CN110528352A - A kind of construction method of swelling rock cutting deep layer discharge structure - Google Patents
A kind of construction method of swelling rock cutting deep layer discharge structure Download PDFInfo
- Publication number
- CN110528352A CN110528352A CN201810510609.1A CN201810510609A CN110528352A CN 110528352 A CN110528352 A CN 110528352A CN 201810510609 A CN201810510609 A CN 201810510609A CN 110528352 A CN110528352 A CN 110528352A
- Authority
- CN
- China
- Prior art keywords
- construction
- well body
- drilling
- body structure
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
A kind of construction method of swelling rock cutting deep layer discharge structure so that deep layer discharge structure can effectively play its precipitation, drainage effect, ensure construction safety, improve construction efficiency, and should have popularization and application foreground and meet the requirement of environmental protection.Include the following steps: to carry out floor marking in face of the position of setting well body structure and vertical drainage body on ground;It is arranged on the outside of vertical drainage body in cutting two sides and carries out closing bored grouting construction;Stage excavation well body structure and and layered setting building enclosure;It is walked in the building enclosure higher slice inspection of construction ladder of well body structure;It drills in ground construction vertical drainage body;In the construction longitudinal drainage body drilling of well body structural base, perforation connection is intersected in the drilling of longitudinal drainage body with the drilling of vertical drainage body;Oblique displacement hull drilling is faced upward in the construction of well body structural base, drilling sets up the drainage grade not less than 4%.
Description
Technical field
The present invention relates to being related to geotechnical engineering, in particular to a kind of construction party of swelling rock cutting deep layer discharge structure
Method.
Background technique
Swelling rock chasm structuref is influenced due to excavating, and WATER LEVEL CHANGES is larger, when high-speed railway is especially without the tiny fragments of stone, coal, etc.
When rail high speed building railway is in swelling rock cutting, how controlling groundwater level to avoid swelling rock ground in underground
Water level effect is lower to occur upward expansion arch deformation, and being must technical problems to be solved.
Currently, the biggish longitudinal the region between the heart and the diaphragm ditch of depth usually is arranged in roadbed two in engineering practice, kept away by lowering of watertable
Exempt from or mitigate on the influence of the disadvantageous deformation of top high-speed railway, but in terms of actual effect, the fluctuation of swelling rock ground SEA LEVEL VARIATION
Amplitude is big, and depth reaches 10m or more sometimes, and longitudinal the region between the heart and the diaphragm ditch setting traditional in this way is limited or constructs extremely difficult, invests huge
Greatly, and construction safety risk is high.
To overcome the shortcomings of above-mentioned existing deep layer discharge structure, the applicant is in the utility model patent Shen proposed on the same day
It please disclose a kind of swelling rock cutting deep layer discharge structure, comprising: well body structure, longitudinal gap are arranged outside road structure
In the rock foundation of side;Vertical drainage body, longitudinal gap are arranged in the rock foundation between adjacent well body structure;Longitudinal row
Water body is horizontally arranged at interval in the rock foundation of well body structural base;Oblique displacement hull is faced upward, is arranged in below road structure
In rock foundation, face upward downwards tiltedly to well body structural base.The water level that deep phreatic water may be implemented in the structure is reduced and is quickly arranged
Except function, to guarantee that the swelling rock ground in big depth bounds is not influenced by ground water level, avoid its occur it is unfavorable upper
Arch deformation;Efficiently solve traditional longitudinal the region between the heart and the diaphragm ditch deep layer constructional difficulties, the technical problems such as investment is huge, construction safety risk is high.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of construction parties of swelling rock cutting deep layer discharge structure
Method so that deep layer discharge structure can effectively play its precipitation, drainage effect, ensure construction safety, improve construction efficiency, and is answered
With popularization and application foreground and meet environmentally friendly requirement.
It is as follows that the present invention solves technical solution used by above-mentioned technical problem:
Technical problem to be solved by the invention is to provide a kind of construction parties of swelling rock cutting deep layer discharge structure
Method, this method comprises the following steps:
1. carrying out floor marking in face of the position of setting well body structure and vertical drainage body on ground;
2. being arranged on the outside of vertical drainage body in cutting two sides and carrying out closing bored grouting construction;
3. stage excavation well body structure and and layered setting building enclosure;
4. the building enclosure higher slice inspection of construction ladder in well body structure walks;
5. repeat step 3., 4. until well body structural base, using concrete enclosing well body structural base;
6. it drills in ground construction vertical drainage body, the permeable geotechnological material that setting is wrapped up using permeable geotextiles in hole
Material;
7. in the construction longitudinal drainage body drilling of well body structural base, the drilling of longitudinal drainage body and the brill of vertical drainage body
Hole intersection perforation connection, and be connected to adjacent well body structure with the drainage grade not less than 4%, setting is using saturating in hole
The permeable earth working material of water and soil work cloth package;
8. facing upward oblique displacement hull drilling in the construction of well body structural base, drilling sets up the drainage grade not less than 4%,
The permeable earth working material that setting is wrapped up using permeable geotextiles in hole.
The invention has the advantages that can avoid or big by being closed in the outside of vertical drainage body using bored grouting
Width reduces later period two sides underground water to infiltration on the inside of cutting;First construction vertical drainage body, rear construction longitudinal drainage body, Ji Nengbao
Connection perforation is intersected in the drilling of card longitudinal drainage body with the drilling of vertical drainage body, it is thus also avoided that construction vertical drainage body drilling
Slag body enters in longitudinal drainage body;The construction method be effectively ensured construction safety, the validity of construction drainage, construction
High efficiency has popularization and application foreground, and meets the requirement of environmental protection.
Detailed description of the invention
This specification includes following three width attached drawing:
Fig. 1 is a kind of floor map of swelling rock cutting deep layer discharge structure;
Fig. 2 is the cross-sectional view of the line A-A along Fig. 1;
Fig. 3 is the cross-sectional view of the line B-B along Fig. 1;
Component name and corresponding label are shown in figure: well body structure 1 checks ladder step 2, vertical drainage body 3, longitudinal direction
Displacement hull 4 faces upward oblique displacement hull 5, roadbed bottom A, roadbed surface layer B, gutter C.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and examples:
Referring to figs. 1 to Fig. 3, technical problem to be solved by the invention is to provide a kind of drainings of swelling rock cutting deep layer
The construction method of structure, this method comprises the following steps:
1. carrying out floor marking in face of the position of setting well body structure 1 and vertical drainage body 3 on ground;
2. carrying out closing bored grouting construction in the outside that cutting two sides are setting vertical drainage body 3;
3. stage excavation well body structure 1 and and layered setting building enclosure;
4. the building enclosure higher slice inspection of construction ladder in well body structure 1 walks 2;
5. repeat step 3., 4. until 1 bottom of well body structure, using 1 bottom of concrete enclosing well body structure;
6. it drills in ground construction vertical drainage body 3, the permeable geotechnological material that setting is wrapped up using permeable geotextiles in hole
Material;
7. in 1 bottom of well body structure, construction longitudinal drainage body 4 drills, the drilling of longitudinal drainage body 4 and vertical drainage body 3
Drilling intersection perforation connection, and be arranged in hole and adopt to be connected to not less than 4% drainage grade with adjacent well body structure 1
The permeable earth working material wrapped up with permeable geotextiles;
8. construction faces upward oblique displacement hull 5 and drills in 1 bottom of well body structure, drilling sets up the weathering not less than 4%
Degree, the permeable earth working material that setting is wrapped up using permeable geotextiles in hole.
The construction method in the outside of vertical drainage body 3 using bored grouting by being closed, after can avoid or substantially reducing
Phase two sides underground water is penetrated into cutting inside;First construction vertical drainage body 3, rear construction longitudinal drainage body 4, both can guarantee longitudinal direction
Connection perforation is intersected in the drilling of displacement hull 4 with the drilling of vertical drainage body 3, it is thus also avoided that the construction drilling slag body of vertical drainage body 3
Into in longitudinal drainage body 4;The construction method be effectively ensured construction safety, the validity of construction drainage, construction it is efficient
Rate has popularization and application foreground, and meets the requirement of environmental protection.
The above only explains through diagrams the one of a kind of swelling rock cutting deep layer discharge structure construction method of the present invention
A little principles, be not intended to for the present invention to be confined to shown in and the concrete construction method scope of application in, therefore it is all it is all can
The corresponding modification that can be utilized and equivalent belong to the applied the scope of the patents of the present invention.
Claims (1)
1. a kind of construction method of swelling rock cutting deep layer discharge structure, includes the following steps:
1. carrying out floor marking in face of the position of setting well body structure (1) and vertical drainage body (3) on ground;
2. being arranged on the outside of vertical drainage body (3) in cutting two sides and carrying out closing bored grouting construction;
3. stage excavation well body structure (1) and and layered setting building enclosure;
4. the building enclosure higher slice inspection of construction ladder in well body structure (1) walks (2);
5. repeat step 3., 4. until well body structure (1) bottom, using concrete enclosing well body structure (1) bottom;
6. it drills in ground construction vertical drainage body (3), the permeable earth working material that setting is wrapped up using permeable geotextiles in hole;
7. it drills in well body structure (1) bottom construction longitudinal drainage body (4), the drilling of longitudinal drainage body (4) and vertical drainage body
(3) drilling intersection perforation connection, and be connected to adjacent well body structure (1) with the drainage grade not less than 4%, it is set in hole
Set the permeable earth working material using permeable geotextiles package;
8. construction faces upward oblique displacement hull (5) and drills in well body structure (1) bottom, drilling sets up the drainage grade not less than 4%,
The permeable earth working material that setting is wrapped up using permeable geotextiles in hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810510609.1A CN110528352A (en) | 2018-05-24 | 2018-05-24 | A kind of construction method of swelling rock cutting deep layer discharge structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810510609.1A CN110528352A (en) | 2018-05-24 | 2018-05-24 | A kind of construction method of swelling rock cutting deep layer discharge structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110528352A true CN110528352A (en) | 2019-12-03 |
Family
ID=68656682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810510609.1A Pending CN110528352A (en) | 2018-05-24 | 2018-05-24 | A kind of construction method of swelling rock cutting deep layer discharge structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110528352A (en) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024951A (en) * | 2007-03-16 | 2007-08-29 | 陈俊生 | Foundation processing method |
CN202577168U (en) * | 2012-05-11 | 2012-12-05 | 中铁第四勘察设计院集团有限公司 | Enclosed karst depression railway bed drainage system |
CN104005344A (en) * | 2014-06-10 | 2014-08-27 | 山东大学 | Device and method for draining capillary water out of roadbed |
CN204000851U (en) * | 2014-07-21 | 2014-12-10 | 冠鲁建设股份有限公司 | The stake of a kind of outsourcing water permeability concrete reinforced pipe gravel slip-casting |
CN204551510U (en) * | 2015-03-26 | 2015-08-12 | 贵州省交通规划勘察设计研究院股份有限公司 | A kind of filled-up ground catchments pressure reduction well drop and drainage structure |
CN204662463U (en) * | 2015-06-02 | 2015-09-23 | 中铁二院工程集团有限责任公司 | Cut Slopes of Expansive Soil depth layer discharge structure |
CN204753612U (en) * | 2015-07-07 | 2015-11-11 | 冯克俊 | Combination deep well device of foundation ditch precipitation |
CN105569058A (en) * | 2016-02-16 | 2016-05-11 | 中国建筑第六工程局有限公司 | Expansive soil cutting structure and construction method thereof |
CN107151950A (en) * | 2017-05-22 | 2017-09-12 | 锦州铁道勘察设计院有限公司 | The construction method of desert area railway underground water route moat |
CN206647135U (en) * | 2017-04-06 | 2017-11-17 | 周国海 | Dredge discharge structure in a kind of tunnel |
CN207210867U (en) * | 2017-07-20 | 2018-04-10 | 兰州铁路局 | A kind of cold area's zero section roadbed anti-freeze expansion discharge structure |
-
2018
- 2018-05-24 CN CN201810510609.1A patent/CN110528352A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101024951A (en) * | 2007-03-16 | 2007-08-29 | 陈俊生 | Foundation processing method |
CN202577168U (en) * | 2012-05-11 | 2012-12-05 | 中铁第四勘察设计院集团有限公司 | Enclosed karst depression railway bed drainage system |
CN104005344A (en) * | 2014-06-10 | 2014-08-27 | 山东大学 | Device and method for draining capillary water out of roadbed |
CN204000851U (en) * | 2014-07-21 | 2014-12-10 | 冠鲁建设股份有限公司 | The stake of a kind of outsourcing water permeability concrete reinforced pipe gravel slip-casting |
CN204551510U (en) * | 2015-03-26 | 2015-08-12 | 贵州省交通规划勘察设计研究院股份有限公司 | A kind of filled-up ground catchments pressure reduction well drop and drainage structure |
CN204662463U (en) * | 2015-06-02 | 2015-09-23 | 中铁二院工程集团有限责任公司 | Cut Slopes of Expansive Soil depth layer discharge structure |
CN204753612U (en) * | 2015-07-07 | 2015-11-11 | 冯克俊 | Combination deep well device of foundation ditch precipitation |
CN105569058A (en) * | 2016-02-16 | 2016-05-11 | 中国建筑第六工程局有限公司 | Expansive soil cutting structure and construction method thereof |
CN206647135U (en) * | 2017-04-06 | 2017-11-17 | 周国海 | Dredge discharge structure in a kind of tunnel |
CN107151950A (en) * | 2017-05-22 | 2017-09-12 | 锦州铁道勘察设计院有限公司 | The construction method of desert area railway underground water route moat |
CN207210867U (en) * | 2017-07-20 | 2018-04-10 | 兰州铁路局 | A kind of cold area's zero section roadbed anti-freeze expansion discharge structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442382B (en) | In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method | |
CN100387785C (en) | Hydraulic sheeting and use method thereof | |
CN107503257B (en) | One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method | |
CN103882881B (en) | Go deep into rock construction method under water | |
CN204253054U (en) | Mountain tunnel stake arch cap excavation method comprehensive support structure | |
CN104631475A (en) | Safe and fast construction method of down-traversing river shallow depth bored tunnel | |
CN207109475U (en) | It is close to mountain high-filled subgrade stabilization and Deformation control structure | |
CN105714772A (en) | Re-drilling concrete wall protecting method for hole formation of rock-socketed pile in karst region | |
CN105239598A (en) | Integral sinking construction method for well-type full-automatic stereo garage | |
CN104775438B (en) | The method of tower position foundation pit construction in karst landform basis rainy season | |
CN107965327A (en) | Arcuately tunnel bottom liner structure and its drainage system | |
CN1737337A (en) | Water preventing method for mine in structure of thin base rock and thick loose aquifer | |
CN103114602B (en) | Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method | |
CN102425179B (en) | Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes | |
CN208219453U (en) | A kind of expensive soil cutting deep layer discharge structure | |
CN209260739U (en) | A kind of foundation pit water-stopping system close to river permeable stratum | |
CN215367226U (en) | Well draw reaming body expanding pile of solid reinforcing of back slip casting root | |
CN114109394B (en) | Method for determining pile length of tunnel shallow-buried weak surrounding rock high-pressure jet grouting pile method ground surface reinforcement | |
CN110528352A (en) | A kind of construction method of swelling rock cutting deep layer discharge structure | |
CN106337418A (en) | Supporting structure and supporting method of deep foundation pit in narrow area | |
CN205399438U (en) | Karst area embedded rock pile pore -forming bores concrete dado structure again | |
CN109024621A (en) | The compound retaining wall supporting construction of embankment high slope tubular pole and its construction method | |
CN103866787A (en) | Process for constructing impervious concrete wall by using open excavation and inverted construction method | |
CN107905808A (en) | The foundation carrying of falling groove-shaped longitudinal beam is without tunnel bottom structure arch lining cutting and its drainage system | |
CN205100226U (en) | Underground continuous wall goes into rock grooving construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191203 |
|