to aforesaid operations, carry out installation next time, use compared to the prior art Lifting machine is laid with, by the present apparatus install it is more accurate and can be adapted for more narrow space environment in place, safety Property height to improving working efficiency.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (6)

1. a kind of light-duty frame board installation system of roofing, including supporting square tube (1), it is characterised in that: the supporting square tube (1) is Two groups and every group of quantity are two, and two supporting square tube (1) upper surfaces are fixedly connected with several fixed frames (11), described Several fixed frame (11) upper surfaces, which are fixedly connected to, reinforces supporting rib column (12), solid at the top of the reinforcement supporting rib column (12) Surely it is connected with the first channel steel (13), is slidably connected mounting rack (2) above the supporting square tube (1), mounting rack (2) bottom Quadrangle is fixedly connected to column (21), and column (21) bottom is mounted on first pulley (22), under the mounting rack (2) Side's tool is there are two symmetrical the second channel steel (3), and second channel steel (3) offers the second sliding cavity (31), two institutes Stating above the second channel steel (3) has auxiliary pushing component (4), and the auxiliary pushing component (4) includes rack (41) and second Pulley (42), rack (41) bottom four corners are fixedly connected to the second pulley (42), the second pulley (42) It is internal to be slidably connected to second sliding cavity (31), supporting square tube (1) the inner wall quadrangle is fixedly connected to jack (5).
2. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: first channel steel (13) is opened Equipped with the first sliding cavity (131), it is internal that the first pulley (22) is slidably connected to first sliding cavity (131).
3. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: column (21) outer wall two Side is fixedly connected to limited block (211), and the limited block (211) is located at the first pulley (22) two sides.
4. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: jack (5) bottom is equal Equipped with hook (51).
5. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: before first channel steel (13) The two sidewalls at both ends offer limiting slot (132) afterwards, are placed with limit plate (133) in the limiting slot (132).
6. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: second channel steel (3) and First channel steel (13) inner wall is coated with Teflon coating.
CN201910828991.5A 2019-09-03 2019-09-03 The light-duty frame board installation system of roofing Pending CN110528795A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910828991.5A CN110528795A (en) 2019-09-03 2019-09-03 The light-duty frame board installation system of roofing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910828991.5A CN110528795A (en) 2019-09-03 2019-09-03 The light-duty frame board installation system of roofing

Publications (1)

Publication Number Publication Date
CN110528795A true CN110528795A (en) 2019-12-03

Family

ID=68666492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910828991.5A Pending CN110528795A (en) 2019-09-03 2019-09-03 The light-duty frame board installation system of roofing

Country Status (1)

Country Link
CN (1) CN110528795A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113758554A (en) * 2021-08-18 2021-12-07 广东韶钢工程技术有限公司 Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324662U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Installation device for foam cement composites
CN204097735U (en) * 2014-08-27 2015-01-14 无锡市华洋染整机械有限公司 A kind of dye vat of dyeing machine
CN105060201A (en) * 2015-09-08 2015-11-18 湖南星邦重工有限公司 Aerial work platform
JP2016003487A (en) * 2014-06-17 2016-01-12 Jfeスチール株式会社 Folded-plate roof re-roofing method
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment
CN207633661U (en) * 2017-07-24 2018-07-20 中铁七局集团西安铁路工程有限公司 A kind of roofing board mounting assembly
CN208327152U (en) * 2018-06-15 2019-01-04 河南省亚欧起重设备有限公司 A kind of gantry crane guiding mechanism
CN109838055A (en) * 2017-11-24 2019-06-04 中建安装工程有限公司 High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle
CN210508434U (en) * 2019-07-22 2020-05-12 森特士兴集团股份有限公司 Roof steel skeleton light net rack cement composite board mounting system
CN210857774U (en) * 2019-09-03 2020-06-26 中国电建集团河南工程有限公司 Roof light framework plate installation device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202324662U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Installation device for foam cement composites
JP2016003487A (en) * 2014-06-17 2016-01-12 Jfeスチール株式会社 Folded-plate roof re-roofing method
CN204097735U (en) * 2014-08-27 2015-01-14 无锡市华洋染整机械有限公司 A kind of dye vat of dyeing machine
CN105060201A (en) * 2015-09-08 2015-11-18 湖南星邦重工有限公司 Aerial work platform
CN106437047A (en) * 2016-07-21 2017-02-22 中铁四局集团建筑工程有限公司 Plant roof panel transporting and mounting equipment
CN207633661U (en) * 2017-07-24 2018-07-20 中铁七局集团西安铁路工程有限公司 A kind of roofing board mounting assembly
CN109838055A (en) * 2017-11-24 2019-06-04 中建安装工程有限公司 High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle
CN208327152U (en) * 2018-06-15 2019-01-04 河南省亚欧起重设备有限公司 A kind of gantry crane guiding mechanism
CN210508434U (en) * 2019-07-22 2020-05-12 森特士兴集团股份有限公司 Roof steel skeleton light net rack cement composite board mounting system
CN210857774U (en) * 2019-09-03 2020-06-26 中国电建集团河南工程有限公司 Roof light framework plate installation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113758554A (en) * 2021-08-18 2021-12-07 广东韶钢工程技术有限公司 Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle

Similar Documents

Publication Publication Date Title
CN103935901A (en) Automatic high-rise wall plate hoisting system
CN107939052B (en) Installation method of concrete wallboard
CN110528795A (en) The light-duty frame board installation system of roofing
CN210857774U (en) Roof light framework plate installation device
CN209353734U (en) For installing the double-track device of curtain wall
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN211257761U (en) Lifting type elevator shaft operating platform
CN104060813A (en) Construction device and method for large-span steel girder frame connection platform
CN111119457B (en) Ceramic tile laying device and method
CN108331335A (en) A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support
CN209874422U (en) Portable scaffold
CN218952738U (en) Scaffold convenient to use
CN114232976A (en) Lifting multi-unit combined construction operation platform
CN209538759U (en) Applied to the jack up high-building construction workshop on climbing frame
CN208981745U (en) Multifunction scaffold
CN220845247U (en) ALC light autoclaved aerated concrete wall auxiliary installation device
CN206110628U (en) Portable lift
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN216190521U (en) Novel multifunctional travelling crane
CN215160677U (en) Auxiliary feeding device for building construction
CN205259574U (en) Quick assembly and disassembly safety protection screen
CN217000787U (en) Elevartor shaft exempts from to dismantle formula lift platform device
CN115818414B (en) Sliding rail type prefabricated plate transportation and installation integrated device
CN213231298U (en) Hoisting accessory is used in building engineering construction
CN212406754U (en) Hydraulic trolley for positioning and mounting tunnel steel arch frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination