CN110528795A - The light-duty frame board installation system of roofing - Google Patents
The light-duty frame board installation system of roofing Download PDFInfo
- Publication number
- CN110528795A CN110528795A CN201910828991.5A CN201910828991A CN110528795A CN 110528795 A CN110528795 A CN 110528795A CN 201910828991 A CN201910828991 A CN 201910828991A CN 110528795 A CN110528795 A CN 110528795A
- Authority
- CN
- China
- Prior art keywords
- pulley
- channel steel
- fixedly connected
- light
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 35
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 55
- 239000010959 steel Substances 0.000 claims abstract description 55
- 230000002787 reinforcement Effects 0.000 claims abstract description 4
- 239000004809 Teflon Substances 0.000 claims description 4
- 229920006362 Teflon® Polymers 0.000 claims description 4
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 239000004568 cement Substances 0.000 abstract description 12
- 239000002131 composite material Substances 0.000 abstract description 12
- 238000010586 diagram Methods 0.000 description 4
- 230000007423 decrease Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 210000003054 facial bone Anatomy 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003647 oxidation Effects 0.000 description 1
- 238000007254 oxidation reaction Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C5/00—Base supporting structures with legs
- B66C5/02—Fixed or travelling bridges or gantries, i.e. elongated structures of inverted L or of inverted U shape or tripods
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D15/00—Apparatus or tools for roof working
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D15/00—Apparatus or tools for roof working
- E04D15/04—Apparatus or tools for roof working for roof coverings comprising slabs, sheets or flexible material
Abstract
The invention discloses a kind of light-duty frame board installation systems of roofing, including supporting square tube, supporting square tube is two groups and every group of quantity is two, two supporting square tube upper surfaces are fixedly connected with several fixed frames, several described fixed frame upper surfaces, which are fixedly connected to, reinforces supporting rib column, the reinforcement supporting rib column top is fixedly connected with the first channel steel, mounting rack is slidably connected above the supporting square tube, the mounting rack bottom four corners are fixedly connected to column, and the column bottom is mounted on first pulley;Mounting rack can be walked about by the first pulley of column bottom on two the first channel steels, to realize the conveying for the steel skeleton light-duty rack cement composite board being hung below mounting rack, staff's high altitude operation is set to have more the sense of security when steel skeleton light-duty rack cement composite board is installed in this way, to improve the safety of high altitude operation.
Description
Technical field
The invention belongs to frame board mounting technique fields, and in particular to the light-duty frame board installation system of roofing.
Background technique
Steel skeleton light-duty rack cement composite board has the comprehensive performances such as preferable environmental protection, energy conservation, fire resisting, lightweight, high-strength,
Not only traditional good durability of concrete product had been maintained, but also has had the characteristics that lightweight, high-strength, heat preservation, heat-proof quality are good, in certain journey
Traditional concrete plate is compensated on degree from great, lightweight profiled sheet is durable, deficiency existing for waterproof etc., and therefore, steel skeleton is light
Type rack cement composite board is widely used as roofing materials.
Prior art installation steel skeleton light-duty rack cement composite board be using comprehensive lifting, using ground lifting machine or
Steel skeleton light-duty rack cement composite board is directly hoisted to roofing installation site from ground stacking place by hoisting machinery, and machinery is only
In Ground Operation, a large amount of manpower conjunction with mechanical operations are needed, by place, road constraint, and installation effectiveness is low.
Summary of the invention
To solve the problems mentioned above in the background art.The present invention provides the light-duty frame board installation system of roofing, tools
The characteristics of being improved installation effectiveness.
To achieve the above object, the invention provides the following technical scheme: the light-duty frame board installation system of roofing, including support
Square tube, the supporting square tube is two groups and every group of quantity is two, and two supporting square tube upper surfaces are fixedly connected with several
A fixed frame, several described fixed frame upper surfaces, which are fixedly connected to, reinforces supporting rib column, the reinforcement supporting rib column top
It is fixedly connected with the first channel steel, mounting rack is slidably connected above the supporting square tube, the mounting rack bottom four corners are fixed
It is connected with column, the column bottom is mounted on first pulley, and there are two symmetrical second for tool below the mounting rack
Channel steel, second channel steel offer the second sliding cavity, have auxiliary pushing component above two second channel steels, described
Auxiliary pushing component includes rack and second pulley, and the rack bottom four corners are fixedly connected to the second pulley,
The second pulley is slidably connected to inside second sliding cavity, and supporting square tube inner wall quadrangle is fixedly connected to down
Chain.
Preferably, first channel steel offers the first sliding cavity, and it is sliding that the first pulley is slidably connected to described first
Move intracavitary portion.
Preferably, column outer wall two sides are fixedly connected to limited block, and the limited block is located at the first pulley
Two sides.
Preferably, the jack bottom is equipped with hook.
Preferably, the two sidewalls of first channel steel rear and front end offer limiting slot, place in the limiting slot
There is limit plate.
Preferably, second channel steel and the first channel steel inner wall are coated with Teflon coating.
Compared with prior art, the beneficial effects of the present invention are:
1, mounting rack can be walked about by the first pulley of column bottom on two the first channel steels, be hung on installation to realize
Make work when the conveying of the steel skeleton light-duty rack cement composite board below frame, in this way installation steel skeleton light-duty rack cement composite board
Make personal height operation and have more the sense of security, improves the safety of high altitude operation.
2, it is moved in the top of supporting square tube along the first groove steel rail direction due to mounting rack, it can be with mounting rack reference
Coordinate system, such staff are easy to determine the precise mounting position of next steel skeleton light-duty rack cement composite board,
It is accurately finished the installation of steel skeleton light-duty rack cement composite board, is avoided because of the correction of later period caused by installation site mistake expense
The laborious phenomenon of thing, so that working efficiency can be improved.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is supporting square tube in the present invention, fixed frame, reinforces the structural schematic diagram after supporting rib column and the installation of the first channel steel;
Fig. 3 is the structural schematic diagram of mounting rack in the present invention;
Fig. 4 is the structural schematic diagram of auxiliary pushing component in the present invention.
Fig. 5 is the top view of the first channel steel and the second channel steel in the present invention
In figure: 1, supporting square tube;11, fixed frame;12, reinforce supporting rib column;13, the first channel steel;131, the first sliding cavity;132,
Limiting slot;133, limit plate;2, mounting rack;21, column;211, limited block;22, first pulley;3, the second channel steel;31, second
Sliding cavity;4, auxiliary pushing component;41, rack;42, second pulley;5, jack;51, it links up with.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention, in the present invention, for ease of description, the relative positional relationship of each component
Description be be described according to the Butut mode of Figure of description, such as: front, rear, top, and bottom, left and right positional relationship
Foundation illustrates Butut direction to determine.
Please refer to Fig. 1-5, the present invention is the following technical schemes are provided: the light-duty frame board installation system of roofing, including support side
Pipe 1, supporting square tube 1 is two groups and every group of quantity is two, and two 1 upper surfaces of supporting square tube are fixedly connected with several fixed frames
11, several 11 upper surfaces of fixed frame, which are fixedly connected to, reinforces supporting rib column 12, reinforces being fixedly connected at the top of supporting rib column 12
There is the first channel steel 13, mounting rack 2 is slidably connected above supporting square tube 1,2 bottom four corners of mounting rack are fixedly connected to column
21,21 bottom of column is mounted on first pulley 22, and there are two the second symmetrical channel steel 3, the second slots for tool below mounting rack 2
Steel 3 offers the second sliding cavity 31, has auxiliary pushing component 4 above two the second channel steels 3, auxiliary pushing component 4 includes
Rack 41 and second pulley 42,41 bottom four corners of rack are fixedly connected to second pulley 42, and the sliding of second pulley 42 connects
It is connected to inside the second sliding cavity 31,1 inner wall quadrangle of supporting square tube is fixedly connected to jack 5.
In the present embodiment, first two groups of supporting square tubes 1 are picked up, two groups of supporting square tubes 1 are individually positioned in and are needed to skeleton
The two sides of the room face keel of plate installation, then lift mounting rack 2, by the first pulley 22 of 21 bottom of column, mounting rack 2 are put
It being placed in the first sliding cavity 131, mounting rack 2 is by the support lifting of column 21, after the completion of placement, then two the second channel steels 3 are right
Claim to be layed in face of the room for needing to carry out mounting framework plate and hold, it is sliding that rack 41 is then pushed to second by second pulley 42
Move in chamber 31, then the frame board installed removed to the upper end of rack 41, fixed frame 11(quantity is three at this time) upper end
Reinforcement supporting rib column 12 frame board is supported, then by the second pulley 42 of 41 bottom of rack, will be located at and place
The frame board of 41 upper end of frame is pushed to the direction of mounting rack 2, after being pushed to the lower section of mounting rack 2, is equipped with by four jacks 5
Hook 51 hooks the frame board for fixing 41 upper end of rack, and there are four lifting lugs for frame board welding, hook lifting lug by hook 51
Fix frame board, worker's hand after the completion of fixing is matched by the first sliding cavity 131 and first pulley 22, by mounting rack 2
It is pushed forward by the continuation of the first channel steel 13, after being pushed to above the room facial bone frame installed, is by jack 5(
Manual chain hoist) decentralization chain make hook 51 drive frame boards decline, jack 5 transfer chain be the prior art details are not described herein,
After the skeleton that frame board touches installation room face, hook 51 is dismantled from skeleton shell lug, completes the peace to frame board
Dress, so that staff's high altitude operation be made to have more the sense of security, improves the safety of high altitude operation, and can pass through mounting rack 2
Reference coordinate system, such staff are easy to determine the accurate installation position of next steel skeleton light-duty rack cement composite board
It sets, is accurately finished the installation of steel skeleton light-duty rack cement composite board, avoid because of later period school caused by installation site mistake
Just bothersome laborious phenomenon.
Specifically, the first channel steel 13 offers the first sliding cavity 131, first pulley 22 is slidably connected to the first sliding cavity
Inside 131;First pulley 22 is set to drive 2 forward slip of mounting rack to the room face installed by the first sliding cavity 131
Above skeleton, slidable adjustment can be carried out according to multiple installation sites, there is no the prior arts to be sling frame board by lifting machine
When being installed, if site environment is narrow, mechanical hoisting can not install accurate defect in place.
Specifically, 21 outer wall two sides of column are fixedly connected to limited block 211, limited block 211 is located at 22 liang of first pulley
Side;Limited block 211 is located inside the first sliding cavity 131, and after jack 5 slings frame board, first pulley 22 is in the first sliding cavity
In 131 when sliding, the shaking that will not be generated because of frame board gravity deviates 22 sliding trace of first pulley, generates frictional force and increases
Greatly, laborious when causing to push.
Specifically, 5 bottom of jack is equipped with hook 51;Frame board is sling by hook 51, hook 51 is made by jack 5
It drives frame board to decline to the position in installation room face, touches installation room slowly until frame board is located to wait a moment above installation room face
Face dismantles hook 51 after contact from frame board, and hook 51 is risen to the installation for being used for next piece of frame board by jack 5.
Specifically, the two sidewalls of 13 rear and front end of the first channel steel offer limiting slot 132, placed in limiting slot 132
There is limit plate 133;After first pulley 22 is put among the first channel steel 13, it will be inserted into limit plate 133 in limiting slot 132, make
When first pulley 22 is slided in the first sliding cavity 131, it will not directly deviate from from the first channel steel 13 because the thrust of manpower is excessive.
Specifically, the second channel steel 3 and 13 inner wall of the first channel steel are coated with Teflon coating;Teflon coefficient of friction it is low and
Anticorrosive and oxidation can be reduced in this way because encountering the rainy day when construction, and the second channel steel 3 and the first channel steel 13 are by rain drop erosion
A possibility that rust, the resistance that first pulley 22 and second pulley 42 push in the second channel steel 3 and the first channel steel 13 increases.
The working principle of the invention and process for using: after the present invention installs, two groups of supporting square tubes 1 being picked up, and point
It is not placed on the two sides for needing the room face keel installed to frame board, then lifts mounting rack 2, passes through the first of 21 bottom of column
Mounting rack 2 is placed in the first sliding cavity 131 by pulley 22, after the completion of placement, by two 3 symmetrical layings of the second channel steel in need
The roofing front end of mounting framework plate is carried out, then rack 41 is pushed in the second sliding cavity 31 by second pulley 42,
The frame board installed is removed to the upper end of rack 41 again, then passes through the second pulley 42 of 41 bottom of rack, by position
Frame board in 41 upper end of rack is pushed to the direction of mounting rack 2 by the second sliding cavity 31, is pushed under mounting rack 2
Fang Hou, the hook 51 being equipped with by four jacks 5 hook the frame board for fixing 41 upper end of rack, worker after the completion of fixing
It with hand, is matched by the first sliding cavity 131 and first pulley 22, mounting rack 2 is pushed forward by the continuation of the first channel steel 13,
After being pushed to above the room facial bone frame installed, hook 51 is set to drive frame board decline on the decentralization chain of jack 5,
After the skeleton that frame board touches installation room face, hook 51 is dismantled and risen from skeleton shell lug, completes to skeleton
Then the installation of plate again retracts mounting rack 2 according to aforesaid operations, carry out installation next time, use compared to the prior art
Lifting machine is laid with, by the present apparatus install it is more accurate and can be adapted for more narrow space environment in place, safety
Property height to improving working efficiency.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (6)
1. a kind of light-duty frame board installation system of roofing, including supporting square tube (1), it is characterised in that: the supporting square tube (1) is
Two groups and every group of quantity are two, and two supporting square tube (1) upper surfaces are fixedly connected with several fixed frames (11), described
Several fixed frame (11) upper surfaces, which are fixedly connected to, reinforces supporting rib column (12), solid at the top of the reinforcement supporting rib column (12)
Surely it is connected with the first channel steel (13), is slidably connected mounting rack (2) above the supporting square tube (1), mounting rack (2) bottom
Quadrangle is fixedly connected to column (21), and column (21) bottom is mounted on first pulley (22), under the mounting rack (2)
Side's tool is there are two symmetrical the second channel steel (3), and second channel steel (3) offers the second sliding cavity (31), two institutes
Stating above the second channel steel (3) has auxiliary pushing component (4), and the auxiliary pushing component (4) includes rack (41) and second
Pulley (42), rack (41) bottom four corners are fixedly connected to the second pulley (42), the second pulley (42)
It is internal to be slidably connected to second sliding cavity (31), supporting square tube (1) the inner wall quadrangle is fixedly connected to jack (5).
2. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: first channel steel (13) is opened
Equipped with the first sliding cavity (131), it is internal that the first pulley (22) is slidably connected to first sliding cavity (131).
3. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: column (21) outer wall two
Side is fixedly connected to limited block (211), and the limited block (211) is located at the first pulley (22) two sides.
4. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: jack (5) bottom is equal
Equipped with hook (51).
5. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: before first channel steel (13)
The two sidewalls at both ends offer limiting slot (132) afterwards, are placed with limit plate (133) in the limiting slot (132).
6. the light-duty frame board installation system of roofing according to claim 1, it is characterised in that: second channel steel (3) and
First channel steel (13) inner wall is coated with Teflon coating.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910828991.5A CN110528795A (en) | 2019-09-03 | 2019-09-03 | The light-duty frame board installation system of roofing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910828991.5A CN110528795A (en) | 2019-09-03 | 2019-09-03 | The light-duty frame board installation system of roofing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110528795A true CN110528795A (en) | 2019-12-03 |
Family
ID=68666492
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910828991.5A Pending CN110528795A (en) | 2019-09-03 | 2019-09-03 | The light-duty frame board installation system of roofing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110528795A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113758554A (en) * | 2021-08-18 | 2021-12-07 | 广东韶钢工程技术有限公司 | Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202324662U (en) * | 2011-12-02 | 2012-07-11 | 中国建筑第七工程局有限公司 | Installation device for foam cement composites |
CN204097735U (en) * | 2014-08-27 | 2015-01-14 | 无锡市华洋染整机械有限公司 | A kind of dye vat of dyeing machine |
CN105060201A (en) * | 2015-09-08 | 2015-11-18 | 湖南星邦重工有限公司 | Aerial work platform |
JP2016003487A (en) * | 2014-06-17 | 2016-01-12 | Jfeスチール株式会社 | Folded-plate roof re-roofing method |
CN106437047A (en) * | 2016-07-21 | 2017-02-22 | 中铁四局集团建筑工程有限公司 | Plant roof panel transporting and mounting equipment |
CN207633661U (en) * | 2017-07-24 | 2018-07-20 | 中铁七局集团西安铁路工程有限公司 | A kind of roofing board mounting assembly |
CN208327152U (en) * | 2018-06-15 | 2019-01-04 | 河南省亚欧起重设备有限公司 | A kind of gantry crane guiding mechanism |
CN109838055A (en) * | 2017-11-24 | 2019-06-04 | 中建安装工程有限公司 | High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle |
CN210508434U (en) * | 2019-07-22 | 2020-05-12 | 森特士兴集团股份有限公司 | Roof steel skeleton light net rack cement composite board mounting system |
CN210857774U (en) * | 2019-09-03 | 2020-06-26 | 中国电建集团河南工程有限公司 | Roof light framework plate installation device |
-
2019
- 2019-09-03 CN CN201910828991.5A patent/CN110528795A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202324662U (en) * | 2011-12-02 | 2012-07-11 | 中国建筑第七工程局有限公司 | Installation device for foam cement composites |
JP2016003487A (en) * | 2014-06-17 | 2016-01-12 | Jfeスチール株式会社 | Folded-plate roof re-roofing method |
CN204097735U (en) * | 2014-08-27 | 2015-01-14 | 无锡市华洋染整机械有限公司 | A kind of dye vat of dyeing machine |
CN105060201A (en) * | 2015-09-08 | 2015-11-18 | 湖南星邦重工有限公司 | Aerial work platform |
CN106437047A (en) * | 2016-07-21 | 2017-02-22 | 中铁四局集团建筑工程有限公司 | Plant roof panel transporting and mounting equipment |
CN207633661U (en) * | 2017-07-24 | 2018-07-20 | 中铁七局集团西安铁路工程有限公司 | A kind of roofing board mounting assembly |
CN109838055A (en) * | 2017-11-24 | 2019-06-04 | 中建安装工程有限公司 | High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle |
CN208327152U (en) * | 2018-06-15 | 2019-01-04 | 河南省亚欧起重设备有限公司 | A kind of gantry crane guiding mechanism |
CN210508434U (en) * | 2019-07-22 | 2020-05-12 | 森特士兴集团股份有限公司 | Roof steel skeleton light net rack cement composite board mounting system |
CN210857774U (en) * | 2019-09-03 | 2020-06-26 | 中国电建集团河南工程有限公司 | Roof light framework plate installation device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113758554A (en) * | 2021-08-18 | 2021-12-07 | 广东韶钢工程技术有限公司 | Auxiliary device and method for disassembling and calibrating weighing sensor of buggy ladle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103935901A (en) | Automatic high-rise wall plate hoisting system | |
CN107939052B (en) | Installation method of concrete wallboard | |
CN110528795A (en) | The light-duty frame board installation system of roofing | |
CN210857774U (en) | Roof light framework plate installation device | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN109516409A (en) | Flooring construction tower crane turns device for hoisting | |
CN211257761U (en) | Lifting type elevator shaft operating platform | |
CN104060813A (en) | Construction device and method for large-span steel girder frame connection platform | |
CN111119457B (en) | Ceramic tile laying device and method | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN209874422U (en) | Portable scaffold | |
CN218952738U (en) | Scaffold convenient to use | |
CN114232976A (en) | Lifting multi-unit combined construction operation platform | |
CN209538759U (en) | Applied to the jack up high-building construction workshop on climbing frame | |
CN208981745U (en) | Multifunction scaffold | |
CN220845247U (en) | ALC light autoclaved aerated concrete wall auxiliary installation device | |
CN206110628U (en) | Portable lift | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN216190521U (en) | Novel multifunctional travelling crane | |
CN215160677U (en) | Auxiliary feeding device for building construction | |
CN205259574U (en) | Quick assembly and disassembly safety protection screen | |
CN217000787U (en) | Elevartor shaft exempts from to dismantle formula lift platform device | |
CN115818414B (en) | Sliding rail type prefabricated plate transportation and installation integrated device | |
CN213231298U (en) | Hoisting accessory is used in building engineering construction | |
CN212406754U (en) | Hydraulic trolley for positioning and mounting tunnel steel arch frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |