CN208219453U - A kind of expensive soil cutting deep layer discharge structure - Google Patents
A kind of expensive soil cutting deep layer discharge structure Download PDFInfo
- Publication number
- CN208219453U CN208219453U CN201820786721.3U CN201820786721U CN208219453U CN 208219453 U CN208219453 U CN 208219453U CN 201820786721 U CN201820786721 U CN 201820786721U CN 208219453 U CN208219453 U CN 208219453U
- Authority
- CN
- China
- Prior art keywords
- drainage body
- vertical shaft
- deep layer
- discharge structure
- layer discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Sewage (AREA)
Abstract
A kind of expensive soil cutting deep layer discharge structure excludes function with quick to realize that the water level of deep phreatic water is reduced, while difficulty of construction and construction investment is effectively reduced.It include: vertical shaft, longitudinal gap is arranged in the expansive soil foundation on the outside of road structure;Vertical drainage body, longitudinal gap are arranged in the expansive soil foundation between adjacent vertical shaft;Longitudinal drainage body is horizontally arranged at interval in the expansive soil foundation of silo bottom;It is engaged rotary churning pile, is set in the expansive soil foundation between adjacent vertical shaft, positioned at the outside of vertical drainage body and longitudinal drainage body;Oblique displacement hull is faced upward, is arranged in the expansive soil foundation below road structure, is faced upward downwards tiltedly to silo bottom.
Description
Technical field
The utility model relates to geotechnical engineering, in particular to a kind of expensive soil cutting deep layer discharge structure.
Background technique
Expensive soil cutting structure is influenced due to excavating, and WATER LEVEL CHANGES is larger, when high-speed railway especially non-fragment orbit
When high-speed railway is built in expensive soil cutting, how controlling groundwater level fluctuation to avoid expansive soil foundation in underground water
Position effect is lower to occur upward expansion arch deformation, and being must technical problems to be solved.
Currently, the biggish longitudinal the region between the heart and the diaphragm ditch of depth usually is arranged in roadbed two in engineering practice, kept away by lowering of watertable
Exempt from or mitigate on the influence of the disadvantageous deformation of top high-speed railway, but in terms of actual effect, expansive soil foundation SEA LEVEL VARIATION fluctuates width
Spend larger, depth reaches 5m or more sometimes, and longitudinal the region between the heart and the diaphragm ditch setting traditional in this way is limited or constructs extremely difficult, invests huge
Greatly, and construction safety risk is high.Therefore it is badly in need of a kind of expensive soil cutting deep layer discharge structure, effectively to solve deep layer rock foundation
Precipitation, drainage problem, and have the characteristics that easy for construction, good economy performance, environmental protection and application value.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of expensive soil cutting deep layer discharge structures, to realize depth
The water level of layer underground water reduces and quickly excludes function, while difficulty of construction and construction investment is effectively reduced.
It is as follows that the utility model solves technical solution used by above-mentioned technical problem:
A kind of expensive soil cutting deep layer discharge structure of the utility model, it is characterized in that it includes: vertical shaft, longitudinal gap is set
It sets in the expansive soil foundation on the outside of road structure;The swelled ground between adjacent vertical shaft is arranged in vertical drainage body, longitudinal gap
In ground;Longitudinal drainage body is horizontally arranged at interval in the expansive soil foundation of silo bottom;It is engaged rotary churning pile, is set to adjacent
In expansive soil foundation between vertical shaft, positioned at the outside of vertical drainage body and longitudinal drainage body;Oblique displacement hull is faced upward, is arranged in roadbed
In expansive soil foundation below structure, face upward downwards tiltedly to silo bottom.
The utility model has the beneficial effects that the water level that deep phreatic water may be implemented reduces and quickly excludes function, from
And guarantee the expansive soil foundation in big depth bounds not is influenced by ground water-level fluctuation, avoids it and unfavorable arch deformation occurs;
Traditional longitudinal the region between the heart and the diaphragm ditch deep layer constructional difficulties are efficiently solved, the technical problems such as investment is huge, construction safety risk is high, with wide
The features such as application value.
Detailed description of the invention
This specification includes following three width attached drawing:
Fig. 1 is a kind of plan view of expensive soil cutting deep layer discharge structure of the utility model;
Fig. 2 is the sectional view of I-I line along Fig. 1;
Fig. 3 is the sectional view of II-II line along Fig. 1.
Component name and corresponding label are shown in figure: vertical shaft 1 checks ladder step 2, vertical drainage body 3, longitudinal drainage body
4, oblique displacement hull 5, occlusion rotary churning pile 6, roadbed bottom A, roadbed surface layer B, draining lateral sulcus C are faced upward.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples:
Referring to figs. 1 to Fig. 3, a kind of expensive soil cutting deep layer discharge structure of the utility model includes: vertical shaft 1, between longitudinal direction
Every in the expansive soil foundation being arranged on the outside of road structure;Vertical drainage body 3, longitudinal gap are arranged between adjacent vertical shaft 1
In expansive soil foundation;Longitudinal drainage body 4 is horizontally arranged at interval in the expansive soil foundation of 1 bottom of vertical shaft;It is engaged rotary churning pile 6, if
It is placed in the expansive soil foundation between adjacent vertical shaft 1, positioned at the outside of vertical drainage body 3 and longitudinal drainage body 4;Face upward oblique draining
Body 5, is arranged in the expansive soil foundation below road structure, faces upward downwards tiltedly to 1 bottom of vertical shaft.
Referring to Fig. 2, vertical shaft 1 is transported as construction longitudinal drainage body 4 and the construction channel for facing upward oblique displacement hull 5, and as the later period
The inspection shaft of battalion.Underground water is blocked to be engaged rotary churning pile 6, avoids it to long-term infiltration on the inside of roadbed.Using vertical drainage body 3 as
The vertical drainage channel of underground water drains into underground water rapidly among longitudinal drainage body 4 by its effect, to make top ground
Soil avoids being influenced by underground water.Longitudinally connected channel using longitudinal drainage body 4 as underground water rapidly can arrange underground water
Out other than impacted cutting range, and the expansive soil foundation underground water being discharged within the scope of roadbed can be accelerated by facing upward oblique displacement hull 5 then.
Referring to Figures 1 and 2, the vertical shaft 1 uses manually digging hole, and 1 surrounding of vertical shaft is that armored concrete goes along with sb. to guard him ruggedized construction,
Fixed setting checks the pedestrian passage that ladder step 2 is checked as the later period on its side wall.
Referring to Fig.1, the vertical drainage body 3 usually 2 rows of setting, interlaced arrangement.
Referring to figs. 1 to Fig. 3, the vertical drainage body 3, longitudinal drainage body 4 face upward oblique displacement hull 5 using geotechnical boring,
Permeable earth working material is filled in hole, the surrounding of earth working material is wrapped up or used the pvc pipe outsourcing of aperture using permeable geotextiles
Permeable geotextiles.The longitudinal drainage body 4 is arranged number of rows and hole count and is determined according to underground water flow rate calculation, longitudinal drainage body 4
Perforation connection is intersected in drilling with the drilling of vertical drainage body 3, and is connected with adjacent vertical shaft 1 with the drainage grade not less than 4%
It is logical.
The above is a kind of some principles of expensive soil cutting deep layer discharge structure of the utility model that explain through diagrams,
Shown in being not intended to for the utility model to be confined to and in the specific structure scope of application, therefore all it may be utilized
It is corresponding modification and equivalent, belong to the applied the scope of the patents of the utility model.
Claims (7)
1. a kind of expensive soil cutting deep layer discharge structure, it is characterized in that it includes: vertical shaft (1), longitudinal gap is arranged in roadbed knot
In expansive soil foundation on the outside of structure;Vertical drainage body (3), the expansive soil foundation that longitudinal gap is arranged between adjacent vertical shaft (1)
In;Longitudinal drainage body (4) is horizontally arranged at interval in the expansive soil foundation of vertical shaft (1) bottom;It is engaged rotary churning pile (6), is set to
In expansive soil foundation between adjacent vertical shaft (1), it is located at the outside of vertical drainage body (3) and longitudinal drainage body (4);Face upward oblique draining
Body (5), is arranged in the expansive soil foundation below road structure, faces upward downwards tiltedly to vertical shaft (1) bottom.
2. a kind of expensive soil cutting deep layer discharge structure as described in claim 1, it is characterized in that: the occlusion rotary churning pile (6)
Depth is set and is greater than vertical shaft (1) depth.
3. a kind of expensive soil cutting deep layer discharge structure as claimed in claim 2, it is characterized in that: the occlusion rotary churning pile (6)
Diameter is 0.8m, spacing 0.6m.
4. a kind of expensive soil cutting deep layer discharge structure as described in claim 1, it is characterized in that: the vertical shaft (1) uses people
Work borehole, vertical shaft (1) surrounding are that armored concrete goes along with sb. to guard him ruggedized construction, and fixed setting checks ladder step (2) on side wall.
5. a kind of expensive soil cutting deep layer discharge structure as described in claim 1, it is characterized in that: the vertical drainage body (3),
Longitudinal drainage body (4) faces upward oblique displacement hull (5) using geotechnical boring, and permeable earth working material, the surrounding of earth working material are filled in hole
The permeable geotextiles of pvc pipe outsourcing of aperture are wrapped up or used using permeable geotextiles.
6. a kind of expensive soil cutting deep layer discharge structure as described in claim 1, it is characterized in that: the vertical drainage body (3)
2 rows, interlaced arrangement are set.
7. a kind of expensive soil cutting deep layer discharge structure as described in claim 1, it is characterized in that: the longitudinal drainage body (4)
Number of rows and hole count is arranged to be determined according to underground water flow rate calculation, the drilling of longitudinal drainage body (4) and the drilling of vertical drainage body (3)
Intersection perforation connection, and be connected to adjacent vertical shaft (1) with the drainage grade not less than 4%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820786721.3U CN208219453U (en) | 2018-05-24 | 2018-05-24 | A kind of expensive soil cutting deep layer discharge structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820786721.3U CN208219453U (en) | 2018-05-24 | 2018-05-24 | A kind of expensive soil cutting deep layer discharge structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208219453U true CN208219453U (en) | 2018-12-11 |
Family
ID=64506573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820786721.3U Active CN208219453U (en) | 2018-05-24 | 2018-05-24 | A kind of expensive soil cutting deep layer discharge structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208219453U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708308A (en) * | 2018-05-24 | 2018-10-26 | 中铁二院工程集团有限责任公司 | A kind of expensive soil cutting deep layer discharge structure |
CN110453542A (en) * | 2019-05-22 | 2019-11-15 | 中铁二院工程集团有限责任公司 | A kind of transit railway soft rock heavy cut arch Deformation control structure and construction method |
-
2018
- 2018-05-24 CN CN201820786721.3U patent/CN208219453U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108708308A (en) * | 2018-05-24 | 2018-10-26 | 中铁二院工程集团有限责任公司 | A kind of expensive soil cutting deep layer discharge structure |
CN110453542A (en) * | 2019-05-22 | 2019-11-15 | 中铁二院工程集团有限责任公司 | A kind of transit railway soft rock heavy cut arch Deformation control structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107503257B (en) | One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method | |
CN105201001B (en) | Composite seepage preventing structure for large karst cave in karst region and construction method thereof | |
CN207109475U (en) | It is close to mountain high-filled subgrade stabilization and Deformation control structure | |
CN106087953B (en) | A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow | |
CN208219453U (en) | A kind of expensive soil cutting deep layer discharge structure | |
CN109339079A (en) | A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum | |
CN110387861A (en) | It is a kind of for the earth rock cofferdam remodeling method for leading over-level flood off of meeting an urgent need | |
CN207143981U (en) | 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure | |
CN108978635A (en) | A kind of synchronous grouting steel sheet pile and application method | |
CN104727332A (en) | Steel sheet pile cofferdam bottom rock-socketed anchoring method | |
CN113216148B (en) | Construction method for pile foundation of pressure-bearing underground air-raid shelter collapse section | |
CN208733655U (en) | A kind of high water level dewatering construction structure | |
CN207047796U (en) | A kind of light-duty mud-rock flow arch blocking dam | |
CN103114602B (en) | Foundation pit waterproof curtain achieving secondary melting mending through seepage dipping poly condensation bonding bodies and construction method | |
CN107679355A (en) | One kind intercepts water flow-guiding type anchorage pile board wall and its design method | |
CN209260739U (en) | A kind of foundation pit water-stopping system close to river permeable stratum | |
CN102425179B (en) | Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes | |
CN209669900U (en) | Tunnel construction cofferdam structure in water-bed highly permeable sandy soil layer | |
CN107700434A (en) | A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process | |
CN112576195A (en) | Hard cutting secant pile construction drill bit with guiding function and construction process thereof | |
CN103821164B (en) | Mountain area cheuch backfill tunnel construction | |
CN106149631B (en) | High mountain strid arch dam avalanche type Slope Treatment method | |
CN208309759U (en) | A kind of swelling rock cutting deep layer discharge structure | |
CN214887086U (en) | Slope debris flow guide-discharge type open cut tunnel structure | |
CN108708308A (en) | A kind of expensive soil cutting deep layer discharge structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |