CN110528708A - A kind of waterproof construction - Google Patents
A kind of waterproof construction Download PDFInfo
- Publication number
- CN110528708A CN110528708A CN201910784915.9A CN201910784915A CN110528708A CN 110528708 A CN110528708 A CN 110528708A CN 201910784915 A CN201910784915 A CN 201910784915A CN 110528708 A CN110528708 A CN 110528708A
- Authority
- CN
- China
- Prior art keywords
- waterproof
- metope
- waterproof construction
- coating layer
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/02—Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/024—Sectional false floors, e.g. computer floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/18—Separately-laid insulating layers; Other additional insulating measures; Floating floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/04—Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Floor Finish (AREA)
Abstract
The present invention relates to a kind of waterproof constructions, include: levelling component and the elastic water-proof component for being layed in the levelling component;The levelling component includes multiple leveling parts for being set to ground, and, lid is pressed on the pressure plare of multiple leveling parts;The elastic water-proof component for being layed in levelling component is set on the pressure plare.Waterproof construction in the present invention has elasticity, and the gap tearing of pressure plare can be effectively prevented.Also, waterproof construction does not use cement and sand, considerably reduces the usage amount of cement sand, more environmentally-friendly.In addition, the present invention does not need to be opened, it is adapted to any size and size space;Do not increase cost additionally, and construction period is substantially reduced.
Description
Technical field
The present invention relates to interior decoration technology more particularly to a kind of waterproof constructions.
Background technique
A most important step in the fitment process of waterproof, this crosses the reliability and durability of range request 100%, together
When be also tradition finishing in a time cycle longest process.Traditional toilet way is as follows, shown referring to Fig.1:
Firstly, making of cement and sand on ground thick levelling, this step mainly above places multiple tune in structured base layer 7 '
Horizontal member 8 ', then cement pressure plate 9 ' is pressed on leveling part 8 ', this is removed, further includes doing metope sharp projection and yin-yang angle simply
Polish processing, the time cycle 1 day;Then, brushing twice of waterproof material, (the irritant volatile matter of conventional waterproof material discharges, right
Workers ' health influences again), it brushes one times sidewards, endways after 6 hours to brush one times, waiting parches, and the time cycle is 1 day, i.e. in Fig. 1
First pass water-repellent paint 3 ' and second time water-repellent paint 4 '.Then, full water being stored on ground and keeping away water experiment, the time cycle is 2 days;
Then, one layer of waterproof protective layer, while leveling of running business into particular one are done with cement after waterproof material parches, the time cycle is 1 day;Most
Afterwards, with bonding agent 5 ' by ceramic tile or building stones 6 ', for example, marble is adhered on ground and wall, the time cycle is 2 days.
There are the following problems for above-mentioned technical proposal: first, integral cycle 7 days;Second, shadow of the waterproof material to workers ' health
It rings;Third, scene uses a large amount of cement and sand, and country is pushing finishing to go cement policy, program of real estate enterprise
Wish that the usage amount of cement can be greatly reduced in toilet.4th, it cannot achieve pipeline separation, if being embedded in water in thick screed-coat
Pipe or fulgurite go wrong, and need to place under repair after removing entire toilet.
In view of the above-mentioned problems, existing assembled finishing enterprise uses the scheme of integral bathroom, including following link:
1, in-site measurement toilet size;
2, it is opened in factory, the water-proof chassis of batch making standard, chassis surrounding reserves wallboard insertion groove;
3, levelling by levelling part in toilet, cement pressure plate is placed above, places water-proof chassis on cement pressure plate,
It is Stilt layer under cement pressure plate, it can be with water-intake pipe fulgurite;
4, aluminium honeycomb composite plate is installed in surrounding metope, and is inserted into four circumferential groove of chassis;
5, all seam crossings are sealed with glass cement;
6, it carries out keeping away within 48 hours water experiment.
Although the above method solves the problems, such as between conventional sanitation decoration method bring 4 substantially, bring again new
The problem of:
The first, water-proof chassis die sinking is costly, may be only available for real estate client in batch, toilet size and shape
Essentially identical, then production finished product shares die sinking expense in batch, reduces cost.This method because cost can not it is a other
It fits up non-standard modulus toilet in process and uses in front yard;
The second, the risk using glass cement there are aging is had the gap, currently on the market the stable week of best glass cement
Phase suggestion is 5 years, and the period of user's secondary decoration may be 10 years, and toilet leak can bring huge property loss;
Third, aluminum honeycomb plate and water-proof chassis perception plastic sense are very strong, for habit toilet using ceramic tile and greatly
The Chinese of fibrous gypsum receive new material and acquire a certain degree of difficulty.
Summary of the invention
To overcome the above problem in the prior art at least to a certain extent, the present invention provides a kind of toilet warterproof knot
Structure production method.
The invention discloses a kind of waterproof constructions, comprising:
Levelling component and the elastic water-proof component for being layed in the levelling component;
The levelling component includes multiple leveling parts for being set to ground, and, lid is pressed on the pressure of multiple leveling parts
Power plate;
The elastic water-proof component for being layed in levelling component is set on the pressure plare.
Further, above-mentioned waterproof construction further include: be layed in the elastic water-proof component of metope;The metope is with described
Face is vertical.
Further, in above-mentioned waterproof construction, the elastic water-proof component for being layed in levelling component, comprising:
Stretch-resistant layer;
The first waterproof coating layer formed along first direction brushing waterproof material;And
The second waterproof coating layer that brushing waterproof material is formed in a second direction;
The pressure plare, the stretch-resistant layer, first waterproof coating layer, second waterproof coating layer are sequentially along vertical
Directly upwardly extends and connect in the direction on the ground.
Further, in above-mentioned waterproof construction, the elastic water-proof component for being layed in metope includes:
Stretch-resistant layer;
The first waterproof coating layer formed along first direction brushing waterproof material;And
The second waterproof coating layer that brushing waterproof material is formed in a second direction;
The stretch-resistant layer, first waterproof coating layer, second waterproof coating layer are sequentially along described perpendicular to wall
The direction in face extends outwardly and connects.
Further, in above-mentioned waterproof construction, the first direction is vertical with the second direction.
Further, in above-mentioned waterproof construction, the stretch-resistant layer is elastomer grid cloth.
Further, in above-mentioned waterproof construction, seam crossing on the ground and the metope, the stretch-proof on the ground
The stretch-resistant layer of layer and the metope is overlapping.
Further, it in above-mentioned waterproof construction, in the gap of the pressure plare Yu the junction of the metope, also sets up
There is sealing strip.
Further, in above-mentioned waterproof construction, the sealing strip is U-shaped.
Further, in above-mentioned waterproof construction, the waterproof material is polyurethane.
The present invention has the advantage that
The first, after the present invention uses leveling part and pressure plare levelling, elastic water-proof structure is laid on pressure plare, due to anti-
Water-bound has elasticity, therefore, the gap tearing of pressure plare can be effectively prevented.Also, during floor leveling, do not use
Cement and sand considerably reduce the usage amount of cement sand, more environmentally-friendly.
Second, the present invention does not need to be opened, and is adapted to any size and size space,
Third, by measuring and calculating, the present invention does not increase cost additionally, and fabrication cycle is substantially reduced.
4th, the waterproof construction invented can facilitate realization rapid-maintenance when toilet occurs being lauched failure, alternatively,
Even not breaking down, it can easily also optimize lower water-bound.This is because ground waterproof is being finished in traditional toilet
After bed course, sewer pipe is just embedded in ground waterproof bed course and suffers, so launching position can not change.And each implementation of the invention
In example, after accomodation ground makes somebody a mere figurehead cement pressure plate by leveling part, the position of adjustment sewer pipe can be facilitated, for example,
It can be realized " co-layer draining " by changing the position for being lauched point and changing sewer pipe.Position can be changed by being lauched point
Benefit is, if sewer position in toilet is unreasonable before, can change, and toilet shower, bath cabinet, platform basin position are ok
Adjustment, this can allow toilet more reasonable employment.Alternatively, when there is the case where stifled or leakage in drainpipe, can quickly dismantle surface layer and
Screed-coat repairs, that is to say, that the waterproof construction of the embodiment of the present invention facilitates the related maintenance operation of toilet.
In a preferred embodiment of the invention, waterproof material, the first water-repellent paint of formation are done using polyurethane
Layer and the second waterproof coating layer all have the problem of elasticity and toughness, seam is not present in made waterproof construction in this way, also,
Waterproof layer will not be destroyed slight misalignment occurs in pressure plare.In addition, polyurethane volatile matter release value is far below conventional waterproof
Material, it is more environmentally-friendly, be conducive to health.It is of course also possible to be mixed using polymer emulsion and cement in given ratio, occur
Hydride modified reaction forms the waterproof material with elasticity and toughness, it may have above-mentioned similar techniques effect.
It should be understood that above general description and following detailed description be only it is exemplary and explanatory, not
It can the limitation present invention.
Detailed description of the invention
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets implementation of the invention
Example, and be used to explain the principle of the present invention together with specification.
Fig. 1 is to use waterproof construction schematic diagram in the prior art;
Fig. 2 is the step flow chart of waterproof construction embodiment production method of the present invention;
When Fig. 3 is this production invention waterproof construction embodiment, the schematic diagram of leveling part is placed using ground jerk;
Fig. 4 is that the schematic diagram of cement pressure plate is placed on leveling part in waterproof construction embodiment of the present invention;
Fig. 5 is to carry out the knot of used U-shaped sealing strip when metope and ground sealing in waterproof construction embodiment of the present invention
Structure schematic diagram;
Fig. 6 is the schematic diagram that U-shaped sealing strip seals metope and cement pressure plate in waterproof construction embodiment of the present invention;
Fig. 7 is in waterproof construction embodiment of the present invention, and the connection relationship of U-shaped sealing strip, cement pressure plate and metope is shown
It is intended to;
Fig. 8 is to be laid with the schematic diagram of stretch-resistant layer on levelling ground and metope in waterproof construction embodiment of the present invention;
Fig. 9 is, along first direction brush waterproof material, to form the first waterproof coating layer in waterproof construction embodiment of the present invention
Schematic diagram;
Figure 10 is in waterproof construction embodiment of the present invention, and brush waterproof material, forms the second waterproof coating layer in a second direction
Schematic diagram;
Figure 11 is after having brushed two layers of water-repellent paint, to apply brush handle ceramic tile or stone material paving in waterproof construction embodiment of the present invention
The schematic diagram of binder on ground and metope;
Figure 12 is in waterproof construction embodiment of the present invention, in binder upper berth tiling or the schematic diagram of stone material;
Figure 13 is using the structural schematic diagram in waterproof construction embodiment of the present invention upper berth tiling or stone material.
Appended drawing reference therein are as follows:
1 ' sealing strip
2 ' tension deep layers
3 ' first waterproof coating layers
4 ' second waterproof coating layers
5 ' binders
6 ' ceramic tiles or building stones
7 ' structured base layers
8 ' leveling parts
9 ' cement pressure plates
1 building base
2 leveling parts
3 ground jerks
4 cement pressure plates
5 sealing strips
6 stretch-resistant layers
7 first waterproof coating layers
8 second waterproof coating layers
9 adhesive layers
10 ceramic tiles or stone material
11 structured base layers
12 sewer pipes
13 originals are lauched point
14 are newly lauched point
Specific embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
It should be mentioned that some exemplary embodiment quilts before exemplary embodiment is discussed in greater detail
Specific structure and function details disclosed herein are only representative, and are for describing the present invention show
The purpose of example property embodiment.But the present invention can be implemented by many alternative forms, and be not interpreted as
It is limited only by the embodiments set forth herein.
Although it should be understood that may have been used term " first ", " second " etc. herein to describe each unit,
But these units should not be limited by these terms.The use of these items is only for by a unit and another unit
It distinguishes.For example, without departing substantially from the range of exemplary embodiment, it is single that first unit can be referred to as second
Member, and similarly second unit can be referred to as first unit.Term "and/or" used herein above include one of them or
Any and all combinations of more listed associated items.
Term used herein above is not intended to limit exemplary embodiment just for the sake of description specific embodiment.Unless
Context clearly refers else, otherwise singular used herein above "one", " one " also attempt to include plural number.Also answer
When understanding, term " includes " and/or "comprising" used herein above provide stated feature, integer, step, operation,
The presence of unit and/or component, and do not preclude the presence or addition of other one or more features, integer, step, operation, unit,
Component and/or combination thereof.
Referring to Fig. 2, Fig. 2 is the production method flow chart of steps of waterproof construction embodiment of the present invention, is included the following steps:
Step S110 carries out floor leveling in the building ground for needing to do water-proofing treatment;
Step S120 is laid with stretch-resistant layer on levelling ground and metope;
Step S130, along first direction brush waterproof material, forms the first waterproof coating layer on the stretch-resistant layer;
Step S140, after first waterproof coating layer is dry, brush waterproof material, forms the second waterproof in a second direction
Dope layer;
Step S150 keeps away water test after second waterproof coating layer is dry.
Stretch-resistant layer, the first waterproof coating layer and the second waterproof coating layer in the present embodiment are elastic construction.In fact
Elastic construction may be other compositions, for example, being additionally provided with third waterproof coating layer, or reduce by a waterproof coating layer,
Which is not limited by the present invention.
The present embodiment has the advantage that
The first, after the present invention uses leveling part and pressure plare levelling, it is laid with elastic water-proof structure on pressure plare, specifically comes
It says, directly stretch-resistant layer is spread on the ground in the space (for example, toilet) for needing to do water-proofing treatment and metope, due to waterproof construction
With elasticity, therefore, the gap tearing of pressure plare can be effectively prevented.Also, during floor leveling, without using cement and
Sand considerably reduces the usage amount of cement sand, more environmentally-friendly.
Second, the present invention does not need to be opened, and is adapted to any size and size space,
Third, by measuring and calculating, the present invention does not increase cost additionally, and fabrication cycle is substantially reduced.
In the following, step S110 is carried out floor leveling in the building ground for needing to do water-proofing treatment and is described further.
For example, when fitting up for the first time floor leveling can be carried out in the following way:
Step S1 sets the first elevation references line;
Step S2, the first difference in height between ground finished surface and the first elevation references line after the completion of setting is levelling;
Step S3 measures the second difference in height between the current location and the first elevation references line in building lot face;
Step S4, the setting that the leveling part placed at the current location in building lot face is calculated by following formula are high
Degree: setting height=second the-the first difference in height of difference in height-flooring base thickness-ground practice thickness degree of part is leveled;
Step S5, cutting leveling part keep the setting for the leveling part placed at the length and current location of the leveling part high
It spends consistent;
The leveling part that cutting obtains is placed into corresponding position by step S6;Pressure plare is sequentially installed on all leveling parts
And ground floor, complete floor leveling.
More specifically, in step S1, the first elevation references line of setting includes the following steps:
Step S11 determines the ground of public domain lift car;
Step S12 marks reference line to predetermined altitude from the ground of public domain lift car, and by the reference line
It is set as the first elevation references line.
Wherein, the ground level of lift car of level height and public domain of ground finished surface is consistent.
Further, in the specific implementation, step S3 measures current location and the first elevation references line in building lot face
Between the second difference in height may include steps of:
Step S31 determines leveling part installation site;
Step S32 is based on the first elevation references line, trapped orbit is installed to metope;
Step S33, installation mounts bar between trapped orbit;
Step S34 installs at least one laser range finder to mounting bar;
Step S35 opens laser range finder, and laser range finder detection point is adjusted to the installation point of leveling part, into
Row elevation carrection obtains the second difference in height.
Wherein, laser range finder detection point is adjusted to the concrete operations of the installation point of leveling part by step S35 are as follows:
The laser rays that adjustment laser range finder is got is vertical with surface water plane, and makes laser rays point in leveling part installation point;Swashing
When light delivery system error, bar is mounted with front and back adjustment and/or left and right adjusts the position of the laser range finder mounted.
Referring to Fig. 3 and Fig. 4.Fig. 3 is to place showing for leveling part 2 using ground jerk 3 in waterproof construction embodiment of the present invention
It is intended to.Building base 1 as metope is as shown in the figure.
Fig. 4 is to place cement pressure plate 4 in waterproof construction embodiment of the present invention on leveling part 2 and complete floor leveling
Schematic diagram.
Referring to Fig. 5, Fig. 6 and Fig. 7.It in one embodiment, further include in cement pressure plate 4 after completing floor leveling
Sealing strip 5 is filled in the metope gap of expression building base 1, in one embodiment, which can be U-shaped sealing
Item, structure is referring to Figure 5.But the structure and shape of sealing strip of the present invention are without limitation, as long as cement pressure plate 4 can be completed
Sealing between metope between gap.
It should be noted that pressure plare can be cement pressure plate, or calcium silicates pressure plare, the present invention to this not
It limits.
Fig. 6 is the schematic diagram that U-shaped sealing strip seals metope and cement pressure plate in waterproof construction embodiment of the present invention.
It is filled as the gap between the metope and cement pressure plate of building base 1 by sealing strip 5.It is leveling part below cement pressure plate
2。
Fig. 7 is U-shaped sealing strip 5, cement pressure plate 4, building base in waterproof construction production method embodiment of the present invention
1 and level part 2 positional relationship, connection relationship diagram.
It is on levelling ground (that is, cement pressure plate 4) and to make in waterproof construction embodiment of the present invention referring to Fig. 8, Fig. 8
For the schematic diagram for being laid with stretch-resistant layer 6 in the building base 1 of wall.From figure 8, it is seen that in cement pressure plate 4 and building base
Layer 1, which needs to do, is paved with stretch-resistant layer at waterproof, also, seam crossing uses overlapping mode.In one embodiment, stretch-resistant layer
6 use fibrous mesh cloth.
Referring to Fig. 9 and Figure 10.
Fig. 9 is, along first direction brush waterproof material, to form the first waterproof coating layer 7 in waterproof construction embodiment of the present invention
Schematic diagram.Figure 10 is after the first waterproof coating layer 7 dries, and brush waterproof material, forms the second water-repellent paint in a second direction
The schematic diagram of layer 8.In one embodiment, first direction and second direction are vertical, but which is not limited by the present invention.
In a preferred embodiment, using high-performance polymer lotion and cement according to given mass ratio (example
Such as 1:2) mixing, polymer emulsion and cement occurs hydride modified reaction, formed with flexible and toughness waterproof material, should
Waterproof material is very environmentally friendly.Certainly, polyurethane also can be directly used in waterproof material.The latter is when implementing using more at present.
By above-mentioned waterproof material, it is anti-that first pass laterally brushes the first waterproof coating layer 7 and second formed in stretch-resistant layer 6
Water paint layer 8 wants can dry for general 6 hours.
Can be seen that screed-coat from the embodiment is all used with leveling part and cement pressure plate, and tradition finishing ground
Cement levelling difference has the gap between cement pressure plate, and this waterproof type not will receive between cement pressure plate and cement pressure
The influence of power plate and metope junction gap.
In the second waterproof coating layer 8 after 6 hours dry, carry out keeping away water test in 48 hours.If being prevented by test
Water-bound completion can start the ceramic tile or building stones that paste surface.
1, Figure 11 is to apply brush handle ceramic tile or stone material paving on ground and metope after having brushed two layers of water-repellent paint referring to Fig.1
Bonding 9 schematic diagram.
2, Figure 12 is the schematic diagram in binder upper berth tiling or stone material 10 referring to Fig.1.
Referring to Fig.1 3, Figure 13 be using waterproof construction production method of the present invention formation waterproof construction on upper berth tiling or
The structural schematic diagram of stone.
As can be seen that waterproof construction includes: levelling component and the elastic water-proof component for being layed in levelling component;Levelling component
Including multiple leveling parts 2 for being set to ground (i.e. structured base layer 11 in Figure 13), and, lid is pressed on the water of multiple leveling parts 2
Mud pressure plare 4;The elastic water-proof component for being layed in levelling component is set on cement pressure plate 4.
In the embodiment, waterproof construction further includes the elastic water-proof component for being layed in metope;Metope is perpendicular to the ground.Its
In, the elastic water-proof component for being layed in levelling component includes: stretch-resistant layer;First formed along first direction brushing waterproof material
Waterproof coating layer 7;And the second waterproof coating layer 8 that brushing waterproof material is formed in a second direction;Cement pressure plate 4, tension
Stretch layer, the first waterproof coating layer 7, the second waterproof coating layer 8 sequentially along perpendicular to the structured base layer 11 as ground direction to
Upper extension simultaneously connects.Ceramic tile or stone material 10 are bonded on the second waterproof coating layer 8 by adhesive layer 9.In this embodiment,
One direction is vertical with second direction.
In the embodiment, the elastic water-proof component for being layed in metope also includes: stretch-resistant layer 6;It is anti-along first direction brushing
The first waterproof coating layer 7 that water material is formed;And the second waterproof coating layer 8 that brushing waterproof material is formed in a second direction;
Stretch-resistant layer 6, the first waterproof coating layer 7, the second waterproof coating layer 8 sequentially extend outwardly and connect along the direction perpendicular to metope
It connects.Ceramic tile or stone material 10 are bonded on the second waterproof coating layer 8 by adhesive layer 9.First direction is vertical with second direction.
In above-mentioned waterproof construction, stretch-resistant layer is elastomer grid cloth.It is of course also possible to as needed, select other
Applicable elastic construction.In the gap of cement pressure plate 4 Yu the junction of metope, it is additionally provided with U-shaped sealing strip 5.Waterproof
Material is preferably polyurethane.
In one embodiment, waterproof construction reaches metope 30cm height in Gan Qu, and wet area reaches metope 180cm height,
Plane materiel also uses traditional ceramic tile or marble simultaneously.
Toilet waterproofing structure made by the above method has the advantages that
1, it is adapted to the toilet of any size and size;
2, the problem of seam is not present, while there is slight misalignment in cement pressure plate will not destroy waterproof layer, this is also
It is required that waterproof construction has the reason of certain elasticity and toughness;
3, decoration cost is close between cost and conventional sanitation;
4, the period reduces by 3 day time than finishing between conventional sanitation;
5, the cement sand usage amount of toilet, only the 5% of the usage amount of tradition finishing are considerably reduced.
6, waterproof material volatile matter release value is far below conventional waterproof material.
7, waterproof construction of the invention can facilitate realization rapid-maintenance when toilet occurs being lauched failure, alternatively,
Even not breaking down, it can easily also optimize lower water-bound.It makes a concrete analysis of as follows:
After finishing ground waterproof bed course, sewer pipe is just embedded in ground waterproof bed course and suffers for traditional toilet, so
Launching position can not change.And in each embodiment of the invention, accomodation ground is by leveling part 24 frame of cement pressure plate
After sky, the position of adjustment sewer pipe 12 can be facilitated, adjusted for example, original shown in dotted line can be lauched point 13 to solid line
Shown in be newly lauched point 14, that is, " co-layer draining ".Being lauched point and can changing the benefit of position is, if toilet before
Sewer position is unreasonable, then can change, and toilet shower, bath cabinet, platform basin position can adjust, this can allow toilet more
Reasonable employment.Alternatively, can quickly dismantle surface layer when the case where stifled or leakage occurs in drainpipe and screed-coat repairs, also
It is to say, the waterproof construction of the embodiment of the present invention facilitates the related maintenance operation of toilet.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example
Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not
Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any
One or more embodiment or examples in can be combined in any suitable manner.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example
Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, modifies, replacement and variant.
Claims (10)
1. a kind of waterproof construction characterized by comprising
Levelling component and the elastic water-proof component for being layed in the levelling component;
The levelling component includes multiple leveling parts for being set to ground, and, lid is pressed on the pressure plare of multiple leveling parts;
The elastic water-proof component for being layed in levelling component is set on the pressure plare.
2. waterproof construction according to claim 1, which is characterized in that further include:
It is layed in the elastic water-proof component of metope;
The metope is vertical with the ground.
3. waterproof construction according to claim 2, which is characterized in that the elastic water-proof group for being layed in levelling component
Part, comprising:
Stretch-resistant layer;
The first waterproof coating layer formed along first direction brushing waterproof material;And
The second waterproof coating layer that brushing waterproof material is formed in a second direction;
The pressure plare, the stretch-resistant layer, first waterproof coating layer, second waterproof coating layer sequentially along perpendicular to
The direction on the ground upwardly extends and connects.
4. waterproof construction according to claim 3, which is characterized in that the elastic water-proof component packet for being layed in metope
It includes:
Stretch-resistant layer;
The first waterproof coating layer formed along first direction brushing waterproof material;And
The second waterproof coating layer that brushing waterproof material is formed in a second direction;
The stretch-resistant layer, first waterproof coating layer, second waterproof coating layer are sequentially along described perpendicular to metope
Direction extends outwardly and connects.
5. waterproof construction according to claim 4, which is characterized in that
The first direction is vertical with the second direction.
6. waterproof construction according to claim 5, which is characterized in that
The stretch-resistant layer is elastomer grid cloth.
7. waterproof construction according to claim 6, which is characterized in that
The stretch-resistant layer of seam crossing on the ground and the metope, the stretch-resistant layer on the ground and the metope is overlapping.
8. waterproof construction according to claim 7, which is characterized in that
In the gap of the pressure plare Yu the junction of the metope, it is additionally provided with sealing strip.
9. waterproof construction according to claim 7, which is characterized in that
The sealing strip is U-shaped.
10. waterproof construction according to claim 7, which is characterized in that
The waterproof material is polyurethane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910784915.9A CN110528708A (en) | 2019-08-23 | 2019-08-23 | A kind of waterproof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910784915.9A CN110528708A (en) | 2019-08-23 | 2019-08-23 | A kind of waterproof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110528708A true CN110528708A (en) | 2019-12-03 |
Family
ID=68664101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910784915.9A Pending CN110528708A (en) | 2019-08-23 | 2019-08-23 | A kind of waterproof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110528708A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111139958A (en) * | 2020-02-24 | 2020-05-12 | 吴美君 | Building floor heat preservation and sound insulation system and construction method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011139466A1 (en) * | 2010-04-28 | 2011-11-10 | W.R. Grace & Co.-Conn. | Waterproofing membrane |
CN203452408U (en) * | 2013-09-09 | 2014-02-26 | 中建八局第三建设有限公司 | Indoor impermeable pool |
CN104100011A (en) * | 2014-07-29 | 2014-10-15 | 天津达因建材有限公司 | Toilet floor heating waterproof construction method and toilet floor heating waterproof system |
CN104234091A (en) * | 2014-08-25 | 2014-12-24 | 四川金锋建设有限公司 | Application method used for cement-based seepage-proof and waterproof structure |
CN107090962A (en) * | 2017-06-26 | 2017-08-25 | 王明权 | Assembled toilet ground spacing system |
CN108979066A (en) * | 2018-09-10 | 2018-12-11 | 成都精工天成装配科技有限公司 | A kind of platform fast leveling method and toilet platform decoration method |
CN109184005A (en) * | 2018-11-08 | 2019-01-11 | 长沙奥佳信息科技有限公司 | A kind of method of architecture indoor waterproof construction |
-
2019
- 2019-08-23 CN CN201910784915.9A patent/CN110528708A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011139466A1 (en) * | 2010-04-28 | 2011-11-10 | W.R. Grace & Co.-Conn. | Waterproofing membrane |
CN203452408U (en) * | 2013-09-09 | 2014-02-26 | 中建八局第三建设有限公司 | Indoor impermeable pool |
CN104100011A (en) * | 2014-07-29 | 2014-10-15 | 天津达因建材有限公司 | Toilet floor heating waterproof construction method and toilet floor heating waterproof system |
CN104234091A (en) * | 2014-08-25 | 2014-12-24 | 四川金锋建设有限公司 | Application method used for cement-based seepage-proof and waterproof structure |
CN107090962A (en) * | 2017-06-26 | 2017-08-25 | 王明权 | Assembled toilet ground spacing system |
CN108979066A (en) * | 2018-09-10 | 2018-12-11 | 成都精工天成装配科技有限公司 | A kind of platform fast leveling method and toilet platform decoration method |
CN109184005A (en) * | 2018-11-08 | 2019-01-11 | 长沙奥佳信息科技有限公司 | A kind of method of architecture indoor waterproof construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111139958A (en) * | 2020-02-24 | 2020-05-12 | 吴美君 | Building floor heat preservation and sound insulation system and construction method thereof |
CN111139958B (en) * | 2020-02-24 | 2021-04-27 | 济南四建(集团)有限责任公司 | Building floor heat preservation and sound insulation system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7493732B2 (en) | Litho-mosaic | |
CN102140836B (en) | Construction method of large-size floor tile | |
CN104612261A (en) | Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area | |
CN103397790A (en) | Assembled bathroom and installation process | |
CN108867894B (en) | Waterproof standard construction process for finely decorated kitchen and toilet | |
CN104831926B (en) | A kind of tenon joint type bulk surface layer flooring method for paving | |
CN102852290A (en) | Roof parapet flashing place structure and construction method thereof | |
Lin | Maintainability of facilities: for building professionals | |
CN101418641A (en) | Obligate pore construction method for construction floor | |
CN113216632A (en) | Basement waterproof construction method | |
CN106381980A (en) | Floor tile paving process | |
RU2007122556A (en) | METHOD FOR CONSTRUCTION OF STRUCTURES AND DEVICE FOR ITS IMPLEMENTATION | |
CN104499614A (en) | Wall heat-preservation integration point hanging system and mounting method thereof | |
CN211080883U (en) | Waterproof structure for toilet | |
CN108642996A (en) | A kind of first floor or basement roof and road/square deformation joint and its construction method | |
CN110528708A (en) | A kind of waterproof construction | |
CN114197524A (en) | Waterproof construction method for civil air defense basement | |
CN109826328A (en) | PTB rubber cement fills up the close piece structure in the unidirectional superimposed sheet bottom of assembled and construction method | |
CN110528709A (en) | A kind of waterproof construction production method | |
CN203394108U (en) | Fabricated bathroom | |
CN112392157A (en) | Toilet waterproof structure, construction process and protection process thereof | |
CN107675811B (en) | Bathroom waterproof system and construction method | |
CN207553344U (en) | A kind of building floor shock-damping structure | |
CN110485675A (en) | A kind of self-adhesive coiled material builds vibration isolation sound insulationg board method is used in combination with floating | |
CN206143935U (en) | Bathroom threshold waterproof construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191203 |